Synergys Hill Top
M/S SYNERGY PROJECTS · Medchal-Malkajgiri · RERA P02200004150
SYNERGYS HILL TOP is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district, developed by M/S SYNERGY PROJECTS. The site extent is 552.58 m², and the project comprises one proposed residential building with 1 Stilt + 5 upper floors and 15 apartments: 5 two-bedroom and 10 three-bedroom units. The configurations are 2BHK and 3BHK, with RERA-filed saleable areas of 56.86 m² and 72.3 m², respectively. It is registered under TG-RERA number P02200004150, with a proposed completion date of 08/08/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SYNERGYS HILL TOP RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single proposed residential building is described in the building permit; no separate phase name is disclosed. |
| TG-RERA registration | P02200004150 |
| Registration validity | 25 February 2022 to 8 April 2027; the certificate records a five-year period. This is the registration validity, not the stated project completion date. |
| Registered promoter | M/S SYNERGY PROJECTS |
| RERA status | The supplied certificate records registration under section 5. It does not record an extension. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Bachupally |
| Revenue village | Bachupally |
| Mandal | Bachupally |
| District | Medchal-Malkajgiri |
| PIN | 500090 |
| Project survey number(s) | Survey No. 332; no subdivision is stated in the project registration certificate. |
| Plot | Plot No. 3 |
| Site extent | 552.58 m², as stated in the building permit |
| Net area | 549.82 m², as stated in the building permit |
| RERA land filing | 552.58 m² total and net area; the building permit separately states a net area of 549.82 m². Land records |
| Boundaries | East: Plot No. 2; West: 40 wide road; North: 40 wide road; South: Plot No. 4. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Nizampet Municipal Corporation Approvals record |
| Principal building-permit number and date | 3142/W1/2020/0144, approved 8 April 2021 Approvals record |
| Approved built-up area | 1,216.40 m², as recorded in the RERA project information RERA filing |
| Building count / configuration | One proposed residential building; 1 Stilt + 5 upper floors RERA filing |
| Sanctioned building height | 14.90 m |
| Parking levels / count | The permit says cellar and stilts approved for parking, but the supplied extract does not give a parking-space count; the building description identifies a stilt and does not state a cellar level. |
| Unit count | 15 units in the RERA inventory; the project information also records one building unit. RERA unit table RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable areas | 2BHK: 56.86 m²; 3BHK: 72.3 m² RERA unit table |
| RERA inventory | 5 two-bedroom and 10 three-bedroom units; all 15 are shown as available and none as booked in the supplied portal reading. The booking record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | The RERA record labels the project “New Project”; no independently verified construction-stage or site-progress evidence is supplied. RERA record RERA amenities |
| Completion date | Promoter’s Form B declaration states completion by 8 April 2027. The project header separately records a proposed completion date of 08/08/2027. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents; the permit requires an occupancy certificate before occupation. Document index |
2. The project story
SYNERGYS HILL TOP is registered as a residential apartment development at Plot No. 3, Survey No. 332, Bachupally. The RERA-filed inventory is for 15 apartments—five 2BHK and ten 3BHK units—within a single proposed residential building. RERA unit table
The building permit describes a stilt and five upper floors, with a sanctioned height of 14.90 m. The supplied evidence establishes the approved building configuration, but does not establish how much construction has been completed on site. The RERA portal’s inventory indicates 15 available units and none booked, without an as-of date. RERA unit table
The promoter’s Form B declaration gives a completion undertaking of 8 April 2027. A completion or occupancy certificate is not present in the evidence supplied for this overview; the building permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The building permit is for one proposed residential building at Plot No. 3, Survey No. 332, with 1 Stilt + 5 upper floors and a stated height of 14.90 m. It records site area of 552.58 m², net area of 549.82 m², and residential built-up area of 1,216.40 m² in the RERA project information. These are distinct filed or sanctioned area descriptions; no carpet-area or FSI calculation is supplied here. RERA filing
The permit also identifies 261.35 m² for stilt in its land-use extraction. It requires the sanctioned plan to be followed and displayed at the site, and requires prior approval for modifications. The supplied material does not provide drawing-derived details for the building footprint, apartments per floor, lift or stair arrangements, entry and exit layout, or common-area distribution.
4. Homes, configurations & floor plans
RERA records 15 apartments across two configurations. The areas below are RERA-filed saleable areas, not carpet areas. The supplied floor-plan dataset reports no measured 2BHK flat design, so no drawing-based carpet area is reported. No measured 3BHK drawing result is supplied either. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 56.86 m² | Not available | Not supplied |
| 3BHK | 10 | 0 | 10 | 72.3 m² | Not available | Not supplied |
The software-measurement record describes its method as measurement from approved floor-plan drawings, not a RERA disclosure, and notes that drawing measurements require review. It contains no measured flat design for the reported 2BHK configuration; no room dimensions or unit-level plan details are supplied for this overview. Carpet area, balcony or utility area, and a unit’s share of common areas are not separately documented in the supplied RERA unit data. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit refers to cellar and stilt areas approved for parking and says those areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. However, the supplied permit extract does not state the number of sanctioned spaces, and the RERA unit records do not establish a parking allocation to any particular apartment. No resident/visitor split, accessible-space count, parking layout, ramp details, vehicle circulation plan, or EV provision is supplied. RERA unit table
6. Amenities, recreation & open spaces
The RERA amenity schedule lists 14 infrastructure and facility items. The schedule marks a green strip/TOT LOT/park, solid-waste management and disposal, and water conservation/rainwater harvesting as “YES”; all entries show 0% progress. These are filed schedule entries, not evidence of completion. The building permit separately requires rainwater harvesting, a transformer space, a garbage house and peripheral tree planting. RERA amenities
| Description / size | Size not supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; progress 0%; completion not independently verified |
| Description / size | Size or system details not supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; progress 0%; completion not independently verified |
| Description / size | Size and capacity not supplied in the RERA amenity schedule |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities; building permit |
| Declared progress / verified status | Marked “YES”; progress 0%; permit requires a rainwater-harvesting structure |
| Description / size | Details and size not supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified |
| Description / size | Area not supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified |
No project-specific RERA evidence supplied here establishes a clubhouse, indoor-games facility, children’s play area or other recreational facility as sanctioned or delivered.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. The listed progress is 0% for each; the schedule does not provide capacities or confirm completion. RERA amenities
The building permit requires a rainwater-harvesting percolation pit and specifies two rainwater-harvesting structures. It also records an underground static water-storage tank of 25,000 L and a terrace tank of 25,000 litres, space for a transformer, and a garbage house. It assigns structural and fire-safety responsibility to the owner, builder/developer, architect and structural engineer. The permit’s stated requirements do not, by themselves, establish installation or completed statutory compliance.
The supplied material does not specify a water source, sewage-treatment capacity, recycled-water use, backup-power capacity, lift count or capacity, CCTV or security arrangement, accessible circulation, or fire-system equipment details. The permit states that an occupancy certificate is compulsory before occupation. RERA amenities
8. Location, access & connectivity
The registered location is Bachupally village, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. The RERA certificate identifies the project locality as Bachupally and Plot No. 3.
A supplied location record gives a cadastral parcel centroid at 17.53445, 78.34954 and lists the nearest sampled Outer Ring Road interchange at approximately 9.5 km. No approach-road route, public-transport distance, or measured distance to local landmarks is supplied in the project-location evidence. Location record
9. Developer & development status
The registered promoter is M/S SYNERGY PROJECTS, identified in the supplied partnership deed as a partnership. The RERA registration certificate gives the promoter office location as Bachupally village, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090. The supplied corporate identifier is GSTIN 36ADQFS6004H1ZV. No official contact details or website are established by the RERA documents included here. Corporate record
The promoter’s Form B affidavit, dated 28 January 2022, declares completion by 8 April 2027 and records undertakings concerning approvals, project funds and accounts. This is a promoter declaration, not independent confirmation of progress. The supplied record identifies one proposed residential building; no separate tower or phase-wise completion status is documented.
10. Approvals, official records & documents
| Identifier / date | P02200004150; issued 25 February 2022; valid through 8 April 2027 |
|---|---|
| Scope and evidence | SYNERGYS HILL TOP, Plot No. 3, Survey No. 332; registration under section 5. |
| Identifier / date | 3142/W1/2020/0144; approved 8 April 2021 |
|---|---|
| Scope and evidence | Nizampet Municipal Corporation; proposed residential building at Plot No. 3, Survey No. 332, Bachupally; 1 Stilt + 5 upper floors. |
| Identifier / date | 031228/LT/MED/FLT/U6/HMDA/01122019 |
|---|---|
| Scope and evidence | Reference recorded in the building permit; a separate approved-layout document is not available in the supplied material. |
| Identifier / date | Dated 28 January 2022 |
|---|---|
| Scope and evidence | Promoter’s affidavit concerning the project, title basis, encumbrance declaration, completion undertaking and other RERA undertakings. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No certificate is present in the supplied document set. Document index |
The building permit records its own validity through 8 April 2027 and requires a completion notice and occupancy certificate after construction; the RERA certificate separately states its registration validity through that date.
1. Project at a glance
Project identity
Registered project name: SYNERGYS HILL TOP
Project type: Residential apartment project
Phase / registered portion: A single proposed residential building is described in the building permit; no separate phase name is disclosed.
TG-RERA registration: P02200004150
Registration validity: 25 February 2022 to 8 April 2027; the certificate records a five-year period. This is the registration validity, not the stated project completion date.
Registered promoter: M/S SYNERGY PROJECTS
RERA status: The supplied certificate records registration under section 5. It does not record an extension.
Land and geographic identity
Locality: Bachupally
Revenue village: Bachupally
Mandal: Bachupally
District: Medchal-Malkajgiri
PIN: 500090
Project survey number(s): Survey No. 332; no subdivision is stated in the project registration certificate.
Plot: Plot No. 3
Site extent: 552.58 m², as stated in the building permit
Net area: 549.82 m², as stated in the building permit
RERA land filing: 552.58 m² total and net area; the building permit separately states a net area of 549.82 m².
Boundaries: East: Plot No. 2; West: 40 wide road; North: 40 wide road; South: Plot No. 4.
Development identity
Sanctioning authority: Nizampet Municipal Corporation
Principal building-permit number and date: 3142/W1/2020/0144, approved 8 April 2021
Approved built-up area: 1,216.40 m², as recorded in the RERA project information
Building count / configuration: One proposed residential building; 1 Stilt + 5 upper floors
Sanctioned building height: 14.90 m
Parking levels / count: The permit says cellar and stilts approved for parking, but the supplied extract does not give a parking-space count; the building description identifies a stilt and does not state a cellar level.
Unit count: 15 units in the RERA inventory; the project information also records one building unit.
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 56.86 m²; 3BHK: 72.3 m²
RERA inventory: 5 two-bedroom and 10 three-bedroom units; all 15 are shown as available and none as booked in the supplied portal reading. The booking record has no as-of date, so counts are indicative.
Construction stage: The RERA record labels the project “New Project”; no independently verified construction-stage or site-progress evidence is supplied.
Completion date: Promoter’s Form B declaration states completion by 8 April 2027. The project header separately records a proposed completion date of 08/08/2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents; the permit requires an occupancy certificate before occupation.
2. The project story
SYNERGYS HILL TOP is registered as a residential apartment development at Plot No. 3, Survey No. 332, Bachupally. The RERA-filed inventory is for 15 apartments—five 2BHK and ten 3BHK units—within a single proposed residential building.
The building permit describes a stilt and five upper floors, with a sanctioned height of 14.90 m. The supplied evidence establishes the approved building configuration, but does not establish how much construction has been completed on site. The RERA portal’s inventory indicates 15 available units and none booked, without an as-of date.
The promoter’s Form B declaration gives a completion undertaking of 8 April 2027. A completion or occupancy certificate is not present in the evidence supplied for this overview; the building permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The building permit is for one proposed residential building at Plot No. 3, Survey No. 332, with 1 Stilt + 5 upper floors and a stated height of 14.90 m. It records site area of 552.58 m², net area of 549.82 m², and residential built-up area of 1,216.40 m² in the RERA project information. These are distinct filed or sanctioned area descriptions; no carpet-area or FSI calculation is supplied here.
The permit also identifies 261.35 m² for stilt in its land-use extraction. It requires the sanctioned plan to be followed and displayed at the site, and requires prior approval for modifications. The supplied material does not provide drawing-derived details for the building footprint, apartments per floor, lift or stair arrangements, entry and exit layout, or common-area distribution.
4. Homes, configurations & floor plans
RERA records 15 apartments across two configurations. The areas below are RERA-filed saleable areas, not carpet areas. The supplied floor-plan dataset reports no measured 2BHK flat design, so no drawing-based carpet area is reported. No measured 3BHK drawing result is supplied either.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 56.86 m² | Not available | Not supplied |
| 3BHK | 10 | 0 | 10 | 72.3 m² | Not available | Not supplied |
The software-measurement record describes its method as measurement from approved floor-plan drawings, not a RERA disclosure, and notes that drawing measurements require review. It contains no measured flat design for the reported 2BHK configuration; no room dimensions or unit-level plan details are supplied for this overview. Carpet area, balcony or utility area, and a unit’s share of common areas are not separately documented in the supplied RERA unit data.
5. Parking & vehicle circulation
The building permit refers to cellar and stilt areas approved for parking and says those areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. However, the supplied permit extract does not state the number of sanctioned spaces, and the RERA unit records do not establish a parking allocation to any particular apartment. No resident/visitor split, accessible-space count, parking layout, ramp details, vehicle circulation plan, or EV provision is supplied.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists 14 infrastructure and facility items. The schedule marks a green strip/TOT LOT/park, solid-waste management and disposal, and water conservation/rainwater harvesting as “YES”; all entries show 0% progress. These are filed schedule entries, not evidence of completion. The building permit separately requires rainwater harvesting, a transformer space, a garbage house and peripheral tree planting.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / TOT LOT / park | Size not supplied | RERA amenity schedule | Marked “YES”; progress 0%; completion not independently verified |
| Solid-waste management and disposal | Size or system details not supplied | RERA amenity schedule | Marked “YES”; progress 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Size and capacity not supplied in the RERA amenity schedule | RERA amenity schedule; building permit | Marked “YES”; progress 0%; permit requires a rainwater-harvesting structure |
| Community buildings | Details and size not supplied | RERA amenity schedule | Progress 0%; completion not independently verified |
| Aggregate recreational open space | Area not supplied | RERA amenity schedule | Progress 0%; completion not independently verified |
No project-specific RERA evidence supplied here establishes a clubhouse, indoor-games facility, children’s play area or other recreational facility as sanctioned or delivered.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. The listed progress is 0% for each; the schedule does not provide capacities or confirm completion.
The building permit requires a rainwater-harvesting percolation pit and specifies two rainwater-harvesting structures. It also records an underground static water-storage tank of 25,000 L and a terrace tank of 25,000 litres, space for a transformer, and a garbage house. It assigns structural and fire-safety responsibility to the owner, builder/developer, architect and structural engineer. The permit’s stated requirements do not, by themselves, establish installation or completed statutory compliance.
The supplied material does not specify a water source, sewage-treatment capacity, recycled-water use, backup-power capacity, lift count or capacity, CCTV or security arrangement, accessible circulation, or fire-system equipment details. The permit states that an occupancy certificate is compulsory before occupation.
8. Location, access & connectivity
The registered location is Bachupally village, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. The RERA certificate identifies the project locality as Bachupally and Plot No. 3.
A supplied location record gives a cadastral parcel centroid at 17.53445, 78.34954 and lists the nearest sampled Outer Ring Road interchange at approximately 9.5 km. No approach-road route, public-transport distance, or measured distance to local landmarks is supplied in the project-location evidence.
9. Developer & development status
The registered promoter is M/S SYNERGY PROJECTS, identified in the supplied partnership deed as a partnership. The RERA registration certificate gives the promoter office location as Bachupally village, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090. The supplied corporate identifier is GSTIN 36ADQFS6004H1ZV. No official contact details or website are established by the RERA documents included here.
The promoter’s Form B affidavit, dated 28 January 2022, declares completion by 8 April 2027 and records undertakings concerning approvals, project funds and accounts. This is a promoter declaration, not independent confirmation of progress. The supplied record identifies one proposed residential building; no separate tower or phase-wise completion status is documented.
10. Approvals, official records & documents
| Identifier / date | P02200004150; issued 25 February 2022; valid through 8 April 2027 |
|---|---|
| Scope and evidence | SYNERGYS HILL TOP, Plot No. 3, Survey No. 332; registration under section 5. |
| Identifier / date | 3142/W1/2020/0144; approved 8 April 2021 |
|---|---|
| Scope and evidence | Nizampet Municipal Corporation; proposed residential building at Plot No. 3, Survey No. 332, Bachupally; 1 Stilt + 5 upper floors. |
| Identifier / date | 031228/LT/MED/FLT/U6/HMDA/01122019 |
|---|---|
| Scope and evidence | Reference recorded in the building permit; a separate approved-layout document is not available in the supplied material. |
| Identifier / date | Dated 28 January 2022 |
|---|---|
| Scope and evidence | Promoter’s affidavit concerning the project, title basis, encumbrance declaration, completion undertaking and other RERA undertakings. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No certificate is present in the supplied document set. |
The building permit records its own validity through 8 April 2027 and requires a completion notice and occupancy certificate after construction; the RERA certificate separately states its registration validity through that date.
Frequently asked questions
Is SYNERGYS HILL TOP registered with Telangana RERA?
Yes. SYNERGYS HILL TOP is registered with the Telangana Real Estate Regulatory Authority as P02200004150; the registration status is New Project.
Who is the developer of SYNERGYS HILL TOP?
The promoter named in the RERA registration is M/S SYNERGY PROJECTS.
Where is SYNERGYS HILL TOP located?
SYNERGYS HILL TOP is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).
When will SYNERGYS HILL TOP be completed?
The promoter's proposed date of completion filed with RERA is 08/08/2027. This is the promoter's declaration, not a guarantee.
More projects in Bachupally