Sunyuga Eco Stay Tower - B

SUNYUGA PROJECTS · Medchal-Malkajgiri · RERA P02200008403

SUNYUGA ECO STAY TOWER - B is a residential apartment project in Doolapally, Dundigal Gandimaisamma, Medchal-Malkajgiri. It is being developed by the registered promoter, SUNYUGA PROJECTS. The project covers 701.5 sq. m and comprises one residential building with 1 stilt + 5 upper floors and 20 2BHK units, each with a RERA-filed saleable area of 105.67 m². Its TG-RERA registration number is P02200008403, and its declared completion date is 31/05/2026.

More from Sunyuga Projects · 3 projects →

01What we found

Period endedTG-RERA registration ran to 31 May 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
1court case on this project's land (survey 150, Dulapally)
8items to check - 1 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 1 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com
Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered nameSUNYUGA ECO STAY TOWER - B RERA record
Project type / registered portionResidential apartment project; the registration identifies Tower B. It is described as a new project. RERA record
TG-RERA registrationP02200008403 RERA record
Registration validity22/06/2024 to 31/05/2026, as stated in the registration certificate. This is the registration period, not an occupancy certificate or confirmation of completion. Approvals record
Registered promoterSUNYUGA PROJECTS, identified in the project record as a partnership. RERA record Corporate record
RERA status in supplied recordRegistration is recorded; no extension is supplied. The certificate states the validity dates above. Approvals record

Land and geographic identity

ItemProject record
LocalityDoolapally / Dulapally, including the project record’s locality spelling DOOLAPALLY. RERA record RERA filing
Revenue villageDulapally; the filed building-permission material also uses Doolapally and DULAPALLE VILLAGE. RERA record
MandalDundigal Gandimaisamma. RERA record
District / PINMedchal-Malkajgiri, 500014. RERA record
Project survey numbers and subdivisionsRERA identifies 150/B/B/1. The filed building-permission/layout material also lists 150/^B/^B/1 and 150/PART. RERA record Land records
Site extent701.5 sq. m total/net area in the RERA project record and building-permission material; the layout extraction states 701.50 sq.mt. net area of plot. Land records
Boundaries in RERA filingEast: ROAD; west, north and south: OTHERS LAND. RERA filing
Road references in approval materialThe layout extraction lists a 9.00 MT WIDE EXISTING ROAD and a 9.00 MT WIDE PROPOSED ROAD; the commencement/building-permission extraction separately refers to 18M.

Development identity

ItemProject record
Sanctioning authority / principal approvalBuilding construction approval 0006/BP/3143/2024, issued by Kompally Municipality/Municipal Corporation on 06 May, 2024. The registration record names GHMC as the RERA authority. Approvals record
Approved building formOne residential building, Building A, with 1 stilt + 5 upper floors; the RERA occupancy-certificate record also describes 1 stilt + 5 upper floors.
Approved area figuresBuilding-permission extraction records 1,711.90 m² proposed built-up area excluding parking, 2,100.70 m² including parking, and a separately stated Total BUA: 2112.74 with Net BUA: 1711.90. These are approval-extraction figures with distinct labels.
Building height14.98 MT in the sanctioned parameters; the layout extraction separately states Total height: 20.93 mt and Height excluding stilt floor: 14.98 mt.
Parking in approval record20 residential parking spaces; the permission describes stilt parking. Parking area is recorded as 388.80 in the layout extraction and 375.28 m² in the commencement-certificate extraction.
Units20 units in the layout/building-permission extraction and RERA unit record. RERA unit table
Approval identifiersBuilding approval 0006/BP/3143/2024; file number 004167/BP/DTCP/3143/0008/2024. Approvals record

Offering and status

ItemProject record
Unit type2BHK; RERA-filed configuration. RERA unit table RERA unit details
RERA-filed saleable area105.67 m². RERA unit table RERA unit details
Booked / available0 booked / 20 available in the portal-derived unit record. The portal record gives no as-of date, so these counts are indicative rather than a current availability confirmation. RERA unit table RERA unit details
Declared completion date31/05/2026, stated in the promoter’s Form B declaration and registration record.
Occupancy statusAn occupancy certificate is present in the supplied records for a residential building at Survey No. 150/B/B/1, Dulapally, with completion date 24/08/2025; its extraction records Total Deviated Builtup Area for Block 63.33. The associated scope and building details are set out under Approvals below.
Construction stageThe supplied material contains an occupancy-certificate record and an architect’s completion certificate; it does not provide independent site-verification evidence.

The project story

SUNYUGA ECO STAY TOWER - B is registered as a residential apartment project on a 701.5 sq. m site in Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri. The RERA filing identifies survey number 150/B/B/1; the filed layout material additionally records 150/^B/^B/1 and 150/PART. The registered development is a single residential building, described in the approval records as Building A, with one stilt level and five upper floors. RERA record Land records

The project record lists 20 two-bedroom apartments. The RERA unit data shows none booked and 20 available, but does not give an as-of date. The promoter’s Form B states a completion deadline of 31/05/2026. Separately, the supplied file includes an occupancy certificate record for the residential building on survey 150/B/B/1, recording a completion date of 24/08/2025. The certificate is evidence of an authority-issued occupancy record in the supplied materials; the data does not include an independent site inspection. RERA unit table RERA unit details

Master plan, architecture & building design

The filed layout and approval extracts describe one residential building on a site recorded as 701.50 sq.mt. net area. The sanctioned configuration is 1 stilt + 5 upper floors, with a stated building height of 14.98 MT. The layout extraction also lists Total height: 20.93 mt and Height excluding stilt floor: 14.98 mt.

The area figures in the layout extraction are not interchangeable: it records Total proposed built up area excluding parking: 1711.90, Total proposed built up area including parking: 2100.70, Total BUA: 2112.74, Deductions: 12.04, and Net BUA: 1711.90. The commencement-certificate extraction separately records Residential upper floors: 5; area 1,711.90 m2 and Stilt parking: 1; area 375.28 m2. The supplied extracts do not specify a basement or podium, nor do they provide a floor-by-floor apartment schedule, flat count per floor, lift capacity, or detailed circulation and landscaping drawings.

The layout records a vacant plot area of 312.72 and lists 2.00 M. WIDE PASSAGE among setbacks. It also lists 1.00, 1.20 and 1.50 without further labels in the extracted setback field. The building-permission conditions call for a fenced tot-lot and greenery, including planting along the site periphery.

Homes, configurations & floor plans

RERA records one configuration of 20 2BHK units, with a filed saleable area of 105.67 m² per unit. The portal-derived status is 0 booked and 20 available, without an as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020105.67 m²Software-measured: median 70.5 m²; range 52.5–78.1 m²33%

Carpet figures are software measurements from approved floor-plan drawing geometry, not RERA-filed measurements; the supplied measurement record says 8 flat designs were measured and flags 1 for review. The drawing-based room schedule for one measured second-floor flat (SEC3) identifies two bedrooms, a drawing room, kitchen and two toilets. It lists bedroom dimensions of 4.12 × 3.0 m and 4.0 × 3.11 m, drawing room 4.0 × 5.64 m, kitchen 4.12 × 3.11 m, and each toilet 2.5 × 1.2 m. These extracted room measurements should be checked against the drawing. RERA unit details Floor plans

RERA saleable area and drawing-measured carpet area are different measures. The supplied measurement record notes that carpet area is smaller than saleable area, which also includes a share of common areas. No separate balcony, utility-area measurement, or RERA-filed loading figure beyond the supplied software measurement is established in the project records. Floor plans RERA unit details

Parking & vehicle circulation

The building-permission/layout extraction lists 20 residential parking spaces and a 388.80 parking area; the commencement-certificate extraction records stilt parking: 1; area 375.28 m² and says that approved cellar/stilt parking is to be used exclusively for vehicles. The supplied records do not give a visitor or accessible-parking count, a parking-allocation schedule for individual units, or a verified spaces-per-home ratio.

The permission material requires parking areas to have electric-vehicle charging infrastructure in accordance with the cited technical requirements and guidelines. The record does not specify the number of charging points or confirm installation. It does not provide detailed ramp, driveway, pedestrian-separation, or vehicle-entry/exit arrangements.

Amenities, recreation & open spaces

The RERA project amenity record names site facilities and services, but most entries have no supplied availability or progress figure. The building-permission extraction also lists a tot-lot, park and building services. No independently verified completion status is supplied for the facilities below. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkSize not stated; permission conditions require a fenced tot-lot and maintained greenery.RERA amenitiesRERA amenity record marks Green Strip/TOT LOT/Park “YES”; no independent completion verification supplied.
Street lightingSize or quantity not stated.RERA amenitiesListed; no progress or completion evidence supplied.
Community buildingsSize or quantity not stated.RERA amenitiesListed; no progress or completion evidence supplied.
Recreational open spaceAggregate area not stated.RERA amenitiesListed; no progress or completion evidence supplied.

Utilities, building services & safety

The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, Energy management, and Electrical Meter Room, Sub-Station, Receiving Station as available. It does not specify capacities, sources, or completion verification. RERA amenities

The building-permission/layout extraction lists RAIN WATER HARVESTING, SEPTIC TANK, Sump, STP, WTP, Electrical Transformer, Lift, and STAIRCASE. The commencement certificate requires a rainwater-harvesting structure, transformer space, a garbage house, and an occupancy certificate before occupation. These entries identify recorded requirements or facilities; they do not by themselves establish installed capacity or statutory compliance.

The RERA amenity record also lists treatment and disposal of sewage and sullage water, solid-waste management and disposal, storm-water drains, and fire-protection/fire-safety requirements, without supplied quantities or progress percentages. The approval/layout material states that parking places are to have EV charging infrastructure and refers to a dual-piping system, but does not establish the installed system’s capacity or whether it has been completed. No lift capacity, backup-power specification, CCTV/access-control details, or accessibility arrangements are provided in the supplied project records. RERA amenities

Location, access & connectivity

The registered project location is Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, 500014. The project record also uses the locality spelling DOOLAPALLY. RERA record

The filed land details record ROAD to the east and OTHERS LAND to the north, south and west. Approval material lists road references including 9.00 MT WIDE EXISTING ROAD, 9.00 MT WIDE PROPOSED ROAD, and 18M; the supplied records do not provide a verified route map or public-transport details. RERA filing

A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 9.4 km. This is a mapped distance, not a travel-time estimate. Location record

Developer & development status

The registered promoter is SUNYUGA PROJECTS, identified in the project data as a partnership, with GSTIN 36ABWFM7191B1ZT. The named partners include MADDIREDDY ANITHA; MADDIREDDY SOMASEKHAR is identified as authorized signatory. The supplied registration certificate gives a promoter address at village/mandal not stated, Medchal-Malkajgiri, PIN 500100; the project record separately lists the promoter address in Gundlapochampally, Doolapally Ward 15, Dundigal Gandimaisamma, Medchal-Malkajgiri, PIN 500014. Corporate record Parties record

The promoter’s Form B declaration states a completion date of 31/05/2026 and records undertakings concerning project funds and pending approvals. The project record also contains a building occupancy certificate with completion date 24/08/2025, and an architect’s Form–1A dated 30-05-2026 certifying completion. These are documentary records; no independent site verification is supplied here.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200008403; validity 22/06/2024–31/05/2026
What the supplied record showsForm C certificate for SUNYUGA ECO STAY TOWER - B, promoter SUNYUGA PROJECTS; identifies Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri.
Building construction approval / commencement certificate
Identifier / date0006/BP/3143/2024; 06 May, 2024; file 004167/BP/DTCP/3143/0008/2024
What the supplied record showsKompally Municipality/Municipal Corporation approval for a residential building with one stilt and five upper floors on a stated 701.5 m² site.
Layout/building-plan material
Identifier / dateDocument 449174
What the supplied record showsExtracted plan information identifies one residential building, 20 units, site and area figures, parking, and listed utilities/conditions.
Occupancy certificate
Identifier / dateProceedings 006279/KOMP/00022/SWOC/2025; completion date 24/08/2025
What the supplied record showsSupplied extraction identifies Survey No. 150/B/B/1, Dulapally, a residential building with one stilt and five upper floors, and Total Deviated Builtup Area for Block 63.33.
Architect’s completion certificate (Form–1A)
Identifier / dateOC identifier 006277/KOMP/00022/SWOC/2025; certificate dated 30-05-2026
What the supplied record showsArchitect’s certificate states completion in all aspects for SUNYUGA ECOSTAY TOWER B and names the occupancy-certificate identifier.
Promoter declaration (Form B)
Identifier / date29 May, 2024
What the supplied record showsAuthorized signatory declares the promoter’s title basis and stated completion date 31/05/2026, among other undertakings.

Other registrations of Sunyuga Eco Stay

Frequently asked questions

Is SUNYUGA ECO STAY TOWER - B registered with Telangana RERA?

Yes. SUNYUGA ECO STAY TOWER - B is registered with the Telangana Real Estate Regulatory Authority as P02200008403; the registration status is New Project.

Who is the developer of SUNYUGA ECO STAY TOWER - B?

The promoter named in the RERA registration is SUNYUGA PROJECTS.

Where is SUNYUGA ECO STAY TOWER - B located?

SUNYUGA ECO STAY TOWER - B is in DOOLAPALLY, Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500014).

When will SUNYUGA ECO STAY TOWER - B be completed?

The promoter's proposed date of completion filed with RERA is 31/05/2026. This is the promoter's declaration, not a guarantee.