Subhagruha Avantika Phase-II
LAHARI INFRASTRUCTURE LTD · Rangareddy · RERA P02400000199
SUBHAGRUHA AVANTIKA PHASE-II is a plotted development in Kondakal, Shankarpalle Mandal, Ranga Reddy District, developed by Lahari Infrastructure Ltd. The project has a total site area of 40602.43 sq.mts and a net site area of 35628.89 sq.mts; it is a residential open layout, with no tower, floor, or total plot count disclosed. The registered offering is residential plots, and plot configurations are not disclosed in the TG-RERA unit data. It is registered with TG-RERA under P02400000199, with a proposed completion date of 03/08/2022.
More from Lahari Infrastructure Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SUBHAGRUHA AVANTIKA PHASE-II RERA record |
| Project type | Plotted development / open residential layout RERA record RERA filing |
| Phase / registered portion | Phase-II; the TG-RERA certificate names this phase. The filed layout documents identify land in Sy.Nos. 454(p), 455(p) and 463(p), Kondakal Village. |
| TG-RERA registration | P02400000199; valid from 21/01/2019 to 03/08/2022, as stated in the registration certificate. The supplied record shows no extension. Approvals record |
| Registered promoter | Lahari Infrastructure Ltd (also styled “LAHARI INFRASTRUCTURE LTD” in the project record) RERA record Corporate record |
| RERA status | Recorded as On-Going Project. The registration-validity period is separate from the completion date and from the status of layout completion/occupancy certification. RERA filing Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Kondakal RERA record RERA filing |
| Revenue village | Kondakal Village |
| Mandal | Shankarpalle RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501203 RERA record |
| Project survey numbers and subdivisions | Sy.Nos. 454(p), 455(p) and 463(p); the RERA certificate records these as 454P, 455 P, 463P. |
| Total site area | 40602.43 sq.mts RERA filing |
| Road-widening / affected area | 4973.54 sq.mts RERA filing |
| Net site area | 35628.89 sq.mts RERA filing |
| Boundaries recorded in RERA land details | East: 100 FEET WIDE ROAD; West: ADEONA DEVELOPERS LAND; North: PROPOSED 100 FEET WIDE ROAD; South: HMDA LAYOUT NO 2186 LO PLG HMDA 2012. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | HMDA approval 000059/LO/Plg/HMDA/2017, dated 03 August, 2017; the final-layout letter identifies the same approval number and is dated 28 January, 2019. Approvals record |
| Approved built-up area | 23728.88 sqmts, as recorded in the RERA land/build-up fields. The layout documents describe this area as “plotted area”; it is not a building floor-area disclosure. RERA filing |
| Buildings / floors / parking levels | Not applicable as a multi-storey building description in the supplied layout record; no building or floor configuration is disclosed. |
| Layout land-use figures in final-layout document | Plotted area 23728.87; road area 7830.08; organized open space/park area 3050.29; utility area 3050.29; social infrastructure area 1019.66. |
| Plot count | The supplied RERA-filed documents do not provide a confirmed total plot count. The draft letter identifies plots 5 to 23 and 25 to 27 as HMDA-mortgaged plots; this is not a total-project plot count. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Residential plots; no apartment or villa configurations are disclosed. RERA filing |
| RERA-filed plot-size range / inventory counts | Not disclosed in the supplied RERA unit data. No booked/available counts are provided. |
| Third-party listing information (not RERA-filed) | Vendor records describe plot offerings and list a saleable range of 2056 - 5823 sq.ft; they also state 96 Units. These are vendor claims, not TG-RERA inventory disclosures. Promoter website |
| Completion dates | Proposed and revised proposed completion date: 03/08/2022. RERA filing |
| Declared completion progress | RERA project fields report 80% completeness; this is a filed/declarative figure, not an independent site measurement. RERA record |
| Layout completion / OC status | The supplied records include HMDA’s final layout letter dated 28 January, 2019 and an architect’s completion certificate. No building occupancy certificate is identified; for this plotted layout, the supplied final-layout and completion records concern layout development, not occupancy of buildings. |
2. The project story
SUBHAGRUHA AVANTIKA PHASE-II is registered as a residential plotted development at Kondakal Village, Shankarpalle Mandal, Ranga Reddy District. The registered portion is identified by Sy.Nos. 454(p), 455(p) and 463(p). HMDA’s filed documents describe an open residential layout with a net site area of 35628.89 sq.mts, including plotted land, roads, open space/park, utility and social-infrastructure areas. RERA record
The HMDA file records draft layout approval in 2017 and final layout approval in 2019. The draft approval describes development works including internal roads, drains, sewerage, water supply, street lighting, plantation, park development and rainwater-harvesting pits. The final-layout document records roads and open spaces as taken over by the Local Authority by registered gift deed.
The project record reports 80% completeness, but the supplied material does not provide a dated, independently verified site inspection or a component-by-component progress assessment. The RERA completion date was 03/08/2022; that date is distinct from the TG-RERA registration validity end date of 03/08/2022 and from the layout completion documents. RERA record RERA filing
3. Master plan, architecture & building design
This is a plotted layout rather than a documented apartment or multi-storey building scheme. The layout documents describe a residential open layout in Sy.Nos. 454(p), 455(p) and 463(p) at Kondakal Village. No tower/block arrangement, building footprints, floor configuration, building heights, or flat layouts are supplied. Individual building permissions are not established by the layout approval documents provided.
The recorded land-area breakdown is:
| Layout component | Area | Evidence |
|---|---|---|
| Total site area | 40602.43 sq.mts | RERA land details and draft layout document RERA filing |
| Road-widening / affected area | 4973.54 sq.mts | RERA land details and final layout document RERA filing |
| Net site area | 35628.89 sq.mts | RERA land details and final layout document RERA filing |
| Plotted area | 23728.87 in the final-layout document; the draft document states 23728.88 Sq.Mt. | |
| Road area | 7830.08 | |
| Organized open space/park area | 3050.29 | |
| Utility area | 3050.29 | |
| Social infrastructure area | 1019.66 |
The draft HMDA document describes a layout road network and infrastructure works, including road formation, drainage, underground utility ducting, protected water supply and street lighting. The supplied material does not include a readable layout drawing from which plot arrangement, road-by-road widths, or the placement of facilities can be described in detail.
4. Homes, configurations & floor plans
The registered offering is plotted development. The supplied TG-RERA unit data does not provide plot counts, booked/available inventory, or a RERA-filed plot-size schedule. The available floor-plan record contains no measured units and no flat drawings; apartment-style carpet-area comparisons therefore do not apply to the information supplied. RERA filing Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Vendor data, rather than a TG-RERA inventory schedule, lists plot sizes from 2056 - 5823 sq.ft and states 96 Units. These figures are vendor claims and are not presented as RERA-filed counts or areas. Promoter website
5. Parking & vehicle circulation
The supplied documents do not give a project-wide count of resident or visitor parking spaces, parking allocation terms, accessible spaces, or EV charging provision. As a plotted layout, no basement, stilt, podium or mechanical parking levels are disclosed.
The draft HMDA letter identifies 22 plots—Plot Nos. 5 to 23 and 25 to 27—with a stated area of 5448.03 Sq.mtrs mortgaged in favour of the Metropolitan Commissioner, HMDA. This is an approval-record restriction on specified plots, not a parking-allocation schedule.
6. Amenities, recreation & open spaces
The HMDA draft approval describes planned layout infrastructure and open-space works. The RERA amenity record marks several infrastructure categories at 100% and others at 0%; these are filed progress fields, not independent verification of present condition. RERA amenities
| Description / size | 3050.29; the draft approval states 8.56% open-space area |
|---|---|
| Declared progress / verified status | RERA amenity record reports “Aggregate area of recreational Open Space” at 100%; no independent site verification supplied. RERA amenities |
| Description / size | 1019.66; draft approval states 2.86 % |
|---|---|
| Declared progress / verified status | Area is recorded in the layout documents; no specific completed community building is established. RERA “Community Buildings” progress is 0%. RERA amenities |
| Description / size | Avenue plantation and plantation/greenery are described in the HMDA documents |
|---|---|
| Declared progress / verified status | RERA “Green Strip/TOT LOT/Park” reports 100%; no independent verification supplied. RERA amenities |
| Description / size | Listed in vendor amenity data; no size or capacity supplied |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor claims only; not established as sanctioned or delivered by the supplied RERA documents. |
| Description / size | Landscaped gardens, compound/gated community, play area and open car parking |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor claims only; no delivery verification supplied. |
7. Utilities, building services & safety
HMDA’s draft-layout conditions describe a planned infrastructure package: storm-water drains; underground drainage and a common septic tank/STP; internal water-supply lines, an overhead tank and an assured water source; electrical lines, street lights and a transformer; underground utility ducting; avenue planting; park development; and rainwater-harvesting pits. These are approval-condition descriptions, not proof that every facility is presently operating.
The final-layout document refers to water supply, sewerage, drainage disposal, street lighting, rainwater-harvesting structure and other civic amenities. The RERA amenity record reports water supply, sewerage, internal roads and footpaths, street lighting, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, and open space at 100%; it reports storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, and fire protection/fire-safety requirements at 0%. The supplied records do not provide capacities, operational test results, or independent site verification. RERA amenities
No building-level lift, fire-escape, accessibility, CCTV/security, or waste-management specification is supplied. The layout approval’s listed infrastructure should not be treated as evidence of building-specific statutory clearances.
8. Location, access & connectivity
The registered location is Kondakal, Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501203. The RERA land record gives the site boundaries as a 100 FEET WIDE ROAD to the east, a PROPOSED 100 FEET WIDE ROAD to the north, ADEONA DEVELOPERS LAND to the west, and HMDA LAYOUT NO 2186 LO PLG HMDA 2012 to the south. RERA record RERA filing
HMDA’s draft conditions require roads to remain open for access to neighbouring sites and describe internal road formation and a main approach road connection to the nearest existing public road. The supplied location data identifies Financial District (Nanakramguda) at 1.2 km as a location-data anchor; the evidence does not specify a travel route or travel time. Location record
9. Developer & development status
The registered promoter is LAHARI INFRASTRUCTURE LTD, a company/public limited entity in the supplied corporate record. A project address field lists LAHARI, ROAD NO. 37, KONDAKAL, KONDAKAL, Shankarpalle, Ranga Reddy, 501203. The TG-RERA certificate separately records the promoter office as Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500033. RERA record Corporate record RERA filing
The promoter’s Form B declaration, dated 18.12.2018, states that the project would be completed by 2nd August 2022 and includes declarations concerning title, encumbrances and project-fund handling. These are promoter declarations in the filed affidavit.
The RERA project fields report 80% completeness, but the supplied record does not include independent verification of that figure. The documents include a final-layout letter and an architect’s certificate stating completion of layout development works; they do not establish occupancy certification for buildings. RERA record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02400000199 | Form C registration for SUBHAGRUHA AVANTIKA PHASE-II; validity stated as 21/01/2019 to 03/08/2022. |
| HMDA draft layout letter, approval 000059/LO/Plg/HMDA/2017, dated 03 August, 2017 | Draft open-plot layout for Sy.Nos. 454(p), 455(p), 463(p), Kondakal Village; records the area breakdown, development conditions and 22 HMDA-mortgaged plots. |
| HMDA final-layout letter, file 014901/LT/SKP/FLT/U6/HMDA/05092018, dated 28 January, 2019 | Final residential open-layout record for the same survey numbers and village; records roads and open spaces taken over by the Local Authority by registered gift deed and refers to relinquishment of the mortgaged plots. |
| Form B declaration, dated 18.12.2018 | Promoter affidavit by Sri. Sukhavasi Satyanarayana as authorised signatory for Lahari Infrastructure Limited, including stated title, encumbrance, completion and separate-account declarations. |
| Architect’s Certificate, Form 1A | States that layout development works were complete and identifies HMDA final-layout approval 000059/LO/PLG/HMDA/2017; the supplied certificate text gives a garbled approval date. |
The supplied material does not include a building-level commencement certificate, building occupancy certificate, or a complete layout drawing suitable for reading individual plot arrangements. The records above describe layout approval and layout-development completion. Document index
1. Project at a glance
Project identity
Registered name: SUBHAGRUHA AVANTIKA PHASE-II
Project type: Plotted development / open residential layout
Phase / registered portion: Phase-II; the TG-RERA certificate names this phase. The filed layout documents identify land in Sy.Nos. 454(p), 455(p) and 463(p), Kondakal Village.
TG-RERA registration: P02400000199; valid from 21/01/2019 to 03/08/2022, as stated in the registration certificate. The supplied record shows no extension.
Registered promoter: Lahari Infrastructure Ltd (also styled “LAHARI INFRASTRUCTURE LTD” in the project record)
RERA status: Recorded as On-Going Project. The registration-validity period is separate from the completion date and from the status of layout completion/occupancy certification.
Land and geographic identity
Locality: Kondakal
Revenue village: Kondakal Village
Mandal: Shankarpalle
District: Ranga Reddy
PIN: 501203
Project survey numbers and subdivisions: Sy.Nos. 454(p), 455(p) and 463(p); the RERA certificate records these as 454P, 455 P, 463P.
Total site area: 40602.43 sq.mts
Road-widening / affected area: 4973.54 sq.mts
Net site area: 35628.89 sq.mts
Boundaries recorded in RERA land details: East: 100 FEET WIDE ROAD; West: ADEONA DEVELOPERS LAND; North: PROPOSED 100 FEET WIDE ROAD; South: HMDA LAYOUT NO 2186 LO PLG HMDA 2012.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: HMDA approval 000059/LO/Plg/HMDA/2017, dated 03 August, 2017; the final-layout letter identifies the same approval number and is dated 28 January, 2019.
Approved built-up area: 23728.88 sqmts, as recorded in the RERA land/build-up fields. The layout documents describe this area as “plotted area”; it is not a building floor-area disclosure.
Buildings / floors / parking levels: Not applicable as a multi-storey building description in the supplied layout record; no building or floor configuration is disclosed.
Layout land-use figures in final-layout document: Plotted area 23728.87; road area 7830.08; organized open space/park area 3050.29; utility area 3050.29; social infrastructure area 1019.66.
Plot count: The supplied RERA-filed documents do not provide a confirmed total plot count. The draft letter identifies plots 5 to 23 and 25 to 27 as HMDA-mortgaged plots; this is not a total-project plot count.
Offering and status
Unit type: Residential plots; no apartment or villa configurations are disclosed.
RERA-filed plot-size range / inventory counts: Not disclosed in the supplied RERA unit data. No booked/available counts are provided.
Third-party listing information (not RERA-filed): Vendor records describe plot offerings and list a saleable range of 2056 - 5823 sq.ft; they also state 96 Units. These are vendor claims, not TG-RERA inventory disclosures.
Completion dates: Proposed and revised proposed completion date: 03/08/2022.
Declared completion progress: RERA project fields report 80% completeness; this is a filed/declarative figure, not an independent site measurement.
Layout completion / OC status: The supplied records include HMDA’s final layout letter dated 28 January, 2019 and an architect’s completion certificate. No building occupancy certificate is identified; for this plotted layout, the supplied final-layout and completion records concern layout development, not occupancy of buildings.
2. The project story
SUBHAGRUHA AVANTIKA PHASE-II is registered as a residential plotted development at Kondakal Village, Shankarpalle Mandal, Ranga Reddy District. The registered portion is identified by Sy.Nos. 454(p), 455(p) and 463(p). HMDA’s filed documents describe an open residential layout with a net site area of 35628.89 sq.mts, including plotted land, roads, open space/park, utility and social-infrastructure areas.
The HMDA file records draft layout approval in 2017 and final layout approval in 2019. The draft approval describes development works including internal roads, drains, sewerage, water supply, street lighting, plantation, park development and rainwater-harvesting pits. The final-layout document records roads and open spaces as taken over by the Local Authority by registered gift deed.
The project record reports 80% completeness, but the supplied material does not provide a dated, independently verified site inspection or a component-by-component progress assessment. The RERA completion date was 03/08/2022; that date is distinct from the TG-RERA registration validity end date of 03/08/2022 and from the layout completion documents.
3. Master plan, architecture & building design
This is a plotted layout rather than a documented apartment or multi-storey building scheme. The layout documents describe a residential open layout in Sy.Nos. 454(p), 455(p) and 463(p) at Kondakal Village. No tower/block arrangement, building footprints, floor configuration, building heights, or flat layouts are supplied. Individual building permissions are not established by the layout approval documents provided.
The recorded land-area breakdown is:
| Layout component | Area | Evidence |
|---|---|---|
| Total site area | 40602.43 sq.mts | RERA land details and draft layout document |
| Road-widening / affected area | 4973.54 sq.mts | RERA land details and final layout document |
| Net site area | 35628.89 sq.mts | RERA land details and final layout document |
| Plotted area | 23728.87 in the final-layout document; the draft document states 23728.88 Sq.Mt. | |
| Road area | 7830.08 | |
| Organized open space/park area | 3050.29 | |
| Utility area | 3050.29 | |
| Social infrastructure area | 1019.66 |
The draft HMDA document describes a layout road network and infrastructure works, including road formation, drainage, underground utility ducting, protected water supply and street lighting. The supplied material does not include a readable layout drawing from which plot arrangement, road-by-road widths, or the placement of facilities can be described in detail.
4. Homes, configurations & floor plans
The registered offering is plotted development. The supplied TG-RERA unit data does not provide plot counts, booked/available inventory, or a RERA-filed plot-size schedule. The available floor-plan record contains no measured units and no flat drawings; apartment-style carpet-area comparisons therefore do not apply to the information supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Vendor data, rather than a TG-RERA inventory schedule, lists plot sizes from 2056 - 5823 sq.ft and states 96 Units. These figures are vendor claims and are not presented as RERA-filed counts or areas.
5. Parking & vehicle circulation
The supplied documents do not give a project-wide count of resident or visitor parking spaces, parking allocation terms, accessible spaces, or EV charging provision. As a plotted layout, no basement, stilt, podium or mechanical parking levels are disclosed.
The draft HMDA letter identifies 22 plots—Plot Nos. 5 to 23 and 25 to 27—with a stated area of 5448.03 Sq.mtrs mortgaged in favour of the Metropolitan Commissioner, HMDA. This is an approval-record restriction on specified plots, not a parking-allocation schedule.
6. Amenities, recreation & open spaces
The HMDA draft approval describes planned layout infrastructure and open-space works. The RERA amenity record marks several infrastructure categories at 100% and others at 0%; these are filed progress fields, not independent verification of present condition.
| Description / size | 3050.29; the draft approval states 8.56% open-space area |
|---|---|
| Declared progress / verified status | RERA amenity record reports “Aggregate area of recreational Open Space” at 100%; no independent site verification supplied. |
| Description / size | 1019.66; draft approval states 2.86 % |
|---|---|
| Declared progress / verified status | Area is recorded in the layout documents; no specific completed community building is established. RERA “Community Buildings” progress is 0%. |
| Description / size | Avenue plantation and plantation/greenery are described in the HMDA documents |
|---|---|
| Declared progress / verified status | RERA “Green Strip/TOT LOT/Park” reports 100%; no independent verification supplied. |
| Description / size | Listed in vendor amenity data; no size or capacity supplied |
|---|---|
| Declared progress / verified status | Vendor claims only; not established as sanctioned or delivered by the supplied RERA documents. |
| Description / size | Landscaped gardens, compound/gated community, play area and open car parking |
|---|---|
| Declared progress / verified status | Vendor claims only; no delivery verification supplied. |
7. Utilities, building services & safety
HMDA’s draft-layout conditions describe a planned infrastructure package: storm-water drains; underground drainage and a common septic tank/STP; internal water-supply lines, an overhead tank and an assured water source; electrical lines, street lights and a transformer; underground utility ducting; avenue planting; park development; and rainwater-harvesting pits. These are approval-condition descriptions, not proof that every facility is presently operating.
The final-layout document refers to water supply, sewerage, drainage disposal, street lighting, rainwater-harvesting structure and other civic amenities. The RERA amenity record reports water supply, sewerage, internal roads and footpaths, street lighting, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, and open space at 100%; it reports storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, and fire protection/fire-safety requirements at 0%. The supplied records do not provide capacities, operational test results, or independent site verification.
No building-level lift, fire-escape, accessibility, CCTV/security, or waste-management specification is supplied. The layout approval’s listed infrastructure should not be treated as evidence of building-specific statutory clearances.
8. Location, access & connectivity
The registered location is Kondakal, Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501203. The RERA land record gives the site boundaries as a 100 FEET WIDE ROAD to the east, a PROPOSED 100 FEET WIDE ROAD to the north, ADEONA DEVELOPERS LAND to the west, and HMDA LAYOUT NO 2186 LO PLG HMDA 2012 to the south.
HMDA’s draft conditions require roads to remain open for access to neighbouring sites and describe internal road formation and a main approach road connection to the nearest existing public road. The supplied location data identifies Financial District (Nanakramguda) at 1.2 km as a location-data anchor; the evidence does not specify a travel route or travel time.
9. Developer & development status
The registered promoter is LAHARI INFRASTRUCTURE LTD, a company/public limited entity in the supplied corporate record. A project address field lists LAHARI, ROAD NO. 37, KONDAKAL, KONDAKAL, Shankarpalle, Ranga Reddy, 501203. The TG-RERA certificate separately records the promoter office as Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500033.
The promoter’s Form B declaration, dated 18.12.2018, states that the project would be completed by 2nd August 2022 and includes declarations concerning title, encumbrances and project-fund handling. These are promoter declarations in the filed affidavit.
The RERA project fields report 80% completeness, but the supplied record does not include independent verification of that figure. The documents include a final-layout letter and an architect’s certificate stating completion of layout development works; they do not establish occupancy certification for buildings.
10. Approvals, official records & documents
TG-RERA registration certificate, P02400000199: Form C registration for SUBHAGRUHA AVANTIKA PHASE-II; validity stated as 21/01/2019 to 03/08/2022.
HMDA draft layout letter, approval 000059/LO/Plg/HMDA/2017, dated 03 August, 2017: Draft open-plot layout for Sy.Nos. 454(p), 455(p), 463(p), Kondakal Village; records the area breakdown, development conditions and 22 HMDA-mortgaged plots.
HMDA final-layout letter, file 014901/LT/SKP/FLT/U6/HMDA/05092018, dated 28 January, 2019: Final residential open-layout record for the same survey numbers and village; records roads and open spaces taken over by the Local Authority by registered gift deed and refers to relinquishment of the mortgaged plots.
Form B declaration, dated 18.12.2018: Promoter affidavit by Sri. Sukhavasi Satyanarayana as authorised signatory for Lahari Infrastructure Limited, including stated title, encumbrance, completion and separate-account declarations.
Architect’s Certificate, Form 1A: States that layout development works were complete and identifies HMDA final-layout approval 000059/LO/PLG/HMDA/2017; the supplied certificate text gives a garbled approval date.
The supplied material does not include a building-level commencement certificate, building occupancy certificate, or a complete layout drawing suitable for reading individual plot arrangements. The records above describe layout approval and layout-development completion.
Frequently asked questions
Is SUBHAGRUHA AVANTIKA PHASE-II registered with Telangana RERA?
Yes. SUBHAGRUHA AVANTIKA PHASE-II is registered with the Telangana Real Estate Regulatory Authority as P02400000199; the registration status is On-Going Project.
Who is the developer of SUBHAGRUHA AVANTIKA PHASE-II?
The promoter named in the RERA registration is LAHARI INFRASTRUCTURE LTD.
Where is SUBHAGRUHA AVANTIKA PHASE-II located?
SUBHAGRUHA AVANTIKA PHASE-II is in KONDAKAL, Shankarpalle, Rangareddy, Telangana (501203).
When will SUBHAGRUHA AVANTIKA PHASE-II be completed?
The promoter's proposed date of completion filed with RERA is 03/08/2022. This is the promoter's declaration, not a guarantee.
More projects in Kondakal