Sign in

Sri Tirumala Hamilton Block B

RATHI CONSTRUCTIONS · Hyderabad · RERA P02500001979

SRI TIRUMALA HAMILTON BLOCK B is a residential apartment project in ARUNA CO-OPERATIVE HOUSING SOCIETY, Musheerabad, Hyderabad district, developed by registered promoter RATHI CONSTRUCTIONS. The registered site extent is 556.23 sq. m., with one building described as Ground + 5 Upper floors; the TG-RERA filing lists 15 homes: 10 2BHK and 5 3BHK. Its TG-RERA registration number is P02500001979, and the promoter’s completion undertaking gives a proposed completion date of 30/04/2021.

More from Rathi Constructions · 7 projects →

01What we found

Period endedTG-RERA registration ran to 30 Apr 2021 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI TIRUMALA HAMILTON BLOCK B RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock B; this registration concerns the named block. The evidence does not identify any other registered phases or establish their scope. RERA record
TG-RERA registrationP02500001979; registration certificate issued 06/07/2020 under section 5. RERA record
Registration validity06/07/2020–30/04/2021; certificate records “0 years.” No extension is recorded in the supplied registration data. This is the registration period, not the building-permit completion cut-off or an occupancy certificate. RERA record
Registered promoterRATHI CONSTRUCTIONS, recorded as a partnership. RERA record Corporate record
RERA project status“New Project” in the supplied project information. Current construction status and current RERA registration status are not established by the supplied record. RERA filing RERA record

Land and geographic identity

FieldRecord
Locality / project locationARUNA CO-OPERATIVE HOUSING SOCIETY; the building-permit extraction locates the site at Zamistanpur, Musheerabad, Hyderabad. RERA record RERA filing
Revenue villageNot disclosed as a separate revenue-village field in the supplied project record. The permit and title documents refer to Zamistanpur/Zamisthanpur Village; the RERA record also uses “ARUNA CO-OPERATIVE HOUSING SOCIETY” as the village/locality value. Land records
Mandal / district / PINMusheerabad / Hyderabad / 500020. The registration certificate lists Hyderabad district and Musheerabad locality; the project record gives PIN 500020. RERA record
All recorded project identifiersH NO 1-6-174/5/42 AND 43; the building-permit extraction renders this as 1-6-174/5142 & 43. The registration certificate records H NO 1­6­174/5/42 AND 43 and plot numbers 42 AND 43. These identifiers are reproduced as recorded. RERA record Land records
Registered site extent556.23 sq. m. in the RERA land record and permit extraction. Land records
Total / net / affected areaRERA land record: total 556.23 sq. m., net 556.23 sq. m., affected 0 sq. m. The permit extraction separately lists site area 1333.85 and net area 1333.85, with road-affected area 0; units for those permit-extracted figures are not stated consistently with the RERA land record. Land records RERA filing
BoundariesEast: land of Gangaputhra Co-operative Housing Society; west: 40 feet wide road; north: plot no. 44; south: land of Gangaputhra Housing Society. RERA filing Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approvalBuilding Permit Order 53561/ZC/CZ/Cir-9/2016, approved 26-JUL-2019; file no. 74963/22/04/2016/HO. Approvals record
Approved building descriptionOne proposed residential building; permit extraction describes Ground + 5 Upper floors.
Approved built-up area1333.85 sq. m. in the project record. RERA filing
Building / block countOne building/unit in the RERA project information; the permit extraction describes one residential building. RERA filing
Sanctioned floor configurationGround + 5 upper floors, as stated in the permit extraction. The extraction also lists “Parking floors 1,” “Cellar 0,” and “Stilt 0”; the exact parking-floor arrangement is not further described.
Approved versus RERA-declared unit countsPermit extraction: 2 units. TG-RERA filing: 15 units across the listed configurations. These are reported as recorded; the supplied evidence does not explain the difference. RERA unit table RERA unit details

Offering and status

FieldRecord
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 101.03 sq. m.; 3BHK: 130.06 sq. m. RERA unit table RERA unit details
Booked / availableThe TG-RERA portal data supplied lists 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal record has no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table RERA unit details
Construction stageNo independently verified site-progress information is supplied. The project is labelled “New Project” in the RERA project information. RERA filing Document index
Completion datesPromoter’s Form B declaration undertakes completion by 30/04/2021; the RERA certificate is valid to 30/04/2021. The building-permit extraction states construction to be completed before 25/JUL/2025. These are separate stated dates, not evidence of completion.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence. Document index

2. The project story

This is a single-block residential apartment project registered as SRI TIRUMALA HAMILTON BLOCK B in Musheerabad, Hyderabad. The RERA record identifies the site as H NO 1-6-174/5/42 AND 43, with Zamistanpur/Zamisthanpur references in the supporting permit and title documents. RERA record Land records

GHMC’s extracted permit describes a proposed residential building with Ground + 5 Upper floors. The TG-RERA unit schedule lists 15 homes: ten 2BHK and five 3BHK. The supplied permit extraction separately states 2 units; the record does not reconcile that figure with the RERA unit schedule. RERA unit table

The promoter’s RERA-filed declarations give a completion undertaking of 30/04/2021. The evidence provided does not establish construction progress, completion, or an issued occupancy/completion certificate, so the project’s present physical status cannot be confirmed here. Document index

3. Master plan, architecture & building design

The available building-permit extraction describes one residential building on the site, with Ground + 5 Upper floors and a height of 14.95 (unit not stated in the extracted parameter list). It records setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m, and Side II 3.50 m. The extraction lists one parking floor, zero cellar and zero stilt; it does not provide a clear floor-by-floor parking arrangement.

The RERA project record states approved built-up area of 1333.85 sq. m. The permit extraction lists “Site Area 1333.85” and “Net Area 1333.85” without a unit in that parameter list; the RERA land record separately gives a registered site extent of 556.23 sq. m. These area fields are retained as recorded, without treating them as interchangeable. RERA filing Land records

The permit extraction identifies Tot-lot as an amenity. Supplied records do not provide a readable approved floor-plan set, building footprint, flats-per-floor arrangement, lift or stair details, internal circulation plan, or residential/common-area breakdown. Two floor-plan drawings are listed, but both remain unmeasured scans; no software-measured carpet-area figures are available. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010101.03 sq. m.Not available: drawings are unmeasured scansNot supplied
3BHK505130.06 sq. m.Not available: drawings are unmeasured scansNot supplied

RERA saleable areas are the figures filed for these configurations. The supplied floor-plan data says carpet area was not measured: both listed drawings are scans pending measurement. No drawing-based room dimensions, balcony or utility measurements are available. RERA unit table RERA unit details Floor plans

The portal’s booked and available counts lack an as-of date and should be treated as indicative only. No measured carpet-area or loading figures are supplied, so these cannot be calculated or compared with saleable area. RERA unit table Floor plans

5. Parking & vehicle circulation

The building-permit extraction records Parking floors 1, Cellar 0, and Stilt 0, but does not state a parking-space count, parking level layout, ramp arrangement, or resident/visitor allocation. The supplied vendor record lists “Closed Car Parking,” “Open Car Parking,” and “Reserved Parking,” but does not provide quantities or project-specific allocation details. Promoter website

No sanctioned bay count, accessible-parking provision, two-wheeler count, EV charging provision, or legally documented unit-level parking allocation is established by the supplied evidence. A parking arrangement or exclusive right to a particular bay cannot be confirmed from the available records. Promoter website Document index

6. Amenities, recreation & open spaces

Tot-lot
Description / sizeSize not stated
Evidence sourceGHMC permit extraction
Declared progress / verified statusIdentified in the permit record; completion not verified.
Green strip / tot lot / park
Description / sizeSize not stated
Evidence sourceTG-RERA amenity record
Declared progress / verified statusListed as available at 100%; independent completion not verified. RERA amenities
Aggregate recreational open space
Description / sizeSize not stated
Evidence sourceTG-RERA amenity record; vendor record also lists this facility
Declared progress / verified statusListed as available at 100% in the RERA amenity data; independent completion not verified. RERA amenities Promoter website
Closed / open car parking and reserved parking
Description / sizeCounts and sizes not stated
Evidence sourceVendor record
Declared progress / verified statusListed by the vendor; sanctioned provision and delivery status are not established by that listing. Promoter website

The supplied data does not identify a clubhouse, indoor recreation facility, or quantified sports/recreation area. RERA amenities Promoter website Document index

7. Utilities, building services & safety

The TG-RERA amenity record lists water supply, sewerage (including chamber, lines, septic tank, STP), storm-water drains, rainwater harvesting/water conservation, and electrical meter room/sub-station/receiving station as available at 100%. These are portal-listed statuses, not independently verified completion findings. RERA amenities

The vendor record additionally lists 24×7 water supply, power backup, lift, sewage treatment plant, storm-water drains, water conservation and rainwater harvesting. Its specification text refers to bore-well and municipal water, overhead tanks and a sump, but the extracted wording is incomplete; capacities and actual commissioning status are not established. Promoter website

No supplied project-specific record establishes fire-protection systems, fire clearance, lift capacity or service lifts, waste-management arrangements, CCTV/security systems, backup capacity, or accessible circulation. The permit extraction’s general conditions and amenity references do not by themselves establish delivery or statutory compliance. RERA amenities Promoter website

8. Location, access & connectivity

The registered project location is in ARUNA CO-OPERATIVE HOUSING SOCIETY, Musheerabad, Hyderabad, PIN 500020. The GHMC permit extraction describes the site as Zamistanpur, Musheerabad, Hyderabad. The site boundaries recorded in the project information include a 40 FEET WIDE ROAD on the west. RERA record RERA filing RERA filing

The supplied location record contains a cadastral parcel-centroid coordinate of 17.41528, 78.35459, but it is not identified as a site-surveyed entrance coordinate. The structured connectivity record lists Financial District (Nanakramguda) at 1.2 km; this is not consistent with the supplied Musheerabad/Hyderabad location fields and is not used here as a project-access distance. No verified approach route or project-specific public-transport distance is established by the supplied location evidence. Location record RERA record

9. Developer & development status

The registered promoter is RATHI CONSTRUCTIONS, identified in the project record as a partnership. The listed partners are Sri Krishna Radheshyam Rathi, Smt Leelavati Radheshyam Rathi, Sri Radheshyam Madan Rathi, Smt Preeti Murlinarayan Rathi, Smt Uma Devi Krishna Rathi, and Sri Murli Narayan Radheshyam Rathi. Mahesh Malani is listed as authorized signatory. Corporate record Parties record

The promoter address in the supplied record is 3-6-1, HIMAYATNAGAR, ZAMISTANPUR, ARUNA CO-OPERATIVE HOUSING SOCIETY, Musheerabad, Hyderabad, 500020. The record lists https://rathiconstructions.com/ as the promoter website; no corporate identification number or other corporate identifier is supplied. Parties record Corporate record

The promoter’s Form B declaration undertakes completion by 30/04/2021. The evidence does not include an independently verified construction-progress update or an occupancy/completion certificate, and therefore does not establish that the stated completion date was achieved. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for SRI TIRUMALA HAMILTON BLOCK B, registration no. P02500001979, issued 06/07/2020; validity stated to 30/04/2021.
GHMC building permitBuilding Permit Order 53561/ZC/CZ/Cir-9/2016, file no. 74963/22/04/2016/HO, dated 26-JUL-2019; extracted as a residential building permit for the Zamistanpur, Musheerabad site.
Form B declarationPromoter declaration dated 23rd December, 2019, including a completion undertaking of 30/04/2021 and a declaration that the land is free from encumbrances.
Completion-date letterLetter dated 04.03.2020 requesting that 30.04.2021 be considered as the proposed RERA completion date; it also states a GHMC permit cut-off of 25.07.2025.
Approved layout / floor drawingsA layout-plan document entry is present but is not extracted; two floor-plan drawings are listed as scans pending measurement. The supplied evidence does not establish the detailed layout or floor-plan contents. Document index Floor plans
Completion / occupancy recordNo completion certificate or occupancy certificate is included in the supplied documents. Document index

Other registrations of Sri Tirumala Hamilton

Frequently asked questions

Is SRI TIRUMALA HAMILTON BLOCK B registered with Telangana RERA?

Yes. SRI TIRUMALA HAMILTON BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02500001979; the registration status is New Project.

Who is the developer of SRI TIRUMALA HAMILTON BLOCK B?

The promoter named in the RERA registration is RATHI CONSTRUCTIONS.

Where is SRI TIRUMALA HAMILTON BLOCK B located?

SRI TIRUMALA HAMILTON BLOCK B is in ARUNA CO-OPERATIVE HOUSING SOCIETY, Musheerabad, Hyderabad, Telangana (500020).

When will SRI TIRUMALA HAMILTON BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2021. This is the promoter's declaration, not a guarantee.

More projects in Musheerabad