Sri Lakshmi Kamala Niliyam
SREERAM INFRA · Medchal-Malkajgiri · RERA P02200008132
SRI LAKSHMI KAMALA NILIYAM is a residential apartment project in Dundigal, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is SREERAM INFRA. The project is on a site of 446.30 sq. m and comprises one building / block with 1 Stilt + 5 upper floors and nine 2BHK homes. Its TG-RERA registration number is P02200008132, and its proposed completion date is 19/04/2027.
More from Sreeram Infra · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRI LAKSHMI KAMALA NILIYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | A single registered project is identified; no separate phase designation is disclosed. RERA record |
| TG-RERA registration | P02200008132 RERA record |
| Registration validity | 29 April 2024–19 December 2026, subject to any extension by the Authority. This is the registration period, not the project completion deadline. RERA record |
| Registered promoter | SREERAM INFRA (also styled “M/s. Sree Ram Infra” in filed documents) RERA record Corporate record |
| RERA status | Recorded as “New Project”; the registration certificate is available. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Dundigal RERA record RERA filing |
| Revenue village | Bowrampet RERA record Land records |
| Mandal | Dundigal Gandimaisamma RERA record Land records |
| District / PIN | Medchal-Malkajgiri / 500043 RERA record |
| Project survey number(s) | Survey No. 538; no project subdivision is disclosed. RERA record Land records |
| RERA-filed site description | Plot Nos. E-127 & E-128, Survey No. 538; total and net area each 446.30 sq. m. RERA filing Land records |
| Boundaries recorded in RERA fields | East: 30 WIDE ROAD; West: PLOT NO E 123 E124; North: PLOT NO E126; South: 30 WIDE ROAD. RERA filing |
| Cadastral context | The cadastral record gives Survey No. 538 as a whole-survey extent of 65,193.68 sq. m; this is the survey extent, not the project site area. Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | HMDA; the RERA record also identifies HMDA as the authority. RERA record Approvals record |
| Principal building-permit number / date | 010827/BP/HMDA/2402/MED/2023, approved 20 December 2023. Approvals record |
| Other approval reference on file | TS/025254/2023, shown on the drawing/permit record. Approvals record |
| Approved building | Residential building, 1 Stilt + 5 upper floors, on Plot Nos. E-127 & E-128 in Survey No. 538; stated site extent 446.30 sq. m. |
| Approved built-up area | The HMDA permit extraction lists Built-up Area 1,165.90 sq. m, Total Built up Area 1,471.10 sq. m, and mortgage area 121.32 sq. m. These are the permit’s stated figures; the area labels are retained as recorded. |
| RERA project fields | Approved built-up area 1,142.45 sq. m; mortgage area 97.52 sq. m. RERA filing |
| Building / block count | One building / block is recorded. RERA filing RERA unit table |
| Parking | The drawing extraction records parking provision inconsistently as “PROPOSED NUMBER OF PARKINGS 0” and “PROPOSED NUMBER OF PARKINGS 10.” The permit extraction also states that the stilt is for parking and that no parking or construction is permitted in setbacks. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 9 units; all 9 are shown as available and 0 booked in the portal-derived record. The record has no booking-count as-of date, so counts are indicative. RERA unit table RERA unit details RERA unit table |
| RERA-filed saleable area | 150.96 sq. m for the filed 2BHK configuration. RERA unit table RERA unit details |
| Completion timeline | Proposed completion date recorded as 19/04/2027. The Form B completion undertaking text is garbled and does not provide a separately readable date. RERA record |
| Construction stage | The project is described in the supplied third-party/vendor material as under construction; no independent site-progress measurement or RERA construction-stage update is supplied here. Promoter website |
| Occupancy / completion certificate | The permit extraction records completion_certified: false; no occupancy or completion certificate is supplied in the reviewed project documents. Document index |
2. The project story
- SRI LAKSHMI KAMALA NILIYAM is registered as a residential apartment project at Plot Nos. E-127 and E-128, Survey No. 538, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA record identifies one building and one tower, with a proposed configuration of nine 2BHK homes. RERA record RERA filing RERA unit table
- The filed HMDA building-permit record describes a residential building with one stilt level and five upper floors. The project’s RERA record gives a proposed completion date of 19 April 2027. Although vendor material calls the project under construction, the supplied material does not establish construction progress through an independently verified site inspection or a dated RERA progress report. No occupancy or completion certificate is included in the documents reviewed. RERA record Promoter website Document index
- The registration certificate records the project as P02200008132 and sets out continuing promoter obligations, including quarterly updates and a conveyance deed for the apartment or common areas, as applicable.
3. Master plan, architecture & building design
- The HMDA building-permit order describes a residential building on the project’s 446.30 sq. m site, comprising 1 Stilt + 5 upper floors. It records a building height of 14.95 MT in the drawing extraction; the permit extraction separately lists “Height of the building 1471.1,” so that field is not treated here as a verified height. The drawing extraction lists 952.05 sq. m as net residential BUA and total proposed built-up area excluding parking, 1,142.45 sq. m including parking, and also lists “TOTAL BUA 1144.70.” These are distinct drawing labels and should not be treated as interchangeable.
- The HMDA permit extraction separately lists Built-up Area 1,165.90 sq. m, Total Built up Area 1,471.10 sq. m, and 121.32 sq. m as the provided mortgage area. RERA’s project fields state an approved built-up area of 1,142.45 sq. m and mortgage area of 97.52 sq. m. The stated area categories are reported as they appear in their respective records; the reviewed material does not provide a reconciled area schedule. RERA filing
- The supplied drawing extraction records a 143.96 sq. m vacant plot area, proposed coverage area of 190.41 sq. m (56.95%), and 10.00 MT-wide roads. It also names a lift and staircase among the building features. No drawing-derived floor-by-floor home count, lift capacity, accessible circulation plan, or detailed landscape schedule is supplied.
4. Homes, configurations & floor plans
- The RERA filing records nine 2BHK homes, with 0 booked and 9 available in the portal-derived count; booking figures have no recorded as-of date. The RERA-filed saleable area is 150.96 sq. m. RERA unit table RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 150.96 sq. m | 64.6 sq. m software-measured | 57% software-derived |
- The 64.6 sq. m carpet measurement is software-measured from one flat design on the approved floor-plan drawing, not a RERA-filed carpet-area disclosure; the measurement is flagged as needing review. The measurement record identifies a first-floor plan, flat ID 03, with living/kitchen, two bedrooms, two toilets and a space labelled “WASH.” RERA unit details Floor plans
- Saleable area and carpet area are different measures: the supplied drawing-measurement note says the RERA saleable figure includes the home’s share of common areas and is larger than the measured carpet area. No balcony or utility-area schedule is provided in the supplied drawing-derived record. Floor plans RERA unit details
5. Parking & vehicle circulation
- The approved drawing extraction states that the stilt floor is to be used for parking and records both “PROPOSED NUMBER OF PARKINGS 0” and “PROPOSED NUMBER OF PARKINGS 10.” The HMDA permit conditions prohibit parking or construction in setback areas. The supplied records therefore do not establish a reliable sanctioned parking count or a unit-by-unit parking allocation.
- No separate visitor or accessible-parking count, two-wheeler count, parking-allotment schedule, EV charging provision, ramp details, or internal vehicle-circulation plan is provided in the material reviewed. A parking space shown or stated in a plan should not be taken as proof of exclusive allocation to a particular unit.
6. Amenities, recreation & open spaces
- The RERA amenity record lists proposed infrastructure and facilities, with the recorded progress percentage at 0 for each item. The table below distinguishes those records from features appearing only in vendor material. RERA amenities Promoter website
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or specification supplied | RERA amenities | 0%; no independent completion verification supplied |
| Green strip / TOT lot / park | No size supplied | RERA amenities | 0%; no independent completion verification supplied |
| Community buildings | No details supplied | RERA amenities | 0%; no independent completion verification supplied |
| Children’s play area; common garden; swimming pool; gym; clubhouse; indoor games | Vendor-listed; no dimensions or capacity supplied | Promoter website | Vendor material only; not established as sanctioned, RERA-declared or delivered by the supplied records |
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, but records 0 progress for the listed items. The supplied drawing extraction names a distribution transformer, sump, septic tank, rainwater harvesting, lift and staircase; the HMDA permit extraction lists a transformer, garbage house and STP. These are filed or drawing-listed provisions, not evidence that the facilities are complete or operational. RERA amenities
- The building-permit conditions call for an STP, require fire-safety and structural-stability arrangements, and state that a commencement notice is to be submitted before work and a completion notice after construction. They also state that an occupancy certificate is compulsory before occupation. The reviewed material does not include an occupancy/completion certificate or evidence independently establishing delivery of these services.
- No project-specific capacities or verified details are supplied for water source or storage, sewage treatment and reuse, storm-water systems, electrical backup, lift capacity, fire equipment, CCTV, access control, waste segregation, or accessible circulation. Vendor material lists power backup, security, CCTV and 24-hour water supply, but the supplied project records do not establish those as completed facilities. Promoter website
8. Location, access & connectivity
- The registered location is Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043; the project fields identify the locality as Dundigal. RERA record RERA filing
- The building-permit extraction identifies the site as Plot Nos. E-127 and E-128 and refers to a minimum 4.5 m approach road; the drawing extraction labels roads as 10.00 MT WIDE ROAD, 10.00 MT WIDE MAINROAD, and 10.0 M WIDE ROAD. The permit condition says the approach road shown in the plan is to be developed and maintained as a black-topped road before release of the occupancy certificate.
- A supplied location record gives an approximate distance of 11.1 km to the nearest sampled Outer Ring Road interchange. This is a sampled map distance, not a travel-time estimate. Location record
9. Developer & development status
- The registered promoter is SREERAM INFRA, identified as a partnership in the project fields, with GSTIN 36AEJFS4709P1ZB. The supplied corporate record does not provide a company-registration number or a distinct registered-office address; the project address record lists Sri Sai Krishna Layout, Pragathi Nagar, Bowrampet, Dundigal, Medchal-Malkajgiri, PIN 500043. Corporate record RERA filing Parties record
- The TG-RERA certificate identifies Sreeram Infra as promoter and records its registered-office address as Village Pragathi Nagar, Mandal Bachupally, District Medchal-Malkajgiri, PIN 500090. The certificate’s address is reproduced as filed; no official contact number, email or promoter website is supplied in the reviewed record.
- The project record gives a proposed completion date of 19/04/2027. The permit extraction marks completion as not certified, and no occupancy/completion certificate is included. The nine-unit booking and availability figures are portal-derived and lack an as-of date; no independently verified construction-progress percentage is supplied. RERA record RERA unit table
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SRI LAKSHMI KAMALA NILIYAM, registration P02200008132; validity recorded as 29 April 2024 to 19 December 2026. |
| Principal building permit | HMDA building permit 010827/BP/HMDA/2402/MED/2023, approved 20 December 2023, for a residential building of 1 Stilt + 5 upper floors at Plot Nos. E-127 & E-128, Survey No. 538, Bowrampet. |
| Drawing / approval reference | Drawing record TS/025254/2023, with a drawing stamp dated 07-04-2023; the drawing stamp is noted in the record as requiring review. Approvals record |
| Commencement / completion / occupancy | A building-permit order is on file. Its extracted conditions require commencement and completion notices and an occupancy certificate before occupation; the supplied record says completion is not certified. No occupancy/completion certificate is included. |
| Promoter declaration | Form B declaration by authorized signatory Bhavani Marikanti, containing promoter declarations concerning title, encumbrances, project funds, approvals and audits. The completion-date text in the extracted declaration is not legible enough to rely on as a separate date. |
| Other filed project documents | Title search report, title documents, encumbrance statement, allotment-letter and agreement-for-sale templates, and registration certificate are listed in the project evidence. Document index |
- The HMDA building-permit order states that the stilt is for parking, that the STP is to be provided, and that an occupancy certificate is required before occupation. Full permit conditions and the title and encumbrance documents are addressed in the relevant approvals and land/title reviews.
1. Project at a glance
Project identity
Registered project name: SRI LAKSHMI KAMALA NILIYAM
Project type: Residential apartment project
Phase / registered portion: A single registered project is identified; no separate phase designation is disclosed.
TG-RERA registration: P02200008132
Registration validity: 29 April 2024–19 December 2026, subject to any extension by the Authority. This is the registration period, not the project completion deadline.
Registered promoter: SREERAM INFRA (also styled “M/s. Sree Ram Infra” in filed documents)
RERA status: Recorded as “New Project”; the registration certificate is available.
Land and geographic identity
Locality: Dundigal
Revenue village: Bowrampet
Mandal: Dundigal Gandimaisamma
District / PIN: Medchal-Malkajgiri / 500043
Project survey number(s): Survey No. 538; no project subdivision is disclosed.
RERA-filed site description: Plot Nos. E-127 & E-128, Survey No. 538; total and net area each 446.30 sq. m.
Boundaries recorded in RERA fields: East: 30 WIDE ROAD; West: PLOT NO E 123 E124; North: PLOT NO E126; South: 30 WIDE ROAD.
Cadastral context: The cadastral record gives Survey No. 538 as a whole-survey extent of 65,193.68 sq. m; this is the survey extent, not the project site area.
Development identity
Sanctioning authority: HMDA; the RERA record also identifies HMDA as the authority.
Principal building-permit number / date: 010827/BP/HMDA/2402/MED/2023, approved 20 December 2023.
Other approval reference on file: TS/025254/2023, shown on the drawing/permit record.
Approved building: Residential building, 1 Stilt + 5 upper floors, on Plot Nos. E-127 & E-128 in Survey No. 538; stated site extent 446.30 sq. m.
Approved built-up area: The HMDA permit extraction lists Built-up Area 1,165.90 sq. m, Total Built up Area 1,471.10 sq. m, and mortgage area 121.32 sq. m. These are the permit’s stated figures; the area labels are retained as recorded.
RERA project fields: Approved built-up area 1,142.45 sq. m; mortgage area 97.52 sq. m.
Building / block count: One building / block is recorded.
Parking: The drawing extraction records parking provision inconsistently as “PROPOSED NUMBER OF PARKINGS 0” and “PROPOSED NUMBER OF PARKINGS 10.” The permit extraction also states that the stilt is for parking and that no parking or construction is permitted in setbacks.
Offering and status
RERA-filed configuration: 2BHK, 9 units; all 9 are shown as available and 0 booked in the portal-derived record. The record has no booking-count as-of date, so counts are indicative.
RERA-filed saleable area: 150.96 sq. m for the filed 2BHK configuration.
Completion timeline: Proposed completion date recorded as 19/04/2027. The Form B completion undertaking text is garbled and does not provide a separately readable date.
Construction stage: The project is described in the supplied third-party/vendor material as under construction; no independent site-progress measurement or RERA construction-stage update is supplied here.
Occupancy / completion certificate: The permit extraction records completion_certified: false; no occupancy or completion certificate is supplied in the reviewed project documents.
2. The project story
- SRI LAKSHMI KAMALA NILIYAM is registered as a residential apartment project at Plot Nos. E-127 and E-128, Survey No. 538, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA record identifies one building and one tower, with a proposed configuration of nine 2BHK homes.
- The filed HMDA building-permit record describes a residential building with one stilt level and five upper floors. The project’s RERA record gives a proposed completion date of 19 April 2027. Although vendor material calls the project under construction, the supplied material does not establish construction progress through an independently verified site inspection or a dated RERA progress report. No occupancy or completion certificate is included in the documents reviewed.
- The registration certificate records the project as P02200008132 and sets out continuing promoter obligations, including quarterly updates and a conveyance deed for the apartment or common areas, as applicable.
3. Master plan, architecture & building design
- The HMDA building-permit order describes a residential building on the project’s 446.30 sq. m site, comprising 1 Stilt + 5 upper floors. It records a building height of 14.95 MT in the drawing extraction; the permit extraction separately lists “Height of the building 1471.1,” so that field is not treated here as a verified height. The drawing extraction lists 952.05 sq. m as net residential BUA and total proposed built-up area excluding parking, 1,142.45 sq. m including parking, and also lists “TOTAL BUA 1144.70.” These are distinct drawing labels and should not be treated as interchangeable.
- The HMDA permit extraction separately lists Built-up Area 1,165.90 sq. m, Total Built up Area 1,471.10 sq. m, and 121.32 sq. m as the provided mortgage area. RERA’s project fields state an approved built-up area of 1,142.45 sq. m and mortgage area of 97.52 sq. m. The stated area categories are reported as they appear in their respective records; the reviewed material does not provide a reconciled area schedule.
- The supplied drawing extraction records a 143.96 sq. m vacant plot area, proposed coverage area of 190.41 sq. m (56.95%), and 10.00 MT-wide roads. It also names a lift and staircase among the building features. No drawing-derived floor-by-floor home count, lift capacity, accessible circulation plan, or detailed landscape schedule is supplied.
4. Homes, configurations & floor plans
- The RERA filing records nine 2BHK homes, with 0 booked and 9 available in the portal-derived count; booking figures have no recorded as-of date. The RERA-filed saleable area is 150.96 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 150.96 sq. m | 64.6 sq. m software-measured | 57% software-derived |
- The 64.6 sq. m carpet measurement is software-measured from one flat design on the approved floor-plan drawing, not a RERA-filed carpet-area disclosure; the measurement is flagged as needing review. The measurement record identifies a first-floor plan, flat ID 03, with living/kitchen, two bedrooms, two toilets and a space labelled “WASH.”
- Saleable area and carpet area are different measures: the supplied drawing-measurement note says the RERA saleable figure includes the home’s share of common areas and is larger than the measured carpet area. No balcony or utility-area schedule is provided in the supplied drawing-derived record.
5. Parking & vehicle circulation
- The approved drawing extraction states that the stilt floor is to be used for parking and records both “PROPOSED NUMBER OF PARKINGS 0” and “PROPOSED NUMBER OF PARKINGS 10.” The HMDA permit conditions prohibit parking or construction in setback areas. The supplied records therefore do not establish a reliable sanctioned parking count or a unit-by-unit parking allocation.
- No separate visitor or accessible-parking count, two-wheeler count, parking-allotment schedule, EV charging provision, ramp details, or internal vehicle-circulation plan is provided in the material reviewed. A parking space shown or stated in a plan should not be taken as proof of exclusive allocation to a particular unit.
6. Amenities, recreation & open spaces
- The RERA amenity record lists proposed infrastructure and facilities, with the recorded progress percentage at 0 for each item. The table below distinguishes those records from features appearing only in vendor material.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or specification supplied | 0%; no independent completion verification supplied | |
| Green strip / TOT lot / park | No size supplied | 0%; no independent completion verification supplied | |
| Community buildings | No details supplied | 0%; no independent completion verification supplied | |
| Children’s play area; common garden; swimming pool; gym; clubhouse; indoor games | Vendor-listed; no dimensions or capacity supplied | Vendor material only; not established as sanctioned, RERA-declared or delivered by the supplied records |
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, but records 0 progress for the listed items. The supplied drawing extraction names a distribution transformer, sump, septic tank, rainwater harvesting, lift and staircase; the HMDA permit extraction lists a transformer, garbage house and STP. These are filed or drawing-listed provisions, not evidence that the facilities are complete or operational.
- The building-permit conditions call for an STP, require fire-safety and structural-stability arrangements, and state that a commencement notice is to be submitted before work and a completion notice after construction. They also state that an occupancy certificate is compulsory before occupation. The reviewed material does not include an occupancy/completion certificate or evidence independently establishing delivery of these services.
- No project-specific capacities or verified details are supplied for water source or storage, sewage treatment and reuse, storm-water systems, electrical backup, lift capacity, fire equipment, CCTV, access control, waste segregation, or accessible circulation. Vendor material lists power backup, security, CCTV and 24-hour water supply, but the supplied project records do not establish those as completed facilities.
8. Location, access & connectivity
- The registered location is Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043; the project fields identify the locality as Dundigal.
- The building-permit extraction identifies the site as Plot Nos. E-127 and E-128 and refers to a minimum 4.5 m approach road; the drawing extraction labels roads as 10.00 MT WIDE ROAD, 10.00 MT WIDE MAINROAD, and 10.0 M WIDE ROAD. The permit condition says the approach road shown in the plan is to be developed and maintained as a black-topped road before release of the occupancy certificate.
- A supplied location record gives an approximate distance of 11.1 km to the nearest sampled Outer Ring Road interchange. This is a sampled map distance, not a travel-time estimate.
9. Developer & development status
- The registered promoter is SREERAM INFRA, identified as a partnership in the project fields, with GSTIN 36AEJFS4709P1ZB. The supplied corporate record does not provide a company-registration number or a distinct registered-office address; the project address record lists Sri Sai Krishna Layout, Pragathi Nagar, Bowrampet, Dundigal, Medchal-Malkajgiri, PIN 500043.
- The TG-RERA certificate identifies Sreeram Infra as promoter and records its registered-office address as Village Pragathi Nagar, Mandal Bachupally, District Medchal-Malkajgiri, PIN 500090. The certificate’s address is reproduced as filed; no official contact number, email or promoter website is supplied in the reviewed record.
- The project record gives a proposed completion date of 19/04/2027. The permit extraction marks completion as not certified, and no occupancy/completion certificate is included. The nine-unit booking and availability figures are portal-derived and lack an as-of date; no independently verified construction-progress percentage is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SRI LAKSHMI KAMALA NILIYAM, registration P02200008132; validity recorded as 29 April 2024 to 19 December 2026.
Principal building permit: HMDA building permit 010827/BP/HMDA/2402/MED/2023, approved 20 December 2023, for a residential building of 1 Stilt + 5 upper floors at Plot Nos. E-127 & E-128, Survey No. 538, Bowrampet.
Drawing / approval reference: Drawing record TS/025254/2023, with a drawing stamp dated 07-04-2023; the drawing stamp is noted in the record as requiring review.
Commencement / completion / occupancy: A building-permit order is on file. Its extracted conditions require commencement and completion notices and an occupancy certificate before occupation; the supplied record says completion is not certified. No occupancy/completion certificate is included.
Promoter declaration: Form B declaration by authorized signatory Bhavani Marikanti, containing promoter declarations concerning title, encumbrances, project funds, approvals and audits. The completion-date text in the extracted declaration is not legible enough to rely on as a separate date.
Other filed project documents: Title search report, title documents, encumbrance statement, allotment-letter and agreement-for-sale templates, and registration certificate are listed in the project evidence.
- The HMDA building-permit order states that the stilt is for parking, that the STP is to be provided, and that an occupancy certificate is required before occupation. Full permit conditions and the title and encumbrance documents are addressed in the relevant approvals and land/title reviews.
Frequently asked questions
Is SRI LAKSHMI KAMALA NILIYAM registered with Telangana RERA?
Yes. SRI LAKSHMI KAMALA NILIYAM is registered with the Telangana Real Estate Regulatory Authority as P02200008132; the registration status is New Project.
Who is the developer of SRI LAKSHMI KAMALA NILIYAM?
The promoter named in the RERA registration is SREERAM INFRA.
Where is SRI LAKSHMI KAMALA NILIYAM located?
SRI LAKSHMI KAMALA NILIYAM is in DUNDIGAL, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will SRI LAKSHMI KAMALA NILIYAM be completed?
The promoter's proposed date of completion filed with RERA is 19/04/2027. This is the promoter's declaration, not a guarantee.