SONABHAN MOHAN Block B
KNB CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001627
SONABHAN MOHAN Block B is a residential apartment project at Pet Basherabad, Qutballapur Mandal, Medchal-Malkajgiri District, developed by registered promoter KNB CONSTRUCTIONS. The registered site area is 654.49 sq. m, and the project comprises one residential building with 1 Stilt + 5 upper floors. The TG-RERA-filed inventory lists one 3BHK unit and one unit recorded as FLAT NO 101 with unspecified configuration. It is registered under TG-RERA P02200001627, with a proposed completion date of 05/09/2025.
More from Knb Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SONABHAN MOHAN Block B RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Block B; the registration certificate identifies the project as “SONABHAN MOHAN Block B.” |
| TG-RERA registration | P02200001627; certificate issued 09/02/2020. RERA record |
| Registration validity | Certificate states validity from 09/02/2020 to 05/09/2025, unless extended by the Authority. The supplied certificate records no extension. This is the registration period, separate from the completion date and the occupancy-certificate record below. |
| Registered promoter | KNB CONSTRUCTIONS; partnership. RERA record RERA filing |
| RERA status in supplied record | Registration certificate on file; no extension is recorded on that certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Pet Basherabad; the certificate and project records identify Pet Basherabad. RERA record |
| Mandal | Qutballapur. RERA record |
| District | Medchal-Malkajgiri. RERA record |
| PIN | 500067. RERA record |
| Project survey numbers and subdivisions | Sy Nos 75/A and 76/B. RERA record Land records |
| Plots identified in the registration certificate | 100, 101, 102 & 103. |
| Registered site extent | 654.49 sq. m; net area 654.49 sq. m and road-widening area recorded as 0. RERA filing |
| Boundaries in the project record | East: Road; West: Road; North: Neighbours Land; South: Plot Nos 99 and 104. RERA filing |
| Separate extent recorded in the occupancy certificate | 929.71 m² is stated in that certificate’s extent field. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 2/C25/13375/2019, dated 05 September 2019. Approvals record |
| Occupancy-certificate approval | 1057/GHMC/KPL/2022-OC, dated 20 April 2022. Approvals record |
| Approved built-up / floor area | 1,600.65 m² in the building-permit record, labelled residential upper-floors area; the occupancy-certificate record labels 1,600.65 m² as floor area per sanctioned plan. These are approved-plan figures, not carpet or saleable area. |
| Building count and configuration | One residential building, identified in the permit as “Building - RES-1 (K RANJITH)”; 1 Stilt + 5 upper floors. RERA filing |
| Parking provision in approval record | Stilt parking area: 320.18 m². The occupancy-certificate record also lists parking area as 320.18 m². The supplied extracts do not state a parking-space count. |
| Unit count | The project record lists 1 total building unit and 1 proposed building unit; the unit inventory separately lists two flat rows. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 3BHK: 1 unit; FLAT NO 101: 1 unit, recorded as “Unspecified.” RERA unit table RERA unit details |
| RERA-filed saleable area | 132.29 m² for each of the two listed units. RERA unit table RERA unit details |
| Booked / available | Both listed units are recorded as unbooked and available. Counts are from the TG-RERA portal reading; no as-of date is supplied, so treat them as indicative. RERA unit table RERA unit details |
| Declared completion date | 05/09/2025, as recorded in the project header. RERA record |
| Occupancy certificate | A GHMC occupancy certificate is on file for the residential building identified with permit 2/C25/13375/2019; it records completion notice dated 20 January 2022 and says the building was inspected and declared fit for occupation. |
| Construction-stage information | No independently verified current site-progress report is supplied. The portal amenity progress entries are reported separately below and are not an independent site inspection. RERA amenities |
2. The project story
SONABHAN MOHAN Block B is registered with TG-RERA as a residential apartment project at Pet Basherabad, Qutballapur Mandal, Medchal-Malkajgiri District, on Sy Nos 75/A and 76/B. The GHMC building-permit record describes one residential building, RES-1, with a stilt and five upper floors. RERA record Land records
The TG-RERA unit inventory contains two flat rows: one 3BHK and one recorded as FLAT NO 101 with unspecified configuration. Both are shown as available in the portal data, whose reading has no stated as-of date. The occupancy-certificate file identifies a GHMC-certified residential building, but the supplied material does not establish the current condition of the site or independently confirm the status of each unit. RERA unit details
The project header gives 05/09/2025 as the proposed completion date, while the registration certificate states a validity end date of 05/09/2025 unless extended. These are distinct RERA record fields; the supplied certificate does not record an extension. The GHMC occupancy-certificate document separately records a completion notice dated 20 January 2022. RERA record
3. Master plan, architecture & building design
The GHMC permit describes a single residential building, RES-1, on a recorded site area of 654.49 m², with 1 stilt and 5 upper floors. It records 1,600.65 m² as residential upper-floors area and 320.18 m² as stilt parking area. The occupancy-certificate record also gives 1,600.65 m² as floor area per sanctioned plan and states a building height of 14.5 m per sanctioned plan. These are sanctioned-plan measurements, not carpet or saleable area.
The permit records a tot-lot area of 0 m² and five rainwater-harvesting structures. It also includes conditions concerning a transformer space, a garbage house, a periphery greenery strip and a tot-lot. The supplied material does not include readable floor-plan drawings from which to describe flat arrangements, building footprint, flats per floor, lift or stair locations, or internal circulation. Floor plans
The occupancy-certificate extract records a site-building-plan floor area of 1,689.75 m² and notes deviations. Those details are recorded here as part of the certificate record; this overview does not infer a design or compliance conclusion from them.
4. Homes, configurations & floor plans
TG-RERA’s filed inventory lists two home units. The saleable-area entries below are RERA-filed figures; saleable area is not the same as carpet area. No drawing-based carpet-area measurement is available in the supplied floor-plan data. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 1 | 0 | 1 | 132.29 m² | Not measured in supplied drawing data | Not supplied |
| Unspecified (filed as FLAT NO 101) | 1 | 0 | 1 | 132.29 m² | Not measured in supplied drawing data | Not supplied |
The floor-plan data says two drawings are recorded, with no flats measured and one scan pending. Consequently, room dimensions, balcony or utility areas, orientation, and typical floor arrangements cannot be described from the supplied drawings. Floor plans
5. Parking & vehicle circulation
The GHMC building-permit record identifies a stilt parking area of 320.18 m² and requires the approved stilt parking area to be used exclusively for vehicle parking. The occupancy-certificate record also lists parking area as 320.18 m². No number of car or two-wheeler spaces, visitor or accessible spaces, parking allocations to individual units, or EV charging provision is established in the supplied records.
The permit requires one entry and one exit to the premises, with minimum width of 4.5 m and height clearance of 5 m. The supplied materials do not show the vehicle route, ramp arrangement, or separation of pedestrian and vehicle circulation.
6. Amenities, recreation & open spaces
The table combines GHMC permit conditions and the RERA portal’s reported progress fields. The portal percentages are recorded declarations, not independently verified completion. RERA amenities
| Description / size | Permit records tot-lot area as 0 m² and requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC building permit; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA record shows Green Strip/TOT LOT/Park at 90%; not independently verified. |
| Description / size | Permit requires a greenery strip around the site and tree planting along the periphery and in front of the premises. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | Permit records 5 rainwater-harvesting structures and requires a percolation-pit structure. |
|---|---|
| Evidence source | GHMC building permit; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA record shows Water Conservation, Rain water Harvesting at 90%; not independently verified. |
| Description / size | No source or capacity specified in the supplied record. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | RERA entry refers to chambers, lines, septic tank and STP; no capacity or treatment details are supplied. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | Facility category is recorded; no equipment capacity is supplied. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | Lift is listed in the RERA amenity record; number and capacity are not supplied. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
The supplied GHMC permit does not evidence a clubhouse or other indoor recreation facility. Vendor-listed facilities are not used here as evidence of sanctioned or delivered project amenities. Promoter website
7. Utilities, building services & safety
The GHMC permit requires a separate underground static water-storage tank of 25,000 litres and a separate 25,000-litre terrace tank for residential buildings. It also requires a rainwater-harvesting structure, transformer space, garbage house and an ETP as per standard specification. The permit records five rainwater-harvesting structures. The supplied documents do not provide current operational status or capacities for sewage treatment, ETP or other systems.
The permit requires a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and fire-resistant swing doors for collapsible lifts on all floors. It also assigns responsibility for structural and fire safety to the owner, builder/developer and relevant professionals. These are permit conditions; the supplied material does not establish independent inspection or current compliance.
A lift is listed in the RERA amenities record, but the number, capacity and service-lift provision are not stated. The supplied extracts do not establish CCTV, access-control arrangements, waste-segregation procedures, accessibility features, or the current status of fire-protection equipment. RERA amenities
8. Location, access & connectivity
The registered project location is Pet Basherabad, Qutballapur Mandal, Medchal-Malkajgiri District, Telangana, PIN 500067. The project record describes roads on the east and west boundaries, and the GHMC permit refers to an 18 m road abutting the site. RERA record RERA filing
The supplied location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. This is the only measured connectivity distance supplied in the location data; no travel time or public-transport information is provided. Location record
9. Developer & development status
The registered promoter is KNB CONSTRUCTIONS, identified in the project record as a partnership. The registration certificate names Knb Constructions as promoter. The supplied promoter address is Sonabhan, RP Road, Pipeline Road, Pet Basherabad, Qutballapur, Medchal-Malkajgiri, 500067. No official website or project contact details are supplied. RERA record RERA filing Corporate record
The project’s Form B declaration was made by K. Rajesh Mohan, an authorised partner signatory, on 8 October 2019. It declares a six-year completion period and states that 70% of amounts realised from allottees would be deposited in a separate scheduled-bank account. These are promoter declarations.
The registration certificate states validity through 05/09/2025 unless extended; no extension is recorded on the supplied certificate. The project header lists 05/09/2025 as the proposed completion date. The GHMC occupancy-certificate record identifies the residential building as fit for occupation, but no independently verified current construction-progress report is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200001627; issued 09/02/2020 |
|---|---|
| What the supplied record establishes | Registration for SONABHAN MOHAN Block B; certificate states validity through 05/09/2025 unless extended. |
| Identifier / date | 2/C25/13375/2019; 05 September 2019 |
|---|---|
| What the supplied record establishes | Building permission for a residential building on Sy Nos 75/A and 76/B, with 1 stilt + 5 upper floors. The permit states that it does not confer ownership rights. |
| Identifier / date | 1057/GHMC/KPL/2022-OC; 20 April 2022 |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building identified with Building Permit No. 2/C25/13375/2019; it records a completion notice dated 20 January 2022 and says the building was inspected and declared fit for occupation. |
| Identifier / date | 2/C25/06484/2019 |
|---|---|
| What the supplied record establishes | Identified in the building-permit document. |
| Identifier / date | G/3378/LP/23/92 |
|---|---|
| What the supplied record establishes | Reference recorded in the building-permit document. |
| Identifier / date | 8 October 2019 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning land title, encumbrances, completion period and project-fund arrangements. |
| Identifier / date | Not available in supplied record |
|---|---|
| What the supplied record establishes | The public lookup was not reachable in the supplied evidence; this does not establish approval or refusal. HMDA |
1. Project at a glance
Project identity
Registered project name: SONABHAN MOHAN Block B
Project type: Residential apartment project
Phase / registered portion: Block B; the registration certificate identifies the project as “SONABHAN MOHAN Block B.”
TG-RERA registration: P02200001627; certificate issued 09/02/2020.
Registration validity: Certificate states validity from 09/02/2020 to 05/09/2025, unless extended by the Authority. The supplied certificate records no extension. This is the registration period, separate from the completion date and the occupancy-certificate record below.
Registered promoter: KNB CONSTRUCTIONS; partnership.
RERA status in supplied record: Registration certificate on file; no extension is recorded on that certificate.
Land and geographic identity
Locality / revenue village: Pet Basherabad; the certificate and project records identify Pet Basherabad.
Mandal: Qutballapur.
District: Medchal-Malkajgiri.
PIN: 500067.
Project survey numbers and subdivisions: Sy Nos 75/A and 76/B.
Plots identified in the registration certificate: 100, 101, 102 & 103.
Registered site extent: 654.49 sq. m; net area 654.49 sq. m and road-widening area recorded as 0.
Boundaries in the project record: East: Road; West: Road; North: Neighbours Land; South: Plot Nos 99 and 104.
Separate extent recorded in the occupancy certificate: 929.71 m² is stated in that certificate’s extent field.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 2/C25/13375/2019, dated 05 September 2019.
Occupancy-certificate approval: 1057/GHMC/KPL/2022-OC, dated 20 April 2022.
Approved built-up / floor area: 1,600.65 m² in the building-permit record, labelled residential upper-floors area; the occupancy-certificate record labels 1,600.65 m² as floor area per sanctioned plan. These are approved-plan figures, not carpet or saleable area.
Building count and configuration: One residential building, identified in the permit as “Building - RES-1 (K RANJITH)”; 1 Stilt + 5 upper floors.
Parking provision in approval record: Stilt parking area: 320.18 m². The occupancy-certificate record also lists parking area as 320.18 m². The supplied extracts do not state a parking-space count.
Unit count: The project record lists 1 total building unit and 1 proposed building unit; the unit inventory separately lists two flat rows.
Offering and status
RERA-filed configurations: 3BHK: 1 unit; FLAT NO 101: 1 unit, recorded as “Unspecified.”
RERA-filed saleable area: 132.29 m² for each of the two listed units.
Booked / available: Both listed units are recorded as unbooked and available. Counts are from the TG-RERA portal reading; no as-of date is supplied, so treat them as indicative.
Declared completion date: 05/09/2025, as recorded in the project header.
Occupancy certificate: A GHMC occupancy certificate is on file for the residential building identified with permit 2/C25/13375/2019; it records completion notice dated 20 January 2022 and says the building was inspected and declared fit for occupation.
Construction-stage information: No independently verified current site-progress report is supplied. The portal amenity progress entries are reported separately below and are not an independent site inspection.
2. The project story
SONABHAN MOHAN Block B is registered with TG-RERA as a residential apartment project at Pet Basherabad, Qutballapur Mandal, Medchal-Malkajgiri District, on Sy Nos 75/A and 76/B. The GHMC building-permit record describes one residential building, RES-1, with a stilt and five upper floors.
The TG-RERA unit inventory contains two flat rows: one 3BHK and one recorded as FLAT NO 101 with unspecified configuration. Both are shown as available in the portal data, whose reading has no stated as-of date. The occupancy-certificate file identifies a GHMC-certified residential building, but the supplied material does not establish the current condition of the site or independently confirm the status of each unit.
The project header gives 05/09/2025 as the proposed completion date, while the registration certificate states a validity end date of 05/09/2025 unless extended. These are distinct RERA record fields; the supplied certificate does not record an extension. The GHMC occupancy-certificate document separately records a completion notice dated 20 January 2022.
3. Master plan, architecture & building design
The GHMC permit describes a single residential building, RES-1, on a recorded site area of 654.49 m², with 1 stilt and 5 upper floors. It records 1,600.65 m² as residential upper-floors area and 320.18 m² as stilt parking area. The occupancy-certificate record also gives 1,600.65 m² as floor area per sanctioned plan and states a building height of 14.5 m per sanctioned plan. These are sanctioned-plan measurements, not carpet or saleable area.
The permit records a tot-lot area of 0 m² and five rainwater-harvesting structures. It also includes conditions concerning a transformer space, a garbage house, a periphery greenery strip and a tot-lot. The supplied material does not include readable floor-plan drawings from which to describe flat arrangements, building footprint, flats per floor, lift or stair locations, or internal circulation.
The occupancy-certificate extract records a site-building-plan floor area of 1,689.75 m² and notes deviations. Those details are recorded here as part of the certificate record; this overview does not infer a design or compliance conclusion from them.
4. Homes, configurations & floor plans
TG-RERA’s filed inventory lists two home units. The saleable-area entries below are RERA-filed figures; saleable area is not the same as carpet area. No drawing-based carpet-area measurement is available in the supplied floor-plan data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 1 | 0 | 1 | 132.29 m² | Not measured in supplied drawing data | Not supplied |
| Unspecified (filed as FLAT NO 101) | 1 | 0 | 1 | 132.29 m² | Not measured in supplied drawing data | Not supplied |
The floor-plan data says two drawings are recorded, with no flats measured and one scan pending. Consequently, room dimensions, balcony or utility areas, orientation, and typical floor arrangements cannot be described from the supplied drawings.
5. Parking & vehicle circulation
The GHMC building-permit record identifies a stilt parking area of 320.18 m² and requires the approved stilt parking area to be used exclusively for vehicle parking. The occupancy-certificate record also lists parking area as 320.18 m². No number of car or two-wheeler spaces, visitor or accessible spaces, parking allocations to individual units, or EV charging provision is established in the supplied records.
The permit requires one entry and one exit to the premises, with minimum width of 4.5 m and height clearance of 5 m. The supplied materials do not show the vehicle route, ramp arrangement, or separation of pedestrian and vehicle circulation.
6. Amenities, recreation & open spaces
The table combines GHMC permit conditions and the RERA portal’s reported progress fields. The portal percentages are recorded declarations, not independently verified completion.
| Description / size | Permit records tot-lot area as 0 m² and requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC building permit; RERA amenities record |
| Declared progress / verified status | RERA record shows Green Strip/TOT LOT/Park at 90%; not independently verified. |
| Description / size | Permit requires a greenery strip around the site and tree planting along the periphery and in front of the premises. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | No independently verified completion status supplied. |
| Description / size | Permit records 5 rainwater-harvesting structures and requires a percolation-pit structure. |
|---|---|
| Evidence source | GHMC building permit; RERA amenities record |
| Declared progress / verified status | RERA record shows Water Conservation, Rain water Harvesting at 90%; not independently verified. |
| Description / size | No source or capacity specified in the supplied record. |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | RERA entry refers to chambers, lines, septic tank and STP; no capacity or treatment details are supplied. |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | Facility category is recorded; no equipment capacity is supplied. |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
| Description / size | Lift is listed in the RERA amenity record; number and capacity are not supplied. |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed as available; 90% progress recorded, not independently verified. |
The supplied GHMC permit does not evidence a clubhouse or other indoor recreation facility. Vendor-listed facilities are not used here as evidence of sanctioned or delivered project amenities.
7. Utilities, building services & safety
The GHMC permit requires a separate underground static water-storage tank of 25,000 litres and a separate 25,000-litre terrace tank for residential buildings. It also requires a rainwater-harvesting structure, transformer space, garbage house and an ETP as per standard specification. The permit records five rainwater-harvesting structures. The supplied documents do not provide current operational status or capacities for sewage treatment, ETP or other systems.
The permit requires a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and fire-resistant swing doors for collapsible lifts on all floors. It also assigns responsibility for structural and fire safety to the owner, builder/developer and relevant professionals. These are permit conditions; the supplied material does not establish independent inspection or current compliance.
A lift is listed in the RERA amenities record, but the number, capacity and service-lift provision are not stated. The supplied extracts do not establish CCTV, access-control arrangements, waste-segregation procedures, accessibility features, or the current status of fire-protection equipment.
8. Location, access & connectivity
The registered project location is Pet Basherabad, Qutballapur Mandal, Medchal-Malkajgiri District, Telangana, PIN 500067. The project record describes roads on the east and west boundaries, and the GHMC permit refers to an 18 m road abutting the site.
The supplied location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. This is the only measured connectivity distance supplied in the location data; no travel time or public-transport information is provided.
9. Developer & development status
The registered promoter is KNB CONSTRUCTIONS, identified in the project record as a partnership. The registration certificate names Knb Constructions as promoter. The supplied promoter address is Sonabhan, RP Road, Pipeline Road, Pet Basherabad, Qutballapur, Medchal-Malkajgiri, 500067. No official website or project contact details are supplied.
The project’s Form B declaration was made by K. Rajesh Mohan, an authorised partner signatory, on 8 October 2019. It declares a six-year completion period and states that 70% of amounts realised from allottees would be deposited in a separate scheduled-bank account. These are promoter declarations.
The registration certificate states validity through 05/09/2025 unless extended; no extension is recorded on the supplied certificate. The project header lists 05/09/2025 as the proposed completion date. The GHMC occupancy-certificate record identifies the residential building as fit for occupation, but no independently verified current construction-progress report is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200001627; issued 09/02/2020 |
|---|---|
| What the supplied record establishes | Registration for SONABHAN MOHAN Block B; certificate states validity through 05/09/2025 unless extended. |
| Identifier / date | 2/C25/13375/2019; 05 September 2019 |
|---|---|
| What the supplied record establishes | Building permission for a residential building on Sy Nos 75/A and 76/B, with 1 stilt + 5 upper floors. The permit states that it does not confer ownership rights. |
| Identifier / date | 1057/GHMC/KPL/2022-OC; 20 April 2022 |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building identified with Building Permit No. 2/C25/13375/2019; it records a completion notice dated 20 January 2022 and says the building was inspected and declared fit for occupation. |
| Identifier / date | 2/C25/06484/2019 |
|---|---|
| What the supplied record establishes | Identified in the building-permit document. |
| Identifier / date | G/3378/LP/23/92 |
|---|---|
| What the supplied record establishes | Reference recorded in the building-permit document. |
| Identifier / date | 8 October 2019 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning land title, encumbrances, completion period and project-fund arrangements. |
| Identifier / date | Not available in supplied record |
|---|---|
| What the supplied record establishes | The public lookup was not reachable in the supplied evidence; this does not establish approval or refusal. |
Other registrations of Sonabhan Mohan
Frequently asked questions
Is SONABHAN MOHAN Block B registered with Telangana RERA?
Yes. SONABHAN MOHAN Block B is registered with the Telangana Real Estate Regulatory Authority as P02200001627; the registration status is New Project.
Who is the developer of SONABHAN MOHAN Block B?
The promoter named in the RERA registration is KNB CONSTRUCTIONS.
Where is SONABHAN MOHAN Block B located?
SONABHAN MOHAN Block B is in Pet Basherabad, Qutballapur, Medchal-Malkajgiri, Telangana (500067).
When will SONABHAN MOHAN Block B be completed?
The promoter's proposed date of completion filed with RERA is 05/09/2025. This is the promoter's declaration, not a guarantee.