SITA EXOTICA TOWER CELOSIA is a residential apartment project in Jeedimetla Village-1, Medchal Mandal, Medchal-Malkajgiri District, developed by registered promoter SITA SHELTERS PRIVATE LIMITED. The RERA land record gives a site area of 2,357.87 sq. m; the RERA filing records 1 building unit and 70 apartments: 20 two-bedroom and 50 three-bedroom homes. The filed configurations are 2BHK at 68.51 sq. m and 3BHK at 98.67 sq. m. The project is registered under TG-RERA number P02200003839, with a proposed completion date of 03/03/2028.

More from Sita Shelters Pvt Ltd · 10 projects →

01What we found

RegisteredTG-RERA - valid till 3 Nov 2027
16documents on file - each fact links to its page
1court case on this project's land (survey 113, Jeedimetla)
14items to check - 7 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

14 items to check before you pay, 7 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from proptiger.comPhoto from proptiger.com
▦ View all 2 photos
Jeedimetla, Medchal, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameSITA EXOTICA TOWER CELOSIA RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registered project is SITA EXOTICA TOWER CELOSIA RERA record
TG-RERA registrationP02200003839, granted under section 5; issued 03/01/2022; registration certificate states validity through 03/11/2027. This is registration validity, not the project completion deadline. Approvals record
Registered promoterSITA SHELTERS PRIVATE LIMITED RERA record Corporate record
RERA statusThe supplied record labels the project “New Project.” Registration is shown as valid through 03/11/2027; no extension is recorded in the supplied certificate. RERA filing

Land and geographic identity

FieldProject record
LocalityJeedimetla Village-1 RERA record RERA filing
Revenue villageJeedimetla RERA record Land records
MandalMedchal in the project identity record; the GHMC permit identifies Quthbullapur Mandal. RERA record Land records
DistrictMedchal-Malkajgiri RERA record Corporate record
PIN500015 RERA record RERA filing
Project survey numbersSy. Nos. 113, 112, 367 Part, 114 Part Land records
Registered site extentRERA land record: 2,357.87 sq. m total and net area. Land records RERA filing
Boundaries in RERA land recordEast: LAND OF D BLOCK; West: LAND OF A BLOCK; North: LAND OF B BLOCK; South: NEIGHBOUR LAND. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit1/C25/10111/2021, approved 03 November 2021; file no. 1/C25/08647/2020. Approvals record
Approved built-up areaGHMC permit extraction records 15,102.19 sq. m built-up area. The RERA project record separately states approved built-up area of 10,316.34 sq. m. RERA filing
Building countRERA lists 1 building unit. GHMC permit extraction identifies residential Buildings 1(A), 1(B), 1(C), 1(D), plus a separate amenities building. RERA filing
Sanctioned floor configurationBuildings 1(B) and 1(C): 1 stilt + 10 upper floors; Building 1(A): 1 stilt + 10 upper floors; Building 1(D): 2 cellars + stilt + 10 upper floors; amenities building: 1 ground + 5 upper floors.
ParkingPermit states cellar and stilt areas approved for vehicle parking; the supplied extraction does not state the number of spaces.
Unit countsGHMC sanction says sanctioned units must not be increased without prior approval, but the supplied extraction does not give the sanctioned unit count. RERA filing records 70 units: 20 two-bedroom and 50 three-bedroom apartments. RERA unit table

Offering and status

FieldProject record
RERA-filed configurations and saleable area2BHK: 68.51 sq. m; 3BHK: 98.67 sq. m. RERA unit table RERA unit details
Booked / available2BHK: 8 booked / 12 available; 3BHK: 1 booked / 49 available. The portal record does not carry an as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageNo independently verified site-progress report is supplied. The RERA amenity-progress record reports water supply at 100%, sewerage at 10%, and electrical meter room/sub-station/receiving station at 10%; listed progress for other infrastructure and amenity categories is 0%. These are recorded progress figures, not independent site verification. RERA amenities
Completion deadlineProposed completion date in the RERA record: 03/03/2028. RERA record RERA filing
Occupancy / completion certificateThe supplied GHMC permit extraction says completion is not certified and requires an occupancy certificate before occupation. No occupancy certificate is supplied.

2. The project story

SITA EXOTICA TOWER CELOSIA is registered as a residential apartment project on land identified in the RERA filing as Sy. Nos. 113, 112, 367 Part and 114 Part, at Jeedimetla Village-1, in the Jeedimetla locality. The RERA land record gives a site area of 2,357.87 sq. m. RERA record Land records RERA filing

The GHMC building permit describes a broader building arrangement: four residential buildings with stilt and upper-floor configurations, including one building with two cellar levels, together with a separate amenities building. The RERA filing, meanwhile, records one building unit and 70 apartments. The supplied records do not explain that building-count presentation; this Overview reports each source’s stated scope without treating the permit extraction as proof of the registered unit arrangement. RERA filing RERA unit table

The RERA filing records 70 apartments—50 3BHK and 20 2BHK—and a proposed completion date of 03/03/2028. No independently verified construction-progress report or occupancy certificate is included. The reported progress percentages for project facilities are filing data, not confirmation of physical completion at the site. RERA unit table RERA record RERA amenities

3. Master plan, architecture & building design

The GHMC Building Permit Order describes the project as an apartment development and lists four residential buildings and an amenities building. The stated configurations are: Building 1(A), 1(B) and 1(C), each with 1 stilt and 10 upper floors; Building 1(D), with 2 cellars, 1 stilt and 10 upper floors; and the amenities building, with 1 ground floor and 5 upper floors.

The permit extraction gives a site area and net area of 12,181.86 sq. m, a road-affected area of 0 and a nala-affected area of 0; it also records a tot-lot of 1,382.78 sq. m and built-up area of 15,102.19 sq. m. The RERA land record separately gives total/net site area of 2,357.87 sq. m and approved built-up area of 10,316.34 sq. m. These are source-recorded figures; this Overview does not reconcile them. Land records RERA filing

The permit extraction records building heights of 29.95 m and 20.95 m but does not identify which height applies to which building in the supplied excerpt. It also lists “605 Trees” and records no number for rainwater-harvesting pits.

The supplied record does not provide a complete drawing-based account of building footprints, flat counts per floor, lifts, stairs, internal circulation, landscaping distribution or phase organization. The layout-plan filing item is marked not extracted, and the publicly reachable HMDA master-plan sheet is image-only; no survey-level zoning reading is supplied. Document index HMDA

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2081268.51 sq. mNot measured in supplied drawingsNot supplied
3BHK5014998.67 sq. mSoftware-measured: 87.7–96.8 sq. m; median 93.3 sq. mNot supplied

RERA-filed saleable areas and unit counts are from the project’s unit record. The booked/available counts are portal figures without an as-of date and should be treated as indicative. RERA unit table RERA unit details

The 3BHK carpet-area figures are software measurements from floor-plan drawing geometry, not RERA-filed carpet-area declarations; the measurement record notes that the drawing measurements need review. It reports 15 measured flat designs and a median of 1004 sq. ft. (93.3 sq. m). Floor plans RERA unit details

The drawing for the typical 9th and 10th floor, flat 04, labels a living/dining area, kitchen, three bedrooms, three toilets, two balconies and a utility. The drawing-measured utility is 2.31 sq. m; balconies and utility are excluded from the software-measured carpet area. Room labels and measurements are drawing-derived, not a RERA disclosure. RERA unit details

Carpet area represents the measured internal floor area described by the drawing-based measurement; saleable area is the separate RERA-filed area and may include a share of common areas. The supplied record does not give a loading figure or a measured 2BHK carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count in the supplied extraction.

The permit extraction does not establish resident-versus-visitor or accessible-space counts, parking allocation to individual units, two-wheeler spaces, ramps, EV charging, or pedestrian separation. No exclusive parking entitlement can be established from the supplied evidence. RERA unit table

6. Amenities, recreation & open spaces

The GHMC permit lists a tot-lot, transformer space, garbage house, rainwater-harvesting structure/percolation pit and ETP; its conditions also require peripheral tree planting and maintenance of the tot-lot as greenery. The RERA filing records facility progress percentages separately. RERA amenities

Tot-lot / green strip
Description / sizeGHMC permit records a tot-lot of 1,382.78 sq. m and requires it to be fenced and maintained as greenery.
Evidence sourceGHMC-sanctioned permit
Declared progress / verified statusRERA progress: Green Strip/TOT LOT/Park 0%; not independently verified complete. RERA amenities
Peripheral greenery / tree planting
Description / sizePeripheral tree planting and a greenery strip are permit conditions; the extraction also lists 605 Trees.
Evidence sourceGHMC-sanctioned permit
Declared progress / verified statusNo completion verification supplied.
Transformer space
Description / sizeSpace for transformer is required by the permit.
Evidence sourceGHMC-sanctioned permit
Declared progress / verified statusRERA electrical meter room/sub-station/receiving station progress: 10%; not independently verified complete. RERA amenities
Garbage house
Description / sizeRequired within the premises under the permit.
Evidence sourceGHMC-sanctioned permit
Declared progress / verified statusRERA solid-waste-management progress: 0%. RERA amenities
Rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure/percolation pit.
Evidence sourceGHMC-sanctioned permit
Declared progress / verified statusRERA water-conservation/rainwater-harvesting progress: 0%; not independently verified complete. RERA amenities
ETP
Description / sizeETP is listed in the permit extraction; the supplied excerpt gives no capacity or design detail.
Evidence sourceGHMC permit extraction
Declared progress / verified statusNo separate completion percentage or independent verification supplied.
Water supply
Description / sizeRERA facility record marks availability “YES.” RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 100% as recorded in the filing; not independently verified.
Sewerage
Description / sizeRERA facility label: “Sewerage (Chamber, Lines, Septic Tank, STP).” RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusAvailability marked “YES”; progress 10% as recorded in the filing; not independently verified.
Storm-water drains
Description / sizeFacility appears in RERA progress record. RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 0%.
Street lighting
Description / sizeFacility appears in RERA progress record. RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 0%.
Community buildings
Description / sizeFacility appears in RERA progress record. RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 0%.
Sewage and sullage treatment/disposal
Description / sizeFacility appears in RERA progress record. RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 0%.
Fire protection and fire safety
Description / sizeFacility appears in RERA progress record; the permit also requires a Fire NOC before occupancy. RERA amenities
Evidence sourceRERA filing and GHMC permit RERA amenities
Declared progress / verified statusRERA progress: 0%; no Fire NOC or independent completion evidence supplied.
Recreational open space
Description / sizeAggregate area of recreational open space appears in RERA progress record. RERA amenities
Evidence sourceRERA filing RERA amenities
Declared progress / verified statusProgress: 0%.

No TG-RERA evidence supplied here establishes a clubhouse, pool, gym or other indoor recreation facility as sanctioned or delivered.

7. Utilities, building services & safety

The GHMC permit requires an ETP, a rainwater-harvesting structure/percolation pit, a garbage house and space for a transformer. It also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. These are permit requirements; the supplied documents do not establish their completed installation or capacities.

The RERA facility record marks water supply “YES” with 100% progress and sewerage “YES” with 10% progress. Electrical meter room/sub-station/receiving station is marked “YES” with 10% progress; water conservation/rainwater harvesting, fire protection, storm-water drains, and solid-waste management are each recorded at 0%. These are RERA-filed progress indicators, not independent site verification. RERA amenities

The permit makes an occupancy certificate compulsory before occupation and requires an Occupancy Fire NOC before issue of the occupancy certificate. No certificate or NOC is supplied. The available record does not specify water sources or storage, treatment capacity, STP capacity, backup power, lift numbers or capacities, CCTV, access control, accessibility provisions or EV charging. RERA amenities

8. Location, access & connectivity

The registered location is Jeedimetla Village-1, Jeedimetla, Medchal Mandal, Medchal-Malkajgiri District, PIN 500015. The GHMC permit identifies Jeedimetla and a road width of 18 mt.; it also requires surrender of the road-affected portion and provision of a service road wherever required. RERA record Land records

The location dataset provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km as an anchor, but the supplied record does not clarify the measurement method or route. Location record

No approach-road route, public-transport information or additional verified landmark distances are supplied.

9. Developer & development status

The registered legal promoter is SITA SHELTERS PRIVATE LIMITED, a company, with GSTIN 36AAKCS2926A1ZK. The RERA filing lists the promoter address as SITA SAROVAR, Begumpet, Jeedimetla Village, Jeedimetla Village-1, Medchal, Medchal-Malkajgiri, 500015. Corporate record Parties record RERA filing

The RERA filing names RAMACHANDRA RAJU PENMESTA as authorized signatory and managing director, and SYAMALA RANI PENMESTA as director. The supplied record lists the promoter’s website as sitashelters.com; no contact number or email is supplied. Parties record Corporate record

The RERA record gives the proposed completion date as 03/03/2028. It does not provide an independently verified construction-stage report. Facility-progress percentages are filing entries, while GHMC’s permit requires an occupancy certificate before occupation. RERA record RERA amenities

10. Approvals, official records & documents

TG-RERA Form ‘C’ registration certificate
Identifier / scopeP02200003839; issued 03/01/2022; valid through 03/11/2027
What the supplied record establishesRegistration of SITA EXOTICA TOWER CELOSIA to Sita Shelters Private Limited; certificate includes a separate-account condition and other stated registration conditions.
GHMC Building Permit Order
Identifier / scopeApproval 1/C25/10111/2021; file 1/C25/08647/2020; approved 03 November 2021
What the supplied record establishesBuilding permit for the proposed residential buildings and amenities at Sy. Nos. 113, 112, 367 PART and 114PART, Jeedimetla; includes floor configurations and conditions.
Layout approval / layout plan filing
Identifier / scopeRERA document item 203543 Document index
What the supplied record establishesFiling item requests a layout approval letter or authority-stamped layout plan; the supplied record marks the document as not extracted.
Title-report filings
Identifier / scope203534, 203538–203541, 203536–203537 Document index
What the supplied record establishesThe supplied material includes a transaction-history excerpt in document 203534; other listed extracts are described as garbled or not reliably identifiable.
Encumbrance filings
Identifier / scope203542, 403757 Document index
What the supplied record establishesOne extract is too garbled to identify a certified search period or transaction rows. Another records a promoter disclosure of construction finance from Bajaj Housing Finance Limited; it does not certify an EC search period.
Completion / occupancy certificate
Identifier / scopeNot supplied
What the supplied record establishesThe permit requires an occupancy certificate before occupation; the permit extraction says completion is not certified.

The GHMC permit also records conditions including commencement and completion notices, compliance with sanctioned plans, parking use for cellar/stilt areas, a transformer space, a garbage house, rainwater harvesting, a Fire NOC before occupancy and road-affected-area surrender.

Frequently asked questions

Is SITA EXOTICA TOWER CELOSIA registered with Telangana RERA?

Yes. SITA EXOTICA TOWER CELOSIA is registered with the Telangana Real Estate Regulatory Authority as P02200003839; the registration status is New Project.

Who is the developer of SITA EXOTICA TOWER CELOSIA?

The promoter named in the RERA registration is SITA SHELTERS PRIVATE LIMITED.

Where is SITA EXOTICA TOWER CELOSIA located?

SITA EXOTICA TOWER CELOSIA is in Jeedimetla Village-1, Medchal, Medchal-Malkajgiri, Telangana (500015).

When will SITA EXOTICA TOWER CELOSIA be completed?

The promoter's proposed date of completion filed with RERA is 03/03/2028. This is the promoter's declaration, not a guarantee.