SIRI NANDINI RESIDENCY is a residential apartment building in Dollar Hills, Bachupally Village, Bachupally Mandal, Medchal-Malkajgiri District. The registered promoter is NANDINI. The project has a registered site extent of 684.93 sq.m and one residential building with 1 Stilt + 5 upper floors, comprising 17 homes: 14 2BHK units and 3 4BHK units. It is registered with TG-RERA as P02200008051, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 22 May 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
90court cases on this project's land (survey 165, 166, 167, 178, 179, Bachupally)
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameSIRI NANDINI RESIDENCY RERA record
Project typeResidential apartment building RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration concerns the project at Bachupally; the filed building approval covers one residential building on Plots 56, 57 and 58. RERA filing
TG-RERA registrationP02200008051; registration certificate states validity from 22/04/2024 to 22/05/2026, unless extended by the Authority. Registration validity is distinct from the completion deadline. RERA record
Registered promoterNANDINI as recorded in the project identity; the filed Form B and registration certificate name Surya Kiran Nandini / Nandini Surya Kiran. Legal entity type is not disclosed. RERA record Corporate record
RERA statusThe project is registered. The supplied registration record does not establish a later extension or current post-expiry status.

Land and geographic identity

ItemProject record
LocalityDollar Hills; project address also identifies SY NO 165, 166, 167, 178 & 179. RERA filing
Revenue villageBachupally Village; the filed documents also use the spelling “Bachpalle” in a land-record context. RERA filing
MandalBachupally RERA filing
DistrictMedchal-Malkajgiri RERA filing
PIN500090 RERA filing
Survey numbers165, 166, 167, 178 and 179; no project-specific subdivisions are disclosed in the registration identity. RERA filing
Registered site extent684.93 sq.m; approved plan records plot area and net area as 684.93 sq.m. RERA filing
BoundariesEast: neighbours’ land and Plot No. 59; West: Plot Nos. 51, 52 and 53; North: 30 wide road; South: 30 feet road and Plot No. 55. RERA filing
Approval-document road referencesThe filed plan refers to “9.00 MT WIDE PROPOSED ROAD” and “9.0M WIDE ROAD.”

Development identity

ItemProject record
Sanctioning authorityNizampet Municipal Corporation; the project record also identifies TS-bPASS and DTCP in approval-related fields. Approvals record
Principal building approvalApproval No. 0084/BP/3142/2023, dated 22 May, 2023. The filed plan also records Permit/Application No. TS/074798/2022, dated 24-11-2022.
BuildingOne residential building, sanctioned as 1 Stilt + 5 upper floors.
Height14.95 m; the approval specifies this excluding the stilt floor.
Approved built-up areaApproval records 1,776.89 m² residential upper-floor area and 1,776.89 m² total proposed built-up area excluding parking; it separately records 343.07 m² stilt area. The filed plan also states total proposed built-up area including parking of 2,132.39 sq.m and “TOTAL BUA” of 2,146.10 sq.m. These are the plan’s separately labelled figures.
Parking provisionThe filed plan states 7 proposed parking spaces. The commencement certificate says approved stilt parking is to be used exclusively for vehicle parking.
Unit count17 dwelling units in the RERA record and approved plan. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 14 units; 4BHK: 3 units. RERA unit table
RERA saleable area2BHK: 71.85 sq.m; 4BHK: 162.41 sq.m. RERA unit table
Booked / availablePortal-derived counts show 0 booked / 14 available for 2BHK and 0 booked / 3 available for 4BHK. The portal record supplies no as-of date, so these counts are indicative. RERA unit table
Construction stageNo independently verified site-progress measurement is supplied. RERA amenity/infrastructure entries show 0% progress for each listed item; this does not by itself establish the building’s overall construction stage. RERA amenities
Completion datesThe project identity lists proposed completion as 30/11/2026. Form B records a promoter undertaking to complete by 27.05.2026. These are recorded completion-date fields, not construction-progress evidence. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The commencement approval requires an occupancy certificate before occupation. Document index

2. The project story

SIRI NANDINI RESIDENCY is registered as a residential apartment project in Dollar Hills, Bachupally Village, Bachupally Mandal, Medchal-Malkajgiri District, PIN 500090. The filed site identity covers Survey Nos. 165, 166, 167, 178 and 179, with a registered site extent of 684.93 sq.m. RERA record RERA filing RERA filing

The approved building is a single residential structure with a stilt and five upper floors. The registration record lists 17 homes: 14 two-bedroom units and three four-bedroom units. No separate phase or tower organization is disclosed. RERA unit table

The supplied material does not establish current construction progress through an independent site inspection. Although the filed infrastructure schedule lists several facilities, its progress entries are recorded at 0%; the available record therefore does not support describing the project as complete or occupancy-certified. The approval requires a completion notice and occupancy certificate before occupation. RERA amenities

3. Master plan, architecture & building design

The filed building plan identifies a 684.93 sq.m residential plot, with 329.40 sq.m vacant plot area and 355.54 sq.m (51.91%) proposed coverage. It records 1,776.89 sq.m net residential BUA and 105.87 total balcony area. The approval separately records 343.07 m² stilt area. These are the plan’s reported measurements and labels; they should not be treated as interchangeable area measures.

The plan is for one building, 1 Stilt + 5 upper floors, with height 14.95 m (excluding the stilt floor). The commencement certificate lists setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m and Side II 3.50 m.

The approved floor-plan drawing includes typical plans for floors 1–3 and a fifth-floor plan. The supplied extraction does not provide a complete, verified account of floor-by-floor unit distribution, building footprint geometry, lifts, stairs, entrances or exits. It records no separate layout sheets. Floor plans

The approval documents list a transformer space, garbage house, rainwater-harvesting structure, sump, overhead water tank, septic tank, lift and harvesting pit. These are approval/document entries, not evidence of installation or operational status.

4. Homes, configurations & floor plans

The RERA filing lists 17 units across two configurations. Area in the RERA column below is saleable area; drawing measurements are software-measured carpet-area estimates, not RERA disclosures. The supplied measurement data flags the 2BHK drawing measurements for review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1401471.85 sq.m51.0–70.3 sq.m; median 53.3 sq.m (software-measured; needs review)26%
4BHK303162.41 sq.m142.9 sq.m (software-measured)Not supplied

The approved drawings’ measured examples show living/kitchen, bedrooms and a toilet in a 2BHK example, with a balcony shown separately. The 4BHK example includes living/dining, bedrooms, kitchen, toilets, balcony and utility; the balcony and utility are excluded from the measured carpet area. Room measurements vary by drawing, and the supplied measurements are software-derived and need checking against the approved drawing. RERA unit details Floor plans

The drawings also show 1BHK and 3BHK designs, but those configurations are not listed in the supplied RERA unit schedule; the RERA unit count and saleable areas above therefore reflect only the filed 2BHK and 4BHK offering. RERA unit details

5. Parking & vehicle circulation

The filed plan states 7 proposed parking spaces. The commencement certificate says the approved stilt parking area is to be used exclusively for vehicle parking and not partitioned with walls or rolling shutters.

The supplied records do not establish a breakdown between resident and visitor parking, accessible spaces, two-wheeler spaces, mechanical parking, EV charging, ramp arrangements or unit-specific parking allocations. A plan-level parking provision does not establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA infrastructure schedule lists the following project facilities. The progress values shown in that schedule are 0%; the schedule is not independent verification of construction or delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size suppliedRERA infrastructure schedule RERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkMarked “YES”; no size suppliedRERA infrastructure schedule RERA amenities; approval conditions0%; not independently verified
Community BuildingsNo description or size suppliedRERA infrastructure schedule RERA amenities0%; not independently verified
Aggregate area of recreational Open SpaceNo area suppliedRERA infrastructure schedule RERA amenities0%; not independently verified

The approval requires the tot-lot to be fenced and maintained as greenery before an occupancy certificate, and requires perimeter greenery and tree planting. These are approval conditions; the supplied evidence does not establish completion.

No project-specific RERA evidence in the supplied records confirms a clubhouse, swimming pool, gym or other indoor/sports facility.

7. Utilities, building services & safety

The RERA infrastructure schedule marks Water Supply, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as “YES,” but records 0% progress for each. The approved plan lists a sump, overhead water tank, rainwater-harvesting pit, septic tank, distribution transformer and lift; the commencement certificate requires a transformer space, rainwater-harvesting structure and garbage house. These entries establish what is recorded or required, not that the services are installed or operational. RERA amenities

The RERA schedule also lists sewerage, storm-water drains, treatment and disposal of sewage/sullage, solid-waste management, energy management and fire-protection/fire-safety requirements, each with 0% progress in the supplied schedule. No capacities, source details for water, STP or reuse specifications, generator/backup capacity, lift capacity, fire-system details, CCTV/access control or accessibility provisions are supplied. RERA amenities

The commencement certificate states that an occupancy certificate is compulsory before occupation and that public water and electricity connections are to be provided only on production of an occupancy certificate.

8. Location, access & connectivity

The registered project location is Dollar Hills, Bachupally Village, Bachupally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500090, on Survey Nos. 165, 166, 167, 178 and 179. RERA filing

The filed site boundaries identify a 30 wide road to the north and a 30 feet road to the south; the plan also refers to a “9.00 MT WIDE PROPOSED ROAD” and a “9.0M WIDE ROAD.” The supplied record does not establish a public-transport route or detailed approach-road condition. RERA filing

A supplied location record gives HITEC City — 9.4 km as an anchor distance, measured from the recorded location data. No travel time is supplied. Location record

9. Developer & development status

The project identity records the registered promoter as NANDINI; the project’s Form B and registration certificate identify Surya Kiran Nandini / Nandini Surya Kiran. The legal entity type is not disclosed in the supplied records. RERA record Corporate record

The promoter’s Form B declaration, dated 29th day of Feb 2024, states a completion undertaking of 27.05.2026 and includes declarations about approvals and project-account management. The project identity separately records proposed completion as 30/11/2026. These are recorded dates; no independent construction-progress assessment or occupancy/completion certificate is supplied. RERA record Document index

The approval records name landowners and the developer/applicant, but the supplied material does not identify a separate registered corporate entity type, company registration number, registered office for a legal entity, or official promoter website/contact details. Corporate record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for SIRI NANDINI RESIDENCY, registration P02200008051; states validity from 22/04/2024 to 22/05/2026, unless extended by the Authority.
Building permission / planFiled plan, Permit/Application No. TS/074798/2022, dated 24-11-2022; identifies one residential building on Plots 56, 57 and 58 in Survey Nos. 165, 166, 167, 178 and 179.
Building-construction approvalNizampet Municipal Corporation approval No. 0084/BP/3142/2023, dated 22 May, 2023; file No. 012466/BP/DTCP/3142/0089/2022.
Approved drawingDrawing record 368053, page 1, dated 24-11-2022; drawing text extraction is identified as needing review. Approvals record
Commencement / occupancy statusThe commencement certificate requires a commencement notice and completion notice, and an occupancy certificate before occupation. No occupancy or completion certificate is identified in the supplied documents. Document index
Promoter declarationForm B by Surya Kiran Nandini, dated 29th day of Feb 2024, including completion and project-fund declarations.
Land/title documents in RERA fileTitle report and deed materials include documents 368051, 368063, 368064, 368065, 368066, 403035 and 435815. Document index
RERA project scheduleThe supplied RERA infrastructure schedule lists 14 infrastructure items, with 0% progress recorded for each; the occupancy status is not established by that schedule. RERA amenities

The HMDA master-plan zoning sheet is image-only and the exact zone at the project survey has not been read from the map. HMDA’s public approved-layout lookup is reported as unavailable; the supplied project record does not state an LP number. These are record limitations, not evidence of refusal or clearance. HMDA

Frequently asked questions

Is SIRI NANDINI RESIDENCY registered with Telangana RERA?

Yes. SIRI NANDINI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200008051; the registration status is New Project.

Who is the developer of SIRI NANDINI RESIDENCY?

The promoter named in the RERA registration is NANDINI.

Where is SIRI NANDINI RESIDENCY located?

SIRI NANDINI RESIDENCY is in SY NO 165, 166, 167, 178 & 179, Bachupally, Medchal-Malkajgiri, Telangana (500090).

When will SIRI NANDINI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.