SASTRY BHAVAN is a residential apartment project in Nacharam, Uppal Mandal, Medchal-Malkajgiri district, developed by SRI SAI INFRADEVELOPERS PRIVATE LIMITED. It is on a 334.52 sq. m site and comprises one block and one tower, with 1 Stilt + 5 upper floors and 10 2BHK homes. The project is registered with TG-RERA as P02200005798, with proposed completion on 09 November 2025.

More from Sri Sai Infradevelopers Pvt Ltd · 9 projects →

01What we found

Period endedTG-RERA registration ran to 9 Nov 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
9court cases on this project's land (survey 195, 197, 206, 209, 210, 211 and 3 more, Nacharam)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSASTRY BHAVAN RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase is not separately identified in the supplied registration record. The filed project comprises one building. RERA record
TG-RERA registrationP02200005798, issued 15/03/2023; recorded validity 15/03/2023–09/11/2025. No extension is recorded in the supplied certificate.
Registered promoterSRI SAI INFRADEVELOPERS PRIVATE LIMITED RERA record Corporate record
RERA statusRegistered; the certificate’s stated validity ended on 09/11/2025. The supplied record does not establish a subsequent extension or current status.

Land and geographic identity

FieldProject record
Locality / revenue villageNacharam / Nacharam Village RERA record
MandalUppal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500076 RERA record
Project survey numbers and subdivisions195/2, 197/2, 206/4, 209, 210, 211/1, 211/2, 212/1, 212/2, 212/3, 214, 215, 216, and 219 RERA record
Site address identifiersHouse No. 4-9-55, Plot No. 24; occupancy record also identifies Plot No. N 24. RERA filing
Registered / sanctioned site area334.52 sq. m; net area 334.52 sq. m; road-affected and nala-affected areas recorded as 0.0 sq. m. RERA filing
Boundaries as filedEast: 30 wide road; West: Plot No. 32; North: Plot No. 23; South: Plot No. 25. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit3989/GHMC/LBN/2022-BP, approved 09 November 2022; file no. 008510/GHMC/4196/LBN2/2022-BP Approvals record
Approved built-up / floor area952.60 sq. m as recorded in project information and the sanctioned-plan data. RERA filing
Building arrangementOne residential building, identified as A (BUILDING); one block and one tower in the supplied project record. RERA record
Sanctioned floors1 Stilt + 5 upper floors; building height 14.99 m.
ParkingSanctioned parking area: 190.5 sq. m. A separate parking-space count or allocation by unit is not supplied.
Unit count10 units in the RERA unit schedule; the project information also records one total building unit, so the precise meaning of that field is not established by the supplied record. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configurations2BHK; ten “DOUBLE BEDROOM” entries, numbered 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502. RERA unit table RERA unit details
RERA saleable area95.26 sq. m for each listed unit. RERA unit table
Booked / availablePortal-derived schedule shows 0 booked and 10 available; the record has no as-of date, so these counts are indicative. RERA unit table
Construction stageThe supplied GHMC occupancy records state the building was inspected and declared fit for occupation. These are completion/occupancy records, not a current site-progress inspection.
Completion datesRERA certificate and promoter Form B undertaking state 09 November 2025 as the completion date. The building-permit record also gives 09 November 2025 as the completion deadline.
Occupancy certificateGHMC occupancy proceedings 1436/GHMC/LBN/2024-OC, dated 01 June 2024, cover Building A; the record refers to completion notice submitted 18 April 2024. Approvals record

2. The project story

SASTRY BHAVAN is a small residential apartment development registered with TG-RERA as P02200005798. The RERA-filed project identity places it at House No. 4-9-55, Plot No. 24, in Nacharam Village, Uppal Mandal, Medchal-Malkajgiri district. The development is recorded on a 334.52 sq. m site and is organized as one building, A (BUILDING), with a stilt and five upper floors. RERA record

The RERA schedule lists ten 2-bedroom units. GHMC’s occupancy records identify Building A as inspected and fit for occupation, with completion notice recorded as submitted on 18 April 2024 and occupancy proceedings dated 01 June 2024. This is documentary occupancy status for the identified building; no independent site inspection or current construction-progress verification is supplied. RERA unit table

3. Master plan, architecture & building design

The GHMC building permit sanctions one residential building on a 334.52 sq. m plot, with a sanctioned net plot area of 334.52 sq. m. It records 1 Stilt + 5 upper floors, a height of 14.99 m, and 952.60 sq. m of upper-floor area; the stilt area is recorded separately as 176.48 sq. m. The stated total parking area is 190.5 sq. m. No separate building-footprint, floor-by-floor unit arrangement, lift/stair detail, internal-road plan, or landscape/open-space plan is available in the supplied extracted records.

The occupancy documentation identifies the same building as residential and records a site building-plan floor area of 992.11 sq. m alongside the sanctioned-plan figure of 952.6 sq. m. This overview records the figures as shown in those GHMC records; it does not treat them as interchangeable area measures.

A layout reference, BA/505/2001-2002, appears in the building-permit and occupancy records. The supplied material does not include an extracted approved layout drawing for describing plot arrangement, internal circulation or open-space distribution.

4. Homes, configurations & floor plans

The RERA schedule lists ten 2BHK homes, each with a saleable area of 95.26 sq. m. The following carpet-area figures are software measurements from the supplied approved floor-plan drawing, not RERA-filed carpet-area declarations; the drawing-based measurements are flagged as needing review. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001095.26 sq. m66.4–70.1 sq. m; median 67.2 sq. m (software-measured)29% (software-derived)

The measured typical-plan sample shows a living/dining room, kitchen, two bedrooms, two toilets, a balcony and a utility area. For the measured flat example, the balcony is labelled “1.61 M. WIDE BALC”; the drawing-measured room areas include living/dining 27.49 sq. m, master bedroom 12.0 sq. m, bedroom 11.7 sq. m and kitchen 6.22 sq. m. Balcony and utility are excluded from the software-measured carpet area. These are drawing-based measurements and should be checked against the drawing. RERA unit details

Carpet area represents the measured internal home area in the drawing; RERA saleable area is a separately filed figure and includes a share of common areas. The supplied record does not provide a separate RERA-filed carpet-area figure. The booked and available counts are portal-derived and have no recorded as-of date. Floor plans RERA unit table

5. Parking & vehicle circulation

GHMC’s building-permit record states a total parking area of 190.5 sq. m. The occupancy record also lists parking area of 190.5 sq. m. The supplied material does not state the number of parking spaces, distinguish resident from visitor or accessible parking, specify parking allotments to individual apartments, or describe vehicle ramps and internal driveways. A parking area figure alone does not establish exclusive parking rights for a particular unit.

The building permit also requires transformer space within the site and records that the second floor was handed over as a mortgaged area under the stated mortgage record. These facts do not provide a unit-wise parking allocation.

6. Amenities, recreation & open spaces

The project’s RERA amenity schedule lists water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as available (“YES”); it records 0% progress for the listed project facilities. The GHMC permit specifies one rainwater-harvesting pit and requires a garbage house within the premises. The occupancy record lists tot-lot area as 0. RERA amenities

Water supply
Description / sizeNo source, storage or treatment capacity stated
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; progress shown as 0%
Sewerage
Description / sizeSchedule describes chambers, lines, septic tank and STP; no capacity or system details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; progress shown as 0%
Rainwater harvesting
Description / sizePermit specifies 1 rainwater-harvesting pit; occupancy record lists rainwater harvesting
Evidence sourceGHMC permit and occupancy record
Declared progress / verified statusRequired in permit; occupancy record lists RWH; no independent operational verification supplied
Electrical meter room / sub-station / receiving station
Description / sizeListed as available; no capacity stated
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; progress shown as 0%
Garbage house
Description / sizeRequired within the premises by the building permit; no size stated
Evidence sourceGHMC permit
Declared progress / verified statusRequirement recorded; completion status not established
Tot-lot / recreational open space
Description / sizeTot lot recorded as NA in the permit and 0 sq. m in the occupancy record
Evidence sourceGHMC permit and occupancy record
Declared progress / verified statusNo tot-lot area recorded

7. Utilities, building services & safety

The RERA schedule records water supply and sewerage as available, but supplies no source, storage, treatment capacity, reuse arrangement or storm-water details. Rainwater harvesting is listed in the schedule; the building permit specifies one pit. The permit also requires transformer space, while the RERA schedule lists an electrical meter room/sub-station/receiving station. No electrical capacity, backup-power arrangement, lift count or lift capacity is supplied in the project records. RERA amenities

The permit requires a garbage house within the premises and states that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate. The supplied occupancy record identifies the building as fit for occupation but does not itself provide a fire-NOC document or detailed fire-safety system specifications. The supplied evidence does not describe CCTV, access control, accessible circulation, escape-stair arrangements or other detailed life-safety systems.

8. Location, access & connectivity

The registered location is Nacharam Village, Uppal Mandal, Medchal-Malkajgiri district, Telangana 500076. The GHMC permit records a road width of 18 mt. and identifies the site’s eastern boundary as a 30 wide road. A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 12.4 km; no travel time is supplied. RERA record Location record

The project record does not supply measured distances to public-transport stops or local landmarks. No independent assessment of route conditions or travel times is available. Location record

9. Developer & development status

The registered legal promoter is SRI SAI INFRADEVELOPERS PRIVATE LIMITED, a company, GSTIN 36AAMCS1680B1ZF. The RERA record lists Kanneganti Srinivas as authorised signatory and Brahmanandam Naidu Balla as director. The promoter’s project address is recorded in Nacharam Village, Uppal, Medchal-Malkajgiri, PIN 500076. Corporate record Parties record

The promoter’s Form B affidavit, dated 05-01-2023, declares completion by 09 November 2025. The GHMC occupancy records identify Building A as inspected and fit for occupation, with occupancy proceedings dated 01 June 2024. The supplied records do not establish a separate phase or additional building.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005798; issued 15/03/2023; validity stated to 09/11/2025
Scope and evidenceForm C certificate for SASTRY BHAVAN; includes project location, survey numbers and registration conditions.
GHMC building permit
Identifier / date3989/GHMC/LBN/2022-BP; 09 November 2022; file no. 008510/GHMC/4196/LBN2/2022-BP
Scope and evidenceBuilding A, residential, 1 Stilt + 5 upper floors, site area 334.52 sq. m.
Layout reference
Identifier / dateBA/505/2001-2002
Scope and evidenceCited in the permit and occupancy records; the approved layout drawing is not available in the supplied extracted material.
GHMC occupancy certificate / proceedings
Identifier / date1436/GHMC/LBN/2024-OC; dated 01 June 2024; application no. 004014/GHMC/1948/LBN2/2024-OC
Scope and evidenceOccupancy record for Building A; completion notice recorded as submitted 18 April 2024.
Promoter Form B declaration
Identifier / date05-01-2023
Scope and evidencePromoter declaration including title/development-agreement basis, encumbrance declaration, project-account undertakings and completion undertaking.
Floor-plan drawing record
Identifier / dateDocument 295642
Scope and evidenceDrawing material used for software measurement of the 2BHK configuration; measured carpet figures are not RERA-filed declarations.

The supplied project file also identifies the title report and encumbrance statement as filed records; detailed title and encumbrance analysis belongs in the relevant title section.

Frequently asked questions

Is SASTRY BHAVAN registered with Telangana RERA?

Yes. SASTRY BHAVAN is registered with the Telangana Real Estate Regulatory Authority as P02200005798; the registration status is New Project.

Who is the developer of SASTRY BHAVAN?

The promoter named in the RERA registration is SRI SAI INFRADEVELOPERS PRIVATE LIMITED.

Where is SASTRY BHAVAN located?

SASTRY BHAVAN is in Nacharam Village, Nacharam, Uppal, Medchal-Malkajgiri, Telangana (500076).

When will SASTRY BHAVAN be completed?

The promoter's proposed date of completion filed with RERA is 09/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Nacharam