Sign in

Sadguru Enclave

Dharam Infra · Rangareddy · RERA P02400004613

Sadguru Enclave is a residential apartment project in Bagh Hayathnagar, Hayathnagar Mandal, Ranga Reddy district, developed by the registered promoter Dharam Infra. It occupies 357.68 sq. m and comprises one building with 1 stilt + 5 upper floors and 10 homes: five 2BHK and five 3BHK apartments. The project is registered under TG-RERA P02400004613, with a promoter-declared proposed completion date of 1 September 2023.

01What we found

Period endedTG-RERA registration ran to 1 Sep 2023 - check its extension on TG-RERA
13documents on file - each fact links to its page
1court case on this project's land (survey 239, Hayathnagar)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSadguru Enclave RERA record
Project type / useResidential apartment project RERA record
Phase / registered portionPhase not separately identified; the RERA record describes one building and 10 units RERA filing RERA unit table
TG-RERA registrationP02400004613 RERA record
Registration validity13 June 2022 to 1 September 2023; no extension is recorded in the supplied certificate
Registered promoterDharam Infra; entity type recorded as partnership RERA filing
RERA statusThe supplied certificate establishes registration for the stated validity period. Current registration status is not established by the supplied record.

Land and geographic identity

FieldRecord
Locality / site addressBagh Hayathnagar; the building permit identifies Surya Nagar (Circle 3A) RERA record
Revenue villageHAYATHNAGAR; the title and approval documents refer to Bagh Hayathnagar Village RERA filing
Mandal / district / PINHayathnagar / Ranga Reddy / 500070 RERA record
Project survey number(s) and subdivision(s)Survey No. 239; no subdivision is stated in the project record RERA filing
PlotPlot No. 34 RERA filing
Registered site area357.68 sq. m; net area 357.68 sq. m in the RERA land details RERA filing
Sanctioned site areaPlot area 357.68 sq. m; net plot area 355.74 sq. m in the GHMC building permit
Boundaries in RERA land detailsEast: Plot No. 45; West: 30 Wide Road; North: 40 Wide Road; South: Plot No. 35 RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit2161/GHMC/LBN/2022-BP, dated 14 February 2022 Approvals record
File number printed in the permit005999/GHMC/3209/LBN2/2022-BP
Approved residential floor area1,038.00 sq. m
Building countOne building RERA filing
Sanctioned configuration1 stilt + 5 upper floors; height 14.95 m
Parking provision in the permitTotal parking area: 275.1 sq. m; the permit states stilt parking is to be used exclusively for vehicle parking
Unit count10 total units in the RERA record; 10 units shown as proposed under the agreement and one building in the land details RERA filing RERA unit table

Offering and status

FieldRecord
RERA-filed configurations2BHK: 5 units; 3BHK: 5 units RERA unit table
RERA-filed saleable areas2BHK: 96.61 sq. m; 3BHK: 139.35 sq. m RERA unit table
Booked / available2BHK: 3 booked, 2 available; 3BHK: 2 booked, 3 available. These portal counts have no stated as-of date and are indicative. RERA unit table
Promoter-declared completion date1 September 2023, in the Form B declaration and RERA certificate
Completion / occupancy recordGHMC issued an Occupancy Certificate for the building on 25 October 2023; the document records a completion notice submitted on 24 August 2023 and states the inspected building is fit for occupation.
Construction-stage evidenceThe supplied record includes an occupancy certificate, but no independent present-day site inspection or construction-progress verification.

2. The project story

Sadguru Enclave is a single-building residential apartment development on Plot No. 34 in Survey No. 239, at Bagh Hayathnagar, Hayathnagar Mandal, Ranga Reddy district. The GHMC permit describes a building with one stilt level and five upper floors, intended for residential use. RERA record RERA filing

The RERA filing lists 10 homes: five 2BHK and five 3BHK apartments. Its portal counts show five booked and five available, but the counts are indicative because no as-of date is supplied. RERA unit table The promoter declared completion by 1 September 2023; GHMC’s occupancy certificate records the building as fit for occupation, with a completion notice dated 24 August 2023. This is documentary status, not an independent inspection of current condition or use.

3. Master plan, architecture & building design

The sanctioned building permit identifies a 357.68 sq. m plot, a net plot area of 355.74 sq. m, 1,038.00 sq. m of residential floor area and a separate 195.48 sq. m stilt area. It sanctions one residential building with 1 stilt + 5 upper floors and a height of 14.95 m. The occupancy certificate also records 1,038 sq. m as the floor area in both its sanctioned-plan and site-building-plan fields.

The available data does not describe a basement or podium, the number of flats per floor, building footprint, lift or stair arrangement, or internal circulation. The building permit calls for a fenced tot-lot/greenery and a peripheral greenery strip, but the occupancy certificate records tot-lot area as 0 sq. m; delivered open-space area is not established here.

4. Homes, configurations & floor plans

The RERA filing supplies the unit counts and saleable areas. The carpet-area figures below are software measurements from the filed floor-plan drawing, not RERA-filed measurements; the drawing-measurement source cautions that the geometry requires review. The supplied loading percentages are reported with those measurements. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
2BHK53296.61 sq. m58.5 sq. m (software-measured)39%
3BHK523139.35 sq. m96.9–98.3 sq. m; median 97.6 sq. m (software-measured)30%

The drawing-measured 2BHK plan shows a living/kitchen, two bedrooms, two toilets, a puja space, a balcony and a utility. The 3BHK plan shows a living/dining area, kitchen, three bedrooms, a wash area, a toilet, a puja space and a balcony. The stated carpet measurements exclude the drawn balcony and utility where identified; saleable area is a separate RERA figure and includes the home’s share of common areas, so the two area measures are not interchangeable. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC building permit records 275.1 sq. m of total parking area and specifies that the sanctioned stilt parking is to be used exclusively for vehicle parking. The occupancy certificate records the same parking area as per both the sanctioned plan and site building plan.

The supplied record does not establish a count of car or two-wheeler spaces, visitor or accessible spaces, ramp or driveway arrangements, EV charging, or unit-specific parking allocations. The RERA unit data marks both configurations as mortgaged; it does not identify a buyer’s individual parking allocation. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record labels water supply, sewerage, green strip/tot-lot/park, rainwater harvesting and an electrical meter room/sub-station/receiving station as available at 100%. Other listed items have a recorded percentage of 0; that is the filed progress field, not independent verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo capacity or source specified in this RERA amenity entryRERA amenity record RERA amenities100% recorded; not independently verified
SewerageListed as “Sewerage (Chamber, Lines, Septic Tank, STP)”RERA amenity record RERA amenities100% recorded; not independently verified
Green strip / tot-lot / parkNo area specified in the RERA amenity entryRERA amenity record RERA amenities100% recorded; not independently verified
Water conservation / rainwater harvestingThe GHMC permit specifies one rainwater-harvesting pitRERA amenity record RERA amenities; GHMC permitRERA record: 100%; permit: required provision; completion not independently verified
Electrical meter room / sub-station / receiving stationNo capacity or equipment detail suppliedRERA amenity record RERA amenities100% recorded; not independently verified
Internal roads and footpathsNo description suppliedRERA amenity record RERA amenities0% recorded
Storm-water drainsNo description suppliedRERA amenity record RERA amenities0% recorded
Street lightingNo description suppliedRERA amenity record RERA amenities0% recorded
Community buildingsNo description suppliedRERA amenity record RERA amenities0% recorded
Sewage/sullage treatment and disposalListed separately from sewerage; no system detail suppliedRERA amenity record RERA amenities0% recorded
Solid-waste management and disposalNo description suppliedRERA amenity record RERA amenities0% recorded
Energy managementNo description suppliedRERA amenity record RERA amenities0% recorded
Fire protection and fire safetyNo system detail supplied in the RERA amenity recordRERA amenity record RERA amenities0% recorded
Recreational open spaceAggregate area not suppliedRERA amenity record RERA amenities0% recorded

The building permit also requires a garbage house within the premises and a fenced tot-lot maintained as greenery. These are permit conditions; the supplied material does not independently establish their completion.

7. Utilities, building services & safety

GHMC’s permit requires one rainwater-harvesting pit, space for a transformer, and a garbage house within the premises. The RERA amenity record marks water supply, sewerage and an electrical meter room/sub-station/receiving station as available, but supplies no capacities or design details. RERA amenities

The records do not specify water source or storage capacity, treatment or reuse arrangements, storm-water system, electrical backup, lift provision or capacity, CCTV/security arrangements, accessible circulation, or detailed fire-safety equipment. The permit states that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate; this overview does not independently establish the NOC or assess compliance with safety requirements.

8. Location, access & connectivity

The registered location is Bagh Hayathnagar, in HAYATHNAGAR revenue village, Hayathnagar Mandal, Ranga Reddy district, PIN 500070. The building permit places the site at Surya Nagar (Circle 3A), Bagh Hayathnagar; the RERA land record identifies Plot No. 34, Survey No. 239, bounded on the west by a 30 Wide Road and on the north by a 40 Wide Road. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 1.4 km. Location record No public-transport details or additional independently measured landmark distances are supplied for this overview.

9. Developer & development status

The registered promoter is Dharam Infra, recorded as a partnership, with GSTIN 36AASFD5359B1ZA. The RERA record gives its address as Sri Vishnu Dhammam, Ambedkarnagar, Surya Nagar (Circle 3A), Bagh Hayathnagar, Hayathnagar, Ranga Reddy, 500070. The authorized signatory is Palaparthi Ramaraya Kesari Nandan Sharma. RERA filing Parties record

The promoter’s Form B declaration dated 13 April 2022 stated a completion undertaking of 1 September 2023. GHMC subsequently issued an occupancy certificate for the one building on 25 October 2023. No current site inspection or independently verified condition report is included.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400004613; issued 13 June 2022; valid to 1 September 2023
Scope and evidenceSadguru Enclave, Plot No. 34, Survey No. 239; promoter Dharam Infra
GHMC building permit
Identifier / date2161/GHMC/LBN/2022-BP; 14 February 2022
Scope and evidenceResidential building, 1 stilt + 5 upper floors; approval document on file
GHMC file number printed in permit
Identifier / date005999/GHMC/3209/LBN2/2022-BP
Scope and evidenceIdentified in the building permit
GHMC Occupancy Certificate
Identifier / dateApplication 009606/GHMC/4765/LBN2/2023-OC; proceedings 4040/GHMC/LBN/2023-OC; 25 October 2023
Scope and evidenceBuilding at Plot No. 34, Survey No. 239; records completion notice dated 24 August 2023 and states the inspected building is fit for occupation
Form B promoter declaration
Identifier / date13 April 2022
Scope and evidencePromoter-declared title and encumbrance statements, fund obligations and completion undertaking
Legal title report
Identifier / dateDocument 229542
Scope and evidenceTitle opinion concerning Plot No. 34, Survey No. 239, Bagh Hayathnagar; document extract reports a municipal mortgage
Development Agreement-cum-GPA
Identifier / dateRegistration No. 6213 of 2021
Scope and evidenceFiled title material concerning development of Plot No. 34, Survey No. 239
Floor-plan drawing
Identifier / dateDocument 229545
Scope and evidenceFiled drawing used for software-measured apartment-plan areas; measurement is not a RERA disclosure

The supplied material does not include an extracted layout approval document or a separate current-site verification report.

Frequently asked questions

Is Sadguru Enclave registered with Telangana RERA?

Yes. Sadguru Enclave is registered with the Telangana Real Estate Regulatory Authority as P02400004613; the registration status is New Project.

Who is the developer of Sadguru Enclave?

The promoter named in the RERA registration is Dharam Infra.

Where is Sadguru Enclave located?

Sadguru Enclave is in Bagh Hayathnagar, HAYATHNAGAR, Rangareddy, Telangana (500070).

When will Sadguru Enclave be completed?

The promoter's proposed date of completion filed with RERA is 01/09/2023. This is the promoter's declaration, not a guarantee.

More projects in Hayathnagar