Sign in

Rr Sai Heaven

SAI TEJA CONSTRUCTIONS · Sangareddy · RERA P01100005038

RR SAI HEAVEN is a residential apartment project in Ameenapur, AMEENPUR mandal, Sangareddy district, developed by the registered promoter SAI TEJA CONSTRUCTIONS. It is on 669.04 sq. m and comprises one residential building with 1 Stilt + 5 Upper floors and 20 2BHK units. The project is registered with TG-RERA under P01100005038, and the promoter’s declaration states completion by 17/03/2026.

More from Sai Teja Constructions · 4 projects →

01What we found

Period endedTG-RERA registration ran to 17 Mar 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameRR SAI HEAVEN RERA record
Project typeResidential apartment project RERA record RERA filing
Registered portion / phaseOne registered project; a separate phase name is not disclosed RERA record
TG-RERA registration numberP01100005038
Registration validityCertificate states 13/09/2022 to 17/03/2026; an extension is not recorded in the supplied certificate
TG-RERA statusRegistration certificate on file; current registration status is not established by the supplied records
Registered promoterSAI TEJA CONSTRUCTIONS RERA record Corporate record
RERA entity typePartnership RERA filing Corporate record

Land and geographic identity

ItemProject record
LocalityAmeenapur / AMEENAPUR RERA record RERA filing
Revenue villageAmeenapur RERA record Land records
MandalAMEENPUR (also recorded in the approval as Ameenpur Mandal) RERA record Land records
DistrictSangareddy RERA record Land records
PIN502032 RERA record
Site / plot identifiersPlot Nos. 78, 79, 80 & 81
Project survey numbers and subdivisions415, 459, 460, 557/AA, 558/A, 559/A & 565/A Land records
Site extent669.04 sq. m (also written as 669.04 Sq.Mts / Sq. Mt. in project records) Land records
Net / total land areaTotal area 669.04 sq. m; net area 669.04 sq. m Land records RERA filing
Road-affected area0 sq. m in the RERA land details RERA filing
BoundariesEast: ROAD WIDTH 12; West: PLOT NO 79A; North: CTS NO; South: ROAD WIDTH 12 RERA filing

Development identity

ItemProject record
Principal technical approvalHMDA technical approval 023478/SKP/R1/U6/HMDA/09052019, dated 17/03/2020 Approvals record
Building permissionAmeenpur Municipality Building F Order 328/2020-2021, dated 20/06/2020 Approvals record
Approved buildingOne residential building, identified in HMDA’s technical approval as Block A (SAITEJA)
Floor configuration1 Stilt + 5 Upper floors
Site / approved built-up areaSite area: 669.04 sq. m. The municipal order lists residential area 362.77 m² and upper-floor area 1813.85 m²; HMDA’s technical approval lists built-up-area figures including 1813.85, 2176.62 and a proposed built-up area of 2176.62 sq. m
Mortgage area recorded in approvalsHMDA technical approval records 184.73 sq. m provided as mortgage area; the municipal order records 182.00 sq. m as mortgaged built-up area
Building / unit countOne building is recorded in the RERA project information. The RERA unit record lists 20 units; the available approval extracts do not state an approved unit count RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration2BHK RERA unit table
RERA-filed unit count20 RERA unit table
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table
RERA-filed saleable area27.22 sq. m as recorded for the 2BHK configuration RERA unit table
Construction stageThe supplied records do not provide a current construction-progress figure or independent site-verification evidence Document index RERA amenities
Completion datesForm B declares completion by 17/03/2026; the municipal permission records completion before 19.05.2026. These are recorded deadlines, not evidence of completion
Occupancy certificate (OC)No OC or completion certificate is included in the supplied project documents. The available building permission makes OC a prerequisite to occupation and to registration of the mortgaged built-up area

2. The project story

RR SAI HEAVEN is registered with TG-RERA as a residential apartment project on 669.04 sq. m at Plot Nos. 78–81 in Ameenapur, Sangareddy district. The RERA project record identifies one building and lists 20 2BHK units. RERA record Land records RERA unit table

The approval records describe a residential building of 1 stilt + 5 upper floors. HMDA issued a technical approval in March 2020, and Ameenpur Municipality issued a building permission in June 2020. The supplied records do not establish the project’s current physical construction stage, whether any units are complete, or whether an OC has been issued. The completion dates in the promoter’s declaration and municipal permission are deadlines stated in those records, not confirmation that work was completed by those dates.

The unit record shows 20 units available and none booked, but gives no portal “as of” date. Treat this as a dated-status limitation rather than a live inventory confirmation. RERA unit table

3. Master plan, architecture & building design

The recorded site is 669.04 sq. m. The project is shown as one residential building, Block A (SAITEJA), with 1 stilt + 5 upper floors. The municipal permission records a building height of 15 Mts and setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m, and Side II 3.50 m. Land records

The documents contain different area labels rather than one consistently defined built-up-area figure: HMDA’s technical approval lists 1813.85 and 2176.62 sq. m figures, including proposed built-up area 2176.62 sq. m; the municipal order lists residential area 362.77 m² and upper-floors area 1813.85 m². The supplied extracts do not identify an FSI-counted area, gross built-up area, carpet area, or floor-by-floor area schedule.

The approvals identify a tot-lot, transformer space, garbage house and rainwater-harvesting provision. No usable approved layout drawing or floor-plan details establishing floor-by-floor unit arrangement, number of flats per floor, lifts, staircases, entrances beyond the stated vehicle entry/exit condition, landscaping plan or common-area distribution are available in the supplied evidence. RERA amenities Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002027.22 sq. mNot establishedNot supplied

The unit count, booking count, availability and saleable area are from the TG-RERA filing; the booking record has no stated as-of date. RERA unit table RERA unit details

Two drawings were recorded as reviewed, but no 2BHK flat design was measured. Accordingly, no software-measured carpet area or room dimensions can be reported. Carpet area, where measured from a drawing, would be a drawing-based software measurement rather than a RERA-filed figure; saleable area is the filed figure and is not interchangeable with carpet area or a separately measured balcony/utility area. Floor plans RERA unit details

5. Parking & vehicle circulation

The approvals require the stilt/cellar space shown for parking to be used exclusively for vehicle parking and not converted. The municipal order records a cellar area of 0.00; the HMDA technical-approval extract describes 1 stilt + 5 upper floors. The supplied records do not give a sanctioned number of car or two-wheeler spaces, visitor or accessible parking, a parking allocation by unit, or EV charging provision.

The municipal permission requires one entry and one exit, each with minimum width 4.5mts. and height clearance 5mts. The HMDA technical approval separately states a service-road requirement wherever required. These are approval conditions; the evidence does not independently confirm their construction or delivery.

6. Amenities, recreation & open spaces

Tot-lot / recreational green area
Description / sizeApproval refers to a tot-lot and requires it to be fenced and maintained as greenery; area is listed as NA in the municipal order
Declared progress / verified statusRequired by approval; completion not verified
Rainwater harvesting
Description / sizeRainwater-harvesting structure / percolation pit
Evidence sourceRERA amenities
Declared progress / verified statusApproval / RERA-listed provision; completion not verified
Clubhouse, swimming pool, gym, children’s play area, common garden, security and CCTV
Description / sizeListed in third-party vendor material; sizes and quantities are not supplied
Evidence sourcePromoter website
Declared progress / verified statusVendor-listed only; not established in the supplied RERA approval documents
Internal roads and footpaths, street lighting, community buildings, storm-water drains, solid-waste management and recreational open space
Description / sizeListed as project infrastructure/amenity fields in the RERA record; the supplied entries show 0 progress for these items
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; declared progress 0; completion not verified

7. Utilities, building services & safety

Water
Evidence in the project recordRERA amenity record marks water supply “YES”; municipal permission requires a separate underground static water storage tank of 25,000 lits. and a separate residential terrace tank of 25,000lits RERA amenities
Status / limitationListed/required provision; supply source and completion are not established
Sewerage and drainage
Evidence in the project recordRERA amenity record marks sewerage (including chamber, lines, septic tank, STP) “YES”; the municipal order requires a septic tank RERA amenities
Status / limitationNo STP capacity, operating status or completion evidence supplied
Storm water / harvesting
Evidence in the project recordStorm-water drains are listed with 0 progress; rainwater harvesting is marked “YES” in the RERA amenity record and is required in the approvals RERA amenities
Status / limitationProvision recorded; completion not verified
Electrical
Evidence in the project recordRERA amenity record marks electrical meter room/sub-station/receiving station “YES”; approvals require transformer space and the municipal permission requires a generator as alternate supply RERA amenities
Status / limitationRequired/listed provisions; installed capacity and completion are not established
Lifts
Evidence in the project recordMunicipal permission requires fire-resistant swing doors for collapsible lifts on all floors; lift count and capacity are not supplied
Status / limitationApproval condition, not evidence of installed lifts
Fire and life safety
Evidence in the project recordApprovals refer to fire-safety requirements, emergency lighting in corridors/common passages and staircases, and automatic sprinklers if basement area exceeds 200 Sq.mts
Status / limitationConditions recorded; no fire-clearance certificate or independent compliance verification supplied
Waste
Evidence in the project recordA garbage house is required within the premises; solid-waste management/disposal is listed with 0 progress RERA amenities
Status / limitationRequired/listed; completion not verified
Accessibility
Evidence in the project recordMunicipal permission states that public and semi-public buildings should provide facilities for physically handicapped persons
Status / limitationNo project-specific accessible route or facilities are described in the supplied records

These records describe approval conditions and RERA-filed infrastructure fields; they do not establish that the services have been installed, commissioned or independently verified.

8. Location, access & connectivity

The registered location is Ameenapur, AMEENPUR mandal, Sangareddy district, PIN 502032, on Plot Nos. 78–81 and the listed project survey land. The cadastral parcel centroid supplied for the project is 17.41528, 78.35459. RERA record Land records Location record

The RERA land record gives East and South boundaries as “ROAD WIDTH 12”; the HMDA technical approval refers to a road width of 18 mt., and the municipal approval records 4.5mts. in its road-width field. These are source-recorded road references; the supplied evidence does not provide a verified approach-road description or public-transport details. RERA filing

A supplied location record lists Financial District (Nanakramguda), 1.2 km as a connectivity anchor. Third-party vendor material mentions nearby schools, airports, restaurants, bus stops and railway stations without measured distances; those claims are not independently substantiated in the supplied records. Location record Promoter website

9. Developer & development status

The TG-RERA-registered promoter is SAI TEJA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ADEFS1857Q1ZD. The supplied promoter address is B, NEW BALAJI NAGAR, AMEENAPUR, AMEENAPUR, AMEENPUR, Sangareddy, 502032. The RERA record names SADU PRATAP REDDY as authorized signatory and SADU SANTHOSH REDDY and SADU TEJASWINI as partners. Corporate record Parties record

The project Form B is a promoter declaration by SADU PRATAP REDDY, dated F 9 JUN 2022, undertaking completion by 17/03/2026. The municipal building order states completion before 19.05.2026. The supplied records do not establish current construction progress or an issued OC.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100005038; issued 13/09/2022
What the supplied record establishesFORM C registration for RR SAI HEAVEN; certificate states validity through 17/03/2026 and includes project conditions.
HMDA technical approval
Identifier / date023478/SKP/R1/U6/HMDA/09052019; 17/03/2020
What the supplied record establishesTechnical approval for a residential building, Block A (SAITEJA), 1 Stilt + 5 Upper floors, on 669.04 Sq. Mt.; final building-plan sanction and release are referred to the local Executive Authority.
Ameenpur Municipality building permission
Identifier / dateBuilding F Order 328/2020-2021; 20/06/2020
What the supplied record establishesBuilding permission for a residential Stilt + 5 Upper floors building on 669.04 Sq.Mts, with stated construction, service, safety and OC conditions.
Form B declaration
Identifier / date09 June 2022 (document text: “F 9 JUN 2022”)
What the supplied record establishesPromoter declaration covering title, encumbrances, project account obligations and completion undertaking.
Layout plan / layout approval
Identifier / dateNot established in the supplied documents
What the supplied record establishesThe RERA document listing includes a layout-plan item, but the available record is not extracted as an approved layout drawing. Document index
OC / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe available documents include building-permission records, not an OC or completion certificate. Document index
Encumbrance statements
Identifier / dateDocuments 240739 and 255829
What the supplied record establishesBoth are titled as encumbrance statements, but the available extracted text does not show transaction details, property schedule or search period.

The approvals and registration certificate should be read with their stated conditions; this overview records the supplied evidence and does not confirm that all conditions have been fulfilled.

Frequently asked questions

Is RR SAI HEAVEN registered with Telangana RERA?

Yes. RR SAI HEAVEN is registered with the Telangana Real Estate Regulatory Authority as P01100005038; the registration status is New Project.

Who is the developer of RR SAI HEAVEN?

The promoter named in the RERA registration is SAI TEJA CONSTRUCTIONS.

Where is RR SAI HEAVEN located?

RR SAI HEAVEN is in AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will RR SAI HEAVEN be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur