Sign in

Roxana Properties

ROXANA PROPERTIES · Hyderabad · RERA P02500001157

ROXANA PROPERTIES is a residential apartment project in Red Hills, Nampally Mandal, Hyderabad District. The registered promoter developing it is ROXANA PROPERTIES, recorded as a Partnership. The project’s RERA land record gives a total area of 708.29 m² and records one residential building with 1 Stilt + 5 floors and 15 3BHK apartments, each with a saleable area of 116.49 m². It is registered with TG-RERA under P02500001157, with a proposed completion date of 23/03/2025.

More from Roxana Properties · 2 projects →

01What we found

Period endedTG-RERA registration ran to 23 Mar 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameROXANA PROPERTIES RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionNot identified as a separate phase in the supplied record RERA record
TG-RERA registrationP02500001157, issued 14/09/2019; registered survey number: 24
Registration validity14/09/2019–23/03/2025; the certificate states five years unless extended. No extension is recorded in the supplied evidence Approvals record
Registered promoterROXANA PROPERTIES; entity type recorded as Partnership RERA filing Parties record
RERA statusThe supplied registration record gives an expiry date of 23/03/2025. The evidence does not establish a later extension or current registration status Approvals record

Land and geographic identity

ItemRecord
Locality / plot addressRed Hills; Plot No. 11-5-408 RERA record Land records
Revenue villageRed Hills RERA record Land records
Mandal / district / PINNampally / Hyderabad / 500004 RERA record
Survey number(s)Survey No. 24; no subdivision is recorded in the supplied project identity Land records
Site area and affected areaRERA land record: total area 708.29 m², road-widening/FTL/nala-affected area 41.78 m² and net area 666.51 m² RERA filing Land records
Site area in GHMC certificate784.29 m²; that certificate records net area 742.51 m² and road-widening area 41.78 m²
Boundaries in RERA land recordNorth: H NO 11-5-410; South: 30 FT ROAD; East: H NO 11-5-407; West: H NO 11-5 -409 RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit No. 1/C12/04823/2019, dated 23 March 2019 Approvals record
Approved building arrangementOne residential building, recorded as 1 Stilt + 5 floors
Approved height15 m
Approved built-up areaThe RERA field records approved built-up area of 1,964.00 m² RERA filing. The GHMC Occupancy Certificate records floor area of 1,964.5 m² as sanctioned
Parking area in GHMC certificate553.15 m² in the sanctioned plan and 553.15 m² in the site building plan
Sanctioned versus RERA-declared unitsThe permit says the sanctioned number of units must not be increased, but the supplied permit extraction does not state that number. RERA records 15 apartments RERA unit table
Principal approval numbers also recordedFile No. 1/C7/17848/2017; Occupancy Certificate application No. 1/C12/12621/2020-OC; Building Permit No. 1/C12/11708/2020 Approvals record

Offering and status

ItemRecord
RERA-filed configuration3BHK; 15 units; saleable area 116.49 m² per unit RERA unit table RERA unit details
Booked / available9 booked and 6 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative RERA unit table RERA unit details
Construction / completion recordGHMC Occupancy Certificate records completion date 09 September 2020 and states the building was inspected and declared fit for occupation
Occupancy Certificate scopeThe certificate identifies one residential building, SHAMEEM (TAHSEEN), with Stilt + 5 Upper Floor; no separate phase or tower scope is identified
Promoter-declared completion undertakingThe filed Form B declaration states completion by 2021
RERA proposed completion date23/03/2025 RERA record RERA filing

2. The project story

  • ROXANA PROPERTIES is registered with TG-RERA as a residential apartment project on Survey No. 24 at Plot No. 11-5-408, Red Hills, Nampally Mandal, Hyderabad. The RERA record lists one building and 15 3BHK apartments. The registered promoter is ROXANA PROPERTIES, recorded as a partnership. RERA record RERA filing RERA filing RERA unit table Parties record
  • The GHMC building-permit record describes a residential building with one stilt and five floors. The supplied GHMC Occupancy Certificate identifies the building as SHAMEEM (TAHSEEN), records a completion date of 09 September 2020, and states that it was inspected and declared fit for occupation. This is documentary certification, not a report of a current independent site inspection.

3. Master plan, architecture & building design

  • The RERA record identifies a single building and gives an approved built-up area of 1,964.00 m². The GHMC permit describes 1 Stilt + 5 floors, a 15 m height and a proposed covered built-up area shown in its extraction as “137,514.00”; the unit or formatting for that extracted figure is not stated, so it is not used here as an area measurement. RERA filing RERA filing
  • The GHMC Occupancy Certificate lists floor area as 1,964.5 m² in the sanctioned plan and 1,984.92 m² in the site building plan. It also records an extent of deviation of 9.68%. These are certificate-recorded particulars; detailed interpretation of approval conditions belongs in the approvals review.
  • The supplied evidence does not establish building footprint, flats per floor, lift or stair configuration, circulation layout, landscaped area or residential/common-area distribution. No approved layout approval is included in the extracted project record. Document index

4. Homes, configurations & floor plans

  • The RERA filing records 15 3BHK apartments, each with a saleable area of 116.49 m²; 9 are recorded as booked and 6 as available. Booking counts have no supplied as-of date and should be treated as indicative. RERA unit table RERA unit details
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1596116.49 m²95.3–105.8 m²; median 103.5 m²Not supplied
  • The carpet-area range and median are software measurements from three flat designs in the approved floor-plan drawing record, not RERA-filed carpet-area disclosures; the source says the measurements need review. The drawing extraction shows a living/dining area, kitchen, bedrooms, toilets and a balcony in the illustrated flat. Its listed balcony area is 4.02 m² and is excluded from the measured carpet area. Floor plans RERA unit details
  • Saleable area and software-measured carpet area are different measurement types: the supplied drawing note says saleable area also includes the home’s share of common areas. The evidence does not provide a verified loading figure or a RERA-filed carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The GHMC Occupancy Certificate records 553.15 m² of parking area in both the sanctioned plan and the site building plan. The building permit states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit describes a stilt but does not establish a cellar or basement level for this project.
  • The supplied documents do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to individual units, parking access arrangements, or EV charging provision. A recorded parking area does not by itself establish exclusive parking rights for a buyer.

6. Amenities, recreation & open spaces

The following status figures are from the RERA amenity record; they are not independent verification of current condition. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, capacity or system details suppliedRERA amenitiesRERA record: available “YES”, 100%; not independently verified
SewerageListed as “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system-specific details suppliedRERA amenitiesRERA record: available “YES”, 100%; not independently verified
Storm-water drainsNo layout or capacity details suppliedRERA amenities0% recorded
Water conservation / rainwater harvestingGHMC permit specifies two rainwater-harvesting pits; RERA amenity record lists water conservation/rainwater harvestingRERA amenitiesRERA record: available “YES”, 100%; permit specifies provision; completion not independently verified
Green strip / tot lot / parkNo size or facility details supplied; GHMC permit extraction records tot-lot area as 0 m²RERA amenities0% recorded
Street lightingNo details suppliedRERA amenities0% recorded
Community buildingsNo details suppliedRERA amenities0% recorded
Sewage and sullage treatment/disposalNo treatment or disposal details suppliedRERA amenities0% recorded
Solid-waste management/disposalNo details suppliedRERA amenities0% recorded
Energy managementNo details suppliedRERA amenities0% recorded
Fire protection and fire safetyNo system details suppliedRERA amenities0% recorded
Electrical meter room / sub-station / receiving stationNo capacity or equipment details suppliedRERA amenitiesRERA record: available “YES”, 100%; not independently verified
Recreational open spaceNo aggregate area suppliedRERA amenities0% recorded
Internal roads and footpathsNo details suppliedRERA amenities0% recorded

7. Utilities, building services & safety

  • The RERA amenity record marks water supply, sewerage and storm-water drains as available at 100%, and marks rainwater harvesting and an electrical meter room/sub-station/receiving station as available at 100%. These are portal declarations, not independent operational checks. RERA amenities
  • The GHMC permit requires rainwater-harvesting pits and space for a transformer, and lists a garbage house. It does not provide capacities or establish current operation. The supplied evidence does not detail water source or storage, sewage-treatment capacity or reuse, electrical supply or backup, lifts, fire systems, escape stairs, CCTV, access control, waste segregation or accessibility provisions. RERA amenities

8. Location, access & connectivity

  • The registered project location is Red Hills, Nampally Mandal, Hyderabad District, PIN 500004, at Plot No. 11-5-408, Survey No. 24. The RERA land record gives the southern boundary as a 30 ft road; the GHMC permit records an 18 m road width. RERA record Land records
  • The supplied structured location record lists the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. It gives no public-transport route, approach-road itinerary or travel time. Location record

9. Developer & development status

  • The registered promoter is ROXANA PROPERTIES, recorded as a partnership, with GSTIN 36AAZFR4138F1ZQ. The promoter address in the supplied record is MOIN COURT, Red Hills, Nampally, Hyderabad, 500004. The listed authorized signatory is Syed Eradhuddin; Molzuddin All Khan is listed as a partner. RERA filing Corporate record Parties record
  • The RERA Form B declaration states that the promoter undertook to complete the project by 2021. The registration certificate lists a proposed completion date of 23/03/2025, and the supplied GHMC Occupancy Certificate records completion on 09 September 2020 for the named residential building. These are respectively a promoter declaration, a registration-record date and an authority-issued certificate; no current independent construction-status inspection is supplied.

10. Approvals, official records & documents

TG-RERA registration
Supplied document / referenceCertificate REGCERT-9588; P02500001157
What it recordsROXANA PROPERTIES, Survey No. 24, registration issued 14/09/2019 and valid through 23/03/2025 unless extended
GHMC building permit
Supplied document / reference1/C12/04823/2019, dated 23 March 2019; File No. 1/C7/17848/2017
What it recordsConditional building permission for a residential building recorded as 1 Stilt + 5 floors
GHMC Occupancy Certificate
Supplied document / referenceApplication No. 1/C12/12621/2020-OC; File No. 1/C7/17848/2017
What it recordsOccupancy Certificate dated 13 November 2020; records completion date 09 September 2020 and identifies building SHAMEEM (TAHSEEN), Stilt + 5 Upper Floor
Additional permit number in Occupancy Certificate
Supplied document / reference1/C12/11708/2020
What it recordsListed as a Building Permit No. in the certificate
RERA Form B declaration
Supplied document / referenceDocuments 51551 and 54790
What it recordsPromoter-filed declaration, including a completion undertaking by 2021
Layout-plan record
Supplied document / referenceDocument 48011
What it recordsListed as a layout-plan document, but the supplied extraction does not establish layout approval details
  • The HMDA approved-layout lookup is unavailable in the supplied evidence; this does not establish whether an approval exists. HMDA
  • The supplied project record also does not provide extracted floor-by-floor approved drawings or detailed building-services plans. Document index

Frequently asked questions

Is ROXANA PROPERTIES registered with Telangana RERA?

Yes. ROXANA PROPERTIES is registered with the Telangana Real Estate Regulatory Authority as P02500001157; the registration status is New Project.

Who is the developer of ROXANA PROPERTIES?

The promoter named in the RERA registration is ROXANA PROPERTIES.

Where is ROXANA PROPERTIES located?

ROXANA PROPERTIES is in RED HILLS, Nampally, Hyderabad, Telangana (500004).

When will ROXANA PROPERTIES be completed?

The promoter's proposed date of completion filed with RERA is 23/03/2025. This is the promoter's declaration, not a guarantee.

More projects in Red Hills