Sign in

Pushpam

MANOMAY INFRA DEVELOPERS · Medchal-Malkajgiri · RERA P02200006524

PUSHPAM is a residential apartment project in SHAMIRPET locality, Thumkunta revenue village, Shamirpet, Medchal-Malkajgiri. The registered promoter is MANOMAY INFRA DEVELOPERS, a partnership. The project covers 3,578.03 Sq. Mt. and comprises 1 building with 1 Cellar + 1 Stilt + 5 upper floors, with 65 apartments: 25 2BHK and 40 3BHK; the RERA-filed saleable areas are 110.88 sqm and 168.01 sqm, respectively. It is registered with TG-RERA under P02200006524, and the RERA header records the proposed completion date as 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 10 Mar 2026 - check its extension on TG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Developer render

1. Project at a glance

Project identity

FieldProject record
Registered project namePUSHPAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name is disclosed. The registration covers the project associated with the surveys listed below; the record identifies one building. RERA record Land records
TG-RERA registrationP02200006524, issued 07/07/2023; stated validity 07/07/2023–10/03/2026. The certificate says validity may be extended by the Authority; the supplied record marks the registration as not extended. RERA record Approvals record
Registered promoterMANOMAY INFRA DEVELOPERS, a partnership RERA record Corporate record Parties record
RERA record statusRegistered project. The supplied registration certificate identifies the project as PUSHPAM; it does not establish construction completion or occupancy certification.

Land and geographic identity

FieldProject record
Locality / revenue villageSHAMIRPET locality; Thumkunta revenue village RERA record RERA filing
Mandal / district / PINShamirpet / Medchal-Malkajgiri / 500078 RERA record RERA filing
Project surveys and subdivisions368/OO/1, 368/OO/2, 370/E, 373/A/EE RERA record Land records
Site extent3,578.03 Sq. Mt.
RERA land areaTotal area 3578.03 sqmts; net area 3578.03 sqmts; recorded road-widening/FTL/nala-widening affected area 0. RERA filing
Boundaries in RERA filingEast: SY NO 373 PART; West: SY NO 370 PART; North: SY NO 370 PART; South: 30 WIDE ROAD. RERA filing

Development identity

FieldProject record
Building-permit authority / principal approvalBuilding Permit Order 009192/BP/HMDA/1878/MED/2022, approved 10 March, 2023; the filed permit is issued by Thumkunta Municipality / Municipal Corporation, with HMDA technical approval. Approvals record
Additional proceedings number002446/BP/HMDA/MED/2023 Approvals record
Approved built-up area13,777.70 Sq.mts
Building count1 building/unit in the RERA land details; one residential building is identified in the permit. RERA filing
Sanctioned floor configuration1 Cellar + 1 Stilt + 5 upper floors; the permit records building height as 14.99 (unit not specified in the supplied extraction).
Approved units65 total units according to the RERA unit record; the permit extraction does not separately state a unit count. RERA unit table RERA filing
RERA-declared units65: 25 2BHK and 40 3BHK. RERA unit table

Offering and status

FieldProject record
RERA-filed unit types and saleable areas2BHK: 110.88 sqm; 3BHK: 168.01 sqm. RERA unit table RERA unit table
Booking / availabilityPortal data lists 0 booked and 65 available (25 2BHK; 40 3BHK). The portal record has no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table RERA unit table
Completion datesPromoter’s Form B declares completion by 10/03/2026; the RERA header records proposed completion as 30/11/2026. These are the dates stated in the respective supplied records; no revised completion order is included. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents; the building-permit extraction records completion certification as false. Document index
Construction stageNo independently verified site-progress assessment or construction-stage percentage is supplied. The RERA amenity progress fields are shown separately below and should not be read as an independently verified construction inspection. RERA amenities

2. The project story

PUSHPAM is a registered residential apartment project in Thumkunta village, Shamirpet mandal, Medchal-Malkajgiri district. Its RERA-identified land comprises survey subdivisions 368/OO/1, 368/OO/2, 370/E and 373/A/EE, with a filed site extent of 3,578.03 Sq. Mt. RERA record Land records

The filed building permit describes one residential building with 1 Cellar, 1 Stilt and 5 upper floors. The RERA unit record lists 65 homes: 25 two-bedroom and 40 three-bedroom apartments. The filed unit inventory shows all 65 as available and none booked, but does not provide an as-of date. RERA unit table

The project’s proposed completion date in the RERA header is 30/11/2026. The promoter’s Form B separately declares 10/03/2026 as its completion undertaking. Neither date is evidence that the building is complete: no occupancy or completion certificate or independently verified construction-progress report is supplied. RERA record Document index

3. Master plan, architecture & building design

The filed building-permit materials describe one residential building on the 3,578.03 Sq. Mt. site, with approved built-up area of 13,777.70 Sq.mts and a configuration of 1 Cellar + 1 Stilt + 5 upper floors. The permit records a building height of 14.99, without a unit in the supplied extraction. The approval extract does not provide building footprint, apartment count per floor, lift or stair details, or an area breakdown distinguishing FSI-counted area from other built-up measures.

The approval materials require the cellar and stilt to remain exclusively for vehicle parking, and prohibit parking or construction in setback areas. The supplied drawing-derived record contains measured floor-plan information, but does not provide a sufficiently detailed architectural schedule here to describe building circulation, entrances, open-space arrangement or landscape design. Floor plans

The approved built-up area above is a sanctioned figure; RERA-filed saleable areas and software-measured carpet areas are presented separately in the homes section. No sanctioned-layout approval number or approved-layout drawing is included in the supplied record. RERA unit table HMDA

4. Homes, configurations & floor plans

RERA records list 65 apartments in two sale configurations. The portal inventory reports zero booked and all units available, but does not provide an as-of date. The “saleable area” below is the RERA-filed figure; carpet-area measurements are software-measured from the filed floor-plan drawing and are not RERA disclosures. RERA unit table RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25025110.88 sqm72.4–77.6 sqm; median 74.1 sqm (software-measured)33%
3BHK40040168.01 sqm102.2–114.3 sqm; median 111.8 sqm (software-measured)33%

The filed drawings show varied apartment plans. One measured 2BHK plan includes living and dining areas, two bedrooms, kitchen, wash area, attached toilets and a balcony. A measured 3BHK plan includes living and dining areas, a master bedroom, a children’s bedroom, a guest room, kitchen, wash area, toilets and a balcony. Room labels and dimensions are drawing-derived measurements, not a guarantee of dimensions in a particular allotted unit.

Carpet area describes the measured internal apartment areas in the drawing analysis; the RERA saleable-area figure is a separate filed area and includes the unit’s share of common areas under the supplied drawing-analysis caveat. Balcony areas are identified separately in the drawings and are not included in the measured carpet area. The supplied materials do not give a separate utility-area schedule for the RERA-listed configurations. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit provides 1 Cellar + 1 Stilt and requires both to be used exclusively for vehicle parking, without partition walls or rolling shutters or conversion to another use. It also states that parking or construction must not be placed in setback areas.

No sanctioned parking-space count, resident-versus-visitor breakdown, accessible-parking count, ramp or driveway details, or unit-specific parking allocation is established by the supplied record. The vendor description mentions covered car parking, but that is a vendor-supplied claim, not proof of a sanctioned count or an exclusive parking right for any apartment. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record lists progress percentages for common infrastructure. These are portal-reported values; the supplied materials do not independently verify completion. The building-permit documents also require or identify certain site utilities, covered separately in the next section. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water SupplySize or source not statedRERA amenity recordAvailable: YES; 45% recorded; not independently verified. RERA amenities
Sewerage (Chamber, Lines, Septic Tank, STP)Size or capacity not statedRERA amenity recordAvailable: YES; 100% recorded; not independently verified. RERA amenities
Storm Water DrainsSize or capacity not statedRERA amenity recordAvailable: YES; 40% recorded; not independently verified. RERA amenities
Water Conservation, Rain water HarvestingNo size or capacity statedRERA amenity record; building-permit conditionAvailable: YES; 30% recorded; not independently verified. RERA amenities
Electrical Meter Room, Sub-Station, Receiving StationNo size or capacity statedRERA amenity recordAvailable: YES; 20% recorded; not independently verified. RERA amenities
Internal Roads & FootpathsNo length or area statedRERA amenity record0% recorded. RERA amenities
Green Strip/TOT LOT/ParkNo area or capacity statedRERA amenity record0% recorded. RERA amenities
Street LightingNo quantity statedRERA amenity record0% recorded. RERA amenities
Community BuildingsNo size or capacity statedRERA amenity record0% recorded. RERA amenities
Treatment and Disposal of Sewage and Sullage WaterNo size or capacity statedRERA amenity record0% recorded. RERA amenities
Solid Waste Management and DisposalNo size or capacity statedRERA amenity record0% recorded. RERA amenities
Energy managementNo system or capacity statedRERA amenity record0% recorded. RERA amenities
Fire Protection and Fire Safety RequirementsNo system or capacity statedRERA amenity record0% recorded. RERA amenities
Aggregate area of recreational Open SpaceArea not statedRERA amenity record0% recorded. RERA amenities

The vendor lists a clubhouse, swimming pool, gym and children’s play area. These are vendor-supplied amenity claims; no supplied RERA amenity entry, approved drawing detail or completion evidence establishes their size, sanctioned status or delivery. Promoter website

7. Utilities, building services & safety

The building-permit materials require the project to provide an STP, rainwater-harvesting structures, a transformer and a garbage house. They do not specify capacities in the supplied extraction. The permit also requires development of the approach road as a black-topped road before release of the occupancy certificate. These are approval conditions, not evidence that the facilities or road have been completed.

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and the electrical meter-room/sub-station/receiving-station item as available, with progress values of 45%, 100%, 40%, 30% and 20%, respectively. The same record lists fire protection at 0%. These are recorded progress fields, not independent verification of operational services or statutory compliance. RERA amenities

The vendor describes three-phase power in each unit, concealed wiring, MCBs, and EV-charging provision in each car park; it also lists two high-speed automatic passenger elevators per block, CCTV, round-the-clock security and boom barriers. These are vendor statements, and the supplied building-permit and RERA materials do not establish their approved specifications, capacities, installation or operational status. Promoter website

8. Location, access & connectivity

The registered project location is Thumkunta, Shamirpet mandal, Medchal-Malkajgiri district, Telangana 500078. The RERA filing identifies the southern boundary as 30 WIDE ROAD. RERA record RERA filing RERA filing

A location record gives the nearest sampled Outer Ring Road interchange at approximately 2.8 km. The supplied evidence does not identify the interchange or provide route-specific measurements, public-transport details or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is MANOMAY INFRA DEVELOPERS, recorded as a partnership, with GSTIN 36ABCFM1424F1ZP. The registered address in the project record is B, R R NAGAR, THUMKUNTA, SHAMIRPET, Shamirpet, Medchal-Malkajgiri, 500078. The supplied materials identify Satheesh Kumar Reddy Bakkannagari as an authorized signatory and Ankamma Rao Gunji and Sampath Reddy Bakkannagari as partners. Corporate record Parties record RERA filing

The promoter’s Form B declares completion by 10/03/2026; the RERA header separately records 30/11/2026 as the proposed completion date. No extension order or independently verified construction-stage report is supplied. No occupancy or completion certificate is included in the supplied project documents. RERA record Document index

The RERA registration certificate records a promoter-office PIN of 500011, without a complete address in the extracted record. No official promoter website or contact details are established in the supplied project data.

10. Approvals, official records & documents

TG-RERA registration certificate
Evidence in the supplied project fileForm C registration P02200006524, issued 07/07/2023; stated validity to 10/03/2026.
Scope / noteProject registration for PUSHPAM.
Building Permit Order
Evidence in the supplied project file009192/BP/HMDA/1878/MED/2022, approved 10 March, 2023; proceedings 002446/BP/HMDA/MED/2023.
Scope / noteOne residential building; permit identifies 368/OO/1, 368/OO/2, 370/E, 373/A/EE.
HMDA technical approval
Evidence in the supplied project fileApproval for building construction under 009192/BP/HMDA/1878/MED/2022, dated 10 March, 2023.
Scope / noteFiled material says plans are to be sanctioned and released by the local body.
TS-bPASS Fee Intimation Letter
Evidence in the supplied project file009192/BP/HMDA/1878/MED/2022.
Scope / noteThe document expressly says it is not approval of the proposal or permission for development.
Form B promoter declaration
Evidence in the supplied project fileSigned by authorized signatory of MANOMAY INFRA DEVELOPERS; includes promoter declarations on title, encumbrances, project accounts and completion.
Scope / notePromoter-declared statements, not independent verification.
Floor-plan drawings
Evidence in the supplied project fileFloor-plan drawing document 316299; software measurements are derived from drawing geometry. Floor plans
Scope / noteDrawing-based measurements are not RERA-filed carpet-area disclosures.
Occupancy / completion certificate
Evidence in the supplied project fileNot present in the supplied documents. Document index
Scope / noteNo certificate status beyond absence from the supplied file can be established here.
Approved layout plan
Evidence in the supplied project fileNo layout approval document is available in the supplied record; the RERA filing lists no layout-plan number. HMDA Document index
Scope / noteThe supplied HMDA DPMS lookup is not publicly reachable; no conclusion about layout approval is drawn from that unavailability. HMDA

Frequently asked questions

Is PUSHPAM registered with Telangana RERA?

Yes. PUSHPAM is registered with the Telangana Real Estate Regulatory Authority as P02200006524; the registration status is New Project.

Who is the developer of PUSHPAM?

The promoter named in the RERA registration is MANOMAY INFRA DEVELOPERS.

Where is PUSHPAM located?

PUSHPAM is in SHAMIRPET, Thumkunta, Medchal-Malkajgiri, Telangana (500078).

When will PUSHPAM be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Thumkunta