Pragathi Paradise Block C
SRI SATYA DEVELOPERS · Medchal-Malkajgiri · RERA P02200001141
PRAGATHI PARADISE BLOCK C is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, developed by registered promoter Sri Satya Developers. It occupies 1,209.13 sq. m and is recorded as one building or block with 1 Stilt + 5 Upper floors and 20 3BHK homes. The project is registered under TG-RERA number P02200001141, with revised proposed completion dated 17/10/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | PRAGATHI PARADISE BLOCK C RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | Block C; the registration is for this named project. The certificate identifies plot 318/A and the project survey schedule. RERA record |
| TG-RERA registration | P02200001141 |
| Registration validity | 05/09/2019 to 17/10/2023, as recorded on the certificate; the certificate says four years and lists no extension. This is registration validity, not a statement that construction was completed. Approvals record |
| Registered promoter | Sri Satya Developers (also named M/s. Sri Satya Developers in the filed declaration) RERA record |
| RERA status | Listed as an On-Going Project in the project record. RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / plot | Bachupally; Plot No. 318/A RERA filing |
| Revenue village | Bachupally in the RERA record; the HMDA technical approval describes Bachpalle. RERA filing |
| Mandal / district / PIN | Bachupally Mandal; Medchal-Malkajgiri District; PIN 500090 RERA filing |
| Project survey numbers and subdivisions | 167(P), 168, 169(P), 175(P), 176(P), 177 and 178(P) RERA filing |
| Registered site extent | 1,209.13 sq. m; the RERA land record gives total area 1209.13 sq. m and net area 1209.13 sq. m, with affected area recorded as 0 sq. m. Land records |
| Boundaries in RERA land record | East: 60 FEET WIDE ROAD; West: PARK TEMPLE; North: 40 FEET WIDE ROAD; South: PART OF PLOT NO 318A Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) technical approval; the letter directs the applicant to seek building-plan sanction and release from the local Executive Authority. Approvals record |
| Principal approval | Application 004312/MED/R1/U6/HMDA/17102017, technically approved 28 May 2018 Approvals record |
| Approved built-up area | 3100.98 sq. m in the RERA project record. RERA filing |
| Building arrangement | One building / one block is recorded; the HMDA letter describes 1 Stilt + 5 Upper floors. RERA filing RERA filing |
| Parking provision | The RERA record gives mortgage area 257.71 sq. m; HMDA’s letter records 257.70 sq. m of first-floor built-up area mortgaged to HMDA. No total parking-space count is supplied. RERA filing |
| Units | 20 total units are recorded in the RERA unit schedule. RERA unit table |
| Approved-versus-declared count | The RERA land record lists 1 total building unit and 1 proposed building unit; the unit schedule separately records 20 apartment units. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK, 20 units; saleable area 147.95 sq. m per unit RERA unit table |
| Booking and availability | 11 booked; 9 available, as last read from the TG-RERA portal. The portal extract supplies no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | The project is listed as ongoing. RERA amenity records give item-specific progress figures; these are declarations in the project record, not an independent site inspection. RERA filing RERA amenities |
| Completion dates | RERA record: proposed completion 28/05/2024 and revised proposed completion 17/10/2023. The Form-B declaration also states 17th October 2023 as the completion undertaking. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The status is therefore not established from this evidence. Document index |
2. The project story
PRAGATHI PARADISE BLOCK C is a residential apartment project registered for a site at Plot 318/A, Bachupally, Medchal-Malkajgiri District. The RERA record identifies a single building and a 20-unit, 3BHK offering. The technical approval letter describes a building of stilt level plus five upper floors. RERA record RERA filing RERA filing RERA unit table
The RERA unit schedule shows 11 booked apartments and 9 available, but provides no date for those counts. The project is recorded as ongoing. The filed amenity progress figures are partial and vary by item; they should be understood as project-record declarations, not independently verified construction progress. No completion or occupancy certificate appears in the supplied documents. RERA unit table RERA amenities Document index
3. Master plan, architecture & building design
The HMDA technical approval describes a residential apartment building on a 1,209.13 sq. m site, with 1 Stilt + 5 Upper floors. The RERA project record gives approved built-up area as 3100.98 sq. m. These are distinct measures: the supplied material does not provide a separately identified FSI-counted area, gross built-up area, or carpet area. RERA filing
The record identifies one building and one block. No supplied drawing extraction establishes the building footprint, flats per floor, tower height, lift or stair layout, unit orientation, internal circulation, or phase-by-phase building arrangement. RERA filing Document index Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 11 | 9 | 147.95 sq. m | Not measured from supplied drawings | Not supplied |
The RERA-filed saleable area is 147.95 sq. m. It is not a carpet-area measurement. The supplied floor-plan record reports that no drawings were measured; two scans are pending and two drawings contain no flats. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans
The filed booking and availability counts have no as-of date and should be treated as indicative. RERA unit table
5. Parking & vehicle circulation
The supplied RERA record and HMDA letter do not establish a total number of parking spaces, visitor or accessible spaces, parking levels, ramps, internal driveways, EV charging, or a unit-by-unit parking allocation. The HMDA approval describes a stilt floor and records a mortgage to HMDA of 257.70 sq. m of first-floor built-up area; the project record lists mortgage area as 257.71 sq. m. Neither figure is a parking-space count or evidence of an allottee’s exclusive parking rights. RERA filing
6. Amenities, recreation & open spaces
The amenity schedule contains 14 items. Its percentages are reported project-record progress figures; the supplied evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Water supply | No source or capacity supplied | RERA amenity schedule | Available: YES; 60%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No capacity supplied | RERA amenity schedule | Available: YES; 30%; not independently verified |
| Storm-water drains | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Green strip / tot lot / park | No area or dimensions supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Street lighting | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Community buildings | No details or size supplied | RERA amenity schedule | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Solid-waste management and disposal | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Water conservation / rainwater harvesting | No capacity supplied | RERA amenity schedule | Available: YES; 60%; not independently verified |
| Energy management | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Fire protection and fire-safety requirements | No system details supplied | RERA amenity schedule | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity or arrangement supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenity schedule | 0%; not independently verified |
7. Utilities, building services & safety
HMDA’s technical approval includes conditions relating to water and sewerage arrangements, treated sewerage disposal, drainage, inspections, and occupancy. It calls for the local Executive Authority to supervise compliance during construction and allows occupation only after completion in accordance with the technically approved plans and issuance of a “Fit for Occupancy” certificate. These are approval conditions, not evidence that the systems have been installed, inspected, or certified as complete.
The RERA amenity schedule records water supply at 60%, sewerage at 30%, water conservation/rainwater harvesting at 60%, and an electrical meter room/sub-station/receiving station as available with 0% progress. It gives no capacities or system specifications. The record does not establish water source or storage capacity, STP capacity or reuse arrangements, power backup, lift number or capacity, fire-system details, waste arrangements, security systems, or accessible circulation. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, PIN 500090. The RERA land record identifies the site at Plot 318/A, bounded by a 60 FEET WIDE ROAD to the east and a 40 FEET WIDE ROAD to the north. RERA filing RERA filing
The supplied location record gives HITEC City at 8.8 km. No public-transport route, travel time, or further verified access detail is supplied. Location record
9. Developer & development status
The registered promoter is Sri Satya Developers, recorded as a partnership. Its RERA record names partners MARNI SRINIVASA MURTHY, GANGAPURAM PRABHAKAR REDDY and PINNAMANENI RADHAKRISHNA, and identifies KANAMATHAREDDY BUTCHI RAMA KRISHNA REDDY as authorized signatory. The supplied evidence does not establish a verified corporate registration number or a separate registered-office address beyond the project/promoter address details in the RERA record. RERA record Corporate record Parties record
The Form-B declaration, signed by K.B. Rama Krishna Reddy as authorized signatory, states that the completion undertaking was 17th October 2023. The project record lists the status as ongoing and gives proposed completion 28/05/2024 and revised proposed completion 17/10/2023. These are recorded dates and declarations; the supplied materials do not establish actual completion or an occupancy certificate. RERA filing Document index
10. Approvals, official records & documents
| Details | FORM ‘C’; project PRAGATHI PARADISE BLOCK C, registration P02200001141, issued 05/09/2019; validity recorded to 17/10/2023 |
|---|
| Details | Application 004312/MED/R1/U6/HMDA/17102017; dated 28 May 2018; residential building, 1 Stilt + 5 Upper floors, site extent 1,209.13 sq. m |
|---|
| Details | Document 8406 of 2018, dated 16/04/2018; records 257.70 sq. m of first-floor built-up area mortgaged in favour of HMDA |
|---|
| Details | Dated 1 February 2019; identifies Peoples Progress Trust as landowner and refers to Development Agreement-cum-General Power of Attorney No. 6172/2018; includes promoter undertakings |
|---|
| Details | RERA document register contains layout-plan entries, but the supplied extracts are not available for review. The HMDA letter is a technical approval and directs the applicant to approach the Executive Authority for sanction and release. |
|---|---|
| Evidence | Document index |
| Details | Not identified in the supplied documents |
|---|---|
| Evidence | Document index |
1. Project at a glance
Project identity
Registered project name: PRAGATHI PARADISE BLOCK C
Project type: Residential apartment project
Phase / registered portion: Block C; the registration is for this named project. The certificate identifies plot 318/A and the project survey schedule.
TG-RERA registration: P02200001141
Registration validity: 05/09/2019 to 17/10/2023, as recorded on the certificate; the certificate says four years and lists no extension. This is registration validity, not a statement that construction was completed.
Registered promoter: Sri Satya Developers (also named M/s. Sri Satya Developers in the filed declaration)
RERA status: Listed as an On-Going Project in the project record.
Land and geographic identity
Locality / plot: Bachupally; Plot No. 318/A
Revenue village: Bachupally in the RERA record; the HMDA technical approval describes Bachpalle.
Mandal / district / PIN: Bachupally Mandal; Medchal-Malkajgiri District; PIN 500090
Project survey numbers and subdivisions: 167(P), 168, 169(P), 175(P), 176(P), 177 and 178(P)
Registered site extent: 1,209.13 sq. m; the RERA land record gives total area 1209.13 sq. m and net area 1209.13 sq. m, with affected area recorded as 0 sq. m.
Boundaries in RERA land record: East: 60 FEET WIDE ROAD; West: PARK TEMPLE; North: 40 FEET WIDE ROAD; South: PART OF PLOT NO 318A
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA) technical approval; the letter directs the applicant to seek building-plan sanction and release from the local Executive Authority.
Principal approval: Application 004312/MED/R1/U6/HMDA/17102017, technically approved 28 May 2018
Approved built-up area: 3100.98 sq. m in the RERA project record.
Building arrangement: One building / one block is recorded; the HMDA letter describes 1 Stilt + 5 Upper floors.
Parking provision: The RERA record gives mortgage area 257.71 sq. m; HMDA’s letter records 257.70 sq. m of first-floor built-up area mortgaged to HMDA. No total parking-space count is supplied.
Units: 20 total units are recorded in the RERA unit schedule.
Approved-versus-declared count: The RERA land record lists 1 total building unit and 1 proposed building unit; the unit schedule separately records 20 apartment units.
Offering and status
RERA-filed configuration: 3BHK, 20 units; saleable area 147.95 sq. m per unit
Booking and availability: 11 booked; 9 available, as last read from the TG-RERA portal. The portal extract supplies no as-of date, so these counts are indicative.
Construction stage: The project is listed as ongoing. RERA amenity records give item-specific progress figures; these are declarations in the project record, not an independent site inspection.
Completion dates: RERA record: proposed completion 28/05/2024 and revised proposed completion 17/10/2023. The Form-B declaration also states 17th October 2023 as the completion undertaking.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The status is therefore not established from this evidence.
2. The project story
PRAGATHI PARADISE BLOCK C is a residential apartment project registered for a site at Plot 318/A, Bachupally, Medchal-Malkajgiri District. The RERA record identifies a single building and a 20-unit, 3BHK offering. The technical approval letter describes a building of stilt level plus five upper floors.
The RERA unit schedule shows 11 booked apartments and 9 available, but provides no date for those counts. The project is recorded as ongoing. The filed amenity progress figures are partial and vary by item; they should be understood as project-record declarations, not independently verified construction progress. No completion or occupancy certificate appears in the supplied documents.
3. Master plan, architecture & building design
The HMDA technical approval describes a residential apartment building on a 1,209.13 sq. m site, with 1 Stilt + 5 Upper floors. The RERA project record gives approved built-up area as 3100.98 sq. m. These are distinct measures: the supplied material does not provide a separately identified FSI-counted area, gross built-up area, or carpet area.
The record identifies one building and one block. No supplied drawing extraction establishes the building footprint, flats per floor, tower height, lift or stair layout, unit orientation, internal circulation, or phase-by-phase building arrangement.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 11 | 9 | 147.95 sq. m | Not measured from supplied drawings | Not supplied |
The RERA-filed saleable area is 147.95 sq. m. It is not a carpet-area measurement. The supplied floor-plan record reports that no drawings were measured; two scans are pending and two drawings contain no flats. Accordingly, no software-measured carpet area or room dimensions can be reported.
The filed booking and availability counts have no as-of date and should be treated as indicative.
5. Parking & vehicle circulation
The supplied RERA record and HMDA letter do not establish a total number of parking spaces, visitor or accessible spaces, parking levels, ramps, internal driveways, EV charging, or a unit-by-unit parking allocation. The HMDA approval describes a stilt floor and records a mortgage to HMDA of 257.70 sq. m of first-floor built-up area; the project record lists mortgage area as 257.71 sq. m. Neither figure is a parking-space count or evidence of an allottee’s exclusive parking rights.
6. Amenities, recreation & open spaces
The amenity schedule contains 14 items. Its percentages are reported project-record progress figures; the supplied evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Water supply | No source or capacity supplied | RERA amenity schedule | Available: YES; 60%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | No capacity supplied | RERA amenity schedule | Available: YES; 30%; not independently verified |
| Storm-water drains | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Green strip / tot lot / park | No area or dimensions supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Street lighting | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Community buildings | No details or size supplied | RERA amenity schedule | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Solid-waste management and disposal | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Water conservation / rainwater harvesting | No capacity supplied | RERA amenity schedule | Available: YES; 60%; not independently verified |
| Energy management | No details supplied | RERA amenity schedule | 0%; not independently verified |
| Fire protection and fire-safety requirements | No system details supplied | RERA amenity schedule | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity or arrangement supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenity schedule | 0%; not independently verified |
7. Utilities, building services & safety
HMDA’s technical approval includes conditions relating to water and sewerage arrangements, treated sewerage disposal, drainage, inspections, and occupancy. It calls for the local Executive Authority to supervise compliance during construction and allows occupation only after completion in accordance with the technically approved plans and issuance of a “Fit for Occupancy” certificate. These are approval conditions, not evidence that the systems have been installed, inspected, or certified as complete.
The RERA amenity schedule records water supply at 60%, sewerage at 30%, water conservation/rainwater harvesting at 60%, and an electrical meter room/sub-station/receiving station as available with 0% progress. It gives no capacities or system specifications. The record does not establish water source or storage capacity, STP capacity or reuse arrangements, power backup, lift number or capacity, fire-system details, waste arrangements, security systems, or accessible circulation.
8. Location, access & connectivity
The registered project location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, PIN 500090. The RERA land record identifies the site at Plot 318/A, bounded by a 60 FEET WIDE ROAD to the east and a 40 FEET WIDE ROAD to the north.
The supplied location record gives HITEC City at 8.8 km. No public-transport route, travel time, or further verified access detail is supplied.
9. Developer & development status
The registered promoter is Sri Satya Developers, recorded as a partnership. Its RERA record names partners MARNI SRINIVASA MURTHY, GANGAPURAM PRABHAKAR REDDY and PINNAMANENI RADHAKRISHNA, and identifies KANAMATHAREDDY BUTCHI RAMA KRISHNA REDDY as authorized signatory. The supplied evidence does not establish a verified corporate registration number or a separate registered-office address beyond the project/promoter address details in the RERA record.
The Form-B declaration, signed by K.B. Rama Krishna Reddy as authorized signatory, states that the completion undertaking was 17th October 2023. The project record lists the status as ongoing and gives proposed completion 28/05/2024 and revised proposed completion 17/10/2023. These are recorded dates and declarations; the supplied materials do not establish actual completion or an occupancy certificate.
10. Approvals, official records & documents
| Details | FORM ‘C’; project PRAGATHI PARADISE BLOCK C, registration P02200001141, issued 05/09/2019; validity recorded to 17/10/2023 |
|---|
| Details | Application 004312/MED/R1/U6/HMDA/17102017; dated 28 May 2018; residential building, 1 Stilt + 5 Upper floors, site extent 1,209.13 sq. m |
|---|
| Details | Document 8406 of 2018, dated 16/04/2018; records 257.70 sq. m of first-floor built-up area mortgaged in favour of HMDA |
|---|
| Details | Dated 1 February 2019; identifies Peoples Progress Trust as landowner and refers to Development Agreement-cum-General Power of Attorney No. 6172/2018; includes promoter undertakings |
|---|
| Details | RERA document register contains layout-plan entries, but the supplied extracts are not available for review. The HMDA letter is a technical approval and directs the applicant to approach the Executive Authority for sanction and release. |
|---|
| Details | Not identified in the supplied documents |
|---|
Frequently asked questions
Is PRAGATHI PARADISE BLOCK C registered with Telangana RERA?
Yes. PRAGATHI PARADISE BLOCK C is registered with the Telangana Real Estate Regulatory Authority as P02200001141; the registration status is On-Going Project.
Who is the developer of PRAGATHI PARADISE BLOCK C?
The promoter named in the RERA registration is SRI SATYA DEVELOPERS.
Where is PRAGATHI PARADISE BLOCK C located?
PRAGATHI PARADISE BLOCK C is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).
When will PRAGATHI PARADISE BLOCK C be completed?
The promoter's proposed date of completion filed with RERA is 28/05/2024. This is the promoter's declaration, not a guarantee.