PALMCOVE is a residential apartment project in Uppal Bagayath, Uppal mandal, Medchal-Malkajgiri district, developed by the registered promoter TRICOLOUR PROPERTIES PRIVATE LIMITED. The project covers 6,434.17 sq. m. and comprises Block-A and Block-B, each Ground + Upper (7) floors, and an amenities block of Ground + Upper (4) floors. It has 150 3BHK homes, with a RERA-filed saleable area of 130.89 sq. m. TG-RERA registration number P02200000314 records a proposed completion date of 17.05.2023.

More from Tricolour Properties Pvt Ltd · 7 projects →

01What we found

Period endedTG-RERA registration ran to 17 May 2023 - check its extension on TG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project namePALMCOVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionRegistration covers the project comprising Block-A and Block-B and an amenities block; no separate phase name is disclosed.
TG-RERA registrationP02200000314
Registration validity16/02/2019 to 17/05/2023; the registration certificate says four years, unless extended by the Authority. The supplied certificate records no extension. Registration validity is separate from the completion deadline and occupancy status.
Registered promoterTRICOLOUR PROPERTIES PRIVATE LIMITED RERA record Corporate record
RERA-recorded status“On-Going Project” in the supplied project record. RERA filing

Land and geographic identity

ItemProject record
Revenue villageUppal in the project record; the GHMC permit, occupancy certificate and registration certificate identify Uppal Bagayath. RERA record RERA filing
Locality / plotUppal Bagayath; plot numbers 1 TO 5. The occupancy certificate also describes the locality as Shanthi Nagar, Uppal.
MandalUppal RERA record RERA filing
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500039 RERA record
Survey numbers and subdivisions95; 115; 110; 111; 111/A (also recorded as 111/a); 112; 113; 114; 116; 116/A (also recorded as 116/a); AA (also recorded as aa); E (also recorded as e); 117. These are the identifiers recorded across the project filing and supplied GHMC/RERA documents. RERA filing
Registered site extent6,434.17 sq. m. RERA filing
Net area / road-affected areaNet area: 6,253.60 sq. m.; road-affected area: 180.57 sq. m. RERA filing
Boundaries in project recordEast: STP AND OTHERS LAND; West: PLOT NO 6 TO 13; North: SURVEY NO 95 AND ROAD; South: 30 FEET WIDE ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit53228/HO/EZ/Cir-2/2016, dated 18. 05. 2017; file no. 61582 / 06 / 02 / 2016 / HO. Approvals record
Approved buildings and floorsResidential Block-A and Block-B, each sanctioned as Ground + Upper (7) floors, with sub-cellar and cellar for parking; amenities block sanctioned as Ground + Upper (4) floors, also with sub-cellar and cellar for parking.
Approved built-up areaThe permit states residential area 19,077.88, amenities area 852.40, cellars area 6,670.71, and total area 19,930.28. The supplied document does not state the units alongside these area figures; they are reproduced as recorded.
Building heightsThe permit lists 23.97 & 14.99 under “Height (m)”; it does not identify which figure applies to which building in the supplied extraction.
Unit countGHMC permit: 150 residential flats in Blocks A and B. The TG-RERA filing also records 150 units. RERA unit table
Parking provisionThe sanctioned plan identifies sub-cellar and cellar areas for parking and lists a cellars area of 6,670.71; the supplied extracts do not give a parking-space count.

Offering and status

ItemProject record
RERA-filed configuration3BHK, 150 units; RERA-filed saleable area 130.89 sq. m. RERA unit table RERA unit details
Booking / availability128 booked and 22 available, as last read from the TG-RERA portal; the record supplies no as-of date, so these counts are indicative. RERA unit table
Construction stageThe supplied record labels the project “On-Going Project”; no independently verified current site-progress percentage is supplied. RERA filing
Completion dateGHMC permit completion deadline and promoter’s Form B undertaking: 17.05.2023.
Occupancy certificate statusGHMC issued a partial occupancy certificate dated 23 April, 2021 for Block-A and Block-B only. The certificate says the amenities-block occupancy certificate may be released after submission of a fire NOC.

2. The project story

PALMCOVE is a residential apartment development registered with TG-RERA as P02200000314. The GHMC permit describes two residential blocks, each Ground + 7 floors, plus a separate Ground + 4-floor amenities block. It sanctions 150 flats in the residential blocks.

The project site is recorded at Uppal Bagayath, Uppal, Medchal-Malkajgiri, on plots 1 to 5 and the survey numbers and subdivisions listed above. The project filing records a total area of 6,434.17 sq. m., including 180.57 sq. m. affected by road widening, and a net area of 6,253.60 sq. m. RERA record RERA filing

The promoter’s filed completion commitment was 17.05.2023. GHMC’s 2021 certificate provides partial occupancy for the two residential blocks, while expressly leaving the amenities-block certificate conditional on submission of a fire NOC. The project record still labels the project “On-Going”; the supplied evidence does not establish the current construction status or completion of all common facilities. RERA filing

3. Master plan, architecture & building design

The GHMC building permit sanctions a residential scheme in Blocks A and B, with an amenities block on the same project site. The residential blocks are each described as Ground + Upper (7) floors; the amenities block is Ground + Upper (4) floors. Sub-cellar and cellar areas are identified for parking.

The permit records a total area of 19,930.28, comprising residential area 19,077.88, amenities area 852.40, and cellars area 6,670.71. These figures are reproduced as stated because the supplied extraction does not specify their units alongside the figures. The permit separately lists heights of 23.97 & 14.99 m without mapping each height to a particular block.

The permit lists eight rainwater-harvesting percolation pits and a tot-lot of 108.27 m². The available evidence does not provide drawing-derived details such as building footprints, flats per floor, lifts, stairs, internal circulation, landscape layout or open-space distribution.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15012822130.89 sq. m.Not measured in the supplied drawingsNot supplied

The configuration, unit count, booking figures and saleable area are TG-RERA filing figures. Booking and availability counts have no supplied as-of date. RERA unit details RERA unit table

Eight floor-plan drawings are listed as awaiting scanning, and none has a software-measured carpet area. The supplied record therefore does not support room dimensions, balcony or utility details, or a drawing-based typical-floor description. Carpet area, where measured from drawings, would be a software measurement rather than a RERA-filed saleable area; no such measurement is available here. Floor plans

5. Parking & vehicle circulation

The GHMC permit sanctions sub-cellar and cellar areas for parking and records a cellars area of 6,670.71. It also states that the approved cellar and stilt parking areas are to be used exclusively for vehicle parking. The supplied extracts do not establish the number or allocation of parking spaces, visitor or accessible parking, parking levels by block, ramps, EV charging, or unit-specific parking rights.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Amenities blockGround + 4 floors; approved area 852.40 (units not stated in the supplied extraction)GHMC building permitSanctioned; occupancy certificate was conditional on submission of a fire NOC.
Tot-lot108.27 m²GHMC building permit and occupancy certificateSanctioned; no independent current completion verification supplied.
Aggregate recreational open spaceNo size suppliedTG-RERA amenities record RERA amenitiesListed at 100%; this is a filed progress record, not independent verification.
Community buildingsNo further description or size suppliedTG-RERA amenities record RERA amenitiesListed at 100%; not independently verified.
Green strip / tot lot / parkNo further size suppliedTG-RERA amenities record RERA amenitiesListed at 0%.

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterTG-RERA amenities data lists water supply at 100%. The permit requires a water-recycling plant before occupancy certification and identifies a space for a transformer; the supplied evidence does not identify water sources, storage or treatment capacity. RERA amenities
Sewerage and drainageTG-RERA amenities data lists sewerage and treatment/disposal of sewage and sullage water at 100%, while storm-water drains are listed at 0%. The permit requires sewer outlets to comply with the cited Telangana State Pollution Control Board letter and requires storm-water disposal and rainwater-harvesting measures. RERA amenities
Rainwater harvestingThe permit specifies rainwater-harvesting structures (percolation pits) and lists 8 RWHPS. TG-RERA amenities data lists water conservation/rainwater harvesting at 100%. RERA amenities
ElectricalTG-RERA amenities data lists an electrical meter room, substation and receiving station at 100%. The permit requires space for a transformer; no supply or backup capacity is supplied. RERA amenities
Fire and life safetyTG-RERA amenities data lists fire-protection and fire-safety requirements at 100%. The permit assigns responsibility for required fire-fighting installations and records a fire-department letter; the amenities-block occupancy certificate remains conditional on submission of a fire NOC. RERA amenities
Waste and site servicesThe permit requires a garbage house. TG-RERA amenities data lists solid-waste management/disposal at 100%; no system details or capacity are supplied. RERA amenities
Vertical transportation and accessibilityNo lift count, capacity, accessible circulation or ramp details are provided in the supplied evidence. The permit refers generally to lifts and other services being executed under qualified technical supervision.

The available TG-RERA amenities record also marks internal roads and footpaths, street lighting at 100%; energy management is listed at 0%. RERA amenities

These are permit conditions and TG-RERA progress entries; they do not independently establish the current condition or operation of the systems. RERA amenities

8. Location, access & connectivity

The registered location is Uppal, Uppal mandal, Medchal-Malkajgiri district, Telangana, PIN 500039; the project filing and supplied certificates use Uppal Bagayath, and the occupancy certificate also describes Shanthi Nagar, Uppal. RERA record RERA filing

The GHMC permit records a site abutting an 18 mt. road and a 180.57 sq. m. road-affected portion. The project-filed boundaries also identify a 30-foot-wide road on the south. The supplied record provides no verified route distances, public-transport measurements or travel times. RERA filing

9. Developer & development status

The registered promoter is TRICOLOUR PROPERTIES PRIVATE LIMITED, a private limited company, GSTIN 36AADCT3647E1ZE. The project record gives the promoter’s office address as TRICOLOUR PROPERTIES PVT LTD, ZINDA TILSMATH ROAD, Back of Aditya Hospital, Uppal, Uppal, Medchal-Malkajgiri, 500039. Corporate record Parties record RERA filing

The promoter’s filed Form B, dated 22 November 2018, states that the promoter has legal title, declares the land free from encumbrances, and undertakes to complete the project by 17 May 2023. These are promoter declarations in the registration file.

No current independent construction-progress assessment is supplied. See the occupancy and status records above. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200000314; issued 16/02/2019; valid through 17/05/2023 unless extended
Scope and evidencePALMCOVE registration and registration conditions.
GHMC building permit order
Identifier / date53228/HO/EZ/Cir-2/2016; 18. 05. 2017; file no. 61582 / 06 / 02 / 2016 / HO
Scope and evidenceSanctions Blocks A and B, the amenities block, 150 residential flats, and stated site and building parameters.
GHMC occupancy certificate
Identifier / dateApproval no. 1/C2/05948/2021; 23 April, 2021; application no. 1/C2/06526/2021-0C
Scope and evidencePartial occupancy for Blocks A and B; amenities-block certificate is conditional on a fire NOC.
Form B promoter declaration
Identifier / date22 November 2018
Scope and evidencePromoter’s filed declarations, including title, encumbrance and completion statements.
Approved layout plan
Identifier / dateNot identified in the supplied extracted records
Scope and evidenceNo layout approval number or approved layout-plan document is available in the supplied evidence.
Floor-plan drawings
Identifier / dateEight drawings listed; scans pending
Scope and evidenceNo drawing-based carpet-area measurements or room-level details are available. Floor plans

The supplied material establishes a GHMC building permit and partial occupancy certification for the residential blocks. It does not include a current RERA registration extension or an occupancy certificate for the amenities block.

Frequently asked questions

Is PALMCOVE registered with Telangana RERA?

Yes. PALMCOVE is registered with the Telangana Real Estate Regulatory Authority as P02200000314; the registration status is On-Going Project.

Who is the developer of PALMCOVE?

The promoter named in the RERA registration is TRICOLOUR PROPERTIES PRIVATE LIMITED.

Where is PALMCOVE located?

PALMCOVE is in Uppal, Medchal-Malkajgiri, Telangana (500039).

When will PALMCOVE be completed?

The promoter's proposed date of completion filed with RERA is 17/05/2023. This is the promoter's declaration, not a guarantee.

More projects in Uppal