Oak Arcade
MEDA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200005680
OAK ARCADE is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri District. The registered promoter developing it is Meda Constructions. The project has a land area of 334.45 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 2BHK apartments, each with a saleable area of 107.48 sq. m. Its TG-RERA registration is P02200005680, and its proposed completion date is 5th May 2025.
More from Meda Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | OAK ARCADE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration concerns OAK ARCADE |
| TG-RERA registration | P02200005680 |
| Registration validity | 09/01/2023 to 05/05/2025; certificate states “2 years.” Extension is recorded as not extended in the supplied certificate data. Registration validity is distinct from the completion deadline and the occupancy certificate. |
| Registered promoter | Meda Constructions |
| RERA status | Registration certificate on file; the supplied certificate validity ended 05/05/2025. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / plot | Uppal; Plot No. 13 OLD, 23 NEW RERA record |
| Revenue village | Uppal Khalsa is named in the GHMC building-permit and OC extracts; the RERA record identifies Uppal. |
| Mandal | Uppal RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500039 RERA record |
| Project survey number(s) and subdivisions | Survey No. 56; no project subdivision is specified in the supplied RERA identity. RERA record Land records |
| Registered site extent | 334.45 sq. m total and net plot area in the supplied land and sanction records. Land records |
| Boundaries | North: Road; South: Plot No. 18; East: Plot No. 24; West: Plot No. 22. Land records |
| Approved layout reference | D/BA/86/2005, recorded in the GHMC approval materials. |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 2462/GHMC/LBN/2022-BP, approved 05 May, 2022 |
| Building configuration in permit | 1 Stilt + 5 upper floors; one residential building is identified. |
| Approved built-up area | 952.35 sq. m RERA filing |
| Building height | 14.95 m as sanctioned |
| Parking area | 190.5 sq. m recorded in the building-permit and OC extracts; a parking-space count is not supplied. |
| Unit count | One building and 10 RERA-filed 2BHK units; the building permit extract does not state a sanctioned apartment count. RERA filing RERA unit table |
| Mortgage-area disclosure | 106.95 sq. m appears in the RERA land/building information and GHMC permit records. RERA filing |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK; saleable area 107.48 sq. m RERA unit table |
| Booked / available | 7 booked; 3 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative. RERA unit table |
| Promoter-declared completion deadline | 5th May 2025, stated in Form B. |
| OC status and scope | GHMC Occupancy Certificate 2172/GHMC/LBN/2024-OC, approved 16 July, 2024, identifies the single residential building, A (S REDDY), at Survey No. 56 as fit for occupation. |
| OC completion date recorded | 20 October, 2023 in the OC extraction. |
| Construction stage | The supplied file includes an OC for the building; no separate independent site-progress assessment is provided. |
2. The project story
OAK ARCADE is registered as a residential apartment project on Survey No. 56, at Plot No. 13 OLD, 23 NEW, in Uppal. The RERA land record gives a site extent of 334.45 sq. m, and the GHMC permit identifies one residential building of 1 Stilt + 5 upper floors. RERA record Land records
The RERA filing lists ten 2BHK units, of which seven were recorded as booked and three as available when the portal data was captured; no capture date is provided for those counts. RERA unit table The GHMC OC extract identifies the building as fit for occupation and records an OC dated 16 July, 2024, with a completion date of 20 October, 2023. This is a document record for the identified building, not an independent site inspection for this report.
3. Master plan, architecture & building design
The GHMC building-permit extract records a single residential building, 1 Stilt + 5 upper floors, on a net plot area of 334.45 sq. m. It records approved built-up area of 952.35 sq. m and a sanctioned building height of 14.95 m. The OC extract records the same sanctioned floor area and height, and a site building-plan floor area of 977.77 sq. m.
The permit extract also records 190.5 sq. m of parking area.
No supplied drawing-derived record establishes building footprint, flats per floor, lift or stair arrangements, circulation, common-area distribution or internal road layout. The floor-plan data reports two drawings, neither measured and both marked as having no flats; no drawing-based room or carpet-area measurements are available. Floor plans
4. Homes, configurations & floor plans
The TG-RERA unit record lists ten 2BHK apartments, each with filed saleable area of 107.48 sq. m. The portal counts are seven booked and three available, but lack an as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 7 | 3 | 107.48 sq. m | Not measured in supplied drawings | Not supplied |
The supplied floor-plan record contains no measured flat plans. Therefore, no software-measured carpet area, room dimensions or layout details can be reported. Saleable area is the RERA-filed figure; it is not a carpet-area measurement, and no loading calculation is supplied. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit extract records 190.5 sq. m of parking area and states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking. The project data does not provide the number or type of parking spaces, a visitor or accessible-space allocation, circulation or ramp details, EV charging provision, or legally documented allocation to individual apartments. A parking-area figure does not establish exclusive ownership or assignment of a bay.
6. Amenities, recreation & open spaces
The GHMC permit extract specifies four rainwater-harvesting pits, transformer space and an on-site garbage house. It also records a tot-lot as “NA”; the OC extract records tot-lot area as 0 m².
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / recreational open space | Permit extract: “Tot Lot NA”; OC extract: 0 m² tot-lot area. | No delivered recreational space is established by the supplied records. | |
| Rainwater harvesting | Permit specifies 4 rainwater-harvesting pits; OC extract lists rainwater harvesting. | Recorded in approval/OC documents; no independent inspection supplied. | |
| Transformer space | Space for a transformer is required by the permit. | Approval condition; completion is not independently verified. | |
| Garbage house | On-site garbage house specified by the permit. | Approval condition; completion is not independently verified. |
No clubhouse, indoor recreation facility, sports amenity, landscaped park or community building is evidenced in the supplied project materials. RERA amenities
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, transformer space, a garbage house, and sanitary, plumbing, fire-safety, lift and electrical installations under qualified technical supervision. It also requires an occupancy fire NOC before issue of an OC and identifies the OC as compulsory before occupation. These are permit conditions; the supplied extracts do not provide system capacities or establish independent verification of each installation.
The project amenity record marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, and an electrical meter room/substation/receiving station as “YES” at 100%. This is a project record, not an independent test of service capacity or operation. The same record shows 0% for fire protection and fire-safety requirements. RERA amenities
The supplied materials do not state water source or storage capacity, STP capacity or reuse arrangements, power-backup capacity, lift number or capacity, CCTV or access-control provision, waste-segregation arrangements, or accessible circulation details. RERA amenities
8. Location, access & connectivity
The registered project location is Uppal, Mandal Uppal, District Medchal-Malkajgiri, PIN 500039; the GHMC permit and OC identify Uppal Khalsa village and Swaroop Nagar, Uppal. RERA record The supplied location record lists Financial District (Nanakramguda), 2.0 km as an anchor-distance entry; no route, measurement method or travel time is provided. Location record
9. Developer & development status
The registered promoter is Meda Constructions, identified in the RERA record as a partnership. Its GSTIN is 36AAWFM3085D1ZY. The supplied promoter address is Plot No. 3, Door No. 14-3, Bibi Saheb Maqtha, Uppal Khalsa, Uppal, Medchal-Malkajgiri, 500039; no official contact details or website are supplied. Parties record Corporate record
Form B, dated 26/11/22, is an affidavit by CH. Srinivas Reddy as authorized signatory for Meda Constructions. It declares the project land free from encumbrances, identifies Agreement of Sale Cum General Power of Attorney With Possession No. 6413/2022 as the title/development document, and undertakes completion by 5th May 2025. These are promoter declarations in the filed document.
The GHMC permit extract names Sri B Muthyam Reddy as applicant and LIGAND DEVELOPERS PVT. LTD. as developer/builder; the OC extract identifies M/S. MEDA CONSTRUCTIONS as developer. The supplied record does not establish a separate phase-wise development programme or independently verified construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P02200005680; issued 09/01/2023; valid to 05/05/2025 |
|---|---|
| What the supplied record establishes | Section 5 registration for OAK ARCADE; certificate records the promoter and registration period. |
| Identifier / date | 2462/GHMC/LBN/2022-BP; 05 May, 2022 |
|---|---|
| What the supplied record establishes | Building permit for one residential building, 1 Stilt + 5 upper floors; includes permit conditions. |
| Identifier / date | 004707/GHMC/2589/LBN2/2021-BP |
|---|---|
| What the supplied record establishes | File number associated with the building-permit record. |
| Identifier / date | D/BA/86/2005 |
|---|---|
| What the supplied record establishes | Reference recorded in the GHMC approval materials. |
| Identifier / date | 2172/GHMC/LBN/2024-OC; 16 July, 2024 |
|---|---|
| What the supplied record establishes | OC extract identifies the building at Survey No. 56 and states it is fit for occupation. |
| Identifier / date | Application 003843/GHMC/1864/LBN2/2024-OC; proceedings 2172/GHMC/LBN/2024-OC |
|---|---|
| What the supplied record establishes | Application and proceedings references in the OC record. |
| Identifier / date | Dated 26/11/22 |
|---|---|
| What the supplied record establishes | Promoter declaration for the project, including completion undertaking and identified agreement document. |
| What the supplied record establishes | Supplied title-report and instrument extracts associated with the project filing. |
|---|
The supplied evidence does not include a separately extracted sanctioned drawing set or a project-specific certificate for fire NOC. The GHMC permit states that an occupancy fire NOC is required before issue of an OC.
1. Project at a glance
Project identity
Registered project name: OAK ARCADE
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration concerns OAK ARCADE
TG-RERA registration: P02200005680
Registration validity: 09/01/2023 to 05/05/2025; certificate states “2 years.” Extension is recorded as not extended in the supplied certificate data. Registration validity is distinct from the completion deadline and the occupancy certificate.
Registered promoter: Meda Constructions
RERA status: Registration certificate on file; the supplied certificate validity ended 05/05/2025.
Land and geographic identity
Locality / plot: Uppal; Plot No. 13 OLD, 23 NEW
Revenue village: Uppal Khalsa is named in the GHMC building-permit and OC extracts; the RERA record identifies Uppal.
Mandal: Uppal
District: Medchal-Malkajgiri
PIN: 500039
Project survey number(s) and subdivisions: Survey No. 56; no project subdivision is specified in the supplied RERA identity.
Registered site extent: 334.45 sq. m total and net plot area in the supplied land and sanction records.
Boundaries: North: Road; South: Plot No. 18; East: Plot No. 24; West: Plot No. 22.
Approved layout reference: D/BA/86/2005, recorded in the GHMC approval materials.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 2462/GHMC/LBN/2022-BP, approved 05 May, 2022
Building configuration in permit: 1 Stilt + 5 upper floors; one residential building is identified.
Approved built-up area: 952.35 sq. m
Building height: 14.95 m as sanctioned
Parking area: 190.5 sq. m recorded in the building-permit and OC extracts; a parking-space count is not supplied.
Unit count: One building and 10 RERA-filed 2BHK units; the building permit extract does not state a sanctioned apartment count.
Mortgage-area disclosure: 106.95 sq. m appears in the RERA land/building information and GHMC permit records.
Offering and status
RERA-filed configuration: 2BHK; saleable area 107.48 sq. m
Booked / available: 7 booked; 3 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative.
Promoter-declared completion deadline: 5th May 2025, stated in Form B.
OC status and scope: GHMC Occupancy Certificate 2172/GHMC/LBN/2024-OC, approved 16 July, 2024, identifies the single residential building, A (S REDDY), at Survey No. 56 as fit for occupation.
OC completion date recorded: 20 October, 2023 in the OC extraction.
Construction stage: The supplied file includes an OC for the building; no separate independent site-progress assessment is provided.
2. The project story
OAK ARCADE is registered as a residential apartment project on Survey No. 56, at Plot No. 13 OLD, 23 NEW, in Uppal. The RERA land record gives a site extent of 334.45 sq. m, and the GHMC permit identifies one residential building of 1 Stilt + 5 upper floors.
The RERA filing lists ten 2BHK units, of which seven were recorded as booked and three as available when the portal data was captured; no capture date is provided for those counts. The GHMC OC extract identifies the building as fit for occupation and records an OC dated 16 July, 2024, with a completion date of 20 October, 2023. This is a document record for the identified building, not an independent site inspection for this report.
3. Master plan, architecture & building design
The GHMC building-permit extract records a single residential building, 1 Stilt + 5 upper floors, on a net plot area of 334.45 sq. m. It records approved built-up area of 952.35 sq. m and a sanctioned building height of 14.95 m. The OC extract records the same sanctioned floor area and height, and a site building-plan floor area of 977.77 sq. m.
The permit extract also records 190.5 sq. m of parking area.
No supplied drawing-derived record establishes building footprint, flats per floor, lift or stair arrangements, circulation, common-area distribution or internal road layout. The floor-plan data reports two drawings, neither measured and both marked as having no flats; no drawing-based room or carpet-area measurements are available.
4. Homes, configurations & floor plans
The TG-RERA unit record lists ten 2BHK apartments, each with filed saleable area of 107.48 sq. m. The portal counts are seven booked and three available, but lack an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 7 | 3 | 107.48 sq. m | Not measured in supplied drawings | Not supplied |
The supplied floor-plan record contains no measured flat plans. Therefore, no software-measured carpet area, room dimensions or layout details can be reported. Saleable area is the RERA-filed figure; it is not a carpet-area measurement, and no loading calculation is supplied.
5. Parking & vehicle circulation
The GHMC permit extract records 190.5 sq. m of parking area and states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking. The project data does not provide the number or type of parking spaces, a visitor or accessible-space allocation, circulation or ramp details, EV charging provision, or legally documented allocation to individual apartments. A parking-area figure does not establish exclusive ownership or assignment of a bay.
6. Amenities, recreation & open spaces
The GHMC permit extract specifies four rainwater-harvesting pits, transformer space and an on-site garbage house. It also records a tot-lot as “NA”; the OC extract records tot-lot area as 0 m².
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / recreational open space | Permit extract: “Tot Lot NA”; OC extract: 0 m² tot-lot area. | No delivered recreational space is established by the supplied records. | |
| Rainwater harvesting | Permit specifies 4 rainwater-harvesting pits; OC extract lists rainwater harvesting. | Recorded in approval/OC documents; no independent inspection supplied. | |
| Transformer space | Space for a transformer is required by the permit. | Approval condition; completion is not independently verified. | |
| Garbage house | On-site garbage house specified by the permit. | Approval condition; completion is not independently verified. |
No clubhouse, indoor recreation facility, sports amenity, landscaped park or community building is evidenced in the supplied project materials.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, transformer space, a garbage house, and sanitary, plumbing, fire-safety, lift and electrical installations under qualified technical supervision. It also requires an occupancy fire NOC before issue of an OC and identifies the OC as compulsory before occupation. These are permit conditions; the supplied extracts do not provide system capacities or establish independent verification of each installation.
The project amenity record marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, and an electrical meter room/substation/receiving station as “YES” at 100%. This is a project record, not an independent test of service capacity or operation. The same record shows 0% for fire protection and fire-safety requirements.
The supplied materials do not state water source or storage capacity, STP capacity or reuse arrangements, power-backup capacity, lift number or capacity, CCTV or access-control provision, waste-segregation arrangements, or accessible circulation details.
8. Location, access & connectivity
The registered project location is Uppal, Mandal Uppal, District Medchal-Malkajgiri, PIN 500039; the GHMC permit and OC identify Uppal Khalsa village and Swaroop Nagar, Uppal. The supplied location record lists Financial District (Nanakramguda), 2.0 km as an anchor-distance entry; no route, measurement method or travel time is provided.
9. Developer & development status
The registered promoter is Meda Constructions, identified in the RERA record as a partnership. Its GSTIN is 36AAWFM3085D1ZY. The supplied promoter address is Plot No. 3, Door No. 14-3, Bibi Saheb Maqtha, Uppal Khalsa, Uppal, Medchal-Malkajgiri, 500039; no official contact details or website are supplied.
Form B, dated 26/11/22, is an affidavit by CH. Srinivas Reddy as authorized signatory for Meda Constructions. It declares the project land free from encumbrances, identifies Agreement of Sale Cum General Power of Attorney With Possession No. 6413/2022 as the title/development document, and undertakes completion by 5th May 2025. These are promoter declarations in the filed document.
The GHMC permit extract names Sri B Muthyam Reddy as applicant and LIGAND DEVELOPERS PVT. LTD. as developer/builder; the OC extract identifies M/S. MEDA CONSTRUCTIONS as developer. The supplied record does not establish a separate phase-wise development programme or independently verified construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P02200005680; issued 09/01/2023; valid to 05/05/2025 |
|---|---|
| What the supplied record establishes | Section 5 registration for OAK ARCADE; certificate records the promoter and registration period. |
| Identifier / date | 2462/GHMC/LBN/2022-BP; 05 May, 2022 |
|---|---|
| What the supplied record establishes | Building permit for one residential building, 1 Stilt + 5 upper floors; includes permit conditions. |
| Identifier / date | 004707/GHMC/2589/LBN2/2021-BP |
|---|---|
| What the supplied record establishes | File number associated with the building-permit record. |
| Identifier / date | D/BA/86/2005 |
|---|---|
| What the supplied record establishes | Reference recorded in the GHMC approval materials. |
| Identifier / date | 2172/GHMC/LBN/2024-OC; 16 July, 2024 |
|---|---|
| What the supplied record establishes | OC extract identifies the building at Survey No. 56 and states it is fit for occupation. |
| Identifier / date | Application 003843/GHMC/1864/LBN2/2024-OC; proceedings 2172/GHMC/LBN/2024-OC |
|---|---|
| What the supplied record establishes | Application and proceedings references in the OC record. |
| Identifier / date | Dated 26/11/22 |
|---|---|
| What the supplied record establishes | Promoter declaration for the project, including completion undertaking and identified agreement document. |
| What the supplied record establishes | Supplied title-report and instrument extracts associated with the project filing. |
|---|
The supplied evidence does not include a separately extracted sanctioned drawing set or a project-specific certificate for fire NOC. The GHMC permit states that an occupancy fire NOC is required before issue of an OC.
Frequently asked questions
Is OAK ARCADE registered with Telangana RERA?
Yes. OAK ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200005680; the registration status is New Project.
Who is the developer of OAK ARCADE?
The promoter named in the RERA registration is MEDA CONSTRUCTIONS.
Where is OAK ARCADE located?
OAK ARCADE is in Uppal, Medchal-Malkajgiri, Telangana (500039).
When will OAK ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 05/05/2025. This is the promoter's declaration, not a guarantee.