Sign in

Nlc Avanthi

NEWLAND CONSTRUCTIONS · Sangareddy · RERA P01100007037

NLC AVANTHI is a residential apartment project in Ameenapur, Ameenpur Mandal, Sangareddy District. It is being developed by registered promoter Newland Constructions. The project occupies 668.80 sq. m and comprises 1 building with 1 stilt + 5 upper floors and 20 2BHK units. Its TG-RERA registration number is P01100007037, and the Form B undertakes completion by 24-03-2026.

More from Newland Constructions · 9 projects →

01What we found

Period endedTG-RERA registration ran to 25 Mar 2026 - check its extension on TG-RERA
19documents on file - each fact links to its page
5court cases on this project's land (survey 105, Ameenapur)
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameNLC AVANTHI RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately named in the registration. The filed site is the building on plots 44, 45, 46/PART (WEST PART) and 47/PART (WEST PART).
TG-RERA registrationP01100007037; granted 29/09/2023, valid through 25/03/2026. The certificate records a two-year validity and does not show an extension.
Registered promoterNewland Constructions; the RERA record identifies the organization type as a partnership. RERA record RERA filing Corporate record
RERA status in supplied recordRegistered project; the certificate states the validity dates above. The supplied record does not establish a current post-expiry registration status.

Land and geographic identity

ItemProject record
LocalityAmeenpur / Ameenapur, as recorded in the project documents. RERA record
Revenue villageAmeenapur; approval documents use “Ameenpur.” RERA record RERA filing
MandalAmeenpur (RERA identity record: AMEENPUR). RERA record
DistrictSangareddy (approval documents also spell it “Sanga Reddy”). RERA record
PIN502032 RERA record
Survey number and subdivisionSy. No. 105/P RERA filing Land records
Project plots44, 45, 46/PART (WEST PART) and 47/PART (WEST PART) RERA filing
Registered site extent668.80 sq. m
RERA land areaTotal area 668.80 sq. m; net area 668.80 sq. m; road-widening/FTL/nala-widening area recorded as 0 sq. m. RERA filing
Boundaries (RERA filing)East: Plot No. 46 part; West: 40 ft wide road; North: Plot No. 43; South: 60 ft wide road. RERA filing

Development identity

ItemProject record
Sanctioning authorityBuilding permit issued by Ameenpur Municipality / Municipal Corporation; the project record identifies HMDA as the planning authority. Approvals record
Principal building approval002153/BP/HMDA/0440/SKP/2023, dated 25 March 2023. Approvals record
Approved built-up area1,687.60 sq. m in the RERA project record and sanctioned parameters. The permit document separately records total built-up area of 2,037.75 sq. m; these are distinct figures as stated in the records. RERA filing
Building count1 building / block. RERA filing RERA unit table
Sanctioned floors1 stilt + 5 upper floors; building height recorded as 14.5 m.
Basements / podiumNot disclosed in the supplied project record.
Parking level / provisionStilt parking is indicated; the occupancy-certificate extract records parking area of 346.4 sq. m. A parking-space count or unit-wise allocation is not established by the supplied data.
UnitsRERA record: 20 residential units. The approved plan record gives one building but no separate approved unit count in the supplied extract. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configuration2BHK, 20 units; filed saleable area 55.16 sq. m per unit. RERA unit details RERA unit table
Booked / available15 booked / 5 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative. RERA unit table
Construction stageAn HMDA occupancy certificate is on file for the residential building. It records the building as fit for occupation; the supplied documents therefore show an occupancy-certified building, not merely a proposed or under-construction phase.
Completion undertaking / registration deadlineForm B undertakes completion by 24-03-2026; the RERA registration certificate states validity through 25/03/2026. These are separate dates and are reported as recorded.
Occupancy certificate006333/OC/HMDA/SKP/2024, dated 25 November 2024, for the residential building at Sy. No. 105/P.
Construction progress percentageNo verified current site-progress percentage is supplied. RERA amenity/infrastructure progress entries are recorded as 0%; these are portal entries, not an independent site inspection. RERA amenities

2. The project story

NLC AVANTHI is registered as a residential apartment project in Ameenapur village, Ameenpur Mandal, Sangareddy District, on the stated parcel in Sy. No. 105/P. The registered development occupies 668.80 sq. m and comprises one residential building on the specified portions of Plots 44, 45, 46 and 47. RERA record RERA filing

The RERA filing lists 20 two-bedroom apartments. Its portal-derived inventory shows 15 booked and 5 available, with no as-of date attached to those counts. The filed saleable area is 55.16 sq. m per unit. RERA unit details RERA unit table

The building permit describes 1 stilt + 5 upper floors. An HMDA occupancy certificate for the building is in the supplied record, and an architect’s certificate dated 14/05/2025 also certifies overall completion. The architect’s certificate text refers to both NLC AVANTHI and NLC AKRUTHI; this overview reports the project-specific occupancy certificate separately and does not treat the architect’s certificate as independent site verification.

3. Master plan, architecture & building design

The RERA-filed site area is 668.80 sq. m, with the same net area recorded. The building permit states a sanctioned built-up area of 1,687.60 sq. m and separately records total built-up area of 2,037.75 sq. m. The occupancy-certificate extract reports floor area of 1,687.6 sq. m as per the sanctioned plan and 1,702.55 sq. m as per the completed building plan. These figures are reproduced under their stated labels; the supplied material does not provide a drawing schedule explaining the different area categories. RERA filing RERA filing

The approved building is one residential block, 1 stilt + 5 upper floors, with a recorded height of 14.5 m. The occupancy-certificate extract records a 4.29% deviation and a fine paid of Rs. 192,376.00. No supplied drawing-derived information establishes flats per floor, building footprint, lift or stair count, internal circulation, landscaping arrangement, or common-area distribution.

The permit lists a 10% built-up-area mortgage requirement: 168.76 sq. m required and 173.00 sq. m provided, under registered mortgage document 8752/2023. The permit also states that the mortgaged built-up area may be registered only after an occupancy certificate is produced.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2015555.16 sq. mNot suppliedNot supplied

The configuration, unit counts, booking counts and saleable area are from the TG-RERA filing/portal record. Booking counts have no supplied as-of date and should be treated as indicative. RERA unit details RERA unit table

The supplied floor-plan processing record does not provide a measured 2BHK carpet area or room dimensions. It states that drawing-based carpet measurements, when available, are software measurements rather than RERA disclosures and need review. No carpet area or loading figure is therefore stated here. Floor plans

5. Parking & vehicle circulation

The building permit describes a stilt level, and the occupancy-certificate extract records a 346.4 sq. m parking area. The permit requires parking to remain out of setback areas. The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible bays, parking allocation to individual apartments, mechanical parking, EV charging, or the detailed vehicle-ramp and internal-driveway arrangement. A parking area or drawn bay does not, by itself, establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA portal records the following project infrastructure/amenity items with progress entries of 0%. A rainwater-harvesting entry is marked “YES”; these portal fields are not independent verification of completion. RERA amenities

Internal roads and footpaths
Description / sizeNo dimensions supplied
Evidence sourceRERA portal amenities RERA amenities
Declared progress / verified status0%; not independently verified
Green strip / tot-lot / park
Description / sizeOccupancy-certificate extract records tot-lot area 0 m²
Evidence sourceRERA portal amenities RERA amenities; occupancy certificate
Declared progress / verified statusRERA progress 0%; no delivered open-space area established
Community buildings
Description / sizeNo size or capacity supplied
Evidence sourceRERA portal amenities RERA amenities
Declared progress / verified status0%; not independently verified
Water conservation / rainwater harvesting
Description / sizePermit requires rainwater-harvesting structures; RERA portal marks availability “YES”
Evidence sourceBuilding permit; RERA portal amenities RERA amenities
Declared progress / verified statusPortal progress 0%; completion not independently verified

Other facilities such as a clubhouse, gym, swimming pool and children’s play area appear in third-party vendor data, not as confirmed RERA-filed or sanctioned facilities in the supplied evidence, so they are not presented as project-provided amenities here. Promoter website

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterThe building permit specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres. The water source and treatment arrangements are not disclosed.
Sewerage / drainageThe permit requires an STP; the RERA portal lists sewerage and sewage/sullage treatment and disposal, each with progress recorded as 0%. STP capacity, reuse arrangements and storm-water design details are not supplied. RERA amenities
ElectricalThe RERA portal lists an electrical meter room/sub-station/receiving station with progress recorded as 0%. No project-specific supply capacity or backup specification is established in the RERA evidence supplied. RERA amenities
Vertical transportationNo RERA-filed lift count or capacity is supplied in the evidence reviewed.
Fire and life safetyThe building permit specifies a minimum of four fire extinguishers per floor and two water-type extinguishers for every 600 sq. m of floor area. The occupancy-certificate extract refers to a Fire NOC and its conditions, but does not supply the NOC details. The RERA portal records fire-protection progress as 0%. RERA amenities
Waste and securityThe permit lists a garbage house; the RERA portal lists solid-waste management and disposal with progress recorded as 0%. CCTV, access-control and security-system completion are not established by the project approval records supplied. RERA amenities
AccessibilityNo project-specific accessible-route or accessibility details are supplied.

8. Location, access & connectivity

The registered project location is Ameenapur village, Ameenpur Mandal, Sangareddy District, Telangana, PIN 502032, on Sy. No. 105/P. The RERA-filed plot boundaries identify a 40 ft wide road on the west and a 60 ft wide road on the south. The building permit refers to a 4.5 m road and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of the occupancy certificate. RERA record RERA filing

A cadastral-parcel centroid is recorded at 17.536107299373214, 78.32189253272621; this is a software/geospatial reference, not a surveyed building entrance location. The nearest sampled Outer Ring Road interchange is recorded at 6.6 km (approx.). Cadastral map Location record

9. Developer & development status

The registered promoter is NEWLAND CONSTRUCTIONS, recorded as a partnership. The RERA record lists GSTIN 36AASFN3244K1ZT and the promoter address as SURAKSHA ENCLAVE, ROAD NO 10, SAI RAJESWARI (PHASE-I), AMEENPUR, AMEENPUR, Sangareddy, 502032. The registration certificate separately prints a promoter-office line as “Village: Mandal: District: Hyderabad, Pin: 500050”; the supplied material does not give a fuller verified office address beyond those recorded details. Corporate record RERA filing RERA record

The Form B affidavit, signed by authorized signatory VENKATA NARAYANA KETHIREDDY and dated 27 May 2023, declares a legal-title basis for development of 800 square yards in Sy. No. 105/P, states the land is free from encumbrances, and undertakes completion by 24-03-2026. These are promoter declarations.

The project record describes one building and does not identify separate development phases. The building has an occupancy certificate in the supplied file; a current construction-progress percentage or independent site inspection is not provided. RERA filing RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeForm C; project NLC AVANTHI, registration P01100007037, issued 29/09/2023; validity through 25/03/2026
Building permit
Reference and scope002153/BP/HMDA/0440/SKP/2023, approved 25 March 2023; residential building on Sy. No. 105/P, site extent 668.80 sq. m
Permit proceedings
Reference and scope002558/BP/HMDA/SKP/2023
EvidenceApprovals record
Layout reference
Reference and scope02/MP2/PLG/HMDA/20 13, printed in the occupancy-certificate extract as the sanctioned layout number
Occupancy certificate
Reference and scopeHMDA certificate 006333/OC/HMDA/SKP/2024, application 011828/OC/HMDA/3133/SKP/2024; dated 25 November 2024; scope: residential building on Sy. No. 105/P
Architect’s completion certificate
Reference and scopeForm 1A dated 14/05/2025; records the NLC project and the NLC AVANTHI occupancy-certificate entry
Form B declaration
Reference and scopePromoter affidavit dated 27 May 2023, including title, encumbrance and completion declarations
Building-permit mortgage
Reference and scopeRegistered mortgage document 8752/2023, dated 14 March 2023; 173.00 sq. m built-up area stated as mortgaged to MC, HMDA

Frequently asked questions

Is NLC AVANTHI registered with Telangana RERA?

Yes. NLC AVANTHI is registered with the Telangana Real Estate Regulatory Authority as P01100007037; the registration status is New Project.

Who is the developer of NLC AVANTHI?

The promoter named in the RERA registration is NEWLAND CONSTRUCTIONS.

Where is NLC AVANTHI located?

NLC AVANTHI is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will NLC AVANTHI be completed?

The promoter's proposed date of completion filed with RERA is 25/03/2026. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur