Navya Vazeer Estates

S S CONSTRUCTIONS · Rangareddy · RERA P02400001500

NAVYA VAZEER ESTATES is a commercial project in Mansoorabad, Saroornagar mandal, Ranga Reddy district, registered under TG-RERA number P02400001500. S S CONSTRUCTIONS, filed as a proprietorship, is the registered promoter developing the project on a total site area of 2,578.94 sq. m. The project comprises one commercial building with 2 Cellar + Ground + 4 floors and five commercial units: GF, 1F, 2F, 3F and 4F COMMERCIAL. Its proposed completion date is 5 November 2024.

More from S S Constructions · 33 projects →

01What we found

Period endedTG-RERA registration ran to 5 Nov 2024 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameNAVYA VAZEER ESTATES RERA record
Project typeCommercial in the TG-RERA record; GHMC’s building permit identifies a commercial building. RERA filing
Phase / registered portionPhase designation is not disclosed. The certificate identifies plots 1, 2 & 3 and Survey No. 52.
TG-RERA registrationP02400001500; granted under section 5.
Registration validity27 December 2019 to 5 November 2024; the certificate records no extension. Registration validity is distinct from the project completion deadline.
Registered promoterS S CONSTRUCTIONS; filed as a proprietorship. RERA record Parties record RERA filing
RERA statusRegistration term shown in the supplied certificate has ended; no extension is recorded in the supplied evidence. This does not, by itself, establish the project’s physical completion or occupancy status.

Land and geographic identity

FieldRecord
LocalityMansoorabad / MANSOORABAD RERA record
Revenue villageMansoorabad (also rendered “Mansurabad” in title records); only this village is identified in the supplied project record. RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500068 RERA record
Project survey number(s)Survey No. 52; no project subdivision is disclosed in the filing. The associated land-record extract shows 52/1, but says the project filing does not identify which child subdivision it holds. Land records
Plots identified in the recordPlot Nos. 1, 2 & 3 RERA filing
Site extentTotal area: 2,578.94 sq. m; road-affected area: 84 sq. m; net area: 2,494.94 sq. m. RERA filing
Boundaries filed with RERAEast: neighbours’ land; west: 30 feet wide road; north: 25 feet wide road; south: NH No. 9. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number / dateApproval No. 1/C3/17319/2018; 5 November 2018. File No. 1/C3/10739/2018. Approvals record
Approved building formOne commercial building: 2 Cellar + Ground + 4; height recorded as 14.95 m.
Approved areasGHMC permit records Ground floor commercial area of 1,251.24 sq. m, upper-floor area of 5,714.72 sq. m, cellar parking floors area of 3,420.62 sq. m, and first-floor area of 723.22 sq. m. The permit also states a proposed covered built-up area as “635,520.00”; the supplied extraction does not clarify that figure’s unit or reconcile it with the floor-area entries.
RERA building / unit countOne building and five commercial units, as recorded in the RERA project data. RERA filing RERA unit table
Parking levelsTwo cellar parking floors are shown in the building permit. A parking-space count is not supplied.

Offering and status

FieldRecord
Unit typesFive commercial units: GF, 1F, 2F, 3F and 4F COMMERCIAL. RERA unit details
RERA-filed saleable areaGF: 1,251.24 sq. m; each of 1F, 2F, 3F and 4F: 1,428.68 sq. m. RERA unit table
Booked / availablePortal-derived filing snapshot: 0 booked and 5 available. The portal record has no as-of date; counts are indicative, not a current availability confirmation. RERA unit table
Construction stageNot established by the supplied evidence; no independently verified site-progress record is provided. Document index
Completion datesGHMC permit states construction was to commence before 5 May 2020 and complete before 5 November 2024. The promoter’s Form B also undertakes completion by 5 November 2024.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; status is unverified. GHMC’s permit says an occupancy certificate is compulsory before occupation. Document index

2. The project story

  • NAVYA VAZEER ESTATES is registered with TG-RERA as a commercial project on plots 1, 2 and 3 in Survey No. 52, Mansoorabad village, Saroornagar mandal, Ranga Reddy district. The registered land record gives a total site area of 2,578.94 sq. m, including 84 sq. m identified as road-affected, and a net area of 2,494.94 sq. m. RERA record RERA filing
  • GHMC’s permit describes one commercial building with two cellar levels, a ground floor and four upper floors. The RERA filing lists five commercial units—ground through fourth floor—with all five shown as available in the portal snapshot; the snapshot is undated and should not be treated as a live sales position. The evidence supplied does not establish construction progress, completion, or occupation of any floor. RERA unit details RERA unit table
  • The permit and Form B both carry a completion date of 5 November 2024. That date is a stated deadline, not evidence that the building was completed. No occupancy or completion certificate has been supplied. Document index

3. Master plan, architecture & building design

  • The GHMC building-permit order is the available sanctioned-design record. It gives a 7.5 m front setback and 5 m at each of the two side setbacks and the rear, and records road widths of 18 m in its building-permit data.
  • The permit’s area entries distinguish ground-floor commercial area (1,251.24 sq. m), upper-floor area (5,714.72 sq. m), cellar parking-floor area (3,420.62 sq. m), and first-floor area (723.22 sq. m). It separately states “Proposed Covered builtup area 635,520.00”; the supplied extraction does not clarify the unit or how this figure relates to the listed floor areas, so it is not used here as an interpreted total. No FSI-counted area, gross built-up area, carpet area, building footprint, floor-by-floor arrangement beyond the listed figures, or approved floor-plan drawings suitable for measurement are supplied. Floor plans
  • The RERA record describes one building, and the GHMC permit includes one commercial-building entry. Detailed evidence on entrances, lifts, stairs, internal circulation, landscaping, open-space layout or phase-wise construction is not available in the supplied materials. RERA filing Document index

4. Homes, configurations & floor plans

The project is commercial, so the registered offering consists of commercial units rather than residential homes. The RERA portal-derived counts show five units, none booked and five available; the record has no as-of date. No software-measured carpet areas are available: the supplied floor-plan review records three drawings, none measured, with no flats identified in those drawings. RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
GF COMMERCIAL1011,251.24 sq. m RERA unit tableNot availableNot supplied
1F COMMERCIAL1011,428.68 sq. m RERA unit tableNot availableNot supplied
2F COMMERCIAL1011,428.68 sq. m RERA unit tableNot availableNot supplied
3F COMMERCIAL1011,428.68 sq. m RERA unit tableNot availableNot supplied
4F COMMERCIAL1011,428.68 sq. m RERA unit tableNot availableNot supplied

Carpet area and saleable area are not interchangeable: the supplied filing gives saleable areas, while no drawing-based carpet measurements are available for comparison. The evidence does not provide unit interiors, room dimensions, balconies, utilities, or a typical floor plan. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit provides for two cellar parking floors, with a recorded combined cellar parking-floor area of 3,420.62 sq. m. The number and type of parking spaces, resident or visitor allocation, accessible bays, mechanical parking, ramps, EV charging, and unit-specific parking arrangements are not established by the supplied records. A parking floor on the sanctioned plan does not establish an exclusive parking allocation to a particular unit. Document index

6. Amenities, recreation & open spaces

The GHMC permit lists two rainwater-harvesting pits, 38 trees, provision for a transformer space, a garbage house within the premises, and a rainwater-harvesting percolation structure. It records the tot-lot area as 0 sq. m. TG-RERA’s amenity record marks some infrastructure items as available but records 0% progress for the listed items; this is a portal declaration, not independent confirmation of delivery. RERA amenities

Rainwater harvesting
Description / sizeTwo RWHPs and a percolation-pit structure; no capacity supplied
Evidence sourceGHMC permit; RERA amenities RERA amenities
Declared progress / verified statusPermit provision / RERA-listed; completion not independently verified
Green strip / tot-lot / park
Description / sizeRERA amenity record marks Green Strip/TOT LOT/Park available; GHMC permit records tot-lot area as 0 sq. m and requires a fenced tot-lot maintained as greenery before OC
Evidence sourceRERA amenities
Declared progress / verified statusRERA status shows 0% progress; not independently verified
Trees
Description / size38 trees recorded in the permit
Declared progress / verified statusSanction-recorded provision; planting status not verified
Transformer space
Description / sizeSpace to be provided within the site
Declared progress / verified statusPermit condition; completion not verified
Garbage house
Description / sizeTo be made within the premises
Declared progress / verified statusPermit condition; completion not verified
Water supply
Description / sizeMarked “YES” in the RERA amenity record
Evidence sourceRERA amenities
Declared progress / verified status0% progress recorded; no source, capacity or completion evidence supplied
Sewerage
Description / sizeRERA record marks sewerage (chambers, lines, septic tank, STP) “YES”
Evidence sourceRERA amenities
Declared progress / verified status0% progress recorded; configuration and completion not verified
Fire protection and fire safety
Description / sizeMarked “YES” in the RERA amenity record
Evidence sourceRERA amenities
Declared progress / verified status0% progress recorded; systems and completion not verified
Other listed infrastructure
Description / sizeInternal roads and footpaths, storm-water drains, street lighting, community buildings, sewage/sullage treatment, solid-waste management, energy management, and aggregate recreational open space appear in the amenity register
Evidence sourceRERA amenities
Declared progress / verified statusEach is recorded at 0%; provision, size and completion are not established by the supplied evidence

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, fire protection and an electrical meter room/sub-station/receiving station as “YES”; the same record shows 0% progress for its listed items. These entries are filing data, not independent evidence that the services have been installed or commissioned. The GHMC permit also calls for transformer space, a garbage house, two rainwater-harvesting pits and a percolation structure. No water source or storage/treatment capacity, STP specification, reuse arrangement, storm-water design, electrical backup capacity, lift details, CCTV, security arrangements or accessibility design is supplied in the project records provided. RERA amenities

The permit makes an occupancy certificate compulsory before occupation and requires the applicant to submit a completion notice after construction and obtain the certificate. The supplied evidence includes no occupancy or completion certificate. Document index

8. Location, access & connectivity

The registered location is Mansoorabad, Saroornagar mandal, Ranga Reddy district, PIN 500068; the project is identified on Survey No. 52 and plots 1, 2 & 3. The filed boundaries are neighbours’ land to the east, a 30 feet wide road to the west, a 25 feet wide road to the north, and NH No. 9 to the south. RERA record RERA filing

A location record gives the nearest sampled Outer Ring Road interchange at approximately 6.9 km. No public-transport, school, airport, restaurant or other landmark distances are supplied in the project evidence. Location record

9. Developer & development status

The registered promoter is S S CONSTRUCTIONS, filed as a proprietorship. The project record names Madhu Yarab arla (also rendered “Yarab arla Madhu” in the party data) as proprietor and authorized signatory; Form B identifies Mr. M. YARABARLA MADHU as the authorized representative of M/s. SS CONSTRUCTIONS. The supplied records do not establish a company-registration identifier, official website, or verified promoter contact details. RERA record Parties record RERA filing

Form B is a promoter declaration dated 5 November 2019. It identifies four landowners—Vazir Ramesh, Vazir Jaihind, Vazir Prakash and Dr. M. Ramakrishna—and refers to development-agreement-cum-GPA documents; it does not state that title was transferred to the promoter. It declares that the land is free from encumbrances and undertakes completion by 5 November 2024. These are statements in the promoter’s filing, not independent verification of title, encumbrances, construction progress or completion.

The GHMC permit also identifies VAZIR RAMESH & OTHERS as applicants and M/s S.S CONSTRUCTIONS as GPA. No phase-wise status, independently verified construction progress, or occupancy certificate is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400001500; issued 27 December 2019; validity through 5 November 2024
What it establishes in the supplied evidenceRegistration of NAVYA VAZEER ESTATES under section 5; certificate states a four-year term and lists project conditions. No extension is recorded in the supplied certificate.
GHMC building permit order
Identifier / dateApproval No. 1/C3/17319/2018; File No. 1/C3/10739/2018; 5 November 2018
What it establishes in the supplied evidencePermit for the commercial building on plots 1, 2 & 3 in Survey No. 52, Mansoorabad; records the building configuration, selected area entries and conditions.
Layout / subdivision reference
Identifier / date1/C3/07545/2017
What it establishes in the supplied evidenceNumber appears in the GHMC permit record; a separate approved layout document is not included in the supplied materials.
Form B declaration
Identifier / dateDated 5 November 2019
What it establishes in the supplied evidencePromoter-filed declaration naming landowners, referring to development agreements and setting out promoter declarations and a completion undertaking.
Encumbrance statements filed with RERA
Identifier / dateStatement Nos. 43485303 and 43485324
What it establishes in the supplied evidenceFiled encumbrance-record extracts for Survey No. 52; the supplied records state a search period of 1 May 1995 to 10 November 2019. They are not a current encumbrance search.
Occupancy / completion certificate
Identifier / dateNot supplied
What it establishes in the supplied evidenceThe available evidence does not establish that an occupancy or completion certificate has been issued. Document index

The supplied materials do not include a separate approved layout plan, a complete set of sanctioned floor drawings, a current site-progress certificate, or an occupancy/completion certificate. The GHMC permit itself says the sanctioned plan must be followed and requires a completion notice and occupancy certificate before occupation. Document index

Frequently asked questions

Is NAVYA VAZEER ESTATES registered with Telangana RERA?

Yes. NAVYA VAZEER ESTATES is registered with the Telangana Real Estate Regulatory Authority as P02400001500; the registration status is New Project.

Who is the developer of NAVYA VAZEER ESTATES?

The promoter named in the RERA registration is S S CONSTRUCTIONS.

Where is NAVYA VAZEER ESTATES located?

NAVYA VAZEER ESTATES is in MANSOORABAD, Saroornagar, Rangareddy, Telangana (500068).

When will NAVYA VAZEER ESTATES be completed?

The promoter's proposed date of completion filed with RERA is 05/11/2024. This is the promoter's declaration, not a guarantee.