Balaji Hills Phase - I
SRI GOPI KRISHNA CONSTRUCTIONS · Rangareddy · RERA P02400008539
BALAJI HILLS PHASE - I is a residential apartment project in Mansoorabad, Saroornagar Mandal, Ranga Reddy District, developed by registered promoter SRI GOPI KRISHNA CONSTRUCTIONS. The project covers 487.19 sq. m. and comprises one building with 1 Stilt + 5 upper floors and 10 homes, configured as 3BHK apartments with a RERA-filed saleable area of 157.94 sq. m. The project is registered under TG-RERA registration P02400008539, with a declared completion date of 30 November 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | BALAJI HILLS PHASE - I |
| Project type | Residential apartment project |
| Phase / registered portion | Phase I; the registration identifies this phase. |
| TG-RERA registration | P02400008539 |
| Registration validity | 27 July 2024 to 6 July 2026, unless extended by the Authority. This is the registration period, not a construction or possession date. |
| Registered promoter | SRI GOPI KRISHNA CONSTRUCTIONS |
| RERA status | The supplied registration certificate records registration. The recorded validity ended on 6 July 2026; the supplied evidence does not establish whether an extension or other later status change was granted. |
RERA record
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Mansoorabad |
| Revenue village | Mansoorabad |
| Mandal | Saroornagar |
| District | Ranga Reddy |
| PIN | 500068 |
| Project survey number(s) | 66/6; no project subdivision is specified in the filed identity. |
| Registered site extent | 487.19 sq. m. |
| Total / net plot area in the building-permit extraction | 487.19 sq. m. / 487.19 sq. m. |
| Boundaries in the RERA filing | East: 30 feet wide road; West: part of Plot No. 8; North: Plot No. 1; South: Plot No. 9. |
RERA record RERA filing RERA filing Land records
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number | 2314/GHMC/LBN/2023-BP, dated 6 July 2023 |
| Related application / permit number | TS/031903/2023; application record dated 6 May 2023 |
| Building | One residential building, A (GUNTI BALRAM) |
| Sanctioned configuration | 1 Stilt + 5 upper floors |
| Building height | 14.75 m |
| Approved built-up area | 1,401.05 sq. m. residential upper-floor area; the permit extraction also records 280.20 sq. m. parking area and 1,681.25 sq. m. total built-up area including parking. |
| Sanctioned units / RERA-filed units | 10 / 10 |
| Parking | The permit extraction records 280.20 sq. m. parking area; the extracted parameter “Proposed number of parkings” is 0. The supplied evidence does not establish a sanctioned bay count or unit-by-unit allocation. |
Approvals record
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 3BHK |
| RERA-filed saleable area | 157.94 sq. m. |
| Units / booked / available | 10 / 0 / 10, as last read from the TG-RERA portal; the portal record has no supplied as-of date, so counts are indicative. |
| Declared completion date | 30 November 2026 in the project record. |
| Building-permit completion date | Before 6 July 2026 in the GHMC permit extraction. |
| Construction stage | Not established by supplied site-progress evidence. |
| Occupancy / completion certificate | No project OC or completion certificate is included in the supplied evidence. |
RERA record RERA unit table RERA unit table
2. The project story
- BALAJI HILLS PHASE - I is registered as a residential apartment project on Survey No. 66/6 at Mansoorabad. The filed and sanctioned development describes a single building, A (GUNTI BALRAM), with a stilt and five upper floors, and a total of 10 units. The RERA-filed offering is 3BHK apartments. RERA record Land records RERA unit table
- The GHMC permit authorizes construction on a 487.19 sq. m. site and records an approved residential upper-floor built-up area of 1,401.05 sq. m. The project record declares completion by 30 November 2026; the permit extraction specifies completion before 6 July 2026. These are separate recorded dates. The evidence supplied does not establish current construction progress or that any part of this phase has received an occupancy or completion certificate. RERA record Document index
3. Master plan, architecture & building design
- The GHMC building-permit record describes one residential building, A (GUNTI BALRAM), comprising 1 Stilt + 5 upper floors, with a stated building height of 14.75 m. The extracted plan figures are 1,401.05 sq. m. residential upper-floor area and 280.20 sq. m. parking area; the permit also records 1,681.25 sq. m. total built-up area including parking.
- The plan extraction records a proposed coverage area of 280.21 sq. m. (57.52%), vacant plot area of 206.98 sq. m., and a mortgage area of 142.39 sq. m. It also records a net residential BUA and total proposed built-up area excluding parking of 1,401.05 sq. m. These are distinct plan labels and are not measures of apartment carpet or saleable area.
- The supplied drawing-derived records include measurements from floor-plan geometry but do not provide a complete, verified architectural schedule for lifts, stairs, floor-by-floor unit arrangement, entrances, exits, or common-area distribution. The GHMC permit conditions require one entry and one exit, each with minimum width of 4.5 m and height clearance of 5 m; this is a permit condition, not evidence that the works are complete.
4. Homes, configurations & floor plans
- The TG-RERA record lists 10 3BHK units, all shown as available and none booked in the portal data supplied. The filed saleable area is 157.94 sq. m. per recorded configuration. Booked and available counts are indicative because the portal record has no supplied as-of date. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.94 sq. m. | 91.4–93.0 sq. m. (software-measured from drawings) | 41% (software-measured record) |
RERA unit table RERA unit details Floor plans
- The carpet-area range is a software measurement from the supplied approved floor-plan drawing record, not a TG-RERA carpet-area disclosure; the drawing measurements are marked as needing review. One measured 3BHK plan shows a hall, kitchen, three bedrooms, three toilets and balconies; the drawing record gives dimensions for the rooms but does not establish the delivered specification of every unit. Carpet area, balcony area and a unit’s share of common areas are not interchangeable; the RERA saleable figure is presented separately from the drawing-based carpet estimate. RERA unit details Floor plans
- The floor-plan extraction also identifies a measured 2BHK design with 68.9 sq. m. software-measured carpet area. The supplied RERA unit record does not list a 2BHK configuration or unit count, so this drawing-derived design is not represented here as a RERA-filed sale offering. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC permit extraction records 280.20 sq. m. as total parking area. A separate extracted permit parameter states “Proposed number of parkings 0.” The supplied records therefore do not establish a sanctioned parking-bay count, visitor or accessible spaces, or parking allocation to individual apartments.
- The permit conditions state that the cellar and stilt areas approved for parking are to be used exclusively for parking and not converted or partitioned for other use. The supplied evidence does not establish parking allocation terms in executed sale agreements or whether parking has been completed.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following facilities or provisions with 0% progress recorded for each item. The “YES” entries are recorded as available in that filing; they do not, by themselves, verify completion or operation. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | GHMC plan extraction identifies a tot-lot and periphery greenery; no size supplied. | RERA amenities; | Amenity record: 0%; completion not independently verified. |
| Water conservation / rainwater harvesting | Permit extraction specifies one rainwater-harvesting pit / percolation structure. | RERA amenities; | Amenity record: 0%; completion not independently verified. |
| Community buildings | No facility description or size supplied. | RERA amenities | 0%; no completion evidence supplied. |
| Internal roads and footpaths | No detail or dimensions supplied in the RERA amenity record. | RERA amenities | 0%; completion not independently verified. |
The supplied evidence does not establish a clubhouse, pool, gym or other indoor or sports facility as a RERA-filed or sanctioned provision. RERA amenities
7. Utilities, building services & safety
- The GHMC permit extraction specifies a separate underground static water-storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. The RERA amenity record marks water supply as “YES” but records 0% progress; no water source or operating status is supplied. RERA amenities
- The permit extraction lists a septic tank and rainwater harvesting, and the RERA amenity record marks sewerage, sewage/sullage treatment and disposal, storm-water drains and water conservation as “YES,” each with 0% progress recorded. No STP capacity or reuse details are supplied. RERA amenities
- The permit conditions require space for a transformer, a generator as an alternate electricity source, emergency lighting in corridors/common passages and stairs, fire-fighting installations, a manually operated alarm system, hose reels and down corners, and specified extinguishers. The permit extraction also states that automatic sprinklers are required if basement area exceeds 200 sq. m. The evidence does not establish installation, testing, fire clearance or operational completion; the building-permit record states that an occupancy fire NOC is to be obtained before issue of an occupancy certificate.
- No lift count or capacity, accessibility arrangements, waste-segregation system, CCTV or access-control details are established by the supplied evidence. The permit does require a garbage house within the premises.
8. Location, access & connectivity
- The registered project location is Mansoorabad, Saroornagar Mandal, Ranga Reddy District, Telangana 500068, on Survey No. 66/6. The filed site boundaries identify a 30 feet wide road to the east and Plot No. 1, Plot No. 9 and part of Plot No. 8 to the north, south and west respectively. RERA record Land records
- The location data provides one sampled connectivity reference: the nearest sampled Outer Ring Road interchange is approximately 6.9 km away. No verified travel time or further road, public-transport or landmark distances are supplied in the location record. Location record
9. Developer & development status
- The registered legal promoter is SRI GOPI KRISHNA CONSTRUCTIONS, recorded as a partnership. Its supplied corporate identifier is GSTIN 36AECFS6839M1ZD. The project record gives a promoter address at CIEFL Colony, East Anandbagh, L B Nagar Municipality, Mansoorabad, Saroornagar, Ranga Reddy, 500068. The registration certificate separately records a promoter address in Anand Bagh, Malkajgiri, Medchal-Malkajgiri, PIN 500047; the project-site address remains Mansoorabad, Saroornagar, Ranga Reddy, PIN 500068. Corporate record Parties record
- The promoter’s Form B declaration, dated 03 September 2023, states a completion undertaking of 6 July 2026 and includes declarations concerning title, encumbrances, project funds and approvals. These are promoter declarations, not independent verification of current site status. The project header separately records a proposed completion date of 30 November 2026. No construction-progress report or OC is included in the evidence supplied for this Overview. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P02400008539; valid 27 July 2024 to 6 July 2026 unless extended |
|---|---|
| What the supplied record establishes | Registration of BALAJI HILLS PHASE - I and conditions recorded in the Form C certificate. |
| Identifier / date | 2314/GHMC/LBN/2023-BP; 6 July 2023 |
|---|---|
| What the supplied record establishes | Permit extraction describes residential construction of one stilt plus five upper floors at Mansoorabad. |
| Identifier / date | TS/031903/2023; application date 9 May 2023 in the permit extraction |
|---|---|
| What the supplied record establishes | Identifies the permit application record. |
| Identifier / date | 005171/GHMC/2578/LBN2/2023-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building-permit extraction. |
| Identifier / date | 352847 |
|---|---|
| What the supplied record establishes | Filed layout-plan item and extracted plan details, including Survey No. 66/6, site area, proposed floors, unit count and permit conditions. |
| Identifier / date | Form B, dated 03 September 2023 |
|---|---|
| What the supplied record establishes | Promoter’s stated title, encumbrance and completion declarations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project OC or completion certificate is established by the supplied documents. Document index |
1. Project at a glance
Project identity
Registered project name: BALAJI HILLS PHASE - I
Project type: Residential apartment project
Phase / registered portion: Phase I; the registration identifies this phase.
TG-RERA registration: P02400008539
Registration validity: 27 July 2024 to 6 July 2026, unless extended by the Authority. This is the registration period, not a construction or possession date.
Registered promoter: SRI GOPI KRISHNA CONSTRUCTIONS
RERA status: The supplied registration certificate records registration. The recorded validity ended on 6 July 2026; the supplied evidence does not establish whether an extension or other later status change was granted.
Land and geographic identity
Locality: Mansoorabad
Revenue village: Mansoorabad
Mandal: Saroornagar
District: Ranga Reddy
PIN: 500068
Project survey number(s): 66/6; no project subdivision is specified in the filed identity.
Registered site extent: 487.19 sq. m.
Total / net plot area in the building-permit extraction: 487.19 sq. m. / 487.19 sq. m.
Boundaries in the RERA filing: East: 30 feet wide road; West: part of Plot No. 8; North: Plot No. 1; South: Plot No. 9.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number: 2314/GHMC/LBN/2023-BP, dated 6 July 2023
Related application / permit number: TS/031903/2023; application record dated 6 May 2023
Building: One residential building, A (GUNTI BALRAM)
Sanctioned configuration: 1 Stilt + 5 upper floors
Building height: 14.75 m
Approved built-up area: 1,401.05 sq. m. residential upper-floor area; the permit extraction also records 280.20 sq. m. parking area and 1,681.25 sq. m. total built-up area including parking.
Sanctioned units / RERA-filed units: 10 / 10
Parking: The permit extraction records 280.20 sq. m. parking area; the extracted parameter “Proposed number of parkings” is 0. The supplied evidence does not establish a sanctioned bay count or unit-by-unit allocation.
Offering and status
RERA-filed configuration: 3BHK
RERA-filed saleable area: 157.94 sq. m.
Units / booked / available: 10 / 0 / 10, as last read from the TG-RERA portal; the portal record has no supplied as-of date, so counts are indicative.
Declared completion date: 30 November 2026 in the project record.
Building-permit completion date: Before 6 July 2026 in the GHMC permit extraction.
Construction stage: Not established by supplied site-progress evidence.
Occupancy / completion certificate: No project OC or completion certificate is included in the supplied evidence.
2. The project story
- BALAJI HILLS PHASE - I is registered as a residential apartment project on Survey No. 66/6 at Mansoorabad. The filed and sanctioned development describes a single building, A (GUNTI BALRAM), with a stilt and five upper floors, and a total of 10 units. The RERA-filed offering is 3BHK apartments.
- The GHMC permit authorizes construction on a 487.19 sq. m. site and records an approved residential upper-floor built-up area of 1,401.05 sq. m. The project record declares completion by 30 November 2026; the permit extraction specifies completion before 6 July 2026. These are separate recorded dates. The evidence supplied does not establish current construction progress or that any part of this phase has received an occupancy or completion certificate.
3. Master plan, architecture & building design
- The GHMC building-permit record describes one residential building, A (GUNTI BALRAM), comprising 1 Stilt + 5 upper floors, with a stated building height of 14.75 m. The extracted plan figures are 1,401.05 sq. m. residential upper-floor area and 280.20 sq. m. parking area; the permit also records 1,681.25 sq. m. total built-up area including parking.
- The plan extraction records a proposed coverage area of 280.21 sq. m. (57.52%), vacant plot area of 206.98 sq. m., and a mortgage area of 142.39 sq. m. It also records a net residential BUA and total proposed built-up area excluding parking of 1,401.05 sq. m. These are distinct plan labels and are not measures of apartment carpet or saleable area.
- The supplied drawing-derived records include measurements from floor-plan geometry but do not provide a complete, verified architectural schedule for lifts, stairs, floor-by-floor unit arrangement, entrances, exits, or common-area distribution. The GHMC permit conditions require one entry and one exit, each with minimum width of 4.5 m and height clearance of 5 m; this is a permit condition, not evidence that the works are complete.
4. Homes, configurations & floor plans
- The TG-RERA record lists 10 3BHK units, all shown as available and none booked in the portal data supplied. The filed saleable area is 157.94 sq. m. per recorded configuration. Booked and available counts are indicative because the portal record has no supplied as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.94 sq. m. | 91.4–93.0 sq. m. (software-measured from drawings) | 41% (software-measured record) |
- The carpet-area range is a software measurement from the supplied approved floor-plan drawing record, not a TG-RERA carpet-area disclosure; the drawing measurements are marked as needing review. One measured 3BHK plan shows a hall, kitchen, three bedrooms, three toilets and balconies; the drawing record gives dimensions for the rooms but does not establish the delivered specification of every unit. Carpet area, balcony area and a unit’s share of common areas are not interchangeable; the RERA saleable figure is presented separately from the drawing-based carpet estimate.
- The floor-plan extraction also identifies a measured 2BHK design with 68.9 sq. m. software-measured carpet area. The supplied RERA unit record does not list a 2BHK configuration or unit count, so this drawing-derived design is not represented here as a RERA-filed sale offering.
5. Parking & vehicle circulation
- The GHMC permit extraction records 280.20 sq. m. as total parking area. A separate extracted permit parameter states “Proposed number of parkings 0.” The supplied records therefore do not establish a sanctioned parking-bay count, visitor or accessible spaces, or parking allocation to individual apartments.
- The permit conditions state that the cellar and stilt areas approved for parking are to be used exclusively for parking and not converted or partitioned for other use. The supplied evidence does not establish parking allocation terms in executed sale agreements or whether parking has been completed.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following facilities or provisions with 0% progress recorded for each item. The “YES” entries are recorded as available in that filing; they do not, by themselves, verify completion or operation.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | GHMC plan extraction identifies a tot-lot and periphery greenery; no size supplied. | RERA amenities; | Amenity record: 0%; completion not independently verified. |
| Water conservation / rainwater harvesting | Permit extraction specifies one rainwater-harvesting pit / percolation structure. | RERA amenities; | Amenity record: 0%; completion not independently verified. |
| Community buildings | No facility description or size supplied. | RERA amenities | 0%; no completion evidence supplied. |
| Internal roads and footpaths | No detail or dimensions supplied in the RERA amenity record. | RERA amenities | 0%; completion not independently verified. |
The supplied evidence does not establish a clubhouse, pool, gym or other indoor or sports facility as a RERA-filed or sanctioned provision.
7. Utilities, building services & safety
- The GHMC permit extraction specifies a separate underground static water-storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. The RERA amenity record marks water supply as “YES” but records 0% progress; no water source or operating status is supplied.
- The permit extraction lists a septic tank and rainwater harvesting, and the RERA amenity record marks sewerage, sewage/sullage treatment and disposal, storm-water drains and water conservation as “YES,” each with 0% progress recorded. No STP capacity or reuse details are supplied.
- The permit conditions require space for a transformer, a generator as an alternate electricity source, emergency lighting in corridors/common passages and stairs, fire-fighting installations, a manually operated alarm system, hose reels and down corners, and specified extinguishers. The permit extraction also states that automatic sprinklers are required if basement area exceeds 200 sq. m. The evidence does not establish installation, testing, fire clearance or operational completion; the building-permit record states that an occupancy fire NOC is to be obtained before issue of an occupancy certificate.
- No lift count or capacity, accessibility arrangements, waste-segregation system, CCTV or access-control details are established by the supplied evidence. The permit does require a garbage house within the premises.
8. Location, access & connectivity
- The registered project location is Mansoorabad, Saroornagar Mandal, Ranga Reddy District, Telangana 500068, on Survey No. 66/6. The filed site boundaries identify a 30 feet wide road to the east and Plot No. 1, Plot No. 9 and part of Plot No. 8 to the north, south and west respectively.
- The location data provides one sampled connectivity reference: the nearest sampled Outer Ring Road interchange is approximately 6.9 km away. No verified travel time or further road, public-transport or landmark distances are supplied in the location record.
9. Developer & development status
- The registered legal promoter is SRI GOPI KRISHNA CONSTRUCTIONS, recorded as a partnership. Its supplied corporate identifier is GSTIN 36AECFS6839M1ZD. The project record gives a promoter address at CIEFL Colony, East Anandbagh, L B Nagar Municipality, Mansoorabad, Saroornagar, Ranga Reddy, 500068. The registration certificate separately records a promoter address in Anand Bagh, Malkajgiri, Medchal-Malkajgiri, PIN 500047; the project-site address remains Mansoorabad, Saroornagar, Ranga Reddy, PIN 500068.
- The promoter’s Form B declaration, dated 03 September 2023, states a completion undertaking of 6 July 2026 and includes declarations concerning title, encumbrances, project funds and approvals. These are promoter declarations, not independent verification of current site status. The project header separately records a proposed completion date of 30 November 2026. No construction-progress report or OC is included in the evidence supplied for this Overview.
10. Approvals, official records & documents
| Identifier / date | P02400008539; valid 27 July 2024 to 6 July 2026 unless extended |
|---|---|
| What the supplied record establishes | Registration of BALAJI HILLS PHASE - I and conditions recorded in the Form C certificate. |
| Identifier / date | 2314/GHMC/LBN/2023-BP; 6 July 2023 |
|---|---|
| What the supplied record establishes | Permit extraction describes residential construction of one stilt plus five upper floors at Mansoorabad. |
| Identifier / date | TS/031903/2023; application date 9 May 2023 in the permit extraction |
|---|---|
| What the supplied record establishes | Identifies the permit application record. |
| Identifier / date | 005171/GHMC/2578/LBN2/2023-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building-permit extraction. |
| Identifier / date | 352847 |
|---|---|
| What the supplied record establishes | Filed layout-plan item and extracted plan details, including Survey No. 66/6, site area, proposed floors, unit count and permit conditions. |
| Identifier / date | Form B, dated 03 September 2023 |
|---|---|
| What the supplied record establishes | Promoter’s stated title, encumbrance and completion declarations. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project OC or completion certificate is established by the supplied documents. |
Frequently asked questions
Is BALAJI HILLS PHASE - I registered with Telangana RERA?
Yes. BALAJI HILLS PHASE - I is registered with the Telangana Real Estate Regulatory Authority as P02400008539; the registration status is New Project.
Who is the developer of BALAJI HILLS PHASE - I?
The promoter named in the RERA registration is SRI GOPI KRISHNA CONSTRUCTIONS.
Where is BALAJI HILLS PHASE - I located?
BALAJI HILLS PHASE - I is in Mansoorabad, Saroornagar, Rangareddy, Telangana (500068).
When will BALAJI HILLS PHASE - I be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Mansoorabad