Sign in

Navya 59 Residency

QUORIZON SPACES · Medchal-Malkajgiri · RERA P02200007607

NAVYA 59 RESIDENCY is a residential apartment project in Uppal Bhagat, Uppal mandal, Medchal-Malkajgiri district, being developed by registered promoter QUORIZON SPACES. It is on Plot No. 59 with a land area of 1672.07 sq.m. and has one building with 1 Stilt + 5 upper floors and 40 apartments: 20 2BHK and 20 3BHK. The project is registered with TG-RERA under P02200007607, and its proposed completion date is 20/04/2030.

More from Quorizon Spaces · 4 projects →

01What we found

RegisteredTG-RERA - valid till 20 Dec 2029
11documents on file - each fact links to its page
10court cases on this project's land (survey 1, 282, Uppal)
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameNAVYA 59 RESIDENCY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; the registration and sanction describe one building on Plot No. 59. RERA record
TG-RERA registrationP02200007607 RERA record
Registration validity20 January 2024–20 December 2029; the certificate states a five-year validity, unless extended by the Authority. This is the registration period, not the project completion date. RERA record
Registered promoterQUORIZON SPACES RERA record Corporate record
TG-RERA statusThe project is recorded as a new project. RERA record

Land and geographic identity

ItemRecord
LocalityUppal Bhagat RERA record
Revenue villageUppal in the RERA identity record; the HMDA technical approval and plan describe Uppal Bhagat Village. RERA record
MandalUppal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500039 RERA record
Project survey numbers and subdivisions1 TO 40, 282 TO 368, 369 PART, 370 TO 373, 374P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505P, 510 TO 564 RERA record
Plot / site extentPlot No. 59; 1672.07 sq.m. recorded as the total and net area in the RERA land details and as the minimum plot area in the filed plan. RERA filing
BoundariesEast: 80 Feet Wide Road; West: Plot No. 52; North: Plot No. 60; South: Plot No. 58. RERA filing

Development identity

ItemRecord
Technical sanctioning authorityHyderabad Metropolitan Development Authority (HMDA), technical approval no. 061970/GHT/R1/U6/HMDA/13102023, dated 21 December 2023. Approvals record
Plan / development descriptionProposed residential apartment building, 1 Stilt + 5 upper floors, on Plot No. 59.
Building countOne building is recorded in the project information. RERA filing
Approved built-up areaThe technical approval extraction lists 3882.70 sq.m. as built-up area and separately lists 4764.32 sq.m. as proposed built-up area. The filed plan also lists residential net BUA of 3882.70, proposed net BUA area of 3910.25, and total proposed net BUA area of 3921.16. These are distinct figures as recorded in the approval extraction.
Parking provision in planStilt is designated for parking. The plan extraction lists required parking area 854.19 sq.m. and proposed parking area 876.60 sq.m.; vehicle-space counts are not stated in the supplied data.
Unit count40 dwelling units in the HMDA technical approval and 40 in the RERA unit record. RERA unit table

Offering and status

ItemRecord
Unit types2BHK and 3BHK apartments. RERA unit table
RERA-filed saleable area2BHK: 113.29 sq.m.; 3BHK: 133.77 sq.m. RERA unit table
Booked / available2BHK: 9 booked, 11 available; 3BHK: 9 booked, 11 available. Counts are from the TG-RERA portal read; the record supplies no as-of date, so they are indicative. RERA unit table
Construction stageNo construction-progress percentage or independently verified site-stage information is supplied. RERA record RERA amenities
Completion dateThe Form B declaration undertakes completion by 20 December 2029; the project header separately records proposed completion as 20/04/2030. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The HMDA technical approval requires an occupancy certificate before occupation.

2. The project story

NAVYA 59 RESIDENCY is recorded with TG-RERA as a residential apartment project by QUORIZON SPACES. The filed development is a single building on Plot No. 59 at Uppal Bhagat, with 40 apartments across 2BHK and 3BHK configurations. The RERA record reports 18 units booked and 22 available, but does not state the date of that inventory snapshot. RERA record RERA unit table

HMDA’s technical approval describes a building with one stilt level and five upper floors. The supplied record does not establish current construction progress, completion of any part of the building, or issuance of an occupancy certificate. The Form B declaration records a completion undertaking of 20 December 2029; the project header also records 20 April 2030 as the proposed completion date. RERA record

3. Master plan, architecture & building design

The supplied HMDA plan extraction describes one residential building on a plot of 1672.07 sq.m., with proposed coverage area of 865.02 sq.m. (51.73%). It records 3882.70 sq.m. as residential net BUA, while also listing proposed net BUA area of 3910.25, total proposed net BUA area of 3921.16, and built-up area of 4764.32 sq.m. These are separate labels in the extracted plan data; they should not be treated as interchangeable area measures.

The technical approval identifies a building height of 14.95 (the supplied extraction does not specify a unit for this height figure). Stilt is designated for parking. The plan extraction lists required parking area of 854.19 sq.m. and proposed parking area of 876.60 sq.m.

The supplied material does not provide a readable floor-by-floor apartment arrangement, flats per floor, lift or stair details, building footprint drawing, internal circulation plan, landscaping/open-space dimensions, or a phase layout. The floor-plan data says two drawings are available but none has been software-measured; no measured carpet-area figures are provided. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20911113.29 sq.m.Not measuredNot supplied
3BHK20911133.77 sq.m.Not measuredNot supplied

RERA saleable-area figures are the filed areas. The supplied floor-plan record identifies two drawings but reports zero measured drawings, so no software-measured carpet-area or room-dimension data is available. Carpet area, exclusive balcony or utility areas, common-area share and saleable area are different measures; the supplied material does not provide the drawing measurements or loading needed to break them out here. RERA unit table RERA unit details Floor plans

The booked and available counts are indicative portal figures with no supplied as-of date. RERA unit table

5. Parking & vehicle circulation

The technical approval states that cellar/stilt areas approved for parking must be used exclusively for vehicles, without partition walls or rolling shutters. The supplied record does not give the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp or driveway details, EV charging provision, or unit-specific parking allocations. A parking bay shown or proposed in a plan does not by itself establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The following facilities are recorded in the supplied HMDA plan or RERA amenity fields. The recorded percentages are 0 where shown; no independent completion verification is supplied. RERA amenities

Tot-lot / green strip
Description / sizeNo size or capacity supplied
Evidence sourceHMDA technical approval; RERA amenity record RERA amenities
Declared progress / verified statusListed; RERA amenity record shows 0%; completion not independently verified
Community buildings
Description / sizeNo description or size supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusRERA amenity record shows 0%; completion not independently verified
Aggregate recreational open space
Description / sizeNo area supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusRERA amenity record shows 0%; completion not independently verified

No RERA-filed clubhouse, indoor recreation or sports facility details, sizes or capacities are supplied in the project evidence used for this overview. Facilities listed on vendor/promoter material are not treated here as sanctioned or delivered project amenities.

7. Utilities, building services & safety

The HMDA plan extraction lists an underground sump water-storage tank of 25,000 L, a terrace tank of 25,000 L capacity, a transformer, main water line, main sewage line, underground drainage, sump, septic tank, STP, garbage pit and dust bin. It also lists fire extinguishers, hose reel, “Down Corner,” and an automatic sprinkler system. These are plan-extraction entries; the supplied material does not establish their installation, capacity beyond the stated tanks, or completed/operational status.

The technical approval requires rainwater-harvesting structures and space for a transformer, identifies fire-safety and structural-stability requirements, and states that an occupancy certificate is compulsory before occupation. These approval conditions do not, by themselves, establish completed installation or statutory compliance.

The supplied material does not state water source or treatment details, STP capacity or reuse arrangements, storm-water design, electrical backup capacity, lift count/capacity, escape-stair details, CCTV/security arrangements, waste-segregation arrangements, or accessibility provisions.

8. Location, access & connectivity

The project is recorded at Plot No. 59, Uppal Bhagat locality, Uppal mandal, Medchal-Malkajgiri district, PIN 500039. The listed site boundary on the east is an 80 Feet Wide Road. The RERA and HMDA records identify the village as Uppal and Uppal Bhagat Village respectively. RERA record RERA filing

A cadastral parcel centroid is supplied at 17.401211424029405, 78.35417703673448. The location data lists Financial District (Nanakramguda) at 2.0 km as an anchor; the supplied data does not identify the route or describe how that distance was measured. Location record

The project material provides no verified road-route, public-transport, bus-stop, railway-station or travel-time measurements.

9. Developer & development status

The registered promoter is QUORIZON SPACES, recorded as a partnership. Its GSTIN is 36AAAFQ7352D1ZE. The RERA record lists its address as Navya Towers, Income Tax Colony, Road No 1, Uppal Bhagat, Uppal, Medchal-Malkajgiri, 500039; a separate registration-certificate extraction describes the registered office as Hyderabad, PIN 500035. Corporate record Parties record

The RERA record names VISWA THEJA MUPPALANENI as authorized signatory and lists RAMESH BABU MUPPALANENI, TRIVIKRAMA VIDYA SAGAR JAMPA, MADHU YARABARLA and SAI SRIKANTH YARABARLA as partners. The project information also identifies SRI. RANA PRATAP SINGH as landowner and records an AreaShare agreement type. Parties record RERA filing

The Form B declaration, made by YARABARLA MADHU on behalf of QUORIZON SPACES, identifies the landowner as RANA PRATAP SINGH and cites Development Agreement cum GPA document 17501/2023 as the title basis.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200007607; valid 20 January 2024–20 December 2029
What it establishes in the supplied materialRegistration of NAVYA 59 RESIDENCY and its stated promoter, with certificate conditions
HMDA technical building approval
Identifier / date061970/GHT/R1/U6/HMDA/13102023; 21 December 2023
What it establishes in the supplied materialTechnical approval for a residential building described as 1 Stilt + 5 upper floors; the approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans
Filed plan / plan extraction
Identifier / date061970/GHT/R1/U6/HMDA/13102023
What it establishes in the supplied materialPlot extent, building and floor description, area and parking figures, and listed facilities/conditions
Form B declaration
Identifier / date2 December 2023 as transcribed in the supplied extraction
What it establishes in the supplied materialPromoter declaration, landowner identification, title basis and completion undertaking
Mortgage referenced in technical approval
Identifier / date20079/2023; 4 December 2023
What it establishes in the supplied materialApproval extraction records 390.22 sq.m. of built-up area as mortgaged in favour of MC, HMDA
Occupancy / completion certificate
Identifier / dateNot supplied
What it establishes in the supplied materialNo certificate is evidenced in the supplied project documents; technical approval requires an occupancy certificate before occupation.
Approved layout record
Identifier / dateNot established in the supplied documents
What it establishes in the supplied materialNo separate approved-layout document is identified; the supplied approval material concerns a building plan. HMDA

Frequently asked questions

Is NAVYA 59 RESIDENCY registered with Telangana RERA?

Yes. NAVYA 59 RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200007607; the registration status is New Project.

Who is the developer of NAVYA 59 RESIDENCY?

The promoter named in the RERA registration is QUORIZON SPACES.

Where is NAVYA 59 RESIDENCY located?

NAVYA 59 RESIDENCY is in Uppal Bhagat, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will NAVYA 59 RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 20/04/2030. This is the promoter's declaration, not a guarantee.

More projects in Uppal