Sign in

My Home Vipina

MY HOME INFRASTRUCTURES PVT LTD · Sangareddy · RERA P01100006053

MY HOME VIPINA is a residential apartment project in MANMOLE, RC PURAM mandal, Sangareddy district, developed by registered promoter My Home Infrastructures Pvt Ltd. The project covers 83405.81 sq.mts and comprises 8 towers, each with 4 Cellars + Ground + 46 floors, a clubhouse with 4 Cellars + Ground + 3 floors, and 3,722 homes in 2BHK, 2.5BHK, 3BHK and 4BHK configurations. It is registered under TG-RERA number P01100006053, and its proposed completion is 15/05/2028.

More from My Home Infrastructures Pvt Ltd · 5 projects →

01What we found

RegisteredTG-RERA - valid till 15 Jan 2028
48documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Developer renderProject photoProject photoDeveloper render
▦ View all 16 photos
Manmole, Rc Puram, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameMY HOME VIPINA RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionNot stated in the TG-RERA registration details supplied. The HMDA permission describes the development on the listed project surveys; phase-specific building allocation is not provided.
TG-RERA registrationP01100006053; Form C records registration from 18/04/2023 to 15/01/2028. Approvals record
RERA statusThe supplied registration certificate records registration under section 5. It does not record an extension.
Registered promoterMy Home Infrastructures Pvt Ltd; company. RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageRERA-filed locality: MANMOLE; revenue village: Manmole. RERA record RERA filing
Mandal / district / PINRERA-filed mandal: RC PURAM; district: Sangareddy; PIN: 502001. The HMDA permission identifies Tellapur Municipality, Ramachandrapuram Mandal and Sanga Reddy District. RERA record RERA filing
Project surveys and subdivisions479/P, 480/P, 481/P. RERA record RERA filing
Registered site extent83405.81 sq.mts in the HMDA permission. RERA land details state total area 83405.81 sq.mts, net area 83405.81 sq.mts, and affected area 0 sq.mts. RERA filing
Boundaries (RERA-filed)East: My Home Tridasa Project; West: land belonging to My Home Infrastructures Pvt Ltd; North: Railway Track; South: 30 M Wide Road and land belonging to My Home Infra. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); permission delegates relevant implementation to Tellapur Municipality. Approvals record
Principal building permissionFile No. 12/SKP/Plq/HMDA/2022, approved 17-02-2023. Approvals record
Approved built-up area615674.92 sqmts in the RERA project fields. The supplied HMDA permission extract gives the site extent and building configuration but does not state an approved built-up-area figure. RERA filing
Approved building arrangement8 towers, each with 4 Cellars + Ground + 46 floors; clubhouse with 4 Cellars + Ground + 3 floors.
Unit countsRERA project fields state 8 total building units as per approved plan and 8 proposed building units as per agreement. The RERA unit schedule records 3,722 homes. RERA filing RERA unit table
ParkingRERA fields record a mortgage area of 92382.88 sq.mts; the supplied records do not establish a parking-space count or unit-level parking allocation. The permission includes basement levels but the extracted material does not provide a parking count. RERA filing

Offering and status

ItemProject record
RERA-filed configurations2BHK, 2.5BHK, 3BHK and 4BHK. RERA unit table
RERA-filed saleable areas2BHK 123.28 sq.m; 2.5BHK 153.75 sq.m; 3BHK 198.18 sq.m; 4BHK 202.53 sq.m. RERA unit table
Booked / availableRERA portal figures supplied: 2,577 booked and 1,145 available across 3,722 units. The portal record has no as-of date, so these counts are indicative. RERA unit table
Construction stageRERA amenities data reports internal roads and footpaths at 46% and community buildings at 37%; it lists other infrastructure and facilities as available but reports 0% progress for those entries. These are reported portal figures, not independent site verification. RERA amenities
Completion timelineForm B promoter declaration gives 15-01-2028; the header and project fields state proposed completion 15/05/2028. RERA record RERA filing
Registration validity15/01/2028 per the Form C certificate; this is distinct from the completion dates stated in the project record.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The HMDA permission says occupation is permitted only after completion to the approved plans and issue of a “Fit for Occupancy” certificate by the Municipal Commissioner.

2. The project story

MY HOME VIPINA is a large residential apartment development registered under TG-RERA as P01100006053, on land identified in the project record as Survey Nos. 479/P, 480/P and 481/P, Manmole village, RC PURAM mandal, Sangareddy district. The registered land area is 83,405.81 sq.mts. The project’s RERA unit schedule lists 3,722 homes across eight residential towers, with a separate clubhouse building. RERA record RERA filing RERA filing RERA unit table

The HMDA building permission describes eight towers with four cellars, a ground floor and 46 floors, and a clubhouse with four cellars, a ground floor and three floors. The RERA schedule records four configurations—2BHK, 2.5BHK, 3BHK and 4BHK. No floor-plan measurement has been completed in the supplied drawing review: all 28 drawings are pending scan, so drawing-derived home areas and room layouts cannot be reported here. RERA unit table Floor plans

Construction-progress figures available from the RERA amenities record show 46% for internal roads and footpaths and 37% for community buildings, while other listed infrastructure items show 0%. These are filed progress entries, not an independently verified construction inspection. No occupancy or completion certificate is in the supplied record. RERA amenities

3. Master plan, architecture & building design

The RERA land schedule states total and net land area of 83405.81 sq.mts, with 0 sq.mts recorded as affected by road widening, FTL or nala widening. The HMDA permission covers a multi-storied residential apartment development on Survey Nos. 479/p, 480/p and 481/p. RERA filing

The sanctioned building arrangement in the HMDA permission is eight residential towers with 4 Cellars + Ground + 46 floors, and a clubhouse with 4 Cellars + Ground + 3 floors. The RERA record separately lists approved built-up area of 615674.92 sqmts and mortgage area of 92382.88 sqmts; these are distinct filed figures, and the supplied material does not provide FSI-counted area, carpet area or a project-wide saleable-area total. RERA filing

The permission extract refers to internal circulation, open space, landscaping, rainwater harvesting, water treatment, STP and building services, but does not provide a drawing-based breakdown of building footprints, tower spacing, flats per floor, lift or stair counts, internal-road dimensions, or the residential/common-area split. It also records a 3OM Internal Road gift deed to Tellapur Municipality.

4. Homes, configurations & floor plans

The RERA-filed unit schedule contains 3,722 units. Booked and available counts below are from the supplied TG-RERA portal record, which has no as-of date. Saleable areas are RERA-filed; no software-measured carpet areas are available because the supplied drawing set has not yet been measured. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK732511221123.28 sq.mNot availableNot supplied
2.5BHK1,4771,036441153.75 sq.mNot availableNot supplied
3BHK1,511995516198.18 sq.mNot availableNot supplied
4BHK220202.53 sq.mNot availableNot supplied

The record distinguishes saleable area from carpet area. A carpet-area measurement, if later derived from drawings, would be software-measured rather than RERA-filed; the supplied drawing review has 28 drawings, 0 measured, and 28 scans pending. The RERA saleable figures are therefore the only available unit-area figures for this overview. RERA unit details Floor plans

5. Parking & vehicle circulation

The sanctioned scheme includes four cellar levels beneath each tower and four cellar levels beneath the clubhouse. The HMDA permission extract does not state the number or type of parking spaces, and the supplied RERA fields do not establish resident, visitor, accessible or two-wheeler parking counts, parking allocation to individual apartments, or mechanical parking. RERA filing

The RERA record reports a mortgage area of 92382.88 sq.mts; this is not a parking-space count or evidence of exclusive parking rights for a buyer. The permission says parking or construction is not permitted in setback areas. RERA filing

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 facility or infrastructure categories. Its reported progress percentages are shown below; they are portal entries and have not been independently verified as completed. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities record46% reported; not independently verified RERA amenities
Water SupplySize/capacity not stated in this entryRERA amenities record0% reported; not independently verified RERA amenities
Sewerage (Chamber, Lines, Septic Tank, STP)Size/capacity not stated in this entryRERA amenities record0% reported; not independently verified RERA amenities
Storm Water DrainsSize not statedRERA amenities record0% reported; not independently verified RERA amenities
Green Strip/TOT LOT/ParkSize not statedRERA amenities record0% reported; not independently verified RERA amenities
Street LightingSize not statedRERA amenities record0% reported; not independently verified RERA amenities
Community BuildingsSize not stated in this entry; HMDA permission identifies a clubhouse buildingRERA amenities record; HMDA permission37% reported; not independently verified RERA amenities
Treatment and Disposal of Sewage and Sullage WaterSize/capacity not stated in this entryRERA amenities record0% reported; not independently verified RERA amenities
Solid Waste Management and DisposalSize/capacity not statedRERA amenities record0% reported; not independently verified RERA amenities
Water Conservation, Rain Water HarvestingSize/capacity not stated in this entryRERA amenities record; HMDA permission0% reported; not independently verified RERA amenities
Energy managementDetails not statedRERA amenities record0% reported; not independently verified RERA amenities
Fire Protection and Fire Safety RequirementsDetails not stated in this entry; HMDA permission specifies fire-safety conditions and systemsRERA amenities record; HMDA permission0% reported; not independently verified RERA amenities
Electrical Meter Room, Sub-Station, Receiving StationSize/capacity not stated; HMDA permission calls for transformer provisionRERA amenities record; HMDA permission0% reported; not independently verified RERA amenities
Aggregate area of recreational Open SpaceArea not statedRERA amenities record0% reported; not independently verified RERA amenities

The HMDA permission also requires a garbage house and refuse chute, and identifies a clubhouse with 4 Cellars + Ground + 3 floors. The supplied project records do not provide a verified facility-by-facility inventory of indoor recreation, sports, landscape or convenience amenities, or their completion status.

7. Utilities, building services & safety

The HMDA permission requires rainwater-harvesting structures, an STP with recycled water to be used for gardening, a water-treatment plant, a transformer and garbage house, and refuse chutes with a garbage-disposal system. It specifies separate underground static water storage and residential terrace tanks, each with a stated capacity of 25.000 Its Capacity and 25,000 lits capacity, respectively, as worded in the supplied extract. These are permission conditions and do not establish completed or operational services.

The permission lists hose reels, downcomers, fire extinguishers, and automatic sprinklers where the basement area exceeds 200 Sq.mtrs; it also requires fire-safety requirements in accordance with the National Building Code, 2016, and clearance from T.S. Fire Services Department. The HMDA permission states the complex may be occupied only after completion in accordance with the technically approved plans and issue of a “Fit for Occupancy” certificate. The supplied extract does not establish that the required clearances or systems are complete.

Promoter-filed specifications list metered DG backup with acoustic enclosure and AMF, three-phase supply with individual prepaid meters, concealed copper wiring, fire alarms, automatic sprinklers and wet risers, and round-the-clock security/surveillance. These are promoter-provided specifications, not independent verification of installation or operation. Promoter website

No project-specific capacity or completed-status evidence is supplied for lifts, service lifts, accessibility routes or ramps, EV charging, CCTV coverage beyond the promoter specification, or accessible parking. Promoter website

8. Location, access & connectivity

The project’s TG-RERA identity places it in Manmole village, RC PURAM mandal, Sangareddy district, PIN 502001. The RERA land schedule records Railway Track to the north and a 30 M Wide Road and My Home Infra land to the south. The HMDA permission identifies Tellapur Municipality. RERA record RERA filing RERA filing

The supplied location record lists the Financial District (Nanakramguda) at 1.2 km. This is the only measured connectivity distance supplied. Location record

The promoter/vendor material describes the location as Tellapur, Hyderabad and lists travel-time claims for nearby roads, transit, schools, hospitals and employment centres. Those claims are not used here as verified distances or travel times. The supplied project evidence does not provide independently measured distances or transport schedules for those destinations. Promoter website

9. Developer & development status

The registered promoter is My Home Infrastructures Pvt Ltd, a company. The supplied corporate record identifies it as CIN: U45200TG2007PTC055439 and GSTIN 36AAFCM2179LIZ3. The RERA registration certificate lists the promoter office as Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, PIN 500081. Corporate record RERA filing

The promoter’s Form B declaration, dated 15 March 2023, states a project-completion date of 15-01-2028 and declares the land free from encumbrances. The project header and information fields state proposed completion 15/05/2028. These are recorded as separate filed statements; registration validity is separately recorded to 15/01/2028. RERA record RERA filing

The RERA amenities record reports 46% progress for internal roads and footpaths and 37% for community buildings. The remaining listed amenity categories show 0% in that record. No independent site inspection, tower-by-tower construction schedule, or occupancy/completion certificate is supplied. RERA amenities

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C, registration P01100006053
What it recordsRegistration from 18/04/2023 to 15/01/2028; project name MY HOME VIPINA and registered surveys 479/P, 480/P, 481/P.
HMDA building permission
Supplied evidenceFile No. 12/SKP/Plq/HMDA/2022, dated 17-02-2023
What it recordsMulti-storied residential apartment permission for eight towers and a clubhouse on the stated Manmole survey parcels, subject to listed conditions.
Promoter declaration
Supplied evidenceForm B affidavit dated 15 March 2023
What it recordsPromoter’s title, encumbrance, completion and separate-account declarations.
HMDA gift and mortgage instruments cited in permission
Supplied evidenceGift Deed 3465/2023; mortgage deeds 3466/2023 and 3467/2023
What it recordsPermission extract records an internal-road gift to Tellapur Municipality and mortgage arrangements affecting built-up area.
Layout / building-plan documents
Supplied evidenceRERA document register includes layout-plan entries 311470, 311482, 311476, 311478, 311479, 311481, 311483–311489, 311491–311493, 311495–311498, 311471–311473 and 311475; entries are not extracted in the supplied record. Document index
What it recordsThe supplied evidence does not provide their drawing contents for review here.
Occupancy / completion certificate
Supplied evidenceNot supplied Document index
What it recordsNo occupancy or completion certificate is evidenced in the provided project documents.

The HMDA permission also refers to environmental clearance identification EC23B000TG155494, file SIA/TGINFRA2/40895 1/2022, an Irrigation NOC SEIC/SRD/DEE(T)TS4/1076 dated 22.07.2020, structural-clearance letter JNTUICEH/CIVILIPC7682/2023 dated 03.02.2023, and bank guarantee 0040NDDGO0028823 dated 02.02.2023. These are references recorded in the permission extract; the underlying documents are not separately supplied for review.

Frequently asked questions

Is MY HOME VIPINA registered with Telangana RERA?

Yes. MY HOME VIPINA is registered with the Telangana Real Estate Regulatory Authority as P01100006053; the registration status is New Project.

Who is the developer of MY HOME VIPINA?

The promoter named in the RERA registration is MY HOME INFRASTRUCTURES PVT LTD.

Where is MY HOME VIPINA located?

MY HOME VIPINA is in MANMOLE, RC PURAM, Sangareddy, Telangana (502001).

When will MY HOME VIPINA be completed?

The promoter's proposed date of completion filed with RERA is 15/05/2028. This is the promoter's declaration, not a guarantee.

More projects in Manmole