Sign in

Mmkcasita

AISHWARYA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001865

MMKCASITA is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri district. The registered promoter developing it is Aishwarya Constructions, a partnership. The site extent is 836.48 sq. m, and the project comprises one residential building with 1 cellar, 1 stilt and 5 upper floors, with 20 apartments in the 2BHK configuration. Its TG-RERA registration number is P02200001865, and the promoter-declared completion deadline is 31/03/2021.

More from Aishwarya Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 31 Mar 2021 - check its extension on TG-RERA
9documents on file - each fact links to its page
2court cases on this project's land (survey 1, Uppal)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameMMKCASITA RERA record
Project type / phaseResidential apartment project; phase or separately identified registered portion is not disclosed. RERA record
TG-RERA registrationP02200001865
Registration validityIssued 21/03/2020; valid through 31/03/2021. The certificate records no extension. Registration validity is separate from the completion deadline and from occupancy certification. Approvals record
Registered promoterAishwarya Constructions; partnership. RERA record Corporate record
RERA statusThe supplied record identifies the project as “New Project”; the certificate states the registration period above. A current registration-status verification is not supplied. RERA record

Land and geographic identity

FieldRecord
Locality / siteUppal; Plot No. 760 RERA filing
Revenue villageUppal Bhagat (also rendered “Uppal Bhagath” in filed documents)
Mandal / district / PINUppal / Medchal-Malkajgiri / 500007 RERA record
Project survey numbers and subdivisions, as filed1 TO 40, 282 TO 368, 369/P, 370 TO 373, 374/P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/P, 510 TO 564 Land records
Site extent836.48 sq. m; filed total area and net area are both 836.48 sq. m. RERA filing
Boundaries in RERA filingEast: Plot No. 759; West: Plot No. 761; North: Plot No. 749; South: road width 18. RERA filing
Site-area description in title reportPlot No. 760, stated as 1,000 sq. yards in the title report.

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalTechnical approval No. 022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019. The approval directs the applicant to obtain sanction and release from the Executive Authority, subject to its conditions. Approvals record
Building shownOne proposed residential building on two plan sheets.
Sanctioned floor configuration1 cellar + 1 stilt + 5 upper floors.
Built-up figures stated in approval recordsBuilt up Area: 1896.35 sq. m; Total Built Up Area: 2286.18 sq. m. The plan also records Residential Net BUA 1896.32, Total Proposed Net BUA Area 1901.61, and Net BUA Area 1896.35; these labels are retained as stated.
Parking levels / approved unitsThe approval records the cellar and stilt as parking levels, and the plan shows 20 dwelling units.
RERA-declared units20 apartments: 18 filed as 2BHK and 2 as “2 BKH”. RERA unit table RERA unit details

Offering and status

FieldRecord
Unit type2BHK apartments RERA unit table
RERA-filed saleable area48.98–54.38 sq. m (2 units at 48.98 sq. m and 18 at 54.38 sq. m in the supplied unit records). RERA unit table
Portal booking snapshot0 booked and 20 available in the supplied records; no as-of date is provided, so counts are indicative rather than a current availability confirmation. RERA unit table
Promoter-declared completion deadline31/03/2021 in the Form B declaration.
Construction stageNo independently verified construction progress or current site-stage evidence is supplied. Document index
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The HMDA technical approval requires an occupancy certificate before occupation. Document index

2. The project story

MMKCASITA is filed with TG-RERA as a residential apartment project at Plot No. 760 in Uppal Bhagat village, Uppal Mandal, Medchal-Malkajgiri district. Its filed site extent is 836.48 sq. m, and the HMDA plan shows one residential building with a cellar, stilt and five upper floors. The sanctioned drawing and TG-RERA records identify 20 dwelling units. RERA record Land records

The project’s Form B declaration gives 31/03/2021 as the promoter’s completion undertaking. That is the declared deadline—not evidence that construction was completed by then. The supplied documents do not establish present construction progress or show an occupancy/completion certificate. Accordingly, the project’s current physical completion and occupancy status remain unverified from this evidence. Document index

3. Master plan, architecture & building design

The filed HMDA plan depicts a single proposed residential building on the stated 836.48 sq. m site. Its floor arrangement is 1 cellar, 1 stilt and 5 upper floors; the plan identifies 20 dwelling units. The approval record states a building height of 14.9 and a total built-up area of 2286.18 sq. m. It separately states “Built up Area 1896.35”; the plan lists additional BUA labels, including Residential Net BUA 1896.32 and Total Proposed Net BUA Area 1901.61. These are different labelled figures in the approval documents and are not interchangeable.

The approval records a proposed coverage area of 45.34% and 379.27, and a consumed net BUA factor of 2.27. It also identifies a tot-lot of 42.27 sq. m and a 13.0 sq. m vent to the cellar. The supplied plan extraction does not establish flat distribution by floor, lift or stair details, building entries beyond the approval’s access condition, or the overall extent of open space and landscaping.

The HMDA record specifies one entry and one exit to the premises, with minimum width 4.5 m and height clearance 5 m. It also states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking.

4. Homes, configurations & floor plans

TG-RERA records 20 apartments in the 2BHK configuration, recorded in the filing as both “2BHK” and “2 BKH.” Filed saleable areas are 48.98 sq. m for 2 units and 54.38 sq. m for 18 units. The portal counts supplied show 0 booked and 20 available, without an as-of date; confirm current availability directly before relying on those counts. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK / “2 BKH”2002048.98–54.38 sq. mNot availableNot supplied

Saleable area is the RERA-filed figure. The supplied floor-plan measurement record reports no measured apartments, so no drawing-based carpet area or room dimensions can be stated. Carpet area, any exclusive balcony or utility space, and the unit’s share of common areas are not quantified in the supplied material; no carpet-to-saleable comparison is made. Floor plans RERA unit details

5. Parking & vehicle circulation

The HMDA approval describes the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking without partition walls or rolling shutters. It also specifies one entry and one exit, with minimum width 4.5 m and height clearance 5 m. The supplied approval extraction does not state the number of sanctioned parking spaces or establish visitor, accessible, two-wheeler or EV-charging provision.

The RERA-filed unit records mark 18 apartments as mortgaged and 2 as not mortgaged; that is not a parking allocation. A third-party vendor entry describes “20 Covered Parking,” but it is not a TG-RERA filing or an approved parking count, and the supplied evidence does not establish unit-wise parking rights. RERA unit table Promoter website

6. Amenities, recreation & open spaces

The approval documents identify a tot-lot, rainwater-harvesting structures, transformer space, garbage house, water supply, and a drainage and sewerage disposal system. These are approval-recorded provisions; no supplied evidence independently verifies that they have been installed or completed.

Clubhouse / indoor — no facility stated
Description / sizeNot disclosed
Evidence sourceSupplied project documents
Declared progress / verified statusNo progress or verification evidence supplied
Sports / recreation — tot-lot
Description / size42.27 sq. m
Evidence sourceHMDA plan extraction and approval
Declared progress / verified statusShown/identified in approval records; completion not verified
Landscape / open space — green strip / tot-lot / park
Description / sizeSize beyond the tot-lot figure not stated
Evidence sourceRERA amenities record RERA amenities; HMDA documents
Declared progress / verified statusRERA record says available “YES”; percentage is 0; physical completion not independently verified
Convenience / community — community buildings
Description / sizeNo size or facility details supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusPercentage is 0; no completion evidence supplied

The RERA amenities record also marks water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station as available “YES”; they are addressed under utilities below. Other amenities in that record have progress percentages of 0 and are not evidence of completed facilities. RERA amenities

7. Utilities, building services & safety

The HMDA approval records separate underground static water storage of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. It also lists water supply, drainage and sewerage disposal, rainwater-harvesting structures, a transformer and a garbage house. These are approval-recorded requirements or provisions; source, treatment, STP capacity, reuse arrangements and installation status are not established in the supplied documents.

The RERA amenities record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station “YES,” while recording 0% for these items. It does not provide capacity or completion evidence. No lift details, backup-power system, EV charging, fire-system specifications, CCTV/access-control details, waste-segregation arrangements or accessibility features are supplied. RERA amenities

HMDA’s technical approval requires a space for a transformer, garbage house within the premises, and rainwater harvesting. It also states that the applicant must obtain an occupancy certificate after completion and that an occupancy certificate is compulsory before occupation. The supplied records do not establish that these requirements have been completed or that an occupancy certificate has issued.

8. Location, access & connectivity

The registered location is Uppal, in Uppal Mandal, Medchal-Malkajgiri district, PIN 500007; the building-plan records identify Plot No. 760 in Uppal Bhagat village. The site boundaries in the RERA filing include road width 18 on the south. HMDA’s approval records an access arrangement with one entry and one exit and the specified minimum clearance. RERA record RERA filing

The supplied location data lists Financial District (Nanakramguda) at 2.0 km as a connectivity anchor. The record provides no route, measurement method or travel time. No public-transport details or further verified approach-road information are supplied. Location record

9. Developer & development status

The registered promoter is Aishwarya Constructions, identified as a partnership, with its address recorded as Haripriya Complex, Hubsiguda, Uppal, Uppal, Medchal-Malkajgiri, 500007. The RERA record identifies Ramesh Battina as an authorized signatory. An authority letter dated 03.01.2020 authorizes him to act for the firm in project registration and compliance. Corporate record Parties record

The Form B affidavit is a promoter declaration: it names Gandla Madhavi, Rachakonda Malathi Srinivas and Kasula Karuna as landowners, states that the land is free from encumbrances, and undertakes completion by 31/03/2021. The certificate records project registration through 31/03/2021 and no extension; no current site-progress evidence or occupancy/completion certificate is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200001865, issued 21/03/2020; valid through 31/03/2021
What the supplied record establishesForm C registration for MMKCASITA; certificate includes the separate-account condition and other registration conditions.
HMDA technical building approval
Identifier / date022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019
What the supplied record establishesTechnical approval for the proposed building, with conditions; the record directs the applicant to obtain sanction/release from the Executive Authority.
HMDA plan sheets filed with TG-RERA
Identifier / dateFile number 022503/GHT/R1/U6/HMDA/09042019
What the supplied record establishesTwo-sheet plan showing one proposed residential building and 20 dwelling units.
Promoter Form B declaration
Identifier / dateVerified 03/01/2019
What the supplied record establishesPromoter’s declarations on title, encumbrances, completion undertaking and statutory obligations.
Encumbrance statement
Identifier / dateFiled document 90591
What the supplied record establishesStatement lists five returned registered transactions and says 5 of 11 are included; it is not a complete transaction listing.
Advocate’s title report
Identifier / dateDated 18-12-2019
What the supplied record establishesTitle scrutiny concerning Plot No. 760 and the owner–promoter development arrangement.
Development Agreement cum GPA
Identifier / dateRegistered no. 7656/2018; April 2018
What the supplied record establishesRegistered development/GPA document filed in the project record.
Agreement for Sale
Identifier / dateTemplate filed as document 90601
What the supplied record establishesUnfilled form template; it does not establish an executed buyer-specific agreement.

No occupancy or completion certificate is present in the supplied documents. The HMDA approval sets out conditions including parking use, access, water storage, rainwater harvesting and the requirement for an occupancy certificate before occupation; the complete conditions and their implications are addressed in the approvals review. Document index

Frequently asked questions

Is MMKCASITA registered with Telangana RERA?

Yes. MMKCASITA is registered with the Telangana Real Estate Regulatory Authority as P02200001865; the registration status is New Project.

Who is the developer of MMKCASITA?

The promoter named in the RERA registration is AISHWARYA CONSTRUCTIONS.

Where is MMKCASITA located?

MMKCASITA is in UPPAL, Medchal-Malkajgiri, Telangana (500007).

When will MMKCASITA be completed?

The promoter's proposed date of completion filed with RERA is 31/03/2021. This is the promoter's declaration, not a guarantee.

More projects in Uppal