AISHWARYA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001865
MMKCASITA is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri district. The registered promoter developing it is Aishwarya Constructions, a partnership. The site extent is 836.48 sq. m, and the project comprises one residential building with 1 cellar, 1 stilt and 5 upper floors, with 20 apartments in the 2BHK configuration. Its TG-RERA registration number is P02200001865, and the promoter-declared completion deadline is 31/03/2021.
More from Aishwarya Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | MMKCASITA RERA record |
| Project type / phase | Residential apartment project; phase or separately identified registered portion is not disclosed. RERA record |
| TG-RERA registration | P02200001865 |
| Registration validity | Issued 21/03/2020; valid through 31/03/2021. The certificate records no extension. Registration validity is separate from the completion deadline and from occupancy certification. Approvals record |
| Registered promoter | Aishwarya Constructions; partnership. RERA record Corporate record |
| RERA status | The supplied record identifies the project as “New Project”; the certificate states the registration period above. A current registration-status verification is not supplied. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site | Uppal; Plot No. 760 RERA filing |
| Revenue village | Uppal Bhagat (also rendered “Uppal Bhagath” in filed documents) |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500007 RERA record |
| Project survey numbers and subdivisions, as filed | 1 TO 40, 282 TO 368, 369/P, 370 TO 373, 374/P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/P, 510 TO 564 Land records |
| Site extent | 836.48 sq. m; filed total area and net area are both 836.48 sq. m. RERA filing |
| Boundaries in RERA filing | East: Plot No. 759; West: Plot No. 761; North: Plot No. 749; South: road width 18. RERA filing |
| Site-area description in title report | Plot No. 760, stated as 1,000 sq. yards in the title report. |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Technical approval No. 022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019. The approval directs the applicant to obtain sanction and release from the Executive Authority, subject to its conditions. Approvals record |
| Building shown | One proposed residential building on two plan sheets. |
| Sanctioned floor configuration | 1 cellar + 1 stilt + 5 upper floors. |
| Built-up figures stated in approval records | Built up Area: 1896.35 sq. m; Total Built Up Area: 2286.18 sq. m. The plan also records Residential Net BUA 1896.32, Total Proposed Net BUA Area 1901.61, and Net BUA Area 1896.35; these labels are retained as stated. |
| Parking levels / approved units | The approval records the cellar and stilt as parking levels, and the plan shows 20 dwelling units. |
| RERA-declared units | 20 apartments: 18 filed as 2BHK and 2 as “2 BKH”. RERA unit table RERA unit details |
Offering and status
| Field | Record |
|---|---|
| Unit type | 2BHK apartments RERA unit table |
| RERA-filed saleable area | 48.98–54.38 sq. m (2 units at 48.98 sq. m and 18 at 54.38 sq. m in the supplied unit records). RERA unit table |
| Portal booking snapshot | 0 booked and 20 available in the supplied records; no as-of date is provided, so counts are indicative rather than a current availability confirmation. RERA unit table |
| Promoter-declared completion deadline | 31/03/2021 in the Form B declaration. |
| Construction stage | No independently verified construction progress or current site-stage evidence is supplied. Document index |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The HMDA technical approval requires an occupancy certificate before occupation. Document index |
2. The project story
MMKCASITA is filed with TG-RERA as a residential apartment project at Plot No. 760 in Uppal Bhagat village, Uppal Mandal, Medchal-Malkajgiri district. Its filed site extent is 836.48 sq. m, and the HMDA plan shows one residential building with a cellar, stilt and five upper floors. The sanctioned drawing and TG-RERA records identify 20 dwelling units. RERA record Land records
The project’s Form B declaration gives 31/03/2021 as the promoter’s completion undertaking. That is the declared deadline—not evidence that construction was completed by then. The supplied documents do not establish present construction progress or show an occupancy/completion certificate. Accordingly, the project’s current physical completion and occupancy status remain unverified from this evidence. Document index
3. Master plan, architecture & building design
The filed HMDA plan depicts a single proposed residential building on the stated 836.48 sq. m site. Its floor arrangement is 1 cellar, 1 stilt and 5 upper floors; the plan identifies 20 dwelling units. The approval record states a building height of 14.9 and a total built-up area of 2286.18 sq. m. It separately states “Built up Area 1896.35”; the plan lists additional BUA labels, including Residential Net BUA 1896.32 and Total Proposed Net BUA Area 1901.61. These are different labelled figures in the approval documents and are not interchangeable.
The approval records a proposed coverage area of 45.34% and 379.27, and a consumed net BUA factor of 2.27. It also identifies a tot-lot of 42.27 sq. m and a 13.0 sq. m vent to the cellar. The supplied plan extraction does not establish flat distribution by floor, lift or stair details, building entries beyond the approval’s access condition, or the overall extent of open space and landscaping.
The HMDA record specifies one entry and one exit to the premises, with minimum width 4.5 m and height clearance 5 m. It also states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking.
4. Homes, configurations & floor plans
TG-RERA records 20 apartments in the 2BHK configuration, recorded in the filing as both “2BHK” and “2 BKH.” Filed saleable areas are 48.98 sq. m for 2 units and 54.38 sq. m for 18 units. The portal counts supplied show 0 booked and 20 available, without an as-of date; confirm current availability directly before relying on those counts. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK / “2 BKH” | 20 | 0 | 20 | 48.98–54.38 sq. m | Not available | Not supplied |
Saleable area is the RERA-filed figure. The supplied floor-plan measurement record reports no measured apartments, so no drawing-based carpet area or room dimensions can be stated. Carpet area, any exclusive balcony or utility space, and the unit’s share of common areas are not quantified in the supplied material; no carpet-to-saleable comparison is made. Floor plans RERA unit details
5. Parking & vehicle circulation
The HMDA approval describes the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking without partition walls or rolling shutters. It also specifies one entry and one exit, with minimum width 4.5 m and height clearance 5 m. The supplied approval extraction does not state the number of sanctioned parking spaces or establish visitor, accessible, two-wheeler or EV-charging provision.
The RERA-filed unit records mark 18 apartments as mortgaged and 2 as not mortgaged; that is not a parking allocation. A third-party vendor entry describes “20 Covered Parking,” but it is not a TG-RERA filing or an approved parking count, and the supplied evidence does not establish unit-wise parking rights. RERA unit table Promoter website
6. Amenities, recreation & open spaces
The approval documents identify a tot-lot, rainwater-harvesting structures, transformer space, garbage house, water supply, and a drainage and sewerage disposal system. These are approval-recorded provisions; no supplied evidence independently verifies that they have been installed or completed.
| Description / size | Not disclosed |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | No progress or verification evidence supplied |
| Description / size | 42.27 sq. m |
|---|---|
| Evidence source | HMDA plan extraction and approval |
| Declared progress / verified status | Shown/identified in approval records; completion not verified |
| Description / size | Size beyond the tot-lot figure not stated |
|---|---|
| Evidence source | RERA amenities record RERA amenities; HMDA documents |
| Declared progress / verified status | RERA record says available “YES”; percentage is 0; physical completion not independently verified |
| Description / size | No size or facility details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Percentage is 0; no completion evidence supplied |
The RERA amenities record also marks water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station as available “YES”; they are addressed under utilities below. Other amenities in that record have progress percentages of 0 and are not evidence of completed facilities. RERA amenities
7. Utilities, building services & safety
The HMDA approval records separate underground static water storage of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. It also lists water supply, drainage and sewerage disposal, rainwater-harvesting structures, a transformer and a garbage house. These are approval-recorded requirements or provisions; source, treatment, STP capacity, reuse arrangements and installation status are not established in the supplied documents.
The RERA amenities record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station “YES,” while recording 0% for these items. It does not provide capacity or completion evidence. No lift details, backup-power system, EV charging, fire-system specifications, CCTV/access-control details, waste-segregation arrangements or accessibility features are supplied. RERA amenities
HMDA’s technical approval requires a space for a transformer, garbage house within the premises, and rainwater harvesting. It also states that the applicant must obtain an occupancy certificate after completion and that an occupancy certificate is compulsory before occupation. The supplied records do not establish that these requirements have been completed or that an occupancy certificate has issued.
8. Location, access & connectivity
The registered location is Uppal, in Uppal Mandal, Medchal-Malkajgiri district, PIN 500007; the building-plan records identify Plot No. 760 in Uppal Bhagat village. The site boundaries in the RERA filing include road width 18 on the south. HMDA’s approval records an access arrangement with one entry and one exit and the specified minimum clearance. RERA record RERA filing
The supplied location data lists Financial District (Nanakramguda) at 2.0 km as a connectivity anchor. The record provides no route, measurement method or travel time. No public-transport details or further verified approach-road information are supplied. Location record
9. Developer & development status
The registered promoter is Aishwarya Constructions, identified as a partnership, with its address recorded as Haripriya Complex, Hubsiguda, Uppal, Uppal, Medchal-Malkajgiri, 500007. The RERA record identifies Ramesh Battina as an authorized signatory. An authority letter dated 03.01.2020 authorizes him to act for the firm in project registration and compliance. Corporate record Parties record
The Form B affidavit is a promoter declaration: it names Gandla Madhavi, Rachakonda Malathi Srinivas and Kasula Karuna as landowners, states that the land is free from encumbrances, and undertakes completion by 31/03/2021. The certificate records project registration through 31/03/2021 and no extension; no current site-progress evidence or occupancy/completion certificate is supplied. Document index
10. Approvals, official records & documents
| Identifier / date | P02200001865, issued 21/03/2020; valid through 31/03/2021 |
|---|---|
| What the supplied record establishes | Form C registration for MMKCASITA; certificate includes the separate-account condition and other registration conditions. |
| Identifier / date | 022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019 |
|---|---|
| What the supplied record establishes | Technical approval for the proposed building, with conditions; the record directs the applicant to obtain sanction/release from the Executive Authority. |
| Identifier / date | File number 022503/GHT/R1/U6/HMDA/09042019 |
|---|---|
| What the supplied record establishes | Two-sheet plan showing one proposed residential building and 20 dwelling units. |
| Identifier / date | Verified 03/01/2019 |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, completion undertaking and statutory obligations. |
| Identifier / date | Filed document 90591 |
|---|---|
| What the supplied record establishes | Statement lists five returned registered transactions and says 5 of 11 are included; it is not a complete transaction listing. |
| Identifier / date | Dated 18-12-2019 |
|---|---|
| What the supplied record establishes | Title scrutiny concerning Plot No. 760 and the owner–promoter development arrangement. |
| Identifier / date | Registered no. 7656/2018; April 2018 |
|---|---|
| What the supplied record establishes | Registered development/GPA document filed in the project record. |
| Identifier / date | Template filed as document 90601 |
|---|---|
| What the supplied record establishes | Unfilled form template; it does not establish an executed buyer-specific agreement. |
No occupancy or completion certificate is present in the supplied documents. The HMDA approval sets out conditions including parking use, access, water storage, rainwater harvesting and the requirement for an occupancy certificate before occupation; the complete conditions and their implications are addressed in the approvals review. Document index
1. Project at a glance
Project identity
Registered project name: MMKCASITA
Project type / phase: Residential apartment project; phase or separately identified registered portion is not disclosed.
TG-RERA registration: P02200001865
Registration validity: Issued 21/03/2020; valid through 31/03/2021. The certificate records no extension. Registration validity is separate from the completion deadline and from occupancy certification.
Registered promoter: Aishwarya Constructions; partnership.
RERA status: The supplied record identifies the project as “New Project”; the certificate states the registration period above. A current registration-status verification is not supplied.
Land and geographic identity
Locality / site: Uppal; Plot No. 760
Revenue village: Uppal Bhagat (also rendered “Uppal Bhagath” in filed documents)
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500007
Project survey numbers and subdivisions, as filed: 1 TO 40, 282 TO 368, 369/P, 370 TO 373, 374/P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/P, 510 TO 564
Site extent: 836.48 sq. m; filed total area and net area are both 836.48 sq. m.
Boundaries in RERA filing: East: Plot No. 759; West: Plot No. 761; North: Plot No. 749; South: road width 18.
Site-area description in title report: Plot No. 760, stated as 1,000 sq. yards in the title report.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Technical approval No. 022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019. The approval directs the applicant to obtain sanction and release from the Executive Authority, subject to its conditions.
Building shown: One proposed residential building on two plan sheets.
Sanctioned floor configuration: 1 cellar + 1 stilt + 5 upper floors.
Built-up figures stated in approval records: Built up Area: 1896.35 sq. m; Total Built Up Area: 2286.18 sq. m. The plan also records Residential Net BUA 1896.32, Total Proposed Net BUA Area 1901.61, and Net BUA Area 1896.35; these labels are retained as stated.
Parking levels / approved units: The approval records the cellar and stilt as parking levels, and the plan shows 20 dwelling units.
RERA-declared units: 20 apartments: 18 filed as 2BHK and 2 as “2 BKH”.
Offering and status
Unit type: 2BHK apartments
RERA-filed saleable area: 48.98–54.38 sq. m (2 units at 48.98 sq. m and 18 at 54.38 sq. m in the supplied unit records).
Portal booking snapshot: 0 booked and 20 available in the supplied records; no as-of date is provided, so counts are indicative rather than a current availability confirmation.
Promoter-declared completion deadline: 31/03/2021 in the Form B declaration.
Construction stage: No independently verified construction progress or current site-stage evidence is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The HMDA technical approval requires an occupancy certificate before occupation.
2. The project story
MMKCASITA is filed with TG-RERA as a residential apartment project at Plot No. 760 in Uppal Bhagat village, Uppal Mandal, Medchal-Malkajgiri district. Its filed site extent is 836.48 sq. m, and the HMDA plan shows one residential building with a cellar, stilt and five upper floors. The sanctioned drawing and TG-RERA records identify 20 dwelling units.
The project’s Form B declaration gives 31/03/2021 as the promoter’s completion undertaking. That is the declared deadline—not evidence that construction was completed by then. The supplied documents do not establish present construction progress or show an occupancy/completion certificate. Accordingly, the project’s current physical completion and occupancy status remain unverified from this evidence.
3. Master plan, architecture & building design
The filed HMDA plan depicts a single proposed residential building on the stated 836.48 sq. m site. Its floor arrangement is 1 cellar, 1 stilt and 5 upper floors; the plan identifies 20 dwelling units. The approval record states a building height of 14.9 and a total built-up area of 2286.18 sq. m. It separately states “Built up Area 1896.35”; the plan lists additional BUA labels, including Residential Net BUA 1896.32 and Total Proposed Net BUA Area 1901.61. These are different labelled figures in the approval documents and are not interchangeable.
The approval records a proposed coverage area of 45.34% and 379.27, and a consumed net BUA factor of 2.27. It also identifies a tot-lot of 42.27 sq. m and a 13.0 sq. m vent to the cellar. The supplied plan extraction does not establish flat distribution by floor, lift or stair details, building entries beyond the approval’s access condition, or the overall extent of open space and landscaping.
The HMDA record specifies one entry and one exit to the premises, with minimum width 4.5 m and height clearance 5 m. It also states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking.
4. Homes, configurations & floor plans
TG-RERA records 20 apartments in the 2BHK configuration, recorded in the filing as both “2BHK” and “2 BKH.” Filed saleable areas are 48.98 sq. m for 2 units and 54.38 sq. m for 18 units. The portal counts supplied show 0 booked and 20 available, without an as-of date; confirm current availability directly before relying on those counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK / “2 BKH” | 20 | 0 | 20 | 48.98–54.38 sq. m | Not available | Not supplied |
Saleable area is the RERA-filed figure. The supplied floor-plan measurement record reports no measured apartments, so no drawing-based carpet area or room dimensions can be stated. Carpet area, any exclusive balcony or utility space, and the unit’s share of common areas are not quantified in the supplied material; no carpet-to-saleable comparison is made.
5. Parking & vehicle circulation
The HMDA approval describes the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking without partition walls or rolling shutters. It also specifies one entry and one exit, with minimum width 4.5 m and height clearance 5 m. The supplied approval extraction does not state the number of sanctioned parking spaces or establish visitor, accessible, two-wheeler or EV-charging provision.
The RERA-filed unit records mark 18 apartments as mortgaged and 2 as not mortgaged; that is not a parking allocation. A third-party vendor entry describes “20 Covered Parking,” but it is not a TG-RERA filing or an approved parking count, and the supplied evidence does not establish unit-wise parking rights.
6. Amenities, recreation & open spaces
The approval documents identify a tot-lot, rainwater-harvesting structures, transformer space, garbage house, water supply, and a drainage and sewerage disposal system. These are approval-recorded provisions; no supplied evidence independently verifies that they have been installed or completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor — no facility stated | Not disclosed | Supplied project documents | No progress or verification evidence supplied |
| Sports / recreation — tot-lot | 42.27 sq. m | HMDA plan extraction and approval | Shown/identified in approval records; completion not verified |
| Landscape / open space — green strip / tot-lot / park | Size beyond the tot-lot figure not stated | RERA amenities record; HMDA documents | RERA record says available “YES”; percentage is 0; physical completion not independently verified |
| Convenience / community — community buildings | No size or facility details supplied | RERA amenities record | Percentage is 0; no completion evidence supplied |
The RERA amenities record also marks water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station as available “YES”; they are addressed under utilities below. Other amenities in that record have progress percentages of 0 and are not evidence of completed facilities.
7. Utilities, building services & safety
The HMDA approval records separate underground static water storage of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. It also lists water supply, drainage and sewerage disposal, rainwater-harvesting structures, a transformer and a garbage house. These are approval-recorded requirements or provisions; source, treatment, STP capacity, reuse arrangements and installation status are not established in the supplied documents.
The RERA amenities record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station “YES,” while recording 0% for these items. It does not provide capacity or completion evidence. No lift details, backup-power system, EV charging, fire-system specifications, CCTV/access-control details, waste-segregation arrangements or accessibility features are supplied.
HMDA’s technical approval requires a space for a transformer, garbage house within the premises, and rainwater harvesting. It also states that the applicant must obtain an occupancy certificate after completion and that an occupancy certificate is compulsory before occupation. The supplied records do not establish that these requirements have been completed or that an occupancy certificate has issued.
8. Location, access & connectivity
The registered location is Uppal, in Uppal Mandal, Medchal-Malkajgiri district, PIN 500007; the building-plan records identify Plot No. 760 in Uppal Bhagat village. The site boundaries in the RERA filing include road width 18 on the south. HMDA’s approval records an access arrangement with one entry and one exit and the specified minimum clearance.
The supplied location data lists Financial District (Nanakramguda) at 2.0 km as a connectivity anchor. The record provides no route, measurement method or travel time. No public-transport details or further verified approach-road information are supplied.
9. Developer & development status
The registered promoter is Aishwarya Constructions, identified as a partnership, with its address recorded as Haripriya Complex, Hubsiguda, Uppal, Uppal, Medchal-Malkajgiri, 500007. The RERA record identifies Ramesh Battina as an authorized signatory. An authority letter dated 03.01.2020 authorizes him to act for the firm in project registration and compliance.
The Form B affidavit is a promoter declaration: it names Gandla Madhavi, Rachakonda Malathi Srinivas and Kasula Karuna as landowners, states that the land is free from encumbrances, and undertakes completion by 31/03/2021. The certificate records project registration through 31/03/2021 and no extension; no current site-progress evidence or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200001865, issued 21/03/2020; valid through 31/03/2021 |
|---|---|
| What the supplied record establishes | Form C registration for MMKCASITA; certificate includes the separate-account condition and other registration conditions. |
| Identifier / date | 022503/GHT/R1/U6/HMDA/09042019, dated 09/07/2019 |
|---|---|
| What the supplied record establishes | Technical approval for the proposed building, with conditions; the record directs the applicant to obtain sanction/release from the Executive Authority. |
| Identifier / date | File number 022503/GHT/R1/U6/HMDA/09042019 |
|---|---|
| What the supplied record establishes | Two-sheet plan showing one proposed residential building and 20 dwelling units. |
| Identifier / date | Verified 03/01/2019 |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, completion undertaking and statutory obligations. |
| Identifier / date | Filed document 90591 |
|---|---|
| What the supplied record establishes | Statement lists five returned registered transactions and says 5 of 11 are included; it is not a complete transaction listing. |
| Identifier / date | Dated 18-12-2019 |
|---|---|
| What the supplied record establishes | Title scrutiny concerning Plot No. 760 and the owner–promoter development arrangement. |
| Identifier / date | Registered no. 7656/2018; April 2018 |
|---|---|
| What the supplied record establishes | Registered development/GPA document filed in the project record. |
| Identifier / date | Template filed as document 90601 |
|---|---|
| What the supplied record establishes | Unfilled form template; it does not establish an executed buyer-specific agreement. |
No occupancy or completion certificate is present in the supplied documents. The HMDA approval sets out conditions including parking use, access, water storage, rainwater harvesting and the requirement for an occupancy certificate before occupation; the complete conditions and their implications are addressed in the approvals review.
Frequently asked questions
Is MMKCASITA registered with Telangana RERA?
Yes. MMKCASITA is registered with the Telangana Real Estate Regulatory Authority as P02200001865; the registration status is New Project.
Who is the developer of MMKCASITA?
The promoter named in the RERA registration is AISHWARYA CONSTRUCTIONS.
Where is MMKCASITA located?
MMKCASITA is in UPPAL, Medchal-Malkajgiri, Telangana (500007).
When will MMKCASITA be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2021. This is the promoter's declaration, not a guarantee.