Mahitha S Green Gokulam Block-B

MAHITHA PROJECTS · Rangareddy · RERA P02400009068

MAHITHA S GREEN GOKULAM BLOCK-B is a residential apartment project in MADEENAGUDA, Serilingampally mandal, Ranga Reddy district. The registered promoter is MAHITHA PROJECTS, recorded as a partnership. The project has a land area of 379.22 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 homes: 5 2BHK and 5 3BHK units. It is registered under TG-RERA number P02400009068, and the promoter’s declared completion deadline is 21-06-2027.

More from Mahitha Projects · 5 projects →

01What we found

RegisteredTG-RERA - valid till 21 Jul 2027
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameMAHITHA S GREEN GOKULAM BLOCK-B RERA record [REGCERT-62787]
Project type / registered portionResidential apartment project; registered portion BLOCK-B. The record identifies one building. RERA record [REGCERT-62787]
TG-RERA registrationP02400009068 RERA record [REGCERT-62787]
Registration validity21/06/2024 to 21/07/2027, unless extended by the Authority. This is the registration period, not an occupancy certificate or evidence of current construction stage. RERA record [REGCERT-62787 p1]
Registered promoterMAHITHA PROJECTS, recorded as a partnership. RERA record Corporate record RERA filing
RERA statusRERA record labels the project New Project. A GHMC occupancy certificate is also in the supplied project documents; its scope is set out below. RERA record

Land and geographic identity

ItemProject record
Locality / site descriptionMADEENAGUDA; north-east part of Plot 35, also described in the filed building-plan details as Plot 35 and the northern part of Plot 22. RERA record
Revenue villageMadina Guda in the RERA identity record; approval and title materials also use MADEENAGUDA / Madeenaguda. RERA record [REGCERT-62787 p1]
Mandal / district / PINSerilingampally / Ranga Reddy / 500049. RERA record [REGCERT-62787 p1]
Project survey numbers and subdivisions203/A and 202/2/A. RERA record
Site extentRERA land record: 379.22 sq. m total and net area 379.22 sq. m. The GHMC building-plan record separately gives 379.22 sq. m minimum plot area and 376.33 sq. m net plot area after a 2.89 sq. m splay deduction. RERA record
Boundaries recorded by RERAEast: 40FT WIDE ROAD; west: WESTERN PART OF PLOT NO 35; north: 40FT WIDE ROAD; south: SOUTHERN PART OF PLOT NO 22 AND SOUTH EAST PART OF (entry truncated). RERA record

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit1756/GHMC/SLP/2024-BP, dated 21 June, 2024. Approvals record
Approved buildingOne residential building, named BLDG (SUBASH BABU) in the plan record: 1 Stilt + 5 upper floors.
Approved built-up area1,049.10 sq. m excluding parking in the building-plan record. The same record lists 1,256.30 sq. m including parking; these are separate plan figures.
Building height14.95 m in the building-permit parameters.
UnitsGHMC plan record: 10 sanctioned units; RERA unit record: 10 proposed units. RERA unit table
ParkingParking is provided for in the sanctioned plan; the building-permit record lists a total parking area of 127.2 (unit not stated in that entry). Other plan records list parking area 207.20 and completion-plan parking area 217.06 sq. m. No confirmed bay count or buyer-specific allocation is supplied.

Offering and status

ItemProject record
Configurations2BHK: 5 units; 3BHK: 5 units. RERA unit table
RERA-filed saleable area2BHK: 118.45 sq. m; 3BHK: 146.32 sq. m. RERA unit table
Booking / availabilityPortal-derived counts show 0 booked and 5 available for each configuration (10 available in total). The source provides no as-of date, so treat these counts as indicative. RERA unit table
Completion dates in the recordForm B promoter declaration states 21-06-2027; the RERA registration certificate runs to 21/07/2027. These are distinct recorded dates. [REGCERT-62787 p1]
Occupancy certificateGHMC OC 005486/GHMC/02699/SWOC/SLP2/2025, dated 30/10/2025, for the residential building at the stated site and survey numbers.
Construction stageNot independently established by the supplied evidence. The OC and architect’s completion certificate are documented below; no current site inspection is supplied.

2. The project story

This is a single-building residential apartment development registered as MAHITHA S GREEN GOKULAM BLOCK-B, at the north-east part of Plot 35 in Madeenaguda, within revenue village Madina Guda, Serilingampally mandal, Ranga Reddy district. Its land identity includes Survey Nos. 203/A and 202/2/A. The GHMC plan record also describes the proposed construction as being on Plot 35 and the northern part of Plot 22. RERA record [REGCERT-62787 p1]

The sanctioned building is 1 Stilt + 5 upper floors and the RERA record lists ten homes: five 2BHK and five 3BHK. The project’s RERA registration is valid through 21/07/2027 unless extended. Separately, the supplied GHMC occupancy certificate records the inspected building as fit for occupation, and the architect’s Form 1A certifies project completion. These documents establish certificate records, not an independent present-day site inspection. RERA unit table [REGCERT-62787 p1]

3. Master plan, architecture & building design

The filed building-plan details describe a 379.22 sq. m minimum plot area, a 2.89 sq. m splay deduction and 376.33 sq. m net plot area. They record 1,049.10 sq. m of proposed built-up area excluding parking, 1,256.30 sq. m including parking, and 207.20 sq. m parking area; a separate building-permit parameter lists parking area as 127.2 without specifying a unit. These are the figures as recorded in their respective plan entries; no area category beyond the stated labels is inferred.

The sanctioned configuration is one residential building, 1 Stilt + 5 upper floors, with a listed building height of 14.95 m. The plan names the building BLDG (SUBASH BABU). The available evidence does not provide a verified floor-by-floor unit schedule, flats per floor, lift count, stair count, detailed circulation plan, or a separate common-area schedule.

The approval record includes a rainwater-harvesting provision, transformer space, sump, septic tank, lift and overhead water tank among its plan-listed facilities. The building-permit record lists 10 No. of Rain Water Harvesting Pits, while the occupancy certificate’s sanctioned and constructed-plan entries each list 1 rainwater-harvesting pit.

4. Homes, configurations & floor plans

RERA records ten homes: five 2BHK and five 3BHK. The portal-derived booking counts are indicative because the record carries no as-of date. Saleable areas below are RERA-filed figures. Carpet areas and loading are software measurements from the approved floor-plan drawing, not RERA disclosures; the measurement record advises review against the drawing. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505118.45 sq. m74.3–77.9 sq. m; median 76.1 sq. m36%
3BHK505146.32 sq. m75.5–77.8 sq. m; median 76.7 sq. m48%

The floor-plan measurements identify two measured designs per configuration. One illustrated 2BHK plan labels a master bedroom, children’s bedroom, living area, dining/kitchen, two toilets, wash area and a 1.20 m wide balcony. One illustrated 3BHK plan labels a master bedroom, two other bedrooms, living/dining, kitchen, two toilets, wash area and a 1.37 m wide balcony. Room dimensions and measured areas are drawing-based software outputs, not RERA-filed room measurements. RERA unit details Floor plans

RERA saleable area and software-measured carpet area are different measurement categories. The drawing-measurement record notes that saleable area includes the home’s share of common areas; balcony is shown separately from measured carpet area in the cited sample plans. Floor plans RERA unit details

5. Parking & vehicle circulation

GHMC’s building-permit record lists a total parking area of 127.2 (unit not stated in that entry). The plan-details record separately lists 207.20 sq. m of parking area, and the occupancy certificate records 207.2 sq. m as sanctioned-plan parking area and 217.06 sq. m in the completion plan. The supplied materials do not establish a parking-bay count, resident-versus-visitor allocation, accessible spaces, two-wheeler provision, or an individual buyer’s parking entitlement.

The approved building includes a stilt level, and GHMC’s plan conditions state that stilt and cellar areas approved for parking must be used exclusively for vehicle parking and not partitioned or repurposed. The supplied project records do not specify a cellar, parking ramp arrangement, internal vehicle circulation details, or a buyer-specific parking allocation.

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 amenity categories; only rainwater harvesting is marked YES, and the recorded progress field for each listed item is 0. These are filing entries, not independent confirmation of delivery. RERA amenities

Water conservation / rainwater harvesting
Description / sizeListed as available: YES; plan records also refer to rainwater-harvesting pits. RERA amenities
Evidence sourceRERA amenities record and GHMC plan records
Declared progress / verified statusRERA progress entry: 0; GHMC occupancy-certificate record lists 1 pit in both sanctioned and constructed-plan entries. RERA amenities
Green strip / tot lot / park
Description / sizeListed as an amenity category; the building-plan record states “Tot-lot NA” and includes conditions for greenery and a fenced tot-lot before OC. RERA amenities
Evidence sourceRERA amenities record and GHMC plan records
Declared progress / verified statusRERA progress entry: 0; no independent delivery verification supplied. RERA amenities
Internal roads and footpaths
Description / sizeListed as an amenity category; no project-specific size or internal-road plan details supplied. RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusProgress entry: 0. RERA amenities
Community buildings
Description / sizeListed as an amenity category; no separate facility size or description supplied. RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusProgress entry: 0. RERA amenities
Other listed site amenities
Description / sizeWater supply; sewerage; storm-water drains; street lighting; sewage/sullage treatment and disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station; aggregate recreational open space. RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusEach has a recorded progress entry of 0; no independent completion verification supplied. RERA amenities

7. Utilities, building services & safety

  • Water and drainage: The building-plan record lists a sump and separate underground static water storage tank of 25,000 litres, plus a separate terrace tank of 25,000 litres. It also lists a septic tank. The RERA amenities record includes water supply, sewerage, storm-water drainage and sewage/sullage treatment categories, but gives each a progress entry of 0; no supplied project evidence establishes a treatment-plant capacity, water source, reuse arrangement or current operating status. RERA amenities
  • Electrical and vertical transport: The plan lists transformer space, a lift, lift machine room and overhead water tank. No lift count, capacity, backup-power provision or confirmed electrical-service commissioning status is supplied.
  • Fire, safety and waste: GHMC’s building-permit conditions require an occupancy fire NOC before issue of the occupancy certificate and call for CCTV, dust control and construction-and-demolition waste handling. The plan also lists fire protection and fire safety as an amenity category, with a RERA progress entry of 0. These records do not, by themselves, establish current operation or independently verify each safety feature. RERA amenities
  • Accessibility and EV charging: The supplied plan records contain general conditions concerning accessibility for specified public and semi-public buildings and EV charging infrastructure in building parking. No project-specific accessible-unit or accessible-route plan, EV charger count, or installation status is supplied.

8. Location, access & connectivity

The registered location is Madina Guda, Serilingampally, Ranga Reddy, 500049, with the site described as the north-east part of Plot 35 in Madeenaguda. RERA records the project’s survey numbers as 203/A and 202/2/A. The filed building-plan details identify a 12.00 m (40'0") wide north road, a 12.00 m wide existing road and a 12.00 m wide proposed road. [REGCERT-62787 p1]

The supplied location record gives HITEC City: 4.7 km. A vendor-listed source separately states distances to Miyapur Metro (1.4 km), Hafizpet Metro (2.8 km) and JNTU College Metro (2.6 km); these are vendor claims, not TG-RERA location measurements. Location record Promoter website

9. Developer & development status

The registered promoter is MAHITHA PROJECTS, identified in the project record as a partnership with GSTIN 36ABDFM3573A1ZK. The supplied corporate record names KORRAPATI SUBASH BABU as authorized signatory. The RERA certificate gives a promoter address in Hyderabad, PIN 500072; the project record separately lists the promoter address as Plot No. 1052/B, Srila Gardens, Madeenaguda, Serilingampally, Ranga Reddy, Telangana, 500049. Corporate record RERA filing [REGCERT-62787 p1] RERA filing

The promoter’s Form B declaration states a project completion deadline of 21-06-2027. The registration certificate gives validity through 21/07/2027 unless extended. The supplied GHMC occupancy certificate and architect’s completion certificate document completed/certified status for the building, but no independent site inspection or current construction-progress verification is provided. [REGCERT-62787 p1]

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeP02400009068, for MAHITHA S GREEN GOKULAM BLOCK-B; validity 21/06/2024–21/07/2027 unless extended. [REGCERT-62787]
Source[REGCERT-62787 p1]
GHMC building permit
Reference and scope1756/GHMC/SLP/2024-BP, dated 21 June, 2024; residential building at the stated site, Survey Nos. 203/A and 202/2/A, 1 Stilt + 5 upper floors.
Building-plan details
Reference and scopeFile No. TS/016465/2024; plan identifies Survey Nos. 203/A and 202/2/A, ten units and sanctioned building-plan parameters. An approved layout letter is referenced as 2985/MP2/HUDA/2000, dated 19/09/2000.
GHMC occupancy certificate
Reference and scope005486/GHMC/02699/SWOC/SLP2/2025, dated 30/10/2025, for the building identified at the north-east part of Plot 35, Survey Nos. 203/A and 202/2/A.
Architect’s Form 1A completion certificate
Reference and scopeRecords completion certification for the registered project and identifies the GHMC OC above; certificate completion date recorded as 02-01-2026.
Form B promoter declaration
Reference and scopePromoter declaration includes title-basis and project-funding undertakings and gives the completion deadline as 21-06-2027.
Other filed records
Reference and scopeEncumbrance statement; legal title search report; title deed materials; partially completed allotment-letter and agreement-for-sale forms; partnership and authorized-signatory documents. Document index

The GHMC occupancy-certificate record notes a total deviated built-up area of 36.24 and records total built-up area as 1,049.1 sq. metres in the sanctioned plan and 1085.3349999999998 sq. metres in the completion plan. These are certificate-record entries; the detailed approval review addresses the associated conditions and implications.

Frequently asked questions

Is MAHITHA S GREEN GOKULAM BLOCK-B registered with Telangana RERA?

Yes. MAHITHA S GREEN GOKULAM BLOCK-B is registered with the Telangana Real Estate Regulatory Authority as P02400009068; the registration status is New Project.

Who is the developer of MAHITHA S GREEN GOKULAM BLOCK-B?

The promoter named in the RERA registration is MAHITHA PROJECTS.

Where is MAHITHA S GREEN GOKULAM BLOCK-B located?

MAHITHA S GREEN GOKULAM BLOCK-B is in MADEENAGUDA, Madina Guda, Serilingampally, Rangareddy, Telangana (500049).

When will MAHITHA S GREEN GOKULAM BLOCK-B be completed?

The promoter's proposed date of completion filed with RERA is 21/07/2027. This is the promoter's declaration, not a guarantee.