LOTUS PARK is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district, developed by registered promoter RAYAAN CONSTRUCTIONS, a partnership. The registered site area is 668.50 m², with one building comprising 1 Stilt + 5 upper floors and 15 homes: 5 2BHK and 10 3BHK. Its TG-RERA registration is P02200004306, and the promoter’s Form B undertaking records a proposed completion date of 09 July 2024.

More from Rayaan Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 9 Jul 2024 - check its extension on TG-RERA
14documents on file - each fact links to its page
9court cases on this project's land (survey 330, 331, 340, 341, Bachupally)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameLOTUS PARK RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registered scope is the project on the land identified below
TG-RERA registrationP02200004306
Registration validity24 March 2022 to 9 July 2024; the certificate says “2 years” and records no extension
Registered promoterRAYAAN CONSTRUCTIONS, a partnership Corporate record RERA filing
RERA statusRegistration period recorded in the certificate has expired; current registration status after 9 July 2024 is not established by the supplied record

Land and geographic identity

FieldRecord
Locality / revenue villageBachupally; the building-permit extract identifies the village field as “WARD 01” RERA record RERA filing
Mandal / district / PINBachupally mandal; Medchal-Malkajgiri district; 500090 RERA record
Project survey numbers330/P, 331/P, 340 and 341
Plot identifiers319, 320 & 340
Registered site extent668.50 m² total site area; 664.64 m² net area RERA filing
Road-affected area3.86 m² in the RERA land details; the building-permit extract states “Road affected area: 0 m²” RERA filing
Boundaries in RERA land detailsEast: Plot No. 339 and 321; west: 40 Feet Wide Road; north: 30 Feet Wide Road; south: 40 Feet Wide Road RERA filing

Development identity

FieldRecord
Sanctioning authorityNIZAMPET Municipal Corporation Approvals record
Principal building-permit number / date3142/W1/2021/0033, approved 09 July 2021 Approvals record
Layout / subdivision reference shown on permit5866/MP2/H/04 Approvals record
Approved built-up area1,525.80 m² RERA filing
Building countOne building / one proposed building unit in the RERA record RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; building height 14.99 m
Parking levels / sanctioned parking countStilt is approved for parking; a separate parking-space count and other parking levels are not established in the supplied extract
Unit count15 units in the RERA filing: 5 2BHK and 10 3BHK RERA unit table

Offering and status

FieldRecord
Configurations2BHK and 3BHK RERA unit table
RERA saleable-area range102.65 m² (2BHK) to 129.13 m² (3BHK) RERA unit table
Booked / available0 booked and 15 available in the portal-derived unit record; no as-of date is supplied, so counts are indicative RERA unit table
Construction stageThe building-permit extract includes “Floor handed over: THIRD FLOOR; Area 168.56 m²,” but this is not an occupancy certificate or independent site-progress verification
Completion dates recordedPromoter’s Form B undertaking: 09 July 2024. Building-permit extract: construction to be completed before 09 July 2027
Occupancy / completion certificateThe permit requires completion notice and an occupancy certificate; no completed certificate is supplied, and the permit extraction marks completion as not certified

2. The project story

LOTUS PARK is filed as a single-building residential apartment development in Bachupally, Medchal-Malkajgiri district. The RERA land record identifies the site across survey numbers 330/P, 331/P, 340 and 341, with plot identifiers 319, 320 and 340. The sanctioned building-permit extract describes one residential building with a stilt and five upper floors. RERA record RERA filing

The RERA offering comprises 15 homes: five 2BHK units and ten 3BHK units. The portal-derived record reports all 15 as available and none booked, but provides no count as-of date. The permit extract refers to a third-floor handover area, while the supplied documents do not establish project completion or issue of an occupancy certificate. RERA unit table

The promoter’s Form B records a 09 July 2024 completion undertaking; the building-permit extract separately states a completion date before 09 July 2027. These are recorded as separate document statements, not as verified evidence of completion.

3. Master plan, architecture & building design

The sanctioned building-permit extract records a 668.5 m² site area and 664.64 m² net area, and permits a residential building with 1,525.80 m² of upper-floor area, one stilt level and five upper floors. The permit states a building height of 14.99 m. These are permit-recorded figures; no separate FSI-counted area or building-footprint measurement is supplied.

The RERA filing identifies one building and 15 units. The supplied material does not provide a readable architectural description of the building’s arrangement, flats per floor, lifts, stairs, entries, internal circulation, landscaping or open-space dimensions. The permit lists a tot-lot and peripheral greenery requirements, but the supplied record does not establish their completion. RERA filing RERA unit table

The permit extract lists a stilt for parking and states that approved stilt parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied data does not establish the number or allocation of parking bays.

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. Carpet areas are software measurements from the approved floor-plan drawing record, not RERA-filed disclosures; the drawing measurements are flagged as needing review. Saleable area includes the home’s share of common areas and should not be treated as carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailable*RERA saleable areaMeasured carpet area**Loading (if supplied)
2BHK505102.65 m²60.8 m² (software-measured)41%
3BHK10010129.13 m²86.7–91.5 m²; median 88.8 m² (software-measured)31%

\* Portal-derived counts have no supplied as-of date and are indicative. \** Measured from drawing geometry; not a RERA disclosure and identified as needing review. The supplied drawing extract labels a 2BHK typical-floor plan and a 3BHK third-floor plan. It includes room labels such as hall/living-dining, kitchen, bedrooms, toilets and wash areas; room dimensions from the extract should be checked against the drawings before reliance. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The building-permit extract approves the stilt for parking and requires that the approved stilt parking be used exclusively for vehicles, without partition walls or rolling shutters. The supplied records do not give a sanctioned parking-space count, visitor or accessible-space provision, two-wheeler count, parking allocation by unit, ramp or driveway details, EV charging provision, or evidence of completed parking works. A drawn or approved parking area does not by itself establish exclusive ownership or allotment.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 amenity/infrastructure categories. “Available: YES” is a filed status where stated; the progress percentages are portal-recorded and are not independent verification of delivery. The building permit also specifies a tot-lot, rainwater-harvesting structure, transformer space and garbage house. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripTot-lot is listed; permit requires it to be fenced and maintained as greenery. No size supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Aggregate recreational open spaceListed; no area supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Community buildingsListed; no size or details supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Internal roads and footpathsListed; no dimensions supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Water supplyRERA-listed as available: YES; permit refers to public amenities including water supply. No source, storage or capacity supplied.RERA amenitiesRERA progress 50%; completion not independently verified
SewerageRERA-listed as available: YES under “Sewerage (Chamber, Lines, Septic Tank, STP).” Specific system and capacity are not supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Storm-water drainsListed; no system details supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Rainwater harvestingRERA-listed as available: YES; permit requires a rainwater-harvesting percolation pit and records five RWHPs.RERA amenitiesRERA progress 0%; completion not independently verified
Street lightingListed; no details supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Sewage and sullage treatment/disposalListed; no treatment method or capacity supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Solid-waste management and disposalListed; permit also requires a garbage house within the premises.RERA amenitiesRERA progress 0%; completion not independently verified
Energy managementListed; no details supplied.RERA amenitiesRERA progress 0%; completion not independently verified
Fire protection and fire-safety requirementsListed; specific systems and clearances are not supplied here.RERA amenitiesRERA progress 0%; completion not independently verified
Electrical meter room / sub-station / receiving stationRERA-listed as available: YES; permit requires space for a transformer.RERA amenitiesRERA progress 0%; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting, electrical meter-room/sub-station/receiving-station provision, energy management, fire protection and solid-waste management. It gives “available: YES” for water supply, sewerage, rainwater harvesting and electrical provision, but supplies no system capacities or independent verification of delivery. RERA amenities

The building permit requires rainwater harvesting, transformer space, a garbage house and a fenced tot-lot, and requires construction-worker safety and comprehensive construction-worker insurance during construction. It also specifies minimum separation distances from high-tension and low-tension electrical lines. No supplied evidence establishes installed fire systems, lifts or capacities, backup power, water-storage or treatment capacity, accessibility arrangements, or completed safety systems.

8. Location, access & connectivity

The registered location is Bachupally, Medchal-Malkajgiri district, Telangana, PIN 500090; the RERA record identifies Bachupally mandal. The project survey identifiers are 330/P, 331/P, 340 and 341. The building-permit extract gives the village field as “WARD 01.” RERA record RERA filing

The supplied location record gives an approximate distance of 10.0 km to the nearest sampled Outer Ring Road interchange. No other measured distances, named approach roads, public-transport details or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is RAYAAN CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAZFR3754K1ZB. The supplied RERA record names Vinod Madireddy as an authorized signatory and Mallika Pillarisetty as a partner. Corporate record RERA filing Parties record

The building-permit extract identifies the landowners as applicants and RAYAAN CONSTRUCTIONS as developer, represented by Mallika Pillarisetty and Vinod Madireddy. The supplied records do not establish an official project website or a verified promoter contact channel.

The portal-derived inventory reports 15 units, none booked and 15 available, without an as-of date. The permit extract’s third-floor handover entry is not equivalent to project completion or an occupancy certificate; neither completion nor OC is established by the supplied documents. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004306, issued 24 March 2022; valid through 9 July 2024
What the supplied record establishesRegistration certificate for LOTUS PARK; no extension is recorded in the certificate extract.
Building permit order
Identifier / date3142/W1/2021/0033, 09 July 2021
What the supplied record establishesNIZAMPET Municipal Corporation permit for a residential building of 1 Stilt + 5 upper floors; it records a 14.99 m building height and approved built-up area of 1,525.80 m².
Layout / subdivision reference
Identifier / date5866/MP2/H/04
What the supplied record establishesReference appearing in the building-permit extract; a separate readable approved layout plan is not supplied.
Form B declaration
Identifier / dateAugust 2021; day not stated
What the supplied record establishesPromoter-signed declaration for LOTUS PARK, including a completion undertaking of 09 July 2024.
RERA-filed floor-plan document
Identifier / date216126
What the supplied record establishesDrawing document used for software measurement; the supplied extract does not include a separate narrative of all architectural features.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe building permit requires completion notice and an occupancy certificate; no such certificate is present in the supplied evidence.

Frequently asked questions

Is LOTUS PARK registered with Telangana RERA?

Yes. LOTUS PARK is registered with the Telangana Real Estate Regulatory Authority as P02200004306; the registration status is New Project.

Who is the developer of LOTUS PARK?

The promoter named in the RERA registration is RAYAAN CONSTRUCTIONS.

Where is LOTUS PARK located?

LOTUS PARK is in Bachupally, Medchal-Malkajgiri, Telangana (500090).

When will LOTUS PARK be completed?

The promoter's proposed date of completion filed with RERA is 09/07/2024. This is the promoter's declaration, not a guarantee.

More projects in Bachupally