Sign in

Ksr Homes Edge

KSR HOMES · Sangareddy · RERA P01100008757

KSR HOMES EDGE is a residential apartment project in SILPA LAYOUT, AMEENPUR mandal, Sangareddy district. The registered promoter is KSR HOMES, identified in the filing as a partnership. The project occupies 367.71 sq. m and comprises 1 building with 1 stilt + 5 upper floors and 10 3BHK units, each with a RERA-filed saleable area of 130.06 sq. m. It is registered under TG-RERA registration number P01100008757, and the promoter-declared completion date is 23/07/2027.

More from Ksr Homes · 10 projects →

01What we found

RegisteredTG-RERA - valid till 23 Jul 2027
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameKSR HOMES EDGE RERA record
Project type / phaseResidential apartment project; phase or separately registered portion is not specified in the supplied record. RERA record
TG-RERA registrationP01100008757 RERA record
Registration validity9 September 2024 to 23 July 2027, unless extended by the Authority. This is the registration-validity period, not an occupancy certificate. RERA record
Registered promoterKSR HOMES, identified in the filing as a partnership. RERA record RERA filing
RERA statusThe record identifies the project as “New Project”; the registration certificate confirms registration. The supplied evidence also includes an occupancy certificate for the identified building; see the occupancy row below. RERA record

Land and geographic identity

ItemProject record
LocalitySILPA LAYOUT RERA record RERA filing
Revenue villageAMEENAPUR RERA record RERA filing
Mandal / district / PINAMEENPUR / Sangareddy / 502032 RERA record RERA filing
Project survey identitySurvey No. 332/P in the RERA registration record; the filed building-permit and occupancy documents describe the site as Sy. No. 332 PART. RERA record
Site / plot identityPlot No. 30 WEST PART & 31 RERA filing
Registered site area367.71 sq. m RERA filing
Total and net land areaTotal area: 367.71 sq. m; net area: 367.71 sq. m RERA filing
Boundaries in RERA recordEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityHMDA; the filed building-permit order identifies Ameenpur Municipality / Municipal Corporation, while the later occupancy certificate is issued by HMDA. RERA record
Principal building-permit number / date001553/BP/HMDA/0324/SKP/2024, approved 23 July 2024.
Later HMDA proceedings / occupancy-certificate number / date006187/HMDA/01867/SWOC/SKP2/2025, approved 10/09/2025.
Building count and sanctioned configuration1 building, recorded as 1 stilt + 5 upper floors.
Approved built-up areaThe occupancy certificate records 1080.75 sq. m total built-up area. The building-permit material separately records 1,297.12 sq. m total BUA, 1080.75 sq. m net BUA and 203.70 sq. m parking area. These are the figures as labelled in the respective filed documents.
Parking configurationStilt is identified for parking in the building-permit conditions; the supplied record does not establish a final count or individual allocation of parking spaces.
Units10 units in the RERA unit record; the plan extraction also states 10. RERA unit table

Offering and status

ItemProject record
Unit type3BHK RERA unit table
RERA-filed saleable area130.06 sq. m per unit. RERA unit table
Booked / available7 booked; 3 available, as last read from the TG-RERA portal. The portal record supplied has no as-of date, so these counts are indicative rather than a dated live inventory. RERA unit table
Promoter-declared completion date23/07/2027 in the Form B declaration.
Occupancy certificate status and scopeAn HMDA occupancy certificate identifies SAI JAGANNADHA VARMA, Plot No. 30 West Part & 31, Sy. No. 332 PART, and a 1 stilt + 5 upper-floor building. It records completion on 20/08/2025 and no deviated built-up area. The supplied certificate is for this identified building; the evidence does not establish a separate phase or additional building scope.

2. The project story

KSR HOMES EDGE is registered as a residential apartment project at Plot No. 30 WEST PART & 31, in Survey No. 332/P (also described in the building-permit and occupancy documents as Sy. No. 332 PART), Ameenapur village, Ameenpur mandal, Sangareddy district. The registered site is 367.71 sq. m and the RERA record identifies one building and ten homes. RERA record RERA filing

The filed plan records a residential building of one stilt level and five upper floors. The RERA inventory is 3BHK apartments; the portal record lists seven as booked and three as available, without an as-of date. RERA unit table

Although the Form B declaration gives a proposed completion date of 23/07/2027, the supplied HMDA occupancy certificate for the identified building records completion on 20/08/2025 and certifies the building fit for occupation. That certificate is building-specific evidence; the record does not provide a separate construction-progress percentage or independent site inspection beyond the authority certificate.

3. Master plan, architecture & building design

The filed building-permit material identifies a single residential apartment building on a 367.71 sq. m site, with a stilt and five upper floors. The later occupancy certificate records a building height of 14.99 metres and total built-up area of 1080.75 sq. m. The permit extraction also labels total BUA as 1,297.12 sq. m, net BUA as 1080.75 sq. m, and parking area as 203.70 sq. m; these figures retain the labels used in the filed plan material and should not be treated as interchangeable area measures.

The drawing extraction describes the proposal as “Stilt +4+ 5th FLOOR (TDR FLOOR)” and separately lists a stilt plus five upper floors. The building-permit order and occupancy certificate likewise identify one stilt plus five upper floors. The supplied material does not include usable details for floor-by-floor unit arrangement, flat count per floor, footprint, lifts or stairs, internal circulation, open-space design, or residential/common-area distribution.

The plan extraction lists a vacant plot area of 151.56 sq. m and amenities/utilities including a transformer, rainwater harvesting, sump, septic tank, P.PIT and lift. These are plan-extraction entries; the supplied record does not establish their present condition or completion.

4. Homes, configurations & floor plans

The TG-RERA filing records ten 3BHK units, with a filed saleable area of 130.06 sq. m each. It lists seven booked and three available; because the portal record has no as-of date, treat the counts as indicative. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1073130.06 sq. mSoftware-measured: median 82.4 sq. m; range 76.2–85.5 sq. m (8 designs measured)37% (software-derived)

The carpet-area figures and loading are software measurements from the approved floor-plan drawing record, not RERA-filed disclosures, and the source says they need review. The RERA saleable area is a separate filed measure and includes the home’s share of common areas; carpet area describes the interior measured from drawing geometry. Balcony/utility and common-area treatment should be checked against the approved drawing and the individual agreement before purchase. RERA unit details Floor plans

The supplied drawing-based example shows a hall, kitchen, three bedroom-labelled spaces, wash area, three toilets and a balcony. The extracted room dimensions are software measurements for one drawing panel and flat, not confirmed dimensions for every unit: hall 2.91 × 6.76 m, kitchen 3.01 × 3.64 m, and balcony 3.01 × 1.72 m, among the listed rooms. RERA unit details

5. Parking & vehicle circulation

The permit material says the stilt floor is to be used for parking and records 203.70 sq. m as parking area. A separate promoter-marketed listing mentions covered car parking, but the supplied TG-RERA documents do not establish the number of spaces, visitor or accessible spaces, the parking allocation for a particular apartment, or whether any bay is exclusively allotted. A drawn or stated parking provision does not by itself establish unit-specific ownership. Promoter website

The plan conditions also refer to electric-vehicle charging infrastructure in building parking places. The available record does not confirm installed chargers, a parking-space count, ramp details, vehicle entry/exit arrangement, or pedestrian separation.

6. Amenities, recreation & open spaces

The RERA amenity record lists fourteen infrastructure categories and reports progress percentages where provided. These percentages are the filed progress entries; they are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkSize not suppliedRERA amenitiesMarked available: YES; 0% recorded; not independently verified
Community buildingsNo description suppliedRERA amenities0% recorded
Aggregate recreational open spaceArea not suppliedRERA amenities0% recorded
Swimming pool, gym, children’s play area, clubhousePromoter-marketed amenities; no size or project-document confirmation suppliedPromoter websiteMarketing claims only; not shown as RERA-verified or completed
Internal roads and footpathsDetails not suppliedRERA amenities0% recorded
Street lightingDetails not suppliedRERA amenities0% recorded

7. Utilities, building services & safety

Water
Evidence in the supplied recordThe RERA amenity record marks water supply YES; the plan extraction lists a sump. A promoter-marketed specification refers to “Water Supply Corporation and Borewell.” RERA amenities Promoter website
Status / limitationRERA amenity entry is recorded at 0%; the promoter-marketed source is not confirmation of installed supply or capacity.
Sewerage and drainage
Evidence in the supplied recordThe RERA record marks sewerage YES at 50% and storm-water drains YES at 40%. The plan extraction lists a septic tank and P.PIT; the building-permit conditions also call for STP provision. RERA amenities
Status / limitationFiled progress entries are not independent completion verification; the supplied materials do not state treatment capacity or reuse arrangements.
Rainwater harvesting
Evidence in the supplied recordThe RERA record marks water conservation/rainwater harvesting YES at 50%; the plan material lists rainwater harvesting. RERA amenities
Status / limitationNo capacity or completed-system verification supplied.
Electrical
Evidence in the supplied recordThe RERA record lists electrical meter room/sub-station/receiving station as available YES at 0%; the plan extraction lists a transformer. RERA amenities
Status / limitationSupply capacity and installation status are not established.
Lifts
Evidence in the supplied recordA lift is listed in the plan extraction.
Status / limitationNumber, capacity and installed status are not supplied.
Fire and life safety
Evidence in the supplied recordThe RERA amenity record lists fire protection and fire-safety requirements at 0%. The plan conditions refer to fire-safety and structural-stability requirements and specify sprinkler provision if basement area exceeds 200 sq. m. RERA amenities
Status / limitationThe documents do not establish installed systems or independent statutory compliance.
Waste management
Evidence in the supplied recordThe building-permit order calls for a garbage house; the RERA solid-waste-management entry is 0%. RERA amenities
Status / limitationCompletion and operating arrangements are not established.
Accessibility and security
Evidence in the supplied recordNo project-specific accessibility or security-system details are supplied. Document index
Status / limitationNot disclosed in the reviewed material.

8. Location, access & connectivity

The registered location is Silpa Layout, Ameenapur village, Ameenpur mandal, Sangareddy district, Telangana, PIN 502032. The registered site is identified as Plot No. 30 WEST PART & 31 in Survey No. 332/P. RERA record RERA filing RERA filing

The location record provides a cadastral parcel-centroid coordinate of 17.51403, 78.33831 and lists the nearest sampled Outer Ring Road interchange at approximately 8.5 km. The filed plan references roads of 12.0M (40'0") and 12.00 MT; the building-permit order separately records a 4.5mts. approach road. These are plan-record entries, not a measured route assessment. Location record Cadastral map

No project-specific public-transport details or measured distances to other landmarks are supplied. Location record

9. Developer & development status

The registered promoter is KSR HOMES, identified in the RERA record as a partnership, with GSTIN 36AASFK6432G1Z1. The registration certificate gives its registered office location as Ameenapur, Ameenpur, Sangareddy, PIN 502032. The supplied evidence does not provide a company-registration number, promoter website, or official contact details. RERA filing Corporate record

The promoter’s Form B declaration, signed by K. Sai Jagannadha Varma as authorised signatory, declares a completion date of 23-07-2027. The project record lists one building and ten 3BHK units. Separately, the supplied HMDA occupancy certificate covers the identified building and records completion on 20/08/2025. No independent construction-progress percentage is provided. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100008757; valid from 09/09/2024 to 23/07/2027 unless extended
Scope and evidenceForm C certificate for KSR HOMES EDGE; registration and promoter conditions.
Building-permit order
Identifier / date001553/BP/HMDA/0324/SKP/2024; 23 July 2024
Scope and evidenceResidential building on Plot Nos. 30 WEST PART and 31, Sy. No. 332 PART; one stilt plus five upper floors.
Filed layout / plan material
Identifier / dateFile No. CA/2O10/48648
Scope and evidencePlan extraction identifies the proposed residential apartment building, site area and plan parameters.
HMDA occupancy certificate
Identifier / date006187/HMDA/01867/SWOC/SKP2/2025; approved 10/09/2025; completion recorded 20/08/2025
Scope and evidenceIdentifies the building at Plot No. 30 West Part and 31, Sy. No. 332 PART, and records zero deviated built-up area.
Occupancy-certificate document filed as local-authority completion/OC
Identifier / dateSame HMDA number and dates
Scope and evidenceIdentifies the same named building and records it fit for occupation.
Form B declaration
Identifier / date23-08-2024
Scope and evidencePromoter declaration of title basis, encumbrance status, RERA undertakings and completion by 23-07-2027.

The supplied record includes a building-permit order and an occupancy certificate for the identified building. It does not include a separate public-layout approval record or a project-specific utilities-completion certificate in the reviewed documents. The plan and permit documents contain additional conditions; this overview records the project evidence without assessing those conditions.

Frequently asked questions

Is KSR HOMES EDGE registered with Telangana RERA?

Yes. KSR HOMES EDGE is registered with the Telangana Real Estate Regulatory Authority as P01100008757; the registration status is New Project.

Who is the developer of KSR HOMES EDGE?

The promoter named in the RERA registration is KSR HOMES.

Where is KSR HOMES EDGE located?

KSR HOMES EDGE is in SILPA LAYOUT, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will KSR HOMES EDGE be completed?

The promoter's proposed date of completion filed with RERA is 23/07/2027. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur