Sign in

Honer Signatis

HONER PRIME HOUSING LLP · Medchal-Malkajgiri · RERA P02200005923

HONER SIGNATIS is a residential apartment project in Kukatpally, Kukatpally, Medchal-Malkajgiri district, developed by registered promoter HONER PRIME HOUSING LLP. The TG-RERA land details record a net area of 108087.27 sq m and 20 building units: 18 homes blocks and 2 amenity blocks; residential blocks are generally 1 Ground + 25 upper floors, and the filed home configurations are 3BHK and 4BHK. The unit schedule records 3,271 total entries. The project is registered under TG-RERA number P02200005923, with the registration certificate stating validity through 27/02/2029 and the project identity record listing proposed completion as 27/06/2029.

01What we found

RegisteredTG-RERA
28documents on file - each fact links to its page
6court cases on this project's land (survey 1011, Kukatpally)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRERA-filed / recorded information
Registered project nameHONER SIGNATIS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase designation not separately disclosed; registration is P02200005923 RERA record
TG-RERA statusNew Project; the supplied record includes a TG-RERA Form C registration certificate RERA record
Registration validityCertificate states validity from 29/03/2023 to 27/02/2029, unless extended by the Authority
Registered promoterHONER PRIME HOUSING LLP (LLP) RERA record Corporate record
Promoter officeCertificate gives “Village: Mandal: District: Hyderabad, Pin: 500081.”; a more complete registered-office address is not established by the supplied material

Land and geographic identity

ItemRERA-filed / recorded information
LocalityKukatpally RERA record RERA filing
Revenue villageKukatpally in the project identity and title records; the GHMC permit extraction identifies the site village as Baghameer. The supplied material does not resolve this village-name difference RERA record Land records
Mandal / district / PINKukatpally / Medchal-Malkajgiri / 500072 RERA record
Project survey numbers627P, 629, 1011/1P, 1011/4P RERA record Land records
Registered site extentTG-RERA land details record total area 112571.21 sq m, affected area 4483.94 sq m, and net area 108087.27 sq m RERA filing
GHMC revised permit area figuresRevised permit extraction records plot area 113474.98, road-affected area 2180.23, nala-affected area 0.0, and net plot area 111287.72; units are not specified in the supplied extraction
BoundariesEast: OTHERS LAND; West: 30 mtrs road; North: OTHERS LAND; South: Villas project RERA filing

Development identity

ItemRERA-filed / sanctioned information
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permitRevised Building Permit Order 2187/GHMC/KPL/2023-BP, dated 30 June, 2023; file no. 005854/GHMC/2909/KPL1/2023-BP Approvals record
Earlier building permit on fileBuilding Permit Order 0239/GHMC/KPL/2023-BP, dated 27 February, 2023; file no. 000673/GHMC/0315/KPL1/2023-BP Approvals record
Approved built-up areaNot established as a single total in the supplied material. The earlier permit lists Area (m2) 46,908.67 and a mortgage entry for 46,908.67; the revised permit lists a mortgage extent of 74,518.69. These figures are not presented here as total approved built-up area
Buildings / blocksRERA filing records 20 total building units, including 18 homes blocks and 2 amenity blocks RERA filing RERA unit table
Revised sanctioned floorsResidential blocks are generally 1 Ground + 25 upper floors; Block A is 3 Cellar + 1 Ground + 25 upper floors. Amenities 1 and 2 are each 1 Ground + 4 upper floors
Earlier sanctioned floorsEarlier permit described residential blocks mainly as 1 Ground + 16 upper floors, with Block A at 3 Cellar + 1 Ground + 16 upper floors, and two amenity buildings at 1 Ground + 4 upper floors
ParkingRevised permit lists Total Parking Area 294434.51; units are not stated in the extraction. It also requires approved cellar/stilt parking to be used exclusively for vehicle parking
Approved vs RERA-declared unitsTG-RERA land details state 20 total building units; the unit schedule records 3,271 total units, including 3,260 classified 3BHK/4BHK units, 10 clubhouse entries, and 1 unclassified filed row RERA filing RERA unit table

Offering and status

ItemRERA-filed / recorded information
Filed configurations3BHK and 4BHK, plus one row filed as “3BGHK” that the supplied unit data does not classify RERA unit table
RERA saleable area3BHK: 204.26–229.94 sq m; 4BHK: 352.94 sq m; “3BGHK”: 175.12 sq m RERA unit table
Booked / availablePortal-read unit figures: 1,423 booked and 1,848 available overall; the record has no as-of date, so these are indicative RERA unit table
Completion deadlineRegistration certificate and GHMC permit state 27/02/2029; the project identity record lists proposed completion as 27/06/2029. The supplied material does not explain the differing dates RERA record
Construction stageNo independently verified site-progress assessment is supplied. RERA amenity-progress entries show Community Buildings 25% and the other listed infrastructure/amenity rows at 0% RERA amenities
Occupancy / completion certificateNot supplied; the GHMC permit states that an occupancy certificate is compulsory before occupation

2. The project story

HONER SIGNATIS is registered as a residential apartment project on land identified in the RERA record as survey numbers 627P, 629, 1011/1P and 1011/4P, in Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri district. The building permit extraction names Baghameer as the village. The supplied records do not reconcile those village descriptions, so both are retained here as source-record identifiers. RERA record Land records

The revised GHMC permit describes residential blocks and two amenity buildings. Residential blocks are sanctioned predominantly at ground plus 25 upper floors, with Block A also having three cellars; each amenity building is ground plus four upper floors. The TG-RERA filing records 20 building units—18 home blocks and two amenity blocks—and a separate unit schedule with 3,271 entries. RERA unit table

The project is registered through 27/02/2029. The supplied records also give a project completion date of 27/06/2029 in the project identity data, while the registration certificate and GHMC permit state 27/02/2029. No explanation for the different completion dates, tower-by-tower handover schedule, independent construction inspection, or occupancy certificate is included in this overview’s evidence. RERA record

3. Master plan, architecture & building design

The revised permit identifies residential blocks A, B and N, C and M, D and L, F and J, G and I, H/P/Q/R, K, and E/O, as well as Amenities 1 and 2. The earlier permit on file describes a different floor configuration, mainly ground plus 16 upper floors; these are permit records, not evidence of as-built construction. The supplied evidence does not establish total approved built-up area, floor-by-floor apartment layouts across all blocks, building footprints, lifts or stairs per block, internal-road dimensions, or a complete residential/common-area schedule. The revised permit lists a height of 80.68 and the earlier permit lists 54.15, without units in the supplied extraction.

4. Homes, configurations & floor plans

The RERA unit schedule records the following home configurations. Booked and available figures are portal-read and carry no as-of date in the supplied record. The 3BGHK row is retained as filed because the available data does not classify it. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK2,8641,2731,591204.26–229.94 sq mSoftware-measured: 93.8–228.7 sq m; median 139.9 sq mNot supplied
4BHK396150246352.94 sq mSoftware-measured: 172.2–283.4 sq m; median 237.9 sq m33% (software-measured dataset)
“3BGHK” (filed label; configuration unclassified)101175.12 sq mNot suppliedNot supplied

Carpet-area figures are software measurements from approved floor-plan drawings, not RERA-filed carpet-area disclosures; the supplied measurement record says the geometry requires review. RERA saleable area is a separate filed measure and should not be treated as carpet area. The measurement set covers 344 3BHK designs and 32 4BHK designs; its drawing-level results include substantial numbers marked for review. Floor plans RERA unit details

Drawing examples show a 3BHK plan with living/dining, kitchen, bedrooms, toilets and utility; the example utility is 4.01 × 1.37 m and is excluded from the measured carpet area. A 4BHK ground-floor example includes drawing room, living/dining, four bedrooms, dress rooms, toilets, wash area and a sit-out. These are drawing-based examples, not a claim that every unit has the same layout. RERA unit details

The RERA unit schedule also contains 10 “CLUB HOUSE” entries, which are not homes offered in the residential configuration table. [unit_types]

5. Parking & vehicle circulation

The revised GHMC permit lists Total Parking Area 294434.51; no unit is specified in the extracted record, and it does not provide a sanctioned parking-space count or visitor/accessible-space breakdown. The earlier permit lists Total Parking Area 283470.06, also without a unit in the extraction. The earlier permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied marketing specifications separately state that parking is to be provided in three basements and describe “Two Cars Park (Back to Back), for all the Apartments in the project”; those are promoter-marketed claims, not proof of sanctioned individual allocations or exclusive ownership. No parking-bay count, vehicle circulation drawing, ramp configuration, EV charging provision, or legally documented unit-by-unit parking allocation is supplied. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity schedule lists 14 infrastructure and community-facility categories. It reports Community Buildings: 25% and 0% for the other listed categories; these are filed progress figures, not independently verified completion. The GHMC permit specifies a tot lot of 10979.23 in the earlier permit; the revised permit extraction lists Tot Lot 0. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsTwo amenity buildings, each ground plus four upper floorsGHMC revised permitRERA schedule: 25%; no independent completion verification supplied RERA amenities
Green strip / tot lot / parkEarlier permit lists Tot Lot 10979.23; requires a fenced tot lot maintained as greeneryGHMC permitRERA schedule: 0%; completion not independently verified RERA amenities
Internal roads and footpathsListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Water supplyListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Sewerage / sewage treatment and disposalListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Storm-water drainsListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Street lightingListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Solid-waste management and disposalListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Water conservation / rainwater harvestingRERA schedule lists the facility; revised permit specifies 14 rainwater-harvesting pitsRERA amenity schedule; GHMC revised permitRERA schedule: 0%; no independent completion verification supplied RERA amenities
Energy managementListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Fire protection and safety requirementsListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities
Electrical meter room / sub-station / receiving stationListed as available in the RERA schedule; permit requires transformer spaceRERA amenity schedule; GHMC permitRERA schedule: 0%; no independent completion verification supplied RERA amenities
Recreational open spaceListed as available in the RERA scheduleRERA amenity schedule0% declared RERA amenities

The promoter’s website material lists additional facilities—including pools, sports courts, gyms and club facilities—but these are marketing disclosures and are not independently verified as delivered in the supplied evidence. Promoter website

7. Utilities, building services & safety

The GHMC permit requires space for a transformer, a garbage house, rainwater-harvesting structures and specified fire-safety measures. The revised permit states that an automatic sprinkler system is to be provided in cellar floors and requires compliance with conditions in Fire Services and Environmental Clearance instruments. It also states that an occupancy certificate is compulsory before occupation and requires a Fire NOC before issue of the occupancy certificate. These are permit conditions; the supplied material does not establish completion or clearance.

Promoter specifications describe municipal water, including Manjeera or other HMWSSB/GHMC supply, alongside borewell water; a water-softening plant; an STP with treated water proposed for landscaping and flushing; 100% DG-set backup; passenger and service lifts; piped gas; fire hydrant and sprinkler systems; fire alarm and public-address systems; security surveillance; and access ramps at block entrances. These are promoter-filed specifications, not independent verification of installed capacity or operation. Promoter website

No water-storage capacity, STP or WTP capacity, generator capacity, lift count or capacity, fire-clearance certificate, waste-processing capacity, or accessibility audit is supplied. RERA amenities

8. Location, access & connectivity

The project is recorded in Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri district, PIN 500072. The RERA land record gives the west boundary as a 30 mtrs road; the revised GHMC permit also refers to an 18 mt. road width. A parcel-centroid geocode is supplied at 17.415275719570207, 78.35458902767974. RERA record RERA filing Location record

The location data includes Financial District (Nanakramguda), 1.2 km as an anchor distance. The promoter’s website lists other landmark distances and travel times, but those are promoter-marketed claims and are not independently measured in the supplied evidence. Location record Promoter website

9. Developer & development status

The registered legal promoter is HONER PRIME HOUSING LLP, an LLP, with GSTIN 36AAMFH9188C1ZZ. The RERA certificate identifies the project promoter as Honer Prime Housing LLP. The supplied office address is incomplete on the certificate; the project record lists PLOT NO 1, KRB TOWERS, JUBILEE ENCLAVE, MADHAPUR, with Kukatpally, Medchal-Malkajgiri and PIN 500072 also appearing in its address fields. Corporate record Parties record

The GHMC building permits name SQUARESPACE INFRA CITY PVT LTD as applicant/developer. The supplied records do not explain the relationship between that permit applicant and the registered RERA promoter.

No independently verified construction progress or occupancy/completion certificate is supplied. RERA portal-read booking figures are indicative because the record carries no as-of date. See the completion-deadline details above. RERA record RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005923, issued 29/03/2023
What the supplied record establishesForm C registration for HONER SIGNATIS; certificate states validity through 27/02/2029
GHMC building permit
Identifier / date0239/GHMC/KPL/2023-BP, 27 February, 2023; file 000673/GHMC/0315/KPL1/2023-BP
What the supplied record establishesConditional building permit record with residential and amenity blocks and permit conditions
GHMC revised building permit
Identifier / date2187/GHMC/KPL/2023-BP, 30 June, 2023; file 005854/GHMC/2909/KPL1/2023-BP
What the supplied record establishesRevised permit record for the project’s residential blocks and two amenity buildings
Approved layout / LRS proceeding reference
Identifier / date1348/GHMC/KPL/2021-LO
What the supplied record establishesReference appears in the building-permit extraction; a separate approved-layout document is not established by the supplied material
Commencement / completion / occupancy
Identifier / dateCommencement and completion certificates are not separately supplied; no occupancy certificate is supplied
What the supplied record establishesThe permit requires commencement and completion notices and an occupancy certificate before occupation
Plan drawings filed with RERA
Identifier / dateDocuments 307922–307926 and 337796–337799
What the supplied record establishesDrawing-derived software measurements are available for some configurations; they are not RERA-filed carpet-area disclosures Floor plans RERA unit details
Form B declaration
Identifier / date307919, dated 14.02.2023
What the supplied record establishesVerification and attestation portion of an affidavit-cum-declaration associated with HONER HOUSING VILLAS LLP

Frequently asked questions

Is HONER SIGNATIS registered with Telangana RERA?

Yes. HONER SIGNATIS is registered with the Telangana Real Estate Regulatory Authority as P02200005923; the registration status is New Project.

Who is the developer of HONER SIGNATIS?

The promoter named in the RERA registration is HONER PRIME HOUSING LLP.

Where is HONER SIGNATIS located?

HONER SIGNATIS is in Kukatpally, Medchal-Malkajgiri, Telangana (500072).

When will HONER SIGNATIS be completed?

The promoter's proposed date of completion filed with RERA is 27/06/2029. This is the promoter's declaration, not a guarantee.

More projects in Kukatpally