HASINI HOMES is a residential apartment project in Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District. It is being developed by the registered promoter, MAHALAKSHMI CONSTRUCTIONS, on a site of 903.99 sq. m, with one building, Building - A, configured as Cellar + Stilt + 5. The TG-RERA filing records 15 “TRIBLE BEDROOM” units, each with a saleable area of 142.04 sq. m. The project is registered under TG-RERA number P02200002444, with a proposed completion date of 01/11/2024.

01What we found

Period endedTG-RERA registration ran to 1 Nov 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
1court case on this project's land (survey 166, Kukatpally)
10items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameHASINI HOMES RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionOne building, Building - A; a separate phase name is not disclosed RERA filing
TG-RERA registrationP02200002444 Approvals record
Registration validityCertificate states 11/01/2021 to 01/11/2024, unless extended by the Authority in accordance with the Act and Rules; the supplied certificate records no extension
Registered promoterMAHALAKSHMI CONSTRUCTIONS RERA record Corporate record
RERA status in project record“On-Going Project” RERA filing
Registered-site identityPlot Nos. 30 AND 31, Survey No. 166, Kukatpally RERA filing

Land and geographic identity

ItemRecord
LocalityKukatpally RERA record
Revenue villageKukatpally in the project record; the title report also describes the land as Kukatpally Village, while the 2017 development agreement recital identifies “Bhagyanagar, Kukatpally Village” RERA filing
MandalKukatpally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500072 RERA record
Survey number / subdivisionSurvey No. 166; no subdivision is specified for the registered project parcel RERA filing
Plot numbers30 AND 31 RERA filing
Registered site extent903.99 sq. m RERA filing
Total / net area and road-affected areaTotal 903.99 sq. m; net 903.99 sq. m; road-affected area 0 in the RERA land record RERA filing
BoundariesEast: Plot No. 32; West: 30 wide road; North: Plot Nos. 44 and 45; South: 30 wide road RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal approvalBuilding Permit Order 1/C24/18543/2018, approved 29 November 2018; file no. 1/C22/13482/2017 Approvals record
Other recorded layout/subdivision number5589/84/H Approvals record
BuildingOne residential building, Building - A
Sanctioned floor configurationCellar + Stilt + 5
Sanctioned height14.75 m
Approved area figuresCovered built-up area 2,130.55 m²; cellar 342.34 m²; stilt 310.45 m²; first-floor area 225.79 m². These are figures recorded in the GHMC permit extraction and are not interchangeable area measures.
Unit countsGHMC permit extraction states that the sanctioned number of units must not be increased without prior approval, but the supplied permit extract does not state a numerical sanctioned-unit count. TG-RERA records 15 units. RERA unit table

Offering and status

ItemRecord
RERA-filed configuration“TRIBLE BEDROOM” (3BHK) RERA unit table
RERA-filed saleable area142.04 sq. m RERA unit table
Units / bookings / availability15 total; 0 booked and 15 available in the portal data. The booking record has no as-of date, so these figures are indicative. RERA unit table
Declared construction stageThe supplied TG-RERA amenity/status data reports water supply, sewerage and electrical meter room/substation/receiving station at 50%, and green strip/tot-lot/park at 20%; the other listed infrastructure items show 0%. These are portal-reported percentages, not independent site verification. RERA amenities
Completion undertaking / proposed datesPromoter’s Form B undertakes completion by 01-11-2024; the project record lists proposed and revised completion dates as 01/11/2024. RERA filing
Occupancy certificate statusThe supplied records do not establish that an occupancy certificate has been issued for Building - A. The GHMC permit states that an occupancy certificate is compulsory before occupation.

2. The project story

HASINI HOMES is recorded with TG-RERA as a residential apartment project on Plot Nos. 30 and 31 in Survey No. 166, Kukatpally. The registered site is 903.99 sq. m, and the GHMC permit describes one building, Building - A, with a Cellar + Stilt + 5 configuration. RERA record RERA filing

The RERA filing records 15 three-bedroom units, each with a filed saleable area of 142.04 sq. m. The portal data reports no booked units and 15 available, but does not give an as-of date for that inventory snapshot. RERA unit table

The project’s RERA completion date and the promoter’s Form B completion undertaking are both 01/11/2024. The supplied records do not establish completion or issuance of an occupancy certificate. Portal percentages for selected infrastructure items are reported above as declarations; they do not independently establish construction progress across the building or confirm on-site completion. RERA filing RERA amenities

3. Master plan, architecture & building design

The supplied GHMC building permit extraction describes a single residential building on a 903.99 sq. m site, with a cellar, stilt and five residential upper floors, and a recorded height of 14.75 m. The extraction lists a covered built-up area of 2,130.55 m², a cellar area of 342.34 m², a stilt area of 310.45 m², and a first-floor area of 225.79 m². These are distinct permit-extraction figures; the supplied material does not provide a complete floor-by-floor area schedule or identify an FSI-counted area.

The permit extraction records 45 trees, one rainwater-harvesting structure (percolation pit), and a tot-lot of 67.49 m². It also lists space for a transformer and a garbage house. It directs that cellar and stilt areas approved for parking be used exclusively for vehicle parking.

A layout-plan document is listed in the TG-RERA files, but the supplied document record is not extracted. Detailed drawings sufficient to establish the building footprint, number of flats per floor, lift and stair arrangements, entrances, internal circulation, open-space distribution or room-by-room approved layout are therefore not available in the supplied evidence. Document index

4. Homes, configurations & floor plans

TG-RERA records 15 three-bedroom units under the filed description “TRIBLE BEDROOM,” with a saleable area of 142.04 sq. m per unit. The portal snapshot reports zero booked and 15 available, without an as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK (“TRIBLE BEDROOM” in filing)15015142.04 sq. mSoftware-measured: median 101.9 sq. m; range 96.3–135.0 sq. m across six measured flat designs28%

The carpet-area figures are software measurements from the listed floor-plan drawing, not RERA-filed measurements, and the measurement record says they need review. The drawing data includes a first-floor plan for flat 03, with living, dining, kitchen, bedrooms, toilets, puja, balcony and utility spaces; the balcony and utility are excluded from the measured carpet area. The supplied data does not establish a single typical arrangement for all units. Saleable area and carpet area are different measures: the floor-plan data explains that RERA saleable area also includes the home’s share of common areas, while the software-measured carpet area is taken from drawing geometry. A balcony or utility measurement should not be treated as carpet area where the drawing measurement marks it excluded. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records Cellar + Stilt and specifies that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. No parking allocation document is supplied, so the record does not establish exclusive parking rights for a particular unit.

The RERA project data records a mortgage area of 225.79 sq. m; the supplied evidence does not identify that figure as a parking count or parking allocation. RERA filing

6. Amenities, recreation & open spaces

The following are the facilities in the supplied GHMC permit extraction and TG-RERA amenity status data. Percentages are portal-reported progress, not independently verified completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripPermit extraction records tot-lot 67.49 m² and requires it to be fenced and maintained as greenery before occupancy certificate; RERA status item is “Green Strip/TOT LOT/Park”RERA amenitiesRERA portal reports 20%; not independently verified complete
Aggregate recreational open spaceNo area suppliedRERA amenities0% in RERA status data
Community buildingsNo facility details suppliedRERA amenities0% in RERA status data

The promoter’s website listing includes a swimming pool, gym, children’s play area, clubhouse and common garden, among other items. These are promoter-marketed claims and are not established as GHMC-sanctioned or delivered facilities in the supplied project records. Promoter website

7. Utilities, building services & safety

The GHMC permit extraction requires a rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house within the premises. It also records one rainwater-harvesting structure. These are permit requirements or permit-extraction items; the supplied data does not independently verify installation or operation.

Water
Supplied evidenceTG-RERA status lists water supply
Status recorded50% portal-reported progress; source, storage capacity and treatment details are not supplied RERA amenities
Sewerage / drainage
Supplied evidenceTG-RERA lists sewerage (chamber, lines, septic tank, STP) as available; treatment and disposal of sewage and sullage water is separately listed
Status recordedSewerage: 50%; treatment/disposal: 0% portal-reported RERA amenities
Storm water
Supplied evidenceStorm-water drains listed
Status recorded0% portal-reported RERA amenities
Rainwater harvesting
Supplied evidencePermit requires a percolation pit and records one rainwater-harvesting structure
Status recordedInstallation status is not independently verified
Electrical
Supplied evidenceElectrical meter room, substation and receiving station listed; permit requires transformer space
Status recorded50% for the RERA-listed electrical item; transformer installation is not independently verified RERA amenities
Fire and life safety
Supplied evidenceTG-RERA lists fire-protection and fire-safety requirements; promoter website also markets “Fire Safety”
Status recorded0% in RERA status data; the supplied records do not provide system specifications or independently verify statutory compliance RERA amenities Promoter website
Waste management
Supplied evidencePermit extraction requires a garbage house; TG-RERA lists solid-waste management and disposal
Status recordedSolid-waste management: 0% portal-reported; garbage-house completion is not independently verified RERA amenities
Lifts, access and backup
Supplied evidenceNo project-filed lift capacity, accessibility details, backup-power specification or security-system details are supplied
Status recordedNot established in the supplied TG-RERA evidence Document index

The GHMC permit also records a requirement to maintain a strip of greenery on the site periphery. The supplied records do not provide a complete services design, capacities or commissioning evidence.

8. Location, access & connectivity

The registered project location is Kukatpally, in Kukatpally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500072, on Plot Nos. 30 and 31 in Survey No. 166. The permit describes the site as having 18 m road widths and the RERA land record gives 30 wide roads on its west and south boundaries. RERA record RERA filing

Supplied location data reports the following distances; the measurement method and retrieval date are not specified in the evidence:

DestinationReported distance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South India Shopping Mall2.6 km
Unnamed park1.2 km
Nanakramguda Government Primary School0.5 km

Location record

The distances are supplied location-record measurements, not stated travel times. The promoter website describes Kukatpally as the nearest landmark but supplies no measured travel time. Location record Promoter website

9. Developer & development status

The registered promoter is MAHALAKSHMI CONSTRUCTIONS, identified in the project record as a partnership. The supplied corporate record lists THIRMAL REDDY M as authorized signatory and SWATHI M as partner. The registered project evidence identifies landowner MAKKAPATI CHANDRA SEKHAR RAO and records an area-share arrangement. Corporate record Parties record

The promoter’s Form B affidavit-cum-declaration, dated 19 November 2020, states that the promoter has a legal-title basis and that the land is free from encumbrances, and undertakes completion by 01-11-2024. These statements are the promoter’s declarations in the RERA file.

The registration certificate records validity from 11/01/2021 to 01/11/2024, unless extended by the Authority; the supplied certificate states no extension. Completion deadline, registration validity and occupancy-certificate status are separate matters: the supplied evidence does not establish an occupancy certificate for the building.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002444, issued 11/01/2021
What the supplied record establishesFORM ‘C’ registration for HASINI HOMES; validity stated through 01/11/2024, unless extended by the Authority
GHMC building permit order
Identifier / dateApproval no. 1/C24/18543/2018; file no. 1/C22/13482/2017; 29 November 2018
What the supplied record establishesBuilding permission for Building - A, Plot Nos. 30 and 31, Kukatpally; permit includes conditions and requires an occupancy certificate before occupation
Layout/subdivision reference
Identifier / date5589/84/H
What the supplied record establishesNumber recorded in the GHMC permit extraction; a separately extracted approved-layout drawing is not supplied
Title report
Identifier / dateDocument 92374
What the supplied record establishesTG-RERA-filed title report describing a development agreement-cum-GPA and recited title instruments for Survey No. 166
Advocate’s title search report
Identifier / dateDocument 140836
What the supplied record establishesTitle-search opinion for Plot Nos. 30 and 31, Survey No. 166
Promoter’s Form B declaration
Identifier / date19 November 2020
What the supplied record establishesPromoter declaration concerning title basis, encumbrances, RERA obligations and completion undertaking
Layout-plan filing
Identifier / dateDocument 92376
What the supplied record establishesLayout-plan document is listed, but its supplied record is not extracted Document index
Occupancy / completion certificate
Identifier / dateNot established in supplied records
What the supplied record establishesGHMC permit requires an occupancy certificate before occupation; no issued certificate is included in the supplied evidence

The permit extraction also lists a contractor’s all-risk policy number 431103/44/2019/26, notarised affidavit number 10044/2018, and floor-handed-over registration number 9743/2018. The supplied record identifies 9743/2018 in connection with surrender of the road-affected portion to GHMC.

Frequently asked questions

Is HASINI HOMES registered with Telangana RERA?

Yes. HASINI HOMES is registered with the Telangana Real Estate Regulatory Authority as P02200002444; the registration status is On-Going Project.

Who is the developer of HASINI HOMES?

The promoter named in the RERA registration is MAHALAKSHMI CONSTRUCTIONS.

Where is HASINI HOMES located?

HASINI HOMES is in KUKATPALLY, Medchal-Malkajgiri, Telangana (500072).

When will HASINI HOMES be completed?

The promoter's proposed date of completion filed with RERA is 01/11/2024. This is the promoter's declaration, not a guarantee.