Sign in

Hari Hara Himagiri

HARI HARA INFRA · Medchal-Malkajgiri · RERA P02200003538

HARI HARA HIMAGIRI is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district. The registered promoter developing it is HARI HARA INFRA. The project occupies 3,047.56 sq m and comprises one building with 1 stilt + 5 upper floors and 75 homes: 50 2-bedroom and 25 3-bedroom apartments. It is registered with TG-RERA under P02200003538, with a proposed completion date of 31/08/2023.

More from Hari Hara Infra · 5 projects →

01What we found

Period endedTG-RERA registration ran to 31 Aug 2023 - check its extension on TG-RERA
11documents on file - each fact links to its page
12court cases on this project's land (survey 143, Bachupally)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from propertypistol.com
▦ View all 2 photos
Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameHARI HARA HIMAGIRI RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionThe record identifies one building and one registered project; separate phase details are not disclosed. RERA filing RERA unit table
TG-RERA registrationP02200003538
Registration validity20/11/2021 to 31/08/2023, according to the certificate; it records no extension. This is the registration period, not a statement of current construction or occupancy status.
Registered promoterHARI HARA INFRA RERA record Corporate record
RERA statusThe supplied record labels the project “New Project.” Registration validity ended on 31/08/2023; a current portal status is not supplied. RERA filing

Land and geographic identity

ItemProject record
LocalityBachupally; the RERA record also describes the location as Bachupally Village, Nizampet Municipal Corporation. RERA record RERA filing
Revenue villageBachupally; the approval and title records also use the spelling Bachpalle. RERA record
MandalBachupally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500090 RERA record
Project survey number(s) / subdivision(s)143/A RERA filing Land records
Registered site extent3,047.56 sq m RERA filing
Land area in building-permit record3,448.54 sq m site area; the same permit records net area 3,047.56 sq m and deductions area 400.98 sq m.
Net / total area in RERA recordTotal area 3,047.56 sq m; net area 3,047.56 sq m; affected area recorded as 0. RERA filing
Boundaries as recordedEast: land in Sy. No. 143 or part; west: 30 feet wide road; north: land in Sy. No. 142 or part; south: land in Sy. No. 143 or part. RERA filing

Development identity

ItemProject record
Technical approvalHMDA technical approval 043961/MED/R1/U6/HMDA/09032021, dated 23/06/2021; it is for Survey No. 143/A and specifies 1 stilt + 5 floors.
Building permitNizampet Municipal Corporation permit G1/BP/24-B/NMC/2021-2022, file 2273/P/MC/NP/2021, dated 16/07/2021.
Approved built-up areaBuilding-permit record: Net BUA Area 8513.25 (unit shown as m² in the permit extraction). HMDA record lists built-up area 8513.25 and proposed built-up area 11443.8; these are separately labelled values in that approval record.
Building count / floorsRERA land details record 1 building. Approval records describe a residential building of 1 stilt + 5 upper floors. RERA filing
Parking levelsNot separately stated in the supplied RERA filing or approval extracts. RERA filing
Unit counts75 total units recorded: 50 2-bedroom and 25 3-bedroom units. RERA unit table RERA unit details

Offering and status

ItemProject record
Configurations2BHK and 3BHK RERA unit table RERA unit details
RERA-filed saleable area2BHK: 1226.12–1250.0 sq m; 3BHK: 1650.0–1728.12 sq m, as recorded in the unit data. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked and 75 available at the last read; the record provides no as-of date, so counts are indicative. RERA unit table
Construction stageNo reliable project-specific, independently verified construction-stage evidence is supplied. Document index RERA amenities
Completion datesThe RERA registration certificate and Form B declaration state 31/08/2023 as the completion date; the building permit states construction to be completed before 16/07/2027. These are different document statements; current completion status is not established here.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. Document index

2. The project story

HARI HARA HIMAGIRI is a registered residential apartment project on Survey No. 143/A in Bachupally, Medchal-Malkajgiri district. The RERA record identifies one building and 75 units; the technical approval and municipal building permit describe a residential building with one stilt level and five upper floors. RERA record RERA filing RERA unit table

The filed unit mix is 50 two-bedroom apartments and 25 three-bedroom apartments. The available portal-derived booking figures show 0 booked and 75 available, but no date accompanies those counts. The project’s stated completion date in the RERA certificate and Form B is 31/08/2023. The supplied documents do not establish the current construction stage, actual completion, or issuance of an occupancy certificate; no stage should therefore be inferred from the filing deadline or third-party status descriptions. RERA unit details RERA unit table Document index

3. Master plan, architecture & building design

The project approvals describe one residential building on a site recorded as 3,047.56 sq m, with a configuration of 1 stilt + 5 upper floors. The Nizampet Municipal Corporation permit records a net built-up area of 8513.25 and building height of 14.95 m. HMDA’s technical approval separately records built-up area 8513.25 and proposed built-up area 11443.8. No supplied drawing extract provides a building footprint, flats-per-floor arrangement, lift or stair details, or a measured residential/common-area breakdown.

The Nizampet permit records 400.98 sq m of deductions and 3,047.56 sq m net area. HMDA records an 18 m road width and describes 400.98 sq m as approach-road area handed over to Nizampet Municipal Corporation by gift deed 16267/2021. The permit also specifies setbacks of 6.0 m front, 4.0 m rear, 4.0 m on side I and 3.7 m on side II.

The municipal permit lists two tot-lots and a tot-lot area of 152.54 sq m, along with 148 plants/trees and 15 rainwater-harvesting pits. These are approval-record provisions, not evidence that the facilities have been completed.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (filed as “DOUBLE BEDROOM” / “DOUBLR BEDROOM”)500501226.12–1250.0 sq mNot measuredNot supplied
3BHK (filed as “TRIPLE BEDROOM” / “TRIPLEBEDROOM”)250251650.0–1728.12 sq mNot measuredNot supplied

The unit counts, booking figures and saleable-area ranges are from the supplied TG-RERA unit record; booking figures have no recorded as-of date and are indicative. RERA unit details RERA unit table

Two floor-plan drawings are listed, but both are scans pending measurement. The supplied data therefore contains no software-measured carpet areas or room dimensions. Carpet area and saleable area are different measures; the file notes that saleable area also includes the home’s share of common areas, but gives no project-specific loading figure. Floor plans

5. Parking & vehicle circulation

The supplied project records do not establish a parking-space count, parking levels or layout, visitor or accessible parking provision, vehicle ramps or circulation, EV charging, or unit-specific parking allocations. The RERA configuration data indicates that the units are mortgaged by configuration status, but that does not establish parking allocation or exclusive parking rights. RERA filing RERA unit table

The approvals and RERA record are not accompanied here by a parking schedule or parking plan from which sanctioned spaces or individual allocations can be confirmed. Document index Approvals record

6. Amenities, recreation & open spaces

Tot-lots
Description / size2 tot-lots; recorded area 152.54 sq m
Evidence sourceMunicipal building permit
Declared progress / verified statusApproval-record provision; completion not verified
Trees / planting
Description / size148 plants/trees; permit also calls for planting along the periphery and front
Evidence sourceMunicipal building permit
Declared progress / verified statusApproval condition; completion not verified
Rainwater-harvesting pits
Description / size15 RWH pits in the permit; HMDA also lists a rainwater-harvesting structure
Declared progress / verified statusApproval-record provision; completion not verified
Green strip / tot-lot / park
Description / sizeListed as available “YES” in the RERA amenity data; no size or completion evidence supplied
Evidence sourceRERA amenities
Declared progress / verified statusFiling status; no independent completion verification
Aggregate recreational open space
Description / sizeListed as available “YES”; no area specified
Evidence sourceRERA amenities
Declared progress / verified statusFiling status; no independent completion verification
Water supply; sewerage; storm-water drains; internal roads and footpaths; street lighting
Description / sizeListed in the RERA amenity schedule; percentage fields are 0 where provided
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule; completion not verified
Community buildings; sewage and sullage treatment/disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station
Description / sizeListed in the RERA amenity schedule; no capacities or completed-status evidence supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule; completion not verified

The RERA amenity data contains 14 listed items. It does not provide facility dimensions or independently verified completion status for most entries. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. The schedule does not give capacities or confirm that these services have been installed or commissioned. RERA amenities

The approval documents list a transformer, garbage house and rainwater-harvesting structure; the municipal permit specifies 15 rainwater-harvesting pits and requires a percolation pit and tree planting. They also state that an occupancy certificate is required before occupation. These records describe approval provisions and conditions, not verified construction or statutory compliance.

No supplied project-specific evidence sets out water sources or storage, STP capacity or reuse arrangements, electrical backup capacity, lift numbers or capacity, fire-system equipment, CCTV/access-control arrangements, or accessibility features. Document index RERA amenities

8. Location, access & connectivity

The registered location is Bachupally village/locality, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090. The RERA record identifies the site as being within Nizampet Municipal Corporation. The site boundaries include a 30 feet wide road on the west, and land in Survey Nos. 142 or part and 143 or part on the other sides. RERA record RERA filing RERA filing

The approval record identifies an 18 m road width and an approach-road area of 400.98 sq m in the HMDA approval. A supplied location record gives HITEC City as an anchor at 10.4 km; it does not provide a measurement method or additional transport details. Location record

9. Developer & development status

The registered promoter is HARI HARA INFRA, identified in the project record as a partnership. Its GSTIN is 36AANFH4838G1Z3. The registered office address supplied is Sri Hanuma S Pagadala Pride, Bachupally Gandimaisamma Road, Bachupally, Medchal-Malkajgiri, Telangana 500090. The record names Gopala Reddy Vaka as an authorized signatory. No official contact number, email address or promoter website is supplied in the project identity records. RERA record Corporate record Parties record

In Form B dated 01/09/2021, the promoter declared a completion date of 31/08/2023 and made declarations concerning title, project funds, accounts, pending approvals and allottee treatment. These are promoter declarations, not independent findings about current project status.

The supplied project documents do not confirm current construction progress, completion, or occupancy certification. The building permit and RERA registration certificate contain different completion-related dates; the current completion and OC position is not established by the material supplied for this Overview.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200003538; 20/11/2021–31/08/2023
Scope and evidenceRegisters HARI HARA HIMAGIRI on Survey No. 143/A. The certificate records a 70% separate-account condition.
HMDA technical approval
Identifier / date043961/MED/R1/U6/HMDA/09032021; 23/06/2021
Scope and evidenceResidential building, Survey No. 143/A; approval record describes 1 stilt + 5 floors.
Nizampet Municipal Corporation building permit
Identifier / dateG1/BP/24-B/NMC/2021-2022; file 2273/P/MC/NP/2021; 16/07/2021
Scope and evidenceBuilding permit for the residential project on Survey No. 143/A.
Form B promoter declaration
Identifier / dateDated 01/09/2021
Scope and evidenceProject completion undertaking of 31/08/2023 and promoter declarations.
Registered sale deed
Identifier / date7557/2021; 24/02/2021
Scope and evidenceTitle-report record describes a conveyance to HARI HARA INFRA of 4,125 sq yd in Sy. No. 143/A, Bachupally.
Registered gift deed
Identifier / date16267/2021; 17/06/2021
Scope and evidenceHMDA approval records 400.98 sq m as approach-road area gifted to Nizampet Municipal Corporation.
Registered mortgage deed
Identifier / date15646/2021; 08/06/2021
Scope and evidenceApproval records describe 890.32 sq m of first-floor built-up area mortgaged in favour of HMDA.
Occupancy/completion certificate
Identifier / dateNot supplied
Scope and evidenceThe available materials do not establish that an OC or completion certificate has been issued. Document index

Frequently asked questions

Is HARI HARA HIMAGIRI registered with Telangana RERA?

Yes. HARI HARA HIMAGIRI is registered with the Telangana Real Estate Regulatory Authority as P02200003538; the registration status is New Project.

Who is the developer of HARI HARA HIMAGIRI?

The promoter named in the RERA registration is HARI HARA INFRA.

Where is HARI HARA HIMAGIRI located?

HARI HARA HIMAGIRI is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will HARI HARA HIMAGIRI be completed?

The promoter's proposed date of completion filed with RERA is 31/08/2023. This is the promoter's declaration, not a guarantee.

More projects in Bachupally