Gokul S Nandanam Block B
GOKUL CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001142
GOKUL S NANDANAM BLOCK B is a residential apartment project in Bowrampet Gram Panchayat, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is GOKUL CONSTRUCTIONS. The project records one block on 1,585.66 sq m, with stilt + 5 upper floors and 35 apartments: 30 2BHK and 5 3BHK. Its TG-RERA registration is P02200001142, and its proposed completion date is 31/12/2019.
More from Gokul Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | GOKUL S NANDANAM BLOCK B RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Registered portion / phase | Block B; one block is recorded. The evidence does not describe the scope of any other phase. RERA record RERA filing |
| TG-RERA registration | P02200001142 RERA record |
| Registration validity | Certificate states 14/09/2019 to 31/12/2019; no extension is recorded in the supplied certificate. This is registration validity, not the project completion date. |
| Registered promoter | GOKUL CONSTRUCTIONS, recorded as a partnership. RERA record Corporate record |
| RERA status | Recorded as On-Going Project in the project record. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Bowrampet Gram Panchayat RERA record RERA filing |
| Revenue village | Bowrampet RERA record Land records |
| Mandal | Dundigal Gandimaisamma RERA record Land records |
| District | Medchal-Malkajgiri RERA record Land records |
| PIN | 500043 RERA record |
| Project survey / subdivision | Sy. No. 461/P; the HMDA approval extraction renders this as “46l/P”. RERA record Land records |
| Registered site extent | 1,585.66 sq m total/net area as entered in the RERA land details. RERA filing |
| Boundaries recorded | East: proposed project Gokul S Nandanam C; West: neighbours’ land; North: neighbours’ land; South: proposed project Gokul S Nandanam Block A. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval is delegated to Bowrampet Grampanchayath for local sanction. Approvals record |
| Principal approval | HMDA technical approval 005201/MED/R1/U6/HMDA/22112/17, dated 08/01/2018. Approvals record |
| Approved built-up area | RERA record: 4,842.57 sq m. The HMDA approval extraction separately lists a sanctioned parameter of 390.465 sq.m built up area; the supplied record does not explain the relationship between these figures. RERA filing |
| Building count and configuration | One residential building/block; HMDA technical approval describes stilt + 5 upper floors. RERA filing |
| Parking levels | Stilt is designated for vehicle parking in the HMDA approval conditions; a parking-space count is not supplied. |
| Unit counts | RERA filing records 35 units: 30 2BHK and 5 3BHK. RERA unit table RERA unit details |
| Occupancy / completion certificate | No completion certificate is recorded in the supplied HMDA approval extraction; no occupancy certificate is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 126.44 sq m; 3BHK: 145.65 sq m RERA unit table RERA unit details |
| Booked / available | 2BHK: 14 booked / 16 available; 3BHK: 3 booked / 2 available. These are portal-record counts without an as-of date, so treat them as indicative. RERA unit table RERA unit details |
| Original / revised proposed completion | 31/12/2019 / 31/12/2019 RERA record RERA filing |
| Construction stage | No independently verified site-progress report or current construction-stage record is supplied. Document index |
| OC status and scope | No occupancy certificate is supplied for Block B. |
2. The project story
GOKUL S NANDANAM BLOCK B is registered as a residential apartment development in Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered parcel is identified as Sy. No. 461/P, and the site boundaries recorded in the RERA filing place proposed Gokul S Nandanam C to the east and Block A to the south. RERA record Land records RERA filing
The RERA unit schedule records one block with 35 homes—30 2BHK and 5 3BHK—and indicates 17 booked and 18 available. The counts have no stated portal “as of” date. RERA unit table RERA unit details The HMDA technical approval describes a residential building with stilt plus five upper floors, subject to conditions including local-authority sanction and inspections.
The filing gives a proposed completion date of 31/12/2019, but the supplied material does not establish present construction progress or provide an occupancy certificate. Registration validity ended on 31/12/2019 according to the registration certificate; that date is distinct from the stated completion deadline. RERA record No completion or occupancy certification is included in the supplied project documents.
3. Master plan, architecture & building design
The project record describes a single residential building/block on a RERA-filed site area of 1,585.66 sq m and records approved built-up area of 4,842.57 sq m. The HMDA technical approval extraction identifies the building configuration as stilt + 5 upper floors and lists a separate sanctioned built-up-area parameter of 390.465 sq.m; the supplied documents do not explain how that parameter relates to the RERA-filed approved built-up area, so the figures are reported separately. RERA filing RERA filing
The approval conditions state that the stilt/cellar is to be used exclusively for vehicle parking, without partitions or rolling shutters, and not converted to another use. They also require one entry and one exit, each subject to stated minimum width and height clearance, and prohibit parking or construction in setback areas. No drawing-derived floor layouts, floor-by-floor unit arrangements, footprint, lift/stair counts, internal circulation plan, landscaped-area measurements or phase plan are available in the supplied material. Floor plans Document index
4. Homes, configurations & floor plans
The RERA filing records 35 apartments in two configurations. The portal counts below are indicative because no as-of date is provided. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 14 | 16 | 126.44 sq m | Not available | Not supplied |
| 3BHK | 5 | 3 | 2 | 145.65 sq m | Not available | Not supplied |
Two floor-plan drawings are reported, but neither contains measured flats. Software-measured carpet areas, room dimensions, orientation and typical floor arrangements are therefore unavailable. Floor plans RERA saleable area is the filed area measure; it is not a carpet-area measurement. The supplied record does not provide a breakdown of apartment carpet area, exclusive balcony/verandah or open terrace area, or common-area loading. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA approval conditions designate the stilt/cellar exclusively for vehicle parking and say it must not be partitioned or converted. They also require one entry and one exit, with a minimum width of 4.5 meters and height clearance of 5 meters. The supplied record does not state the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, ramp arrangements, EV charging provision, or unit-specific parking allocations. A parking bay shown or described in project material would not, by itself, establish exclusive ownership; no unit allocation document is supplied. Document index
6. Amenities, recreation & open spaces
The RERA amenities record lists selected infrastructure items with percentage figures. These are filing entries, not independent verification of present delivery. The HMDA approval also contains conditions about certain building services. RERA amenities
| Description / size | No source, storage capacity or system details in the RERA amenities entry |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | Entry specifies chamber, lines, septic tank / STP; no capacity or treatment details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No area or facility detail supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No fixture or coverage details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No capacity or design detail supplied |
|---|---|
| Evidence source | RERA amenities record; HMDA approval conditions |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No system description supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No capacity or equipment specifications supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified RERA amenities |
| Description / size | No size or further description supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Each is listed at 0%; this records the supplied filing entry and does not establish present site status. RERA amenities |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting/water conservation, energy management, and an electrical meter room/sub-station/receiving station as “YES” at 100%. It does not provide capacities, detailed system descriptions or independent verification. RERA amenities
The HMDA technical approval conditions specify a septic tank, drainage and sewerage arrangements subject to local conditions, rainwater-harvesting structures, a transformer and garbage house, and a generator as an alternate electricity source. The same approval calls for emergency lighting in corridors, common passages and staircases; fire extinguishers; a manual and alarm system; fire-resistant lift swing doors; and compliance with stated fire-service norms. These are approval conditions, not evidence that the facilities are installed or that statutory compliance has been certified.
No supplied record establishes water-source or tank capacity, STP capacity or reuse, backup-generation capacity, lift count/capacity, CCTV or access-control installation, waste-segregation arrangements, accessibility features, or current fire-clearance status. RERA amenities Document index
8. Location, access & connectivity
The registered location is Bowrampet Gram Panchayat, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana, PIN 500043. The project parcel is identified as Sy. No. 461/P. RERA record Land records
The supplied location record lists these distances, without specifying a measurement method or route:
| Place / facility | Recorded distance |
|---|---|
| Financial District (Nanakramguda) | 1.2 km |
| IndusInd Bank | 0.4 km |
| Unnamed bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | 1.6 km |
| Sankaraya Eye Hospital | 1.6 km |
| ADP | 0.0 km |
| South India Shopping Mall | 2.6 km |
| Unnamed park | 1.2 km |
| Nanakramguda Government Primary School | 0.5 km |
Location record
No approach-road description, public-transport route, travel-time estimate or road-network plan is supplied. Location record
9. Developer & development status
The registered promoter is GOKUL CONSTRUCTIONS, recorded as a partnership. The project record names Palampally Madhusudan Reddy as an authorized signatory and partner, and Menta Tirupalaiah as a partner. Corporate record RERA filing The supplied registration certificate lists the promoter’s office as “Village: Mandal: District: Hyderabad, Pin: 500090”; the village, mandal and district fields are not filled in that entry.
The promoter’s Form-B declaration, verified 29-11-2018, contains declarations about title, encumbrances, project funds, audits, pending approvals and completion. Its completion-date text is OCR-garbled (“31_-1.2-2079”), so it is not used as a clear date. The project record separately states proposed and revised completion as 31/12/2019. RERA record No current construction-progress evidence or occupancy certificate is supplied. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for GOKUL S NANDANAM BLOCK B, P02200001142, issued 14/09/2019, valid through 31/12/2019; no extension is recorded in this certificate. |
| HMDA technical approval | Approval 005201/MED/R1/U6/HMDA/22112/17, dated 08/01/2018, for a residential building on Sy. No. 461/P at Bowrampet; local sanction is delegated to Bowrampet Grampanchayath and remains subject to the stated conditions. |
| HMDA application reference | 005281/MED/R1/U6/HMDA/22112017 Approvals record |
| Form-B promoter declaration | Affidavit-cum-declaration verified 29-11-2018; contains promoter declarations and an OCR-garbled completion-date field. |
| Building / floor plans | Two floor-plan drawings are recorded, but neither has measured flats in the supplied floor-plan data. Floor plans |
| Completion / occupancy certificate | No completion certificate is recorded in the supplied HMDA approval extraction; no occupancy certificate is supplied. |
The supplied material does not include a separate local-authority final building sanction, a completion certificate or an occupancy certificate. The HMDA approval conditions state that occupation/use is to follow completion in accordance with the technically approved plans and issuance of a fit-for-occupancy certificate by the Executive Authority.
1. Project at a glance
Project identity
Registered project name: GOKUL S NANDANAM BLOCK B
Project type: Residential apartment project
Registered portion / phase: Block B; one block is recorded. The evidence does not describe the scope of any other phase.
TG-RERA registration: P02200001142
Registration validity: Certificate states 14/09/2019 to 31/12/2019; no extension is recorded in the supplied certificate. This is registration validity, not the project completion date.
Registered promoter: GOKUL CONSTRUCTIONS, recorded as a partnership.
RERA status: Recorded as On-Going Project in the project record.
Land and geographic identity
Locality: Bowrampet Gram Panchayat
Revenue village: Bowrampet
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500043
Project survey / subdivision: Sy. No. 461/P; the HMDA approval extraction renders this as “46l/P”.
Registered site extent: 1,585.66 sq m total/net area as entered in the RERA land details.
Boundaries recorded: East: proposed project Gokul S Nandanam C; West: neighbours’ land; North: neighbours’ land; South: proposed project Gokul S Nandanam Block A.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval is delegated to Bowrampet Grampanchayath for local sanction.
Principal approval: HMDA technical approval 005201/MED/R1/U6/HMDA/22112/17, dated 08/01/2018.
Approved built-up area: RERA record: 4,842.57 sq m. The HMDA approval extraction separately lists a sanctioned parameter of 390.465 sq.m built up area; the supplied record does not explain the relationship between these figures.
Building count and configuration: One residential building/block; HMDA technical approval describes stilt + 5 upper floors.
Parking levels: Stilt is designated for vehicle parking in the HMDA approval conditions; a parking-space count is not supplied.
Unit counts: RERA filing records 35 units: 30 2BHK and 5 3BHK.
Occupancy / completion certificate: No completion certificate is recorded in the supplied HMDA approval extraction; no occupancy certificate is supplied.
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 126.44 sq m; 3BHK: 145.65 sq m
Booked / available: 2BHK: 14 booked / 16 available; 3BHK: 3 booked / 2 available. These are portal-record counts without an as-of date, so treat them as indicative.
Original / revised proposed completion: 31/12/2019 / 31/12/2019
Construction stage: No independently verified site-progress report or current construction-stage record is supplied.
OC status and scope: No occupancy certificate is supplied for Block B.
2. The project story
GOKUL S NANDANAM BLOCK B is registered as a residential apartment development in Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered parcel is identified as Sy. No. 461/P, and the site boundaries recorded in the RERA filing place proposed Gokul S Nandanam C to the east and Block A to the south.
The RERA unit schedule records one block with 35 homes—30 2BHK and 5 3BHK—and indicates 17 booked and 18 available. The counts have no stated portal “as of” date. The HMDA technical approval describes a residential building with stilt plus five upper floors, subject to conditions including local-authority sanction and inspections.
The filing gives a proposed completion date of 31/12/2019, but the supplied material does not establish present construction progress or provide an occupancy certificate. Registration validity ended on 31/12/2019 according to the registration certificate; that date is distinct from the stated completion deadline. No completion or occupancy certification is included in the supplied project documents.
3. Master plan, architecture & building design
The project record describes a single residential building/block on a RERA-filed site area of 1,585.66 sq m and records approved built-up area of 4,842.57 sq m. The HMDA technical approval extraction identifies the building configuration as stilt + 5 upper floors and lists a separate sanctioned built-up-area parameter of 390.465 sq.m; the supplied documents do not explain how that parameter relates to the RERA-filed approved built-up area, so the figures are reported separately.
The approval conditions state that the stilt/cellar is to be used exclusively for vehicle parking, without partitions or rolling shutters, and not converted to another use. They also require one entry and one exit, each subject to stated minimum width and height clearance, and prohibit parking or construction in setback areas. No drawing-derived floor layouts, floor-by-floor unit arrangements, footprint, lift/stair counts, internal circulation plan, landscaped-area measurements or phase plan are available in the supplied material.
4. Homes, configurations & floor plans
The RERA filing records 35 apartments in two configurations. The portal counts below are indicative because no as-of date is provided.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 14 | 16 | 126.44 sq m | Not available | Not supplied |
| 3BHK | 5 | 3 | 2 | 145.65 sq m | Not available | Not supplied |
Two floor-plan drawings are reported, but neither contains measured flats. Software-measured carpet areas, room dimensions, orientation and typical floor arrangements are therefore unavailable. RERA saleable area is the filed area measure; it is not a carpet-area measurement. The supplied record does not provide a breakdown of apartment carpet area, exclusive balcony/verandah or open terrace area, or common-area loading.
5. Parking & vehicle circulation
The HMDA approval conditions designate the stilt/cellar exclusively for vehicle parking and say it must not be partitioned or converted. They also require one entry and one exit, with a minimum width of 4.5 meters and height clearance of 5 meters. The supplied record does not state the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, ramp arrangements, EV charging provision, or unit-specific parking allocations. A parking bay shown or described in project material would not, by itself, establish exclusive ownership; no unit allocation document is supplied.
6. Amenities, recreation & open spaces
The RERA amenities record lists selected infrastructure items with percentage figures. These are filing entries, not independent verification of present delivery. The HMDA approval also contains conditions about certain building services.
| Description / size | No source, storage capacity or system details in the RERA amenities entry |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | Entry specifies chamber, lines, septic tank / STP; no capacity or treatment details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No area or facility detail supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No fixture or coverage details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No capacity or design detail supplied |
|---|---|
| Evidence source | RERA amenities record; HMDA approval conditions |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No system description supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No capacity or equipment specifications supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Listed “YES”, 100%; completion not independently verified |
| Description / size | No size or further description supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Each is listed at 0%; this records the supplied filing entry and does not establish present site status. |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting/water conservation, energy management, and an electrical meter room/sub-station/receiving station as “YES” at 100%. It does not provide capacities, detailed system descriptions or independent verification.
The HMDA technical approval conditions specify a septic tank, drainage and sewerage arrangements subject to local conditions, rainwater-harvesting structures, a transformer and garbage house, and a generator as an alternate electricity source. The same approval calls for emergency lighting in corridors, common passages and staircases; fire extinguishers; a manual and alarm system; fire-resistant lift swing doors; and compliance with stated fire-service norms. These are approval conditions, not evidence that the facilities are installed or that statutory compliance has been certified.
No supplied record establishes water-source or tank capacity, STP capacity or reuse, backup-generation capacity, lift count/capacity, CCTV or access-control installation, waste-segregation arrangements, accessibility features, or current fire-clearance status.
8. Location, access & connectivity
The registered location is Bowrampet Gram Panchayat, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana, PIN 500043. The project parcel is identified as Sy. No. 461/P.
The supplied location record lists these distances, without specifying a measurement method or route:
Financial District (Nanakramguda): 1.2 km
IndusInd Bank: 0.4 km
Unnamed bus station: 2.2 km
Manuu Polytechnic Hyderabad: 1.6 km
Sankaraya Eye Hospital: 1.6 km
ADP: 0.0 km
South India Shopping Mall: 2.6 km
Unnamed park: 1.2 km
Nanakramguda Government Primary School: 0.5 km
No approach-road description, public-transport route, travel-time estimate or road-network plan is supplied.
9. Developer & development status
The registered promoter is GOKUL CONSTRUCTIONS, recorded as a partnership. The project record names Palampally Madhusudan Reddy as an authorized signatory and partner, and Menta Tirupalaiah as a partner. The supplied registration certificate lists the promoter’s office as “Village: Mandal: District: Hyderabad, Pin: 500090”; the village, mandal and district fields are not filled in that entry.
The promoter’s Form-B declaration, verified 29-11-2018, contains declarations about title, encumbrances, project funds, audits, pending approvals and completion. Its completion-date text is OCR-garbled (“31_-1.2-2079”), so it is not used as a clear date. The project record separately states proposed and revised completion as 31/12/2019. No current construction-progress evidence or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for GOKUL S NANDANAM BLOCK B, P02200001142, issued 14/09/2019, valid through 31/12/2019; no extension is recorded in this certificate.
HMDA technical approval: Approval 005201/MED/R1/U6/HMDA/22112/17, dated 08/01/2018, for a residential building on Sy. No. 461/P at Bowrampet; local sanction is delegated to Bowrampet Grampanchayath and remains subject to the stated conditions.
HMDA application reference: 005281/MED/R1/U6/HMDA/22112017
Form-B promoter declaration: Affidavit-cum-declaration verified 29-11-2018; contains promoter declarations and an OCR-garbled completion-date field.
Building / floor plans: Two floor-plan drawings are recorded, but neither has measured flats in the supplied floor-plan data.
Completion / occupancy certificate: No completion certificate is recorded in the supplied HMDA approval extraction; no occupancy certificate is supplied.
The supplied material does not include a separate local-authority final building sanction, a completion certificate or an occupancy certificate. The HMDA approval conditions state that occupation/use is to follow completion in accordance with the technically approved plans and issuance of a fit-for-occupancy certificate by the Executive Authority.
Other registrations of Gokul S Nandanam
Frequently asked questions
Is GOKUL S NANDANAM BLOCK B registered with Telangana RERA?
Yes. GOKUL S NANDANAM BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02200001142; the registration status is On-Going Project.
Who is the developer of GOKUL S NANDANAM BLOCK B?
The promoter named in the RERA registration is GOKUL CONSTRUCTIONS.
Where is GOKUL S NANDANAM BLOCK B located?
GOKUL S NANDANAM BLOCK B is in BOWRAMPET GRAM PANCHAYAT, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will GOKUL S NANDANAM BLOCK B be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2019. This is the promoter's declaration, not a guarantee.
More projects in Bowrampet





