Gokul Garnet

GOKUL CONSTRUCTIONS · Sangareddy · RERA P01100007305

GOKUL GARNET is a residential apartment project in Ameenapur, Ameenpur Mandal, Sangareddy District, developed by the registered promoter GOKUL CONSTRUCTIONS, a partnership. The registered site area is 399.14 sq m, and the project comprises one residential building with 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. It is registered under TG-RERA number P01100007305, with a proposed completion date of 30/11/2026.

📘 Project brochure from the promoter’s website ↗

More from Gokul Constructions · 10 projects →

01What we found

Period endedTG-RERA registration ran to 24 Jul 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
14items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

14 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameGOKUL GARNET RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single project registration; the registered site is identified as Plot No. 11 (South Part). No separate phase name is disclosed. RERA record
TG-RERA registrationP01100007305 RERA record
Registration validity05/12/2023 to 24/07/2026, as stated on the registration certificate; extension status is not shown in the supplied certificate. Registration validity is separate from the completion undertaking.
Registered promoterGOKUL CONSTRUCTIONS, a partnership RERA record RERA filing
RERA statusThe supplied Form C is a registration certificate under section 5. The project record labels its status “New Project.” RERA record

Land and geographic identity

ItemProject record
LocalityAmeenapur / Ameenpur RERA record
Revenue villageAMEENAPUR (also rendered “Ameenpur Village” in the building-permit document) RERA record
MandalAMEENPUR (permit: Ameenpur Mandal) RERA record
DistrictSangareddy (permit: Sanga Reddy District) RERA record
PIN502032 RERA record
Project survey number / subdivision109/P Land records
Site descriptionPlot No. 11 (South Part) RERA filing
Registered site areaTotal area 399.14 sq m; net area 399.14 sq m; affected area recorded as 0 sq m RERA filing
BoundariesNorth: part of Plot No. 11; South: Plot No. 29 and part of Plot No. 30; East: part of Plot No. 11; West: 40 ft wide road RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal building-permit number003590/BP/HMDA/0733/SKP/2023, dated 24 July 2023 Approvals record
Sanctioned buildingOne residential building, identified as “A (RESIDENTIAL BUILDING)”
Sanctioned floor configuration1 Stilt + 5 upper floors
Approved built-up area1,177.90 sq m RERA filing
Other area figure in permitTotal built-up area: 1,427.79 sq m; this is separately stated in the permit from the “Built-up Area” figure above.
Parking levels / approved parking countThe stilt is required by the permit to be used exclusively for vehicle parking. A parking-space count is not provided in the supplied extracts.
Unit countsHMDA-permit extract: one proposed residential building. TG-RERA unit schedule: 10 units—five 2BHK and five 3BHK. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable-area figures2BHK: 120.77 sq m; 3BHK: 153.29 sq m RERA unit table
Booked / availablePortal figures as last read: 0 booked / 5 available for each configuration. The portal record has no as-of date, so these counts are indicative. RERA unit table
Construction stageNo independently verified site-progress assessment is supplied. The RERA amenities schedule records 0% for its listed work items; those entries do not establish current physical site progress. RERA amenities
Completion undertaking / proposed completionForm B undertaking: 24/07/2026; project header’s proposed completion date: 30/11/2026. RERA record
Occupancy certificateThe building-permit conditions require an Occupancy Certificate before occupation; the supplied permit extraction says completion has not been certified. No OC is supplied.

2. The project story

  • GOKUL GARNET is registered as a residential apartment project on Plot No. 11 (South Part), Survey No. 109/P, in revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy District. The registered land area is 399.14 sq m. RERA record Land records
  • The supplied HMDA Building Permit Order approves one residential building with 1 stilt + 5 upper floors. The RERA unit schedule records 10 apartments: five 2BHK and five 3BHK. The permit requires the stilt to be used for vehicle parking. RERA unit table
  • The project record does not provide independently verified construction progress. Its RERA-listed development-work entries show 0% for the listed items, while the permit extract states that completion has not been certified. These records do not establish what work is physically complete today. RERA amenities

3. Master plan, architecture & building design

  • The project is described in the HMDA permit as one residential building on a 399.14 sq m site at Plot No. 11 (South Part), Survey No. 109/P. The permit gives the configuration as 1 Stilt + 5 upper floors. The RERA record gives an approved built-up area of 1,177.90 sq m; the permit separately states Total Built up Area: 1,427.79 Sq.mts. These are the figures as labelled in their respective records and should not be treated as interchangeable. RERA filing
  • The supplied floor-plan document is identified as a layout plan, but its extracted content does not establish building footprint, flats per floor, lift or stair arrangements, access circulation, open-space dimensions, or residential/common-area distribution. The floor-plan geometry has been software-measured for apartment carpet-area analysis, not independently verified as built construction.

4. Homes, configurations & floor plans

The TG-RERA schedule records two configurations and 10 units in total. Saleable area below is RERA-filed; carpet-area figures are software measurements from the supplied floor-plan drawing, not RERA disclosures. The drawing measurement set covers two designs per configuration and is flagged as needing review. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505120.77 sq m72.3–73.0 sq m; median 72.7 sq m40%
3BHK505153.29 sq m91.1–95.4 sq m; median 93.3 sq m39%
  • The drawing-labelled 2BHK plan includes living, dining/kitchen, two bedrooms, two toilets and a 1.30 m wide balcony. The measured 3BHK plan includes living/dining, kitchen, three bedrooms, three toilets and a balcony labelled 1.93 m wide. These are drawing-derived descriptions and measurements, not confirmation of as-built dimensions.
  • Carpet area measures the apartment’s internal floor area as interpreted from the drawing; the RERA-filed saleable area is a distinct figure. The drawing-analysis record describes the saleable-area measure as including the home’s share of common areas. It does not supply a separate RERA-filed carpet-area disclosure. RERA unit table

5. Parking & vehicle circulation

  • HMDA’s permit requires the stilt to be used exclusively for vehicle parking and prohibits parking or construction in setback areas. It also requires one entry and one exit, each with a minimum width of 4.5 m and a height clearance of 5 m.
  • The supplied project extracts do not establish the approved number of parking bays, visitor or accessible parking, two-wheeler provision, EV charging locations, ramp arrangement, pedestrian separation, or unit-specific parking allocations. The existence of a parking bay in a drawing, if any, would not on its own establish an exclusive ownership right. The stilt’s permitted parking use is not evidence of completed parking facilities.

6. Amenities, recreation & open spaces

The RERA amenities schedule lists the following items and records 0% progress for each. Rainwater harvesting is marked “YES”; its listed progress is also 0%. The permit separately requires rainwater-harvesting structures. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Water supplySize/capacity not stated in this scheduleRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Sewerage, chambers, lines, septic tank / STPSize/capacity not stated in this scheduleRERA amenities schedule RERA amenities; permit0% in schedule; permit requires an STP; completion not verified
Storm-water drainsSize not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Green strip / tot lot / parkSize not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Street lightingQuantity not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Community buildingsSize/type not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Sewage and sullage treatment/disposalCapacity not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Solid-waste management and disposalCapacity not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Water conservation / rainwater harvestingSize/capacity not statedRERA amenities schedule RERA amenities; permitMarked “YES”; progress 0%; completion not verified
Energy managementDetails not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Fire protection and fire-safety requirementsSystems/details not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied
Electrical meter room / sub-station / receiving stationSize/capacity not statedRERA amenities schedule RERA amenities; permit0% in schedule; permit requires provision for a transformer
Aggregate recreational open spaceArea not statedRERA amenities schedule RERA amenities0%; no independent completion verification supplied

7. Utilities, building services & safety

  • The building-permit conditions require a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. The permit also describes a dual-piping system. Water source, treatment capacity and the detailed reuse arrangement are not specified in the supplied extracts.
  • For sewerage and drainage, the permit requires an STP and rainwater-harvesting structures; the RERA amenities schedule records sewerage, sewage/sullage treatment and storm-water drains at 0% progress. No STP capacity, treated-water reuse volume, storm-water design or harvesting capacity is supplied. RERA amenities
  • The permit requires provision for a transformer and a garbage house, and the RERA amenities schedule lists an electrical meter room/sub-station/receiving station and solid-waste management/disposal. The extracts do not give electrical or backup capacity, waste-processing details, or EV-charging provision. RERA amenities
  • The permit requires one entry and one exit with minimum width 4.5 m and height clearance 5 m, and requires CCTV cameras. It also requires occupancy certification before occupation. No lift count or capacity, fire-system details, escape-stair information, accessibility features, or completed safety-system verification is supplied. A permit condition or RERA-listed work item is not, by itself, evidence that the facility is complete or that statutory compliance has been verified. RERA amenities

8. Location, access & connectivity

  • The registered location is Plot No. 11 (South Part), Survey No. 109/P, revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502032. The site’s west boundary is recorded as a 40 ft wide road. RERA record RERA filing
  • The location record gives the cadastral parcel centroid as 17.534518074102543, 78.3255732091502. Its nearest sampled Outer Ring Road interchange is listed at an approximate distance of 7.0 km. This is a mapped distance record; no travel time or public-transport distance is supplied. Location record Cadastral map
  • The building permit requires the approach road indicated in the plan to have the minimum width shown there and to be developed and maintained as a black-topped road before release of the Occupancy Certificate. The precise approach-road width from the plan is not included in the supplied extract.

9. Developer & development status

  • The registered legal promoter is GOKUL CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAOFG4124B1ZQ. The RERA project record lists CHANDRA SRINIVASA RAO as authorized signatory and K PADMAVATI as partner. RERA filing Corporate record Parties record
  • The RERA record gives the promoter address as P No. 521, Vasanth Nagar, Ameenpur, Sangareddy, Telangana, PIN 502032. The registration certificate separately prints a promoter-office address of Village/Mandal/District Ranga Reddy, PIN 500085. RERA filing
  • The promoter’s website is listed as https://www.gokulconstructions.com/. Sales telephone numbers printed in the promoter brochure are 9000096899 and 8977911660; these are marketing contacts, not contacts independently verified as current. Corporate record
  • The promoter’s Form B affidavit declares completion by 24/07/2026. The project header states a proposed completion date of 30/11/2026; no independently verified construction-progress assessment or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C registration certificate, P01100007305, issued 05/12/2023, valid through 24/07/2026 as printed on the certificate
Overview relevanceProject registration and registered identity
HMDA building permit
Supplied evidenceBuilding Permit Order 003590/BP/HMDA/0733/SKP/2023, dated 24 July 2023
Overview relevanceOne residential building; 1 stilt + 5 upper floors; conditions include OC before occupation
RERA Form B
Supplied evidenceDeclaration by CH SRINIVASA RAO on behalf of GOKUL CONSTRUCTIONS, dated 27•09-2023
Overview relevancePromoter declaration, including stated completion undertaking
Further Form B declaration
Supplied evidenceDeclaration dated 27-09-2023, including project-fund and approval commitments
Overview relevancePromoter-filed declaration
Layout-plan submission
Supplied evidenceRERA file identifies document 358496 as a layout-plan document; extracted plan details are limited
Overview relevanceDrawing source used for software-measured apartment areas
Occupancy / completion certificate
Supplied evidenceNo certificate supplied; permit extract states completion is not certified and makes an OC compulsory before occupation
Overview relevanceOC status is not evidenced as granted

The supplied records do not provide an occupancy certificate or independently verified construction-completion evidence. The building permit also records a simple mortgage in favour of MC, HMDA, under mortgage document 8563/2023.

Frequently asked questions

Is GOKUL GARNET registered with Telangana RERA?

Yes. GOKUL GARNET is registered with the Telangana Real Estate Regulatory Authority as P01100007305; the registration status is New Project.

Who is the developer of GOKUL GARNET?

The promoter named in the RERA registration is GOKUL CONSTRUCTIONS.

Where is GOKUL GARNET located?

GOKUL GARNET is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will GOKUL GARNET be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.