Gateway Manors
UNITON INFRA PRIVATE LIMITED · Nizamabad · RERA P03100008272
GATEWAY MANORS is a new plotted development / layout with open plots in BLOCK NO 26, NIZAMABAD SOUTH mandal, Nizamabad district. The registered promoter is UNITON INFRA PRIVATE LIMITED. The registered site extent is 20,133.95 sq m, and the RERA-filed layout drawing lists 60 plots; no tower, block or floor configuration is supplied. TG-RERA registration number P03100008272 is recorded as valid from 24 May 2024 to 9 May 2025, and the promoter-declared completion date is 09.05.2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | GATEWAY MANORS RERA record |
| Project type | New plotted development / layout with open plots RERA record RERA filing |
| Phase or registered portion | Not identified as a separate phase; registration is for the project recorded under P03100008272 |
| TG-RERA registration | P03100008272; recorded as valid from 24 May 2024 to 9 May 2025 RERA record Approvals record |
| RERA status | “New Project” in the project record. The supplied certificate gives the stated validity period; no extension record is supplied here. RERA filing |
| Registered promoter | UNITON INFRA PRIVATE LIMITED RERA record Corporate record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / address descriptors | BLOCK NO 26; the stamped layout identifies WARD NO.6, BLOCK NO.26, NIZAMABAD SHIVAR RERA record |
| Revenue village | NIZAMABAD SHIVAR is named in the layout drawing; the RERA registration certificate says NIZAMABAD SOUTH. The RERA land record itself does not disclose a village. Land records |
| Mandal | NIZAMABAD SOUTH in the RERA identity record; the layout drawing identifies NIZAMABAD RERA record |
| District / PIN | Nizamabad / 503001 RERA record |
| All project survey numbers and subdivisions | 3035/A/3, 3033/A/1, 3036/A/2/2, 3038/AA, 3036/A/1, 3036/AA, 3037/AA, 3035/E, 3036/A/2/1, 3037/E, 2998 RERA record Land records |
| Registered site extent | 20,133.95 sq m in the RERA land record Land records |
| Drawing area statement | Total layout area 20,133.36 sq m; the drawing states net layout area 20,133.36 sq m in its sanctioned parameters and separately lists “Total net layout” as 19,925.06 sq m. |
| Boundaries | North: 18 METERS PROPOSED ROAD; south, east and west: NEIGHBOURS LAND Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | RERA fields identify DTCP; the supplied tentative-layout approval is issued by NIZAMABAD Municipality/Municipal Corporation. RERA record Approvals record |
| Principal approval | Tentative Layout Plan No. 0106/LO/3072/2023, approved 09 May 2023; application No. 003670/LO/DTCP/3072/0043/2022 Approvals record |
| Other plan identifier | TS/026514/2022 appears on the approved layout drawing; its stamp reads 23-04-2022 and is flagged as requiring review. Approvals record |
| Approved area / buildings | The layout is an open-plot development; sanctioned parameters state NET BUA BUILT UP AREA 0.00. No tower or apartment-building count or floor configuration is supplied. |
| Plot count | The RERA-filed drawing extraction lists 60 plots; the tentative-layout approval document describes 62 residential plots. |
| Roads and reserved land | Drawing identifies 9.00 m and 10.06 m internal roads, and an 18.29 m existing road and 18.29 m proposed road. |
| Parking | The drawing’s sanctioned parameters state proposed number of parkings: 0; common parking area is also listed as 0.00. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots RERA record |
| Plot schedule | 60 plots in the layout drawing’s schedule; plot areas read from the drawing range from 102.94 sq m to 318.89 sq m (software-measured from drawing text and requiring verification). Layout record |
| RERA saleable-area range / booked and available counts | Not supplied in the available RERA unit data. |
| Promoter-declared completion date | 09.05.2025 in the Form B declaration |
| Registration validity | 24 May 2024 to 9 May 2025 as stated in the registration certificate |
| Construction / development stage | RERA record reports 80% completeness; the supplied data does not identify the measurement date or independently verify site progress. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For this plotted layout, the available approval is described as a tentative layout approval. |
2. The project story
GATEWAY MANORS is registered as a new plotted layout in Nizamabad, covering the survey parcels listed above. The RERA-filed layout drawing shows plots arranged within a road network, with land reserved for organized open space/park, social infrastructure and utilities. It does not describe apartment buildings or a residential tower scheme. RERA record
The RERA record reports 80% completeness, while the promoter’s Form B declaration undertakes completion by 09.05.2025. These are different kinds of information: the former is a recorded progress figure with no supplied measurement date or independent site verification; the latter is the promoter’s declared deadline. The supplied record does not establish that the layout works are complete or that a final layout approval or completion certificate has been issued. RERA record
The tentative-layout approval describes infrastructure and amenity works to be carried out by the applicant and requires the open-space, utility and road areas to be handed over to the Municipality by registered gift deed before release of the tentative layout. The supplied documents do not establish completion of those works or completion of that handover.
3. Master plan, architecture & building design
This is a plotted layout, not a building development: the sanctioned parameters give a net built-up area of 0.00 and proposed parking of 0. No building count, building footprint, floors, tower heights, lifts or apartment circulation details are supplied.
The layout drawing’s area statement records a total site area of 20,133.36 sq m and the following land-use allocation. These are figures from the approved-drawing extraction, not independently measured site boundaries.
| Layout use | Area | Share shown on drawing |
|---|---|---|
| Plotted area | 11,660.43 sq m | 57.92% |
| Roads | 5,742.96 sq m | 28.52% |
| Organized open space / park | 1,812.04 sq m | 9.00% |
| Social infrastructure | 508.06 sq m | 2.52% |
| Utility area | 201.57 sq m | 1.00% |
| Amenity area | 0.00 sq m | 0.00% |
The drawing lists 9.00 m and 10.06 m internal roads, plus an 18.29 m existing road and an 18.29 m proposed road. It also identifies a social-infrastructure area, utility plot, tot-lot, bore well, well, STN and OIL; the supplied extraction does not expand the last two abbreviations.
The tentative-layout approval separately identifies reserved open space, social-infrastructure and utility areas, and specifies that roads are to be opened for access to neighbouring sites. It requires infrastructure and amenity works and gift of open space, utilities and roads to the Municipality before release of the tentative layout.
4. Homes, configurations & floor plans
The offering is plots, not apartments. The available layout extraction reports 60 scheduled plots and drawing-derived plot areas as follows. Plot count and sizes are read by software from drawing text and should be checked against the stamped drawing; the supplied RERA unit data does not provide plot-wise booked or available counts or RERA-filed saleable areas. Layout record
| Plot-size band | Plot count |
|---|---|
| 100–150 sq yd (84–125 sq m) | 1 |
| 150–200 sq yd (125–167 sq m) | 16 |
| 200–250 sq yd (167–209 sq m) | 25 |
| 250–300 sq yd (209–251 sq m) | 12 |
| 300–400 sq yd (251–334 sq m) | 6 |
The layout extraction reports the smallest plot as 102.94 sq m (123.1 sq yd), median as 187.14 sq m (223.8 sq yd), and largest as 318.89 sq m (381.4 sq yd). These are software-measured from the drawing, not RERA-filed saleable-area figures. Layout record
The supplied floor-plan review reports two layout sheets and no apartment units measured. It therefore provides no room configurations or measured carpet areas. Floor plans
5. Parking & vehicle circulation
The approved-layout drawing’s sanctioned parameters state proposed number of parkings: 0, and its land-use statement lists common parking area as 0.00. No resident, visitor, accessible, mechanical or EV parking provision, parking allocation arrangement, or vehicle-space count is supplied.
The drawing identifies internal roads of 9.00 m and 10.06 m and an 18.29 m existing and proposed road. The tentative-layout approval says roads must be opened for accessibility to neighbouring sites. The available record does not describe ramps, separate pedestrian routes or a specific site entry/exit arrangement.
6. Amenities, recreation & open spaces
The RERA-filed amenity checklist records several facilities with 0% progress; where the checklist marks an item “YES,” that is a recorded declaration, not evidence that it has been completed or independently verified. RERA amenities
| Group | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Organized open space / park | 1,812.04 sq m; 9.00% in the layout drawing | Reserved in drawing; completion not established | |
| Landscape / open space | Green strip / tot-lot / park | No separate size supplied | RERA amenities | “YES” recorded; 0% progress; not independently verified |
| Sports / recreation | Tot-lot | Identified on layout drawing; no size supplied | Drawing-listed; completion not established | |
| Convenience / community | Social infrastructure area | 508.06 sq m; 2.52% | Reserved; facility use and completion not established | |
| Convenience / community | Community buildings | No description or size supplied | RERA amenities | 0% progress; not independently verified |
| Convenience / community | Utility plot | 201.57 sq m; 1.00% | Reserved; completion not established |
A third-party listing mentions a “Theme Park,” but the supplied RERA/layout evidence does not establish it as an approved or delivered facility; it is therefore not presented as a project facility here. Promoter website
7. Utilities, building services & safety
The tentative-layout approval identifies planned utility and infrastructure provisions, including a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval-document descriptions of planned works; the supplied record does not establish their completion, operating status or capacities.
The RERA amenity checklist includes water supply; sewerage (chambers, lines, septic tank and STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management; water conservation and rainwater harvesting; energy management; fire protection and fire-safety requirements; and an electrical meter room, substation or receiving station. The checklist records 0% progress for these entries; it does not provide capacities or confirm delivery. RERA amenities
No project-specific evidence is supplied for fire-system specifications or clearance, emergency access, security/CCTV, waste segregation arrangements, accessibility features, or completed utility commissioning. RERA amenities
8. Location, access & connectivity
The registered project record places GATEWAY MANORS in Nizamabad district, PIN 503001, with locality recorded as BLOCK NO 26. The stamped layout identifies WARD NO.6, BLOCK NO.26, NIZAMABAD SHIVAR; the RERA registration certificate describes the location as NIZAMABAD SOUTH, Nizamabad. RERA record
The drawing shows internal roads of 9.00 m and 10.06 m and identifies an 18.29 m existing road and an 18.29 m proposed road. The tentative-layout approval requires roads to be open for access to neighbouring sites. No public-transport information or measured distance to a landmark is supplied for this Nizamabad project.
9. Developer & development status
The registered legal promoter is UNITON INFRA PRIVATE LIMITED, a private limited company. Its GSTIN is 36AACCU1358G1ZE; the corporate identification number supplied is U45309TG2017PTC119147. The RERA record lists the company address as SBR Peral, 3rd Floor, Ward No. 6, Block No. 26, Nizamabad South, Nizamabad, 503001. Corporate record RERA filing
The RERA project record reports 80% completeness, but the supplied data does not state when that figure was assessed or provide independent site verification. The Form B affidavit dated 10 May 2024 is the promoter’s declaration and undertakes completion by 09.05.2025. The registration certificate separately states validity through 09/05/2025; no extension or final-completion record is supplied here. RERA record
10. Approvals, official records & documents
| Identifier / date | P03100008272; 24/05/2024–09/05/2025 |
|---|---|
| Scope and evidence | Form C certificate for GATEWAY MANORS and UNITON INFRA PRIVATE LIMITED. |
| Identifier / date | TS/026514/2022; drawing stamp dated 23-04-2022 |
|---|---|
| Scope and evidence | Approved-layout drawing supplied in the RERA filing; stamp date is read from the drawing text layer and marked for review. |
| Identifier / date | 0106/LO/3072/2023; approved 09 May 2023 |
|---|---|
| Scope and evidence | Issued by NIZAMABAD Municipality/Municipal Corporation; application No. 003670/LO/DTCP/3072/0043/2022. |
| Identifier / date | 10 May 2024 |
|---|---|
| Scope and evidence | Promoter declaration covering its stated title basis, project-account and audit obligations, pending approvals and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No OC or completion certificate is included in the supplied project documents. |
The tentative-layout approval states that the applicant is responsible for layout development and that open space, utilities and roads are to be handed to the Municipality by registered gift deed before release of the tentative layout. It also records a municipal mortgage over specified plots, referenced as Mortgage Deed No. 5855/22 dated 08 June 2022.
1. Project at a glance
Project identity
Registered project name: GATEWAY MANORS
Project type: New plotted development / layout with open plots
Phase or registered portion: Not identified as a separate phase; registration is for the project recorded under P03100008272
TG-RERA registration: P03100008272; recorded as valid from 24 May 2024 to 9 May 2025
RERA status: “New Project” in the project record. The supplied certificate gives the stated validity period; no extension record is supplied here.
Registered promoter: UNITON INFRA PRIVATE LIMITED
Land and geographic identity
Locality / address descriptors: BLOCK NO 26; the stamped layout identifies WARD NO.6, BLOCK NO.26, NIZAMABAD SHIVAR
Revenue village: NIZAMABAD SHIVAR is named in the layout drawing; the RERA registration certificate says NIZAMABAD SOUTH. The RERA land record itself does not disclose a village.
Mandal: NIZAMABAD SOUTH in the RERA identity record; the layout drawing identifies NIZAMABAD
District / PIN: Nizamabad / 503001
All project survey numbers and subdivisions: 3035/A/3, 3033/A/1, 3036/A/2/2, 3038/AA, 3036/A/1, 3036/AA, 3037/AA, 3035/E, 3036/A/2/1, 3037/E, 2998
Registered site extent: 20,133.95 sq m in the RERA land record
Drawing area statement: Total layout area 20,133.36 sq m; the drawing states net layout area 20,133.36 sq m in its sanctioned parameters and separately lists “Total net layout” as 19,925.06 sq m.
Boundaries: North: 18 METERS PROPOSED ROAD; south, east and west: NEIGHBOURS LAND
Development identity
Sanctioning authority: RERA fields identify DTCP; the supplied tentative-layout approval is issued by NIZAMABAD Municipality/Municipal Corporation.
Principal approval: Tentative Layout Plan No. 0106/LO/3072/2023, approved 09 May 2023; application No. 003670/LO/DTCP/3072/0043/2022
Other plan identifier: TS/026514/2022 appears on the approved layout drawing; its stamp reads 23-04-2022 and is flagged as requiring review.
Approved area / buildings: The layout is an open-plot development; sanctioned parameters state NET BUA BUILT UP AREA 0.00. No tower or apartment-building count or floor configuration is supplied.
Plot count: The RERA-filed drawing extraction lists 60 plots; the tentative-layout approval document describes 62 residential plots.
Roads and reserved land: Drawing identifies 9.00 m and 10.06 m internal roads, and an 18.29 m existing road and 18.29 m proposed road.
Parking: The drawing’s sanctioned parameters state proposed number of parkings: 0; common parking area is also listed as 0.00.
Offering and status
Unit type: Plots
Plot schedule: 60 plots in the layout drawing’s schedule; plot areas read from the drawing range from 102.94 sq m to 318.89 sq m (software-measured from drawing text and requiring verification).
RERA saleable-area range / booked and available counts: Not supplied in the available RERA unit data.
Promoter-declared completion date: 09.05.2025 in the Form B declaration
Registration validity: 24 May 2024 to 9 May 2025 as stated in the registration certificate
Construction / development stage: RERA record reports 80% completeness; the supplied data does not identify the measurement date or independently verify site progress.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For this plotted layout, the available approval is described as a tentative layout approval.
2. The project story
GATEWAY MANORS is registered as a new plotted layout in Nizamabad, covering the survey parcels listed above. The RERA-filed layout drawing shows plots arranged within a road network, with land reserved for organized open space/park, social infrastructure and utilities. It does not describe apartment buildings or a residential tower scheme.
The RERA record reports 80% completeness, while the promoter’s Form B declaration undertakes completion by 09.05.2025. These are different kinds of information: the former is a recorded progress figure with no supplied measurement date or independent site verification; the latter is the promoter’s declared deadline. The supplied record does not establish that the layout works are complete or that a final layout approval or completion certificate has been issued.
The tentative-layout approval describes infrastructure and amenity works to be carried out by the applicant and requires the open-space, utility and road areas to be handed over to the Municipality by registered gift deed before release of the tentative layout. The supplied documents do not establish completion of those works or completion of that handover.
3. Master plan, architecture & building design
This is a plotted layout, not a building development: the sanctioned parameters give a net built-up area of 0.00 and proposed parking of 0. No building count, building footprint, floors, tower heights, lifts or apartment circulation details are supplied.
The layout drawing’s area statement records a total site area of 20,133.36 sq m and the following land-use allocation. These are figures from the approved-drawing extraction, not independently measured site boundaries.
| Layout use | Area | Share shown on drawing |
|---|---|---|
| Plotted area | 11,660.43 sq m | 57.92% |
| Roads | 5,742.96 sq m | 28.52% |
| Organized open space / park | 1,812.04 sq m | 9.00% |
| Social infrastructure | 508.06 sq m | 2.52% |
| Utility area | 201.57 sq m | 1.00% |
| Amenity area | 0.00 sq m | 0.00% |
The drawing lists 9.00 m and 10.06 m internal roads, plus an 18.29 m existing road and an 18.29 m proposed road. It also identifies a social-infrastructure area, utility plot, tot-lot, bore well, well, STN and OIL; the supplied extraction does not expand the last two abbreviations.
The tentative-layout approval separately identifies reserved open space, social-infrastructure and utility areas, and specifies that roads are to be opened for access to neighbouring sites. It requires infrastructure and amenity works and gift of open space, utilities and roads to the Municipality before release of the tentative layout.
4. Homes, configurations & floor plans
The offering is plots, not apartments. The available layout extraction reports 60 scheduled plots and drawing-derived plot areas as follows. Plot count and sizes are read by software from drawing text and should be checked against the stamped drawing; the supplied RERA unit data does not provide plot-wise booked or available counts or RERA-filed saleable areas.
100–150 sq yd (84–125 sq m): 1
150–200 sq yd (125–167 sq m): 16
200–250 sq yd (167–209 sq m): 25
250–300 sq yd (209–251 sq m): 12
300–400 sq yd (251–334 sq m): 6
The layout extraction reports the smallest plot as 102.94 sq m (123.1 sq yd), median as 187.14 sq m (223.8 sq yd), and largest as 318.89 sq m (381.4 sq yd). These are software-measured from the drawing, not RERA-filed saleable-area figures.
The supplied floor-plan review reports two layout sheets and no apartment units measured. It therefore provides no room configurations or measured carpet areas.
5. Parking & vehicle circulation
The approved-layout drawing’s sanctioned parameters state proposed number of parkings: 0, and its land-use statement lists common parking area as 0.00. No resident, visitor, accessible, mechanical or EV parking provision, parking allocation arrangement, or vehicle-space count is supplied.
The drawing identifies internal roads of 9.00 m and 10.06 m and an 18.29 m existing and proposed road. The tentative-layout approval says roads must be opened for accessibility to neighbouring sites. The available record does not describe ramps, separate pedestrian routes or a specific site entry/exit arrangement.
6. Amenities, recreation & open spaces
The RERA-filed amenity checklist records several facilities with 0% progress; where the checklist marks an item “YES,” that is a recorded declaration, not evidence that it has been completed or independently verified.
| Group | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Organized open space / park | 1,812.04 sq m; 9.00% in the layout drawing | Reserved in drawing; completion not established | |
| Landscape / open space | Green strip / tot-lot / park | No separate size supplied | “YES” recorded; 0% progress; not independently verified | |
| Sports / recreation | Tot-lot | Identified on layout drawing; no size supplied | Drawing-listed; completion not established | |
| Convenience / community | Social infrastructure area | 508.06 sq m; 2.52% | Reserved; facility use and completion not established | |
| Convenience / community | Community buildings | No description or size supplied | 0% progress; not independently verified | |
| Convenience / community | Utility plot | 201.57 sq m; 1.00% | Reserved; completion not established |
A third-party listing mentions a “Theme Park,” but the supplied RERA/layout evidence does not establish it as an approved or delivered facility; it is therefore not presented as a project facility here.
7. Utilities, building services & safety
The tentative-layout approval identifies planned utility and infrastructure provisions, including a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval-document descriptions of planned works; the supplied record does not establish their completion, operating status or capacities.
The RERA amenity checklist includes water supply; sewerage (chambers, lines, septic tank and STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management; water conservation and rainwater harvesting; energy management; fire protection and fire-safety requirements; and an electrical meter room, substation or receiving station. The checklist records 0% progress for these entries; it does not provide capacities or confirm delivery.
No project-specific evidence is supplied for fire-system specifications or clearance, emergency access, security/CCTV, waste segregation arrangements, accessibility features, or completed utility commissioning.
8. Location, access & connectivity
The registered project record places GATEWAY MANORS in Nizamabad district, PIN 503001, with locality recorded as BLOCK NO 26. The stamped layout identifies WARD NO.6, BLOCK NO.26, NIZAMABAD SHIVAR; the RERA registration certificate describes the location as NIZAMABAD SOUTH, Nizamabad.
The drawing shows internal roads of 9.00 m and 10.06 m and identifies an 18.29 m existing road and an 18.29 m proposed road. The tentative-layout approval requires roads to be open for access to neighbouring sites. No public-transport information or measured distance to a landmark is supplied for this Nizamabad project.
9. Developer & development status
The registered legal promoter is UNITON INFRA PRIVATE LIMITED, a private limited company. Its GSTIN is 36AACCU1358G1ZE; the corporate identification number supplied is U45309TG2017PTC119147. The RERA record lists the company address as SBR Peral, 3rd Floor, Ward No. 6, Block No. 26, Nizamabad South, Nizamabad, 503001.
The RERA project record reports 80% completeness, but the supplied data does not state when that figure was assessed or provide independent site verification. The Form B affidavit dated 10 May 2024 is the promoter’s declaration and undertakes completion by 09.05.2025. The registration certificate separately states validity through 09/05/2025; no extension or final-completion record is supplied here.
10. Approvals, official records & documents
| Identifier / date | P03100008272; 24/05/2024–09/05/2025 |
|---|---|
| Scope and evidence | Form C certificate for GATEWAY MANORS and UNITON INFRA PRIVATE LIMITED. |
| Identifier / date | TS/026514/2022; drawing stamp dated 23-04-2022 |
|---|---|
| Scope and evidence | Approved-layout drawing supplied in the RERA filing; stamp date is read from the drawing text layer and marked for review. |
| Identifier / date | 0106/LO/3072/2023; approved 09 May 2023 |
|---|---|
| Scope and evidence | Issued by NIZAMABAD Municipality/Municipal Corporation; application No. 003670/LO/DTCP/3072/0043/2022. |
| Identifier / date | 10 May 2024 |
|---|---|
| Scope and evidence | Promoter declaration covering its stated title basis, project-account and audit obligations, pending approvals and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No OC or completion certificate is included in the supplied project documents. |
The tentative-layout approval states that the applicant is responsible for layout development and that open space, utilities and roads are to be handed to the Municipality by registered gift deed before release of the tentative layout. It also records a municipal mortgage over specified plots, referenced as Mortgage Deed No. 5855/22 dated 08 June 2022.
Frequently asked questions
Is GATEWAY MANORS registered with Telangana RERA?
Yes. GATEWAY MANORS is registered with the Telangana Real Estate Regulatory Authority as P03100008272; the registration status is New Project.
Who is the developer of GATEWAY MANORS?
The promoter named in the RERA registration is UNITON INFRA PRIVATE LIMITED.
Where is GATEWAY MANORS located?
GATEWAY MANORS is in BLOCK NO 26, NIZAMABAD SOUTH, Nizamabad, Telangana (503001).
When will GATEWAY MANORS be completed?
The promoter's proposed date of completion filed with RERA is 09/05/2025. This is the promoter's declaration, not a guarantee.