FORTUNE-18 3 LP is a plotted development in AMANGAL, Amangal Mandal, Ranga Reddy District. The registered promoter is FORTUNE INFRA DEVELOPERS PVT LTD. The TG-RERA land record states a total and net area of 78049.96 sq. m, and the layout approvals record 188 open plots, with drawing-derived plot sizes ranging from 112.65 sq. m to 478.6 sq. m; tower, floor and home configurations are not stated. It is registered under TG-RERA number P02400006316, with proposed completion by 29/05/2025.
More from Fortune Infra Developers Pvt Ltd · 31 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | FORTUNE-18 3 LP RERA record |
| Project type | Plotted development / layout RERA record |
| Registered portion / phase | “3 LP” is in the registered name; a separate phase description is not disclosed in the supplied record. RERA record |
| TG-RERA registration | P02400006316; granted 07/07/2023, valid through 29/05/2025 on the supplied certificate. The certificate records no extension. Registration validity is separate from the completion deadline and from layout release. Approvals record |
| Registered legal promoter | FORTUNE INFRA DEVELOPERS PVT LTD RERA record Corporate record |
| RERA record status | The project is identified as a “New Project”; the supplied registration certificate’s validity has ended, and no extension is recorded in the supplied certificate. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | AMANGAL; the RERA certificate also records locality as Ram Nagar. RERA record RERA filing |
| Revenue village(s) | Amangal Revenue Village is named in the tentative layout approval; the RERA certificate records Ram Nagar. |
| Mandal | Amangal RERA record |
| District | Ranga Reddy RERA record |
| PIN | 509321 RERA record |
| Project survey numbers | 18/P and 29/P RERA record Land records |
| Registered site extent / net area | RERA land details state total and net area of 78049.96 sq. m. RERA filing Land records |
| Total site area in layout data | The layout drawing-derived record gives 78407.77 sq. m; the supplied RERA land record gives 78049.96 sq. m. Layout record RERA filing |
| Boundaries filed with RERA | North: neighbours’ land; South: neighbours’ land; East: neighbours’ land; West: existing layout. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Amangal Municipality / Municipal Corporation; the final layout order records HMDA technical approval. Approvals record |
| Principal tentative layout approval | 0002/LO/3134/2023, dated 30/05/2023. Approvals record |
| Final layout permit / release | 2059/HMDA/SWFL/2026, dated 27/04/2026; final layout order for 188 plots. Approvals record |
| Approved built-up area | 00 sq. m in the RERA filing. This is a plotted layout, and no building-count or floor-configuration information is supplied. RERA filing |
| Layout scale | 188 plots are stated in the tentative approval and final layout order. |
| Mortgage area | RERA filing: 5989.44 sq. m; the tentative layout approval identifies plots mortgaged to the Municipality as a development-condition measure. RERA filing Layout record |
| Parking / building configuration | No parking-space count, residential building floor configuration, or building-level approval details are disclosed in the supplied project record. Document index |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Open plots; RERA record identifies a plotted development. RERA record Promoter website |
| Plot count and size information | Drawing-derived schedule: 188 plots, ranging from 112.65 sq. m to 478.6 sq. m; median 211.22 sq. m. These are software-measured from the layout drawing and should be checked against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied data. RERA filing Document index |
| Original completion deadline | 29/05/2025, as declared in Form B and recorded on the RERA certificate. |
| Declared progress | The project header records 80% completeness; this is a supplied project-record figure, not independent site verification. RERA record |
| Completion / occupancy record | A final layout order was issued 27/04/2026. This is a layout-release document, not an occupancy certificate for buildings or plots. |
2. The project story
FORTUNE-18 3 LP is a plotted residential layout registered with TG-RERA under P02400006316. The project land is identified by survey numbers 18/P and 29/P, in Amangal, Amangal Mandal, Ranga Reddy District, PIN 509321. The tentative layout approval describes 188 plots and requires the promoter to provide layout infrastructure; the final layout order records release of the final plotted layout for 188 plots. RERA record Land records
The supplied layout-derived schedule reports 188 plot areas, with sizes from 112.65 sq. m to 478.6 sq. m. The layout drawing’s area statement allocates land to plots, roads, parks/open space, utilities and social infrastructure. The supplied data does not establish which plots are booked or available, nor does it establish construction of individual homes. Layout record Document index
The RERA record gives a proposed completion date of 29/05/2025 and a project completeness figure of 80%. The latter is not accompanied here by independent site inspection evidence. The 27/04/2026 final layout order is an approval record; it should not be read as an occupancy certificate for any dwelling. RERA record
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment project. The tentative layout approval records 188 plots over an extent stated there as 19 Acer 15.01 Gts / 93778 Sq. Yds. Its land-use allocation is: plotted area 49.84%; roads 36.3%; open-space park 9.08%; social infrastructure 2.79%; utilities 1.01%; and mortgage area 15.36%. These are the approval document’s stated allocations.
The drawing-derived layout record reports 78,049.96 sq. m as the land-use table base and identifies 38,904.18 sq. m for plots, 28,333.25 sq. m for roads, 7,085.11 sq. m for parks/open space, 787.97 sq. m for utilities, 2,174.01 sq. m for social infrastructure, and no amenity area. Plot counts and sizes are software-measured from the drawing; the record says the plot-area sum matches the drawing’s plotted-area statement, but recommends verifying the drawing. Layout record
The final layout order records 188 plots and a net layout extent of 78,050.38 sq. m, with its own land-use schedule: plotted area 39,002.43 sq. m (49.97%); roads 28,235.17 sq. m (36.18%); open space 7,085.06 sq. m (9.08%); buffer area 765.71 sq. m (0.98%); social infrastructure 2,174.0 sq. m (2.79%); utilities 787.96 sq. m (1.01%); and common parking and amenities each 0.0 sq. m.
No apartment towers, floors, building footprints, building-level built-up area, or unit floor plans are established in the supplied materials. The RERA-filed approved built-up area is recorded as 00 sq. m. RERA filing Floor plans
4. Homes, configurations & floor plans
The registered project is a plotted development; the RERA-filed unit configuration counts, booked/available inventory and plot-wise saleable areas are not supplied. The following plot count and sizes are measured from the approved layout drawing by software, rather than taken from a RERA unit-inventory table. RERA record Layout record Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 188 | Not disclosed | Not disclosed | Not disclosed plot by plot | Not applicable | Not supplied |
| Drawing-derived plot size band | Plot count |
|---|---|
| 100–150 sq. yd | 4 |
| 150–200 sq. yd | 45 |
| 200–250 sq. yd | 45 |
| 250–300 sq. yd | 55 |
| 300–400 sq. yd | 33 |
| 400–500 sq. yd | 4 |
| 500–1000 sq. yd | 2 |
The drawing-derived minimum, median and maximum plot sizes are 112.65 sq. m, 211.22 sq. m and 478.6 sq. m, respectively. These are software-measured figures and should be verified against the layout drawing. Apartment carpet area, balcony/utility area and common-area loading are not applicable to the plot offering as presented in the supplied data. Layout record Floor plans
5. Parking & vehicle circulation
The final layout order records 0.0 sq. m of common parking area. The tentative approval requires the layout’s roads to remain accessible and open, and the final layout order also states that roads are to be kept open for free public access. No sanctioned parking-space count, visitor or accessible parking provision, plot-specific parking allocation, vehicle-entry arrangement, or EV charging provision is supplied.
The tentative approval lists roads as 36.3% of its stated layout allocation; the final layout order lists road area as 28,235.17 sq. m (36.18%). These are layout road allocations, not evidence of parking bays or exclusive parking rights.
6. Amenities, recreation & open spaces
The project’s layout approvals and RERA-filed architect certificate identify open space and layout infrastructure. The amenity record marks some items “YES” but supplies 0% progress figures; those entries establish disclosure, not verified completion. RERA amenities
| Description / size | Tentative approval: 1 Acer 30.03 Gts / 8474 Sq. Yds (9.08%). Final layout order: 7,085.06 sq. m (9.08%). |
|---|---|
| Declared progress / verified status | Final order records the open spaces as taken over by the local authority by registered gift deed; no independent inspection is supplied. |
| Description / size | Listed as available in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Amenity record shows 0% progress; architect certificate reports green strip/tot lot/park among the project works for the March 2025 quarter. RERA amenities |
| Description / size | Tentative approval: 0 Acer 21.49 Gts / 2600 Sq. Yds (2.79%). Final order: 2,174.0 sq. m (2.79%). |
|---|---|
| Declared progress / verified status | Final order says social infrastructure was handed over with roads, open spaces and utilities; independent completion verification is not supplied. |
| Description / size | Listed in the RERA amenity record; no size or quantity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress / completion not established in the supplied data. |
| Description / size | RERA amenity record includes an aggregate recreational open-space entry; no separate size supplied. |
|---|---|
| Evidence source | RERA amenities Layout record |
| Declared progress / verified status | Progress / completion not established by the amenity percentage field. |
7. Utilities, building services & safety
The tentative layout approval requires the promoter to provide internal water supply pipelines, an overhead tank, a water reservoir, sewerage or septic-tank/STP arrangements, underground drainage, storm-water drains, electrical lines and transformer, street lighting, solid-waste management, avenue planting, park development and rainwater-harvesting pits. The final layout order records water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structures as layout provisions.
The RERA-filed architect certificate for the March 2025 quarter lists internal roads and footpaths, water supply, sewerage works (chambers, lines, septic tank and STP), storm-water drains, green strip/tot lot/park, street lighting and electrical meter room/sub-station/receiving station. It reports specified internal and external development works as completed; this is a certificate filed with RERA, not independent site verification in this report.
| Service / safety area | Supplied evidence and limits |
|---|---|
| Water | Water supply, internal pipelines, reservoir and overhead tank are identified in the approval/certificate records. No source, storage capacity or treatment capacity is supplied. |
| Sewerage and drainage | Septic tank/STP, sewerage lines and chambers, underground drainage and storm-water drains are identified. No capacity or reuse specification is supplied. |
| Electrical | Transformer, electrical supply lines, street lights and electrical meter room/sub-station/receiving station are identified. No supply or backup capacity is supplied. |
| Waste and conservation | Solid-waste management and rainwater-harvesting pits/structures are specified. The supplied documents do not provide capacity or operational verification. |
| Fire, accessibility and security | The supplied material does not specify fire-system design, accessible circulation, CCTV, access control or security systems. RERA amenities Document index |
8. Location, access & connectivity
The registered location is Amangal, Amangal Mandal, Ranga Reddy District, Telangana, PIN 509321; the project land is identified as survey numbers 18/P and 29/P. The tentative layout approval names Amangal Revenue Village. The RERA certificate records locality as Ram Nagar. RERA record Land records
The supplied location record gives coordinates 16.8497797, 78.5325679 for Amangal and a nearest sampled Outer Ring Road interchange distance of 43.4 km. Location record
Promoter-marketing material describes the project as near Mucherla Pharma City and claims walking-distance access to the Hyderabad–Srisailam Highway, connection to Hyderabad through the Outer Ring Road, airport access and about 10 minutes to Gandimaisamma Temple. These are promoter-marketed claims, not independently measured distances or travel times in the supplied location record. Promoter website
9. Developer & development status
The registered legal promoter is FORTUNE INFRA DEVELOPERS PVT LTD, a private limited company, GSTIN 36AAACF9926B1ZR. The supplied corporate address is FORTUNE HOUSE, JUBILEE HILLS, SURYA COTTON MILL BACK SIDE, AMANGAL, Amangal, Ranga Reddy, 509321. The registration certificate separately records the promoter office as Village/Mandal/District: Hyderabad, PIN 500033. RERA record Corporate record Parties record
BATTULA SESHAGIRI RAO is identified in the project record as Chairperson and authorized signatory. The promoter’s Form B declaration, verified 10 June 2023, undertakes completion by 29/05/2025 and declares that the land is free from encumbrances. These are promoter declarations in the filed document. Parties record
The project header records 80% completeness. The architect’s March 2025 certificate reports specified layout works as completed, while the final layout order dated 27/04/2026 records release of the final layout. No independent site inspection, plot-wise inventory, or occupancy certificate for dwelling buildings is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400006316; issued 07/07/2023; valid through 29/05/2025 on the supplied certificate |
|---|---|
| What it evidences | Registration of FORTUNE-18 3 LP and stated registration conditions. |
| Identifier / date | 0002/LO/3134/2023; 30/05/2023; application 002560/LO/DTCP/3134/0004/2023 |
|---|---|
| What it evidences | Tentative approval for a 188-plot layout in survey numbers 18/P and 29/P, with development conditions and municipal mortgage arrangements. |
| Identifier / date | 2059/HMDA/SWFL/2026; 27/04/2026; application 015897/HMDA/04256/SWFL/SHZ/2026 |
|---|---|
| What it evidences | Amangal Municipality final layout order recording HMDA technical approval and release for 188 plots. |
| Identifier / date | 8139/2023; 20/05/2023 |
|---|---|
| What it evidences | Tentative-approval record of plots mortgaged in favour of the Municipality; the final order records gift-deed handover of roads, open spaces, social infrastructure and utilities under the same document number. |
| Identifier / date | 7571/2026; 25/04/2026 |
|---|---|
| What it evidences | Final-order record of relinquishment concerning mortgaged plots in favour of HMDA. |
| Identifier / date | Drawing stamp TS/017368/2023, dated 06-03-2023 |
|---|---|
| What it evidences | Layout drawing used for the supplied software-measured plot schedule and area breakdown; the drawing text extraction is flagged as needing review. Layout record |
| Identifier / date | March 2025 RERA quarter update; registration P02400006316 |
|---|---|
| What it evidences | Reports specified layout development works as completed. |
| Identifier / date | Verified 10 June 2023 |
|---|---|
| What it evidences | Promoter’s title, encumbrance and completion declarations, including the 29/05/2025 completion undertaking. |
| Identifier / date | Title report 330797; encumbrance statement 330809 |
|---|---|
| What it evidences | Project-filed title and encumbrance documents; detailed review is outside this overview. |
The supplied material does not include a building-specific commencement certificate, residential building plans, plot-wise booking status, or an occupancy certificate for homes. The layout drawing’s software-derived measurements are not a substitute for checking the stamped drawing and project-specific records. Document index Floor plans
1. Project at a glance
Project identity
Registered project name: FORTUNE-18 3 LP
Project type: Plotted development / layout
Registered portion / phase: “3 LP” is in the registered name; a separate phase description is not disclosed in the supplied record.
TG-RERA registration: P02400006316; granted 07/07/2023, valid through 29/05/2025 on the supplied certificate. The certificate records no extension. Registration validity is separate from the completion deadline and from layout release.
Registered legal promoter: FORTUNE INFRA DEVELOPERS PVT LTD
RERA record status: The project is identified as a “New Project”; the supplied registration certificate’s validity has ended, and no extension is recorded in the supplied certificate.
Land and geographic identity
Locality: AMANGAL; the RERA certificate also records locality as Ram Nagar.
Revenue village(s): Amangal Revenue Village is named in the tentative layout approval; the RERA certificate records Ram Nagar.
Mandal: Amangal
District: Ranga Reddy
PIN: 509321
Project survey numbers: 18/P and 29/P
Registered site extent / net area: RERA land details state total and net area of 78049.96 sq. m.
Total site area in layout data: The layout drawing-derived record gives 78407.77 sq. m; the supplied RERA land record gives 78049.96 sq. m.
Boundaries filed with RERA: North: neighbours’ land; South: neighbours’ land; East: neighbours’ land; West: existing layout.
Development identity
Sanctioning authority: Amangal Municipality / Municipal Corporation; the final layout order records HMDA technical approval.
Principal tentative layout approval: 0002/LO/3134/2023, dated 30/05/2023.
Final layout permit / release: 2059/HMDA/SWFL/2026, dated 27/04/2026; final layout order for 188 plots.
Approved built-up area: 00 sq. m in the RERA filing. This is a plotted layout, and no building-count or floor-configuration information is supplied.
Layout scale: 188 plots are stated in the tentative approval and final layout order.
Mortgage area: RERA filing: 5989.44 sq. m; the tentative layout approval identifies plots mortgaged to the Municipality as a development-condition measure.
Parking / building configuration: No parking-space count, residential building floor configuration, or building-level approval details are disclosed in the supplied project record.
Offering and status
Unit type: Open plots; RERA record identifies a plotted development.
Plot count and size information: Drawing-derived schedule: 188 plots, ranging from 112.65 sq. m to 478.6 sq. m; median 211.22 sq. m. These are software-measured from the layout drawing and should be checked against the drawing.
Booked / available counts: Not disclosed in the supplied data.
Original completion deadline: 29/05/2025, as declared in Form B and recorded on the RERA certificate.
Declared progress: The project header records 80% completeness; this is a supplied project-record figure, not independent site verification.
Completion / occupancy record: A final layout order was issued 27/04/2026. This is a layout-release document, not an occupancy certificate for buildings or plots.
2. The project story
FORTUNE-18 3 LP is a plotted residential layout registered with TG-RERA under P02400006316. The project land is identified by survey numbers 18/P and 29/P, in Amangal, Amangal Mandal, Ranga Reddy District, PIN 509321. The tentative layout approval describes 188 plots and requires the promoter to provide layout infrastructure; the final layout order records release of the final plotted layout for 188 plots.
The supplied layout-derived schedule reports 188 plot areas, with sizes from 112.65 sq. m to 478.6 sq. m. The layout drawing’s area statement allocates land to plots, roads, parks/open space, utilities and social infrastructure. The supplied data does not establish which plots are booked or available, nor does it establish construction of individual homes.
The RERA record gives a proposed completion date of 29/05/2025 and a project completeness figure of 80%. The latter is not accompanied here by independent site inspection evidence. The 27/04/2026 final layout order is an approval record; it should not be read as an occupancy certificate for any dwelling.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment project. The tentative layout approval records 188 plots over an extent stated there as 19 Acer 15.01 Gts / 93778 Sq. Yds. Its land-use allocation is: plotted area 49.84%; roads 36.3%; open-space park 9.08%; social infrastructure 2.79%; utilities 1.01%; and mortgage area 15.36%. These are the approval document’s stated allocations.
The drawing-derived layout record reports 78,049.96 sq. m as the land-use table base and identifies 38,904.18 sq. m for plots, 28,333.25 sq. m for roads, 7,085.11 sq. m for parks/open space, 787.97 sq. m for utilities, 2,174.01 sq. m for social infrastructure, and no amenity area. Plot counts and sizes are software-measured from the drawing; the record says the plot-area sum matches the drawing’s plotted-area statement, but recommends verifying the drawing.
The final layout order records 188 plots and a net layout extent of 78,050.38 sq. m, with its own land-use schedule: plotted area 39,002.43 sq. m (49.97%); roads 28,235.17 sq. m (36.18%); open space 7,085.06 sq. m (9.08%); buffer area 765.71 sq. m (0.98%); social infrastructure 2,174.0 sq. m (2.79%); utilities 787.96 sq. m (1.01%); and common parking and amenities each 0.0 sq. m.
No apartment towers, floors, building footprints, building-level built-up area, or unit floor plans are established in the supplied materials. The RERA-filed approved built-up area is recorded as 00 sq. m.
4. Homes, configurations & floor plans
The registered project is a plotted development; the RERA-filed unit configuration counts, booked/available inventory and plot-wise saleable areas are not supplied. The following plot count and sizes are measured from the approved layout drawing by software, rather than taken from a RERA unit-inventory table.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 188 | Not disclosed | Not disclosed | Not disclosed plot by plot | Not applicable | Not supplied |
100–150 sq. yd: 4
150–200 sq. yd: 45
200–250 sq. yd: 45
250–300 sq. yd: 55
300–400 sq. yd: 33
400–500 sq. yd: 4
500–1000 sq. yd: 2
The drawing-derived minimum, median and maximum plot sizes are 112.65 sq. m, 211.22 sq. m and 478.6 sq. m, respectively. These are software-measured figures and should be verified against the layout drawing. Apartment carpet area, balcony/utility area and common-area loading are not applicable to the plot offering as presented in the supplied data.
5. Parking & vehicle circulation
The final layout order records 0.0 sq. m of common parking area. The tentative approval requires the layout’s roads to remain accessible and open, and the final layout order also states that roads are to be kept open for free public access. No sanctioned parking-space count, visitor or accessible parking provision, plot-specific parking allocation, vehicle-entry arrangement, or EV charging provision is supplied.
The tentative approval lists roads as 36.3% of its stated layout allocation; the final layout order lists road area as 28,235.17 sq. m (36.18%). These are layout road allocations, not evidence of parking bays or exclusive parking rights.
6. Amenities, recreation & open spaces
The project’s layout approvals and RERA-filed architect certificate identify open space and layout infrastructure. The amenity record marks some items “YES” but supplies 0% progress figures; those entries establish disclosure, not verified completion.
| Description / size | Tentative approval: 1 Acer 30.03 Gts / 8474 Sq. Yds (9.08%). Final layout order: 7,085.06 sq. m (9.08%). |
|---|---|
| Declared progress / verified status | Final order records the open spaces as taken over by the local authority by registered gift deed; no independent inspection is supplied. |
| Description / size | Listed as available in the RERA amenity record. |
|---|---|
| Declared progress / verified status | Amenity record shows 0% progress; architect certificate reports green strip/tot lot/park among the project works for the March 2025 quarter. |
| Description / size | Tentative approval: 0 Acer 21.49 Gts / 2600 Sq. Yds (2.79%). Final order: 2,174.0 sq. m (2.79%). |
|---|---|
| Declared progress / verified status | Final order says social infrastructure was handed over with roads, open spaces and utilities; independent completion verification is not supplied. |
| Description / size | Listed in the RERA amenity record; no size or quantity supplied. |
|---|---|
| Declared progress / verified status | Progress / completion not established in the supplied data. |
| Description / size | RERA amenity record includes an aggregate recreational open-space entry; no separate size supplied. |
|---|---|
| Declared progress / verified status | Progress / completion not established by the amenity percentage field. |
7. Utilities, building services & safety
The tentative layout approval requires the promoter to provide internal water supply pipelines, an overhead tank, a water reservoir, sewerage or septic-tank/STP arrangements, underground drainage, storm-water drains, electrical lines and transformer, street lighting, solid-waste management, avenue planting, park development and rainwater-harvesting pits. The final layout order records water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structures as layout provisions.
The RERA-filed architect certificate for the March 2025 quarter lists internal roads and footpaths, water supply, sewerage works (chambers, lines, septic tank and STP), storm-water drains, green strip/tot lot/park, street lighting and electrical meter room/sub-station/receiving station. It reports specified internal and external development works as completed; this is a certificate filed with RERA, not independent site verification in this report.
Water: Water supply, internal pipelines, reservoir and overhead tank are identified in the approval/certificate records. No source, storage capacity or treatment capacity is supplied.
Sewerage and drainage: Septic tank/STP, sewerage lines and chambers, underground drainage and storm-water drains are identified. No capacity or reuse specification is supplied.
Electrical: Transformer, electrical supply lines, street lights and electrical meter room/sub-station/receiving station are identified. No supply or backup capacity is supplied.
Waste and conservation: Solid-waste management and rainwater-harvesting pits/structures are specified. The supplied documents do not provide capacity or operational verification.
Fire, accessibility and security: The supplied material does not specify fire-system design, accessible circulation, CCTV, access control or security systems.
8. Location, access & connectivity
The registered location is Amangal, Amangal Mandal, Ranga Reddy District, Telangana, PIN 509321; the project land is identified as survey numbers 18/P and 29/P. The tentative layout approval names Amangal Revenue Village. The RERA certificate records locality as Ram Nagar.
The supplied location record gives coordinates 16.8497797, 78.5325679 for Amangal and a nearest sampled Outer Ring Road interchange distance of 43.4 km.
Promoter-marketing material describes the project as near Mucherla Pharma City and claims walking-distance access to the Hyderabad–Srisailam Highway, connection to Hyderabad through the Outer Ring Road, airport access and about 10 minutes to Gandimaisamma Temple. These are promoter-marketed claims, not independently measured distances or travel times in the supplied location record.
9. Developer & development status
The registered legal promoter is FORTUNE INFRA DEVELOPERS PVT LTD, a private limited company, GSTIN 36AAACF9926B1ZR. The supplied corporate address is FORTUNE HOUSE, JUBILEE HILLS, SURYA COTTON MILL BACK SIDE, AMANGAL, Amangal, Ranga Reddy, 509321. The registration certificate separately records the promoter office as Village/Mandal/District: Hyderabad, PIN 500033.
BATTULA SESHAGIRI RAO is identified in the project record as Chairperson and authorized signatory. The promoter’s Form B declaration, verified 10 June 2023, undertakes completion by 29/05/2025 and declares that the land is free from encumbrances. These are promoter declarations in the filed document.
The project header records 80% completeness. The architect’s March 2025 certificate reports specified layout works as completed, while the final layout order dated 27/04/2026 records release of the final layout. No independent site inspection, plot-wise inventory, or occupancy certificate for dwelling buildings is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400006316; issued 07/07/2023; valid through 29/05/2025 on the supplied certificate |
|---|---|
| What it evidences | Registration of FORTUNE-18 3 LP and stated registration conditions. |
| Identifier / date | 0002/LO/3134/2023; 30/05/2023; application 002560/LO/DTCP/3134/0004/2023 |
|---|---|
| What it evidences | Tentative approval for a 188-plot layout in survey numbers 18/P and 29/P, with development conditions and municipal mortgage arrangements. |
| Identifier / date | 2059/HMDA/SWFL/2026; 27/04/2026; application 015897/HMDA/04256/SWFL/SHZ/2026 |
|---|---|
| What it evidences | Amangal Municipality final layout order recording HMDA technical approval and release for 188 plots. |
| Identifier / date | 8139/2023; 20/05/2023 |
|---|---|
| What it evidences | Tentative-approval record of plots mortgaged in favour of the Municipality; the final order records gift-deed handover of roads, open spaces, social infrastructure and utilities under the same document number. |
| Identifier / date | 7571/2026; 25/04/2026 |
|---|---|
| What it evidences | Final-order record of relinquishment concerning mortgaged plots in favour of HMDA. |
| Identifier / date | Drawing stamp TS/017368/2023, dated 06-03-2023 |
|---|---|
| What it evidences | Layout drawing used for the supplied software-measured plot schedule and area breakdown; the drawing text extraction is flagged as needing review. |
| Identifier / date | March 2025 RERA quarter update; registration P02400006316 |
|---|---|
| What it evidences | Reports specified layout development works as completed. |
| Identifier / date | Verified 10 June 2023 |
|---|---|
| What it evidences | Promoter’s title, encumbrance and completion declarations, including the 29/05/2025 completion undertaking. |
| Identifier / date | Title report 330797; encumbrance statement 330809 |
|---|---|
| What it evidences | Project-filed title and encumbrance documents; detailed review is outside this overview. |
The supplied material does not include a building-specific commencement certificate, residential building plans, plot-wise booking status, or an occupancy certificate for homes. The layout drawing’s software-derived measurements are not a substitute for checking the stamped drawing and project-specific records.
Frequently asked questions
Is FORTUNE-18 3 LP registered with Telangana RERA?
Yes. FORTUNE-18 3 LP is registered with the Telangana Real Estate Regulatory Authority as P02400006316; the registration status is New Project.
Who is the developer of FORTUNE-18 3 LP?
The promoter named in the RERA registration is FORTUNE INFRA DEVELOPERS PVT LTD.
Where is FORTUNE-18 3 LP located?
FORTUNE-18 3 LP is in AMANGAL, Ram Nagar, Rangareddy, Telangana (509321).
When will FORTUNE-18 3 LP be completed?
The promoter's proposed date of completion filed with RERA is 29/05/2025. This is the promoter's declaration, not a guarantee.
More projects in Amangal