BREEZY HILLS is a plotted development in Amangal, Amangal Mandal, Ranga Reddy District. It is being developed by M/s.ALIENS DEVELOPERS PRIVATE LIMITED. The registered land area is 76,667.02 sq. m, and the filed tentative layout approval provides for 250 plots; no towers or floors are stated, and the plot sizes range from 77.6 sq. m to 362.83 sq. m (92.8 sq. yd to 433.9 sq. yd). Its TG-RERA registration number is P02400009147, and its proposed completion date is 27/06/2025.

More from Aliens Developers Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA
37documents on file - each fact links to its page
1court case on this project's land (survey 64, Amangal)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Amangal, Amangal, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameBREEZY HILLS RERA record
Project typePlotted development / tentative plotted layout RERA record RERA filing
Phase or registered portionA phase is not identified in the supplied record; registered site is in Survey No. 64/P. RERA record
TG-RERA registration numberP02400009147 RERA record
Registration period28/06/2023 to 27/06/2025, per the certificate. The supplied certificate records no extension.
RERA status in supplied recordRegistration certificate issued; status is “New Project.” The supplied record does not establish a current post-expiry registration status. RERA filing
Registered promoterM/s.ALIENS DEVELOPERS PRIVATE LIMITED, a company. RERA record Corporate record

Land and geographic identity

FieldProject record
LocalityAmangal RERA record RERA filing
Revenue villageVitaipally / Vittaipally as identified in the filed layout approval and RERA-filed land/title documents; the project record also lists Amangal as the village.
MandalAmangal RERA record
DistrictRanga Reddy (also rendered “Rangareddy” in the layout approval) RERA record
PIN509321 RERA record
Survey number(s) and subdivision(s)64/P is the registered project survey number. The supplied title materials also refer to Survey No. 64 and subdivisions including 64/A/2/1, 64/U/1, 64/EE/1, 64/VU/1 and 64/2/A/1; these references are not all stated as separate project-registration parcels. RERA record Land records
Registered site extentRERA land record: 76,667.02 sq. m. RERA filing Land records
Layout extent in filed approval18 Acer 37.78 Gts 91693 Sq. Yds.
Net/total area and boundariesRERA land details show total and net area both as 76,667.02 sq. m, with affected area 0 sq. m. Boundaries are recorded as “OTHERS LAND” on all four sides. RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityAmangal Municipality/Municipal Corporation; the RERA record identifies DTCP as the RERA authority. Approvals record
Principal approvalTentative Layout Plan No. 0004/LO/3134/2023, approved 28 June, 2023. Application No. 009792/LO/DTCP/3134/0006/2022. Approvals record
Approved developmentTentative layout for 250 plots, subject to the approval conditions.
Approved built-up areaRERA record: 38,568.04 sq. m. No building configuration or building count is supplied for this plotted layout. RERA filing
Floor/building configurationNot disclosed in the supplied project record; the approval is for a plotted layout, not a stated multi-storey building scheme.
ParkingNo project parking count, parking levels, or plot-wise parking allocation is established in the supplied record. RERA amenities

Offering and status

FieldProject record
Unit typePlots; the filed layout approval provides for 250 plots. RERA record
Plot count and size rangeSoftware-read from the approved layout drawing: 248 plots with sizes from 77.6 sq. m to 362.83 sq. m ( 92.8 sq. yd to 433.9 sq. yd). The drawing-derived count and sizes should be checked against the drawing; the RERA-filed approval states 250 plots. Layout record
Booked/available countsNot supplied in the available project evidence. RERA filing
Construction/development stageRERA-recorded progress data is incomplete: the available amenities record reports internal roads and footpaths at 10% and the other listed items at 0%; these are filed progress figures, not independent site verification. RERA amenities
Completion timelineProposed completion date: 27/06/2025. The Form-B declaration dated 15 November 2024 says the project was unlikely to meet that date, citing rocky terrain, and anticipates completion by 27 June 2025 while stating that the company would apply for extension/permissions. RERA record
Occupancy/completion certificateNo occupancy or completion certificate is included in the supplied record. Document index

2. The project story

BREEZY HILLS is registered as a plotted development at Amangal, in the revenue-village area described in the filed approval as Vitaipally, Amangal Mandal, Ranga Reddy District. Its registered land identity is Survey No. 64/P. The filed tentative layout approval describes a 250-plot scheme; the drawing-derived layout data identifies a plot schedule and software-reads 248 plots, with the drawing figures requiring verification against the original plan. RERA record RERA filing Layout record

The layout is intended to include plots, internal roads, open space, social-infrastructure land and utility land. The approval requires the developer to carry out the layout infrastructure and works, including roads, storm-water drains, underground drainage and a common septic tank/STP, internal water supply, an overhead tank, electrical lines and streetlights, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval requirements, not evidence that the works have been completed.

The RERA registration certificate ran from 28/06/2023 through 27/06/2025 and the supplied evidence does not establish an extension or a completion certificate. The Form-B declaration records the promoter’s expectation that the stated completion deadline would not be met, referring to rocky terrain, and its intention to apply for extension/permissions. Filed progress figures show 10% for internal roads and footpaths and 0% for the other listed infrastructure items; they are not independently verified site measurements. RERA amenities

3. Master plan, architecture & building design

This is a plotted layout rather than a documented apartment or multi-tower scheme. The filed tentative layout approval covers 18 Acer 37.78 Gts 91693 Sq. Yds in Survey No. 64/P and provides for 250 plots. The drawing-derived land-use table records 38,566.52 sq. m of plotted area, 28,067.98 sq. m of roads, 6,913.53 sq. m of parks/open space, 808.76 sq. m of utilities and 2,307.72 sq. m of social infrastructure; amenities are listed as 0.0 sq. m in that table. These software-read drawing figures are derived from the layout drawing and its area statement. Layout record

The approval document separately records 50.31% plotted area, 36.61% road area, 9.02% open space, 3.01% social infrastructure and 1.05% utilities. It identifies a 0 Acer 58.79 Gts 7113 Sq. Yds mortgage area, stated as 15.38% of plotted area.

No building footprint, building count, floors, tower heights, building parking levels or apartment/common-area configuration is established in the supplied record. The RERA-filed approved built-up area is 38,568.04 sq. m; it is not a plot saleable area or a carpet-area figure. RERA filing

4. Homes, configurations & floor plans

The RERA-filed offering is plots, not flats. The filed tentative layout approval states 250 plots. Software-measured layout data reports 248 plots, with a smallest size of 77.6 sq. m (92.8 sq. yd), median size of 146.32 sq. m (175.0 sq. yd) and largest size of 362.83 sq. m (433.9 sq. yd); the software-read plot schedule and sizes should be verified against the drawing. No booked or available inventory counts are supplied. Layout record

Plot-size band (sq. yd)Plots
0–1002
100–15060
150–200118
200–25051
250–3004
300–40011
400–5002

Layout record

No apartment floor plans or RERA-filed apartment saleable areas are supplied. The floor-plan record states that there are two layout sheets, with no flats on them; no carpet-area measurements were made. Plot area should not be treated as apartment carpet or saleable area. Floor plans Layout record

5. Parking & vehicle circulation

The layout approval identifies roads as 36.61% of the approved layout area and requires roads to remain open for access to neighbouring sites. It also requires road formation and related drainage and street works. The supplied evidence does not establish parking-space counts, visitor or accessible parking, parking facilities, vehicle-entry arrangements, or plot-specific parking allocations. Layout record

6. Amenities, recreation & open spaces

The layout approval describes required layout infrastructure and facilities. The progress percentages below are from the available project amenities record and do not independently verify construction or delivery.

Internal roads and footpaths
Description / sizeRoads and footpaths; road area in drawing-derived land-use table: 28,067.98 sq. m
Evidence sourceLayout record RERA amenities
Declared progress / verified status10% in available progress record; not independently verified
Parks / open space
Description / sizeApproval reserves 1 Acer 28.34 Gts 8269 Sq. Yds (9.02%); drawing-derived area 6,913.53 sq. m
Evidence sourceLayout record
Declared progress / verified status0% in available progress record; not independently verified
Social infrastructure land
Description / sizeApproval reserves 0 Acer 22.81 Gts 2760 Sq. Yds (3.01%); drawing-derived area 2,307.72 sq. m
Evidence sourceLayout record
Declared progress / verified statusNo completed facility or progress percentage established
Utility land
Description / sizeApproval reserves 0 Acer 7.99 Gts 967 Sq. Yds (1.05%); drawing-derived area 808.76 sq. m
Evidence sourceLayout record
Declared progress / verified status0% in available progress record; not independently verified
Community buildings
Description / sizeListed in amenities record without a size or description
Evidence sourceRERA amenities
Declared progress / verified statusNo progress percentage or delivery evidence supplied
Avenue planting and park development
Description / sizeRequired layout works; no dimensions or planting quantities supplied
Declared progress / verified statusNo independent completion evidence supplied

A third-party/vendor listing mentions a clubhouse, swimming pool, gym and children’s play area, but these are not established as approved or delivered facilities in the supplied TG-RERA project record. Promoter website

7. Utilities, building services & safety

The layout approval requires internal water-supply pipelines, an assured water source and an overhead tank; a common septic tank/STP and underground drainage lines; storm-water drains; electrical supply lines, streetlights and a transformer; solid-waste management; and rainwater-harvesting pits. The approval also identifies water-reservoir, septic-tank, STP, transformer and solid-waste-management land or facilities as relevant infrastructure. These are approval requirements; the supplied evidence does not establish capacities or completion.

The available amenities record lists water supply, sewerage, storm-water drainage, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and electrical-meter/substation/receiving-station items. Their recorded progress is 0%, except internal roads and footpaths at 10%. The record does not provide technical specifications, capacities, fire-clearance evidence, accessibility details or independent verification. RERA amenities

8. Location, access & connectivity

The registered location is Amangal, Ranga Reddy District, Telangana, PIN 509321; the filed layout approval identifies Vitaipally Revenue Village, Amangal Mandal. The RERA record describes all four site boundaries as “OTHERS LAND.” The supplied location record gives a cadastral parcel centroid of 17.41528, 78.35459. RERA record RERA filing Location record RERA filing

The layout approval requires the roads to remain open for access to neighbouring sites. No project-specific approach-road name, public-transport route or verified distance to a landmark is established in the supplied location data. Location record

9. Developer & development status

The registered promoter is M/s.ALIENS DEVELOPERS PRIVATE LIMITED, a company, identified by CIN: U70102TG2006PTC049552 and GSTIN: 36AAFCA7204E1Z2. The project record lists the promoter address as SPACE STATION, Tellapur, Vitaipally Revenue Village, Amangal, Ranga Reddy, 509321; the registration certificate’s promoter-office field gives Ranga Reddy and PIN 502032. Corporate record Parties record RERA filing

The project’s proposed completion date is 27/06/2025. In its Form-B declaration dated 15 November 2024, the promoter stated that rocky terrain had impeded progress, that the project was unlikely to be completed by the stated date, and that it anticipated completion by 27 June 2025 while intending to apply for extension/permissions. This is a promoter declaration, not independent progress verification. RERA record

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate P02400009147Form C records BREEZY HILLS, the promoter and Survey No. 64/P; registration validity is 28/06/2023–27/06/2025. The supplied record does not establish an extension.
Tentative Layout Plan 0004/LO/3134/2023Issued by Amangal Municipality/Municipal Corporation, dated 28 June, 2023, for a 250-plot layout in Survey No. 64/P, Vitaipally Revenue Village.
Layout applicationApplication No. 009792/LO/DTCP/3134/0006/2022.
Layout infrastructure mortgageThe approval identifies Mortgage Deed No. 8840/2023, dated 01 June, 2023, for specified plots in favour of Amangal Municipality/Municipal Corporation.
Form-B declarationPromoter declaration dated 15 November, 2024, concerning title basis, mortgage disclosure, completion expectations and project undertakings.
Occupancy/completion certificateNone supplied; the project is a plotted layout and no such certificate is established in the reviewed evidence. Document index

The layout approval is expressly a tentative approval and includes conditions concerning infrastructure works and the release of reserved areas and mortgaged plots. The detailed conditions and title evidence are addressed in the relevant Approvals and Land & Title sections.

Frequently asked questions

Is BREEZY HILLS registered with Telangana RERA?

Yes. BREEZY HILLS is registered with the Telangana Real Estate Regulatory Authority as P02400009147; the registration status is New Project.

Who is the developer of BREEZY HILLS?

The promoter named in the RERA registration is M/s.ALIENS DEVELOPERS PRIVATE LIMITED.

Where is BREEZY HILLS located?

BREEZY HILLS is in Amangal, Rangareddy, Telangana (509321).

When will BREEZY HILLS be completed?

The promoter's proposed date of completion filed with RERA is 27/06/2025. This is the promoter's declaration, not a guarantee.