Aratikayala METRO RESIDENCY

METRO PROJECTS · Medchal-Malkajgiri · RERA P02200003262

Aratikayala METRO RESIDENCY is a residential apartment project in Uppal Bhagat Village, Uppal Mandal, Medchal-Malkajgiri District, being developed by the registered promoter METRO PROJECTS. The project covers 1,672.64 Sq. Mt. and comprises one residential block, A (RESI BUILD), configured as 1Stilt + 5 upper floors. The RERA filing lists 41 apartments: 31 2BHK units of 93.26 Sq.mt. each and 10 3BHK units of 132.85 Sq.mt. each. Its TG-RERA registration is P02200003262, and the proposed completion date is 09/07/2025.

01What we found

Period endedTG-RERA registration ran to 9 Jul 2025 - check its extension on TG-RERA
9documents on file - each fact links to its page
1court case on this project's land (survey 2, Uppal Bhagat)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

ItemProject record
Registered nameAratikayala METRO RESIDENCY RERA record
Project type / categoryResidential apartment project RERA record
Phase / registered portionNo phase name is disclosed. The registration covers the project identified at Plot No. 914 and the survey numbers listed below. RERA record
TG-RERA registrationP02200003262, granted under section 5; recorded as effective from 25/08/2021 to 09/07/2025. The certificate says it may be extended by the Authority; no extension is evidenced in the supplied record. Approvals record
RERA statusThe supplied certificate records the registration period above. The available material does not establish a current extension or an occupancy/completion certificate. Approvals record
Registered promoterMETRO PROJECTS (also written “M/S METRO PROJECTS” in filed documents). RERA record Corporate record

Land and geographic identity

ItemProject record
Locality / revenue villageUppal Bhagat Village; the title documents also use “Uppal Bhagath.” RERA record Land records
MandalUppal RERA record Land records
DistrictMedchal-Malkajgiri RERA record Land records
PIN500039 RERA record Land records
Plot number914 RERA filing
Project survey numbers1 to 40, 282 to 368, 369(p), 370 to 373, 374(p), 375 to 387, 395 to 401, 454, 456 to 459, 505(p), 510 to 564 Land records
Registered site extent1,672.64 Sq. Mt. in the HMDA technical approval; the RERA land record also states total/net area of 1672.64 sqmts. RERA filing
BoundariesEast: Road; North: Road; West: Plot No 907; South: Plot No 913. RERA filing

Development identity

ItemProject record
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalTechnical Approval Accorded, No. 021341/GHT/R1/U6/HMDA/08032019, dated 09/07/2019. The approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval. Approvals record
BuildingOne residential block, identified as A (RESI BUILD)
Sanctioned floor configuration1Stilt + 5 upper floors
Approved built-up area4126.15 as stated in the sanctioned parameters; the same approval separately records Proposed Built-up Area 5098.36. These are kept as distinct figures as labelled in that document.
Building height14.95 (unit not stated in the supplied extract)
Mortgage recorded in approval420.50 sq. mts of built-up area, described as 10.00% mortgage in favour of MC, HMDA; the approval says the mortgaged built-up area is registrable only after an Occupancy Certificate is produced.
Unit countRERA filing records 41 units: 31 2BHK and 10 3BHK. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations and saleable areas2BHK: 31 units, 93.26 Sq.mt. each as recorded; 3BHK: 10 units, 132.85 Sq.mt. each as recorded. RERA unit table RERA unit details
Booked / availablePortal figures show 0 booked and 41 available (31 2BHK and 10 3BHK). The portal extract has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Promoter-declared completion undertakingForm B states completion within 6 Years; the declaration date is recorded as 2021, with the day illegible.
RERA-filed proposed completion09/07/2025 RERA record RERA filing
Registration validity25/08/2021–09/07/2025; this is the registration period, not an occupancy certificate.
Construction stage / OC statusCurrent construction progress and an occupancy or completion certificate are not established by the supplied records. The HMDA approval requires a completion notice and occupancy certificate before occupation.

2. The project story

Aratikayala METRO RESIDENCY is registered as a residential apartment project on Plot No. 914 in Uppal Bhagat Village, Uppal Mandal, Medchal-Malkajgiri District. The RERA record identifies a site of 1672.64 sq. metres and one residential building. HMDA’s technical approval describes block A as 1 stilt plus 5 upper floors. RERA record RERA filing

The RERA filing lists 41 apartments—31 2BHK and 10 3BHK—with no units shown as booked in the supplied portal snapshot. Those counts are portal-record figures without an as-of date, not independently verified current inventory. RERA unit table RERA unit details

The project’s RERA registration certificate records validity through 09/07/2025. The promoter’s Form B separately undertakes completion within 6 Years, while the RERA project information gives a proposed completion date of 09/07/2025. The supplied material does not establish construction progress or an issued occupancy/completion certificate; the building should therefore not be described here as complete or occupancy-certified. RERA filing

3. Master plan, architecture & building design

The approved project record is for one residential block, A (RESI BUILD), configured as 1Stilt + 5 upper floors. The HMDA technical approval lists an approved built-up area of 4126.15, a separate proposed built-up area of 5098.36, and a building height of 14.95 (unit not stated in the supplied extract). These are approval-document figures; no FSI-counted area, carpet area, floor-by-floor apartment schedule, or building footprint is supplied.

The approval records a 420.50 sq. mts mortgage of built-up area in favour of MC, HMDA, described as 10.00% of the built-up area and located on the First and Second floor.

No drawing-derived detail is available in the supplied floor-plan data: two drawings are recorded, but neither has measured flats. The evidence does not specify apartment numbers per floor, lift or stair counts, entries and exits, circulation layout, landscaping/open-space dimensions, or a residential/common-area split. Floor plans

4. Homes, configurations & floor plans

The TG-RERA filing lists 41 apartments across two configurations. The supplied portal snapshot records no bookings, but does not provide an as-of date. Saleable areas below are RERA-filed figures; no software-measured carpet-area or loading figures are available. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK3103193.26 Sq.mt.Not measured in supplied drawing dataNot supplied
3BHK10010132.85 Sq.mt.Not measured in supplied drawing dataNot supplied

The drawing review data records two drawings and zero measured flats. Accordingly, no drawing-based room measurements, room layouts, balcony or utility areas, or typical floor arrangements can be described from the supplied evidence. RERA saleable area is not a carpet-area measurement; no project-specific carpet-area figure is available here. Floor plans RERA unit details

5. Parking & vehicle circulation

HMDA’s technical approval states that the cellar and stilts approved for parking in the plan should be used exclusively for parking vehicles without partition walls and rolling shutters. However, the supplied approval extract identifies the building as 1Stilt + 5 and does not give a parking-space count, a separate cellar configuration, or the number or location of individual bays. The RERA filing also does not supply parking counts or unit-wise parking allocations in the available data.

The approval requires a transformer space to be provided on site, but the supplied material does not specify vehicle-entry arrangements, ramps, visitor or accessible parking, EV charging, or legally documented exclusive parking allocations. A parking bay shown in a plan, by itself, would not establish exclusive ownership.

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities and infrastructure items, with the supplied progress values shown as 0 where provided. “Available: YES” is a filed availability entry, not independent verification of installation or completion. No facility is independently confirmed complete in the supplied evidence. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsListed; no size statedRERA amenitiesProgress 0%; completion not independently verified
Water SupplyListed; no source or capacity stated in this RERA amenity entryRERA amenitiesAvailable: YES; progress 0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Listed; no capacity statedRERA amenitiesAvailable: YES; progress 0%; completion not independently verified
Storm Water DrainsListed; no details statedRERA amenitiesProgress 0%; completion not independently verified
Green Strip/TOT LOT/ParkListed; no area or dimensions statedRERA amenitiesAvailable: YES; progress 0%; completion not independently verified
Street LightingListed; no details statedRERA amenitiesProgress 0%; completion not independently verified
Community BuildingsListed; no size or use statedRERA amenitiesProgress 0%; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterListed; no details statedRERA amenitiesProgress 0%; completion not independently verified
Solid Waste Management and DisposalListed; no system details statedRERA amenitiesAvailable: YES; progress 0%; completion not independently verified
Water Conservation, Rain Water HarvestingListed; no capacity statedRERA amenitiesAvailable: YES; progress 0%; approval requires a rainwater-harvesting structure; completion not independently verified
Energy managementListed; no details statedRERA amenitiesProgress 0%; completion not independently verified
Fire Protection and Fire Safety RequirementsListed; no system details statedRERA amenitiesProgress 0%; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationListed; no capacity statedRERA amenitiesAvailable: YES; progress 0%; approval requires transformer space; completion not independently verified
Aggregate area of recreational Open SpaceListed; no area statedRERA amenitiesProgress 0%; completion not independently verified
LiftListed; no number, type or capacity statedRERA amenitiesAvailable: YES; progress 0%; completion not independently verified

The supplied vendor data additionally lists a swimming pool, but it does not provide a size, capacity, progress status, or confirmation that the facility is sanctioned or delivered. Promoter website

7. Utilities, building services & safety

The RERA amenity list includes water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and a lift. Apart from entries marked “Available: YES,” no capacities, system designs, or completion evidence are supplied. The progress entries shown in the amenity data are 0%; completion is not independently verified. RERA amenities

HMDA’s technical approval requires a rainwater-harvesting percolation pit, transformer space, and a garbage house within the premises. It also states that the stilt/cellar parking area is to be used exclusively for parking and that an occupancy certificate is compulsory before occupation. These are approval conditions; the supplied records do not establish that the works have been completed or that statutory compliance has been confirmed.

The vendor record describes water supply as “Corporation and Borewell,” but gives no capacities or supporting project-specific technical document. No water-storage or treatment capacity, STP capacity or reuse arrangement, backup-power details, lift capacity/count, fire-system specifications, CCTV/security configuration, or accessibility details are established in the supplied evidence. Promoter website RERA amenities

8. Location, access & connectivity

The registered location is Plot No. 914, Uppal Bhagat Village, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039. The filed site boundaries identify roads on the east and north, Plot No 907 on the west, and Plot No 913 on the south. RERA record RERA filing

The supplied location record gives the Financial District (Nanakramguda) at 1.2 km as an anchor distance. It also provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459. No approach-road names, public-transport routes, or further measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is METRO PROJECTS, identified in the RERA record as a Partnership. The project record supplies GSTIN 36ABHFM3868L1ZN and lists Vinod Kumar Bukka as authorized signatory and Rama Krishnaiah Bukka as partner. The supplied registration certificate gives a promoter-office address of Village: SBH Colony, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500060. Corporate record Parties record

Form B is a promoter declaration by VINDO KUMAR BUKKA as authorised signatory. It states a six-year completion undertaking and includes declarations concerning project funds, approvals, audits, and allottee obligations. The declaration’s year is recorded as 2021, with its day illegible.

The RERA record gives 09/07/2025 as the proposed completion date, while the registration certificate records registration validity to that date. The supplied material does not document a registration extension, current construction progress, or an occupancy/completion certificate. These items should be treated separately: a registration end date or completion undertaking is not evidence that the project is complete or occupancy-certified. RERA filing

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate, P02200003262Form C records registration of Aratikayala METRO RESIDENCY under section 5, commencing 25/08/2021 and ending 09/07/2025.
HMDA Technical Approval Accorded, 021341/GHT/R1/U6/HMDA/08032019, dated 09/07/2019Technical approval for a residential building at Plot No. 914 in Uppal Bhagat Village; identifies block A as 1Stilt + 5 and records approval conditions. It directs that building plans be sanctioned by the Executive Authority in conformity with the technical approval.
Registered mortgage cited in the HMDA approval, Doc No. 6958/2019, dated 6/5/2019The approval records mortgage of 420.50 sq. mts of built-up area in favour of MC, HMDA; it states that the mortgaged built-up area may be registered only after an Occupancy Certificate is produced.
Form B declarationPromoter declaration by VINDO KUMAR BUKKA as authorised signatory of M/S METRO PROJECTS, including the six-year completion undertaking and prescribed project-fund and compliance declarations.
Occupancy/completion certificateNo such certificate is present in the supplied project evidence. Document index
Approved layout / detailed drawing recordThe supplied material identifies the HMDA technical approval, but does not provide a separately evidenced approved-layout record or measured apartment floor plans in the data available for this Overview. Approvals record Floor plans

The HMDA approval lists survey numbers 1to40, 282to368, 369(P), 370to373, 374 (P), 375to387, 395to401, 454, 456to459, 505(P), 510to564; the RERA certificate lists 1 to 40, 282 to 368, 369(p), 370 to 373, 374(p), 375 to 387, 395 to 401, 454, 456 to 459, 505(p), 510 to 564. The project identity table above preserves the RERA-listed survey numbers and subdivisions.

Frequently asked questions

Is Aratikayala METRO RESIDENCY registered with Telangana RERA?

Yes. Aratikayala METRO RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200003262; the registration status is New Project.

Who is the developer of Aratikayala METRO RESIDENCY?

The promoter named in the RERA registration is METRO PROJECTS.

Where is Aratikayala METRO RESIDENCY located?

Aratikayala METRO RESIDENCY is in Uppal Bhagat Village, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will Aratikayala METRO RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 09/07/2025. This is the promoter's declaration, not a guarantee.