Ar Anmol Developers
AR ANMOL DEVELOPERS · Medchal-Malkajgiri · RERA P02200001948
AR ANMOL DEVELOPERS is a plotted development, described as a proposed open-plot gated-community layout, at VOLVO SERVICE CENTER OPP. ROAD, Bachupally mandal, Medchal-Malkajgiri district. The registered promoter developing it is AR ANMOL DEVELOPERS, a partnership. The layout covers 32379.78 Sq.Mt. and identifies 95 plots, with drawing-measured plot sizes of 124.58–790.14 sq m (149–945 sq yd); tower, block and floor counts are not stated. Its TG-RERA registration is P02200001948, and its proposed completion is 31/03/2020.
More from Ar Anmol Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | AR ANMOL DEVELOPERS RERA record |
| Project type | Plotted development / proposed open-plot gated-community layout RERA record RERA filing |
| Phase or registered portion | Phase not separately identified; the registration record names the project as a whole. RERA record |
| TG-RERA registration | P02200001948 RERA record |
| Registration validity | The certificate records issue/commencement on 06/07/2020 and expiry on 31/03/2020, and describes the term as “0 years.” The supplied record states no extension. |
| Registered promoter | AR ANMOL DEVELOPERS, described in the project record as a partnership. RERA record RERA filing |
| RERA status | The supplied certificate records a grant of registration under section 5; the supplied dates are reproduced above, without treating registration validity as the project completion deadline. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address description | VOLVO SERVICE CENTER OPP. ROAD RERA record RERA filing |
| Revenue village | Bachupally in the project record; the HMDA draft-layout letter also uses Bachpalle Village. RERA record |
| Mandal | Bachupally RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500090 RERA record |
| Survey numbers / subdivisions | Project record: Survey No. 332. The HMDA draft-layout letter also identifies 332/p in its survey list and refers to plot Nos. in Sy. No. 332/p. RERA record Land records |
| Registered site extent | 32379.78 Sq.Mt. in the HMDA draft-layout letter. |
| Net / total area | RERA land record gives total and net area as 32379.78 sq m; the HMDA draft-layout letter also records total and net site area as 32379.78 Sq.Mt. RERA filing |
| Boundaries | North: 40 FEET WIDE ROAD; South: SURVEY NO 332 PART; East: SURVEY NO 332 PART; West: SY NO 332 PART AND SY NO1171 OF AMEENPER VILLAGE. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft layout letter / approval No. 000054/LO/Plg/HMDA/2018, dated 06 April, 2018. The filed letter says it technically approves and forwards a draft layout proposal to Bachupally Gram Panchayath for further action and release. Approvals record |
| File / application reference | File No. 002297/MED/LT/U6/HMDA/24072017; the letter also prints application reference 002297/MED/LT/UG/HMDA/24072017 dated 07 February, 2018. Approvals record |
| Approved built-up area | Not applicable/not disclosed as a building figure in the supplied records for this plotted layout. The RERA form lists 19439.51 sq m as approved built-up area, while the layout drawing labels 19439.51 as plotted area; this table does not treat that as a building-area specification. RERA filing |
| Buildings, floors and parking levels | No building count, floor configuration or structured parking levels are established in the supplied project records. The HMDA letter says buildings are not to be constructed on plots until final layout release. |
| Layout plot count | 95 plots, read by software from the approved-layout drawing; verify against the drawing. Layout record |
| Final-layout status | The supplied HMDA document is identified as a draft layout and sets out conditions before release of the final layout. A final layout release is not included in the supplied evidence. |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots in a proposed residential layout; no RERA unit-type inventory, booked/available count or plot-wise sales status is supplied. RERA filing Layout record |
| Plot sizes | Software-measured from the drawing: 124.58–790.14 sq m (149–945 sq yd); median 142.14 sq m (170 sq yd). Verify against the drawing. Layout record |
| Construction stage | RERA record labels the project New Project; the supplied RERA amenity fields report selected infrastructure percentages, but these are not independent site verification. RERA filing RERA amenities |
| Completion dates | Header records proposed completion 31/03/2020. Form B documents state completion undertakings, including one with the extracted wording “315 August, 2024” and another stating 31 August, 2024; these are promoter declarations, not proof of completion. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. Document index |
2. The project story
This is a plotted residential layout in Survey No. 332 at Bachupally, Medchal-Malkajgiri, rather than a tower or apartment scheme. The filed proposal covers 32379.78 Sq.Mt. and is described by HMDA as an open-plot gated-community layout. The drawing-derived layout record identifies 95 plots; plot sizes are software-measured and should be checked against the plan. Layout record
The HMDA letter is a draft-layout document dated 06 April, 2018. It records technical approval and forwarding to Bachupally Gram Panchayath for further action and release, and specifies that the final layout plan is to be released only after stated development and handover conditions. The supplied evidence does not establish that final release occurred.
RERA records the project as a New Project and gives proposed completion as 31/03/2020. Promoter Form B declarations separately state completion undertakings; these are declarations and do not establish actual progress or completion. RERA’s reported infrastructure percentages are filing data, not an independent inspection of the site. RERA filing RERA record RERA amenities
3. Master plan, architecture & building design
The proposed layout drawing allocates the 32379.78 sq m net layout area as follows. These are areas printed in the drawing; the percentage shares are software-derived from its area statement. Layout record
| Layout use | Area |
|---|---|
| Plotted area | 19439.51 sq m |
| Roads | 9589.27 sq m |
| Parks / open space | 2539.27 sq m |
| Social infrastructure | 811.72 sq m |
The drawing identifies 95 plots and internal roads, with widths printed at multiple locations. The HMDA letter lists 30' wide road and 40' wide road; the registered land boundary also identifies a 40-foot-wide road to the north. The supplied records do not establish a building footprint, residential floor configuration, tower arrangement or apartment common-area plan. Layout record RERA filing
The draft-layout letter describes required layout works including road formation, storm-water drainage, underground drainage and common septic tank/STP, internal water pipelines and overhead tank, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are stated development conditions, not confirmation that the works are complete.
4. Homes, configurations & floor plans
This is a plotted layout, and the supplied RERA data does not provide plot-wise RERA configuration counts, booked/available inventory or RERA saleable-area figures. The following plot count and size distribution are software-measured from the layout drawing, not RERA-filed inventory; verify them against the plan. Layout record
| Plot information | Drawing-derived record |
|---|---|
| Plots identified | 95 |
| Smallest–largest | 124.58–790.14 sq m (149–945 sq yd) |
| Median | 142.14 sq m (170 sq yd) |
| Size bands | 100–150 sq yd: 5; 150–200 sq yd: 63; 200–250 sq yd: 11; 250–300 sq yd: 5; 300–400 sq yd: 1; 500–1000 sq yd: 10 |
| Common printed plot sizes | 170 sq yd: 42 plots; 175 sq yd: 7; 182 sq yd: 6; 149 sq yd: 5; 250 sq yd: 4 |
The floor-plan review records two layout sheets and no apartment floor plans with homes to measure. Carpet-area measurements for dwellings therefore are not available. Plot area is not apartment carpet area or saleable area. Floor plans Layout record
5. Parking & vehicle circulation
No sanctioned parking count, visitor or accessible parking provision, parking levels, parking allocation to individual plots, EV charging provision, or resident/visitor arrangement is established in the supplied records. The layout includes internal roads, and the HMDA draft letter requires roads to be formed and kept open for access to neighbouring sites; it also refers to road formation, side drains and related works. These are layout conditions, not evidence that the works have been completed.
The layout drawing marks 18 plots—Nos. 37–40, 84–90 and 91–97—as mortgage area, extent 3061.92. This is a mortgage designation in the plan, not evidence of parking allocation.
6. Amenities, recreation & open spaces
| Description / size | 2539.27 sq m |
|---|---|
| Evidence source | HMDA draft-layout letter and layout drawing |
| Declared progress / verified status | Required for development and handover under the draft-layout conditions; no independent completion verification supplied. |
| Description / size | 811.72 sq m |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Identified for handover to the local body before final layout release; completion not verified in the supplied evidence. |
| Description / size | No size stated |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Listed as a layout development condition; completion not independently verified. |
The RERA filing lists Internal Roads & Footpaths, Water Supply, Sewerage, Storm Water Drains, Green Strip/TOT LOT/Park, Street Lighting and Water Conservation, Rain water Harvesting as available, with reported percentages of 50%, 55%, 70%, 10%, 10%, 80% and 50%, respectively. These are filing-reported progress figures, not independent verification. RERA amenities
A third-party listing mentions a swimming pool, gym, clubhouse, children’s play area, common garden, power backup, fire safety, CCTV security and covered car parking. These are vendor-reported features, not established by the supplied TG-RERA or HMDA layout evidence. Promoter website
7. Utilities, building services & safety
The HMDA draft-layout conditions describe the proposed layout infrastructure, including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage and a common septic tank/STP; storm-water drainage and nala channelization; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. The document describes these as works to be undertaken; no capacities or independent completion verification are supplied.
RERA’s filed progress fields report water supply at 55%, sewerage at 70%, storm-water drains at 10%, street lighting at 80% and water conservation/rainwater harvesting at 50%. The filing shows 0% for fire protection and fire-safety requirements, electrical meter room/substation/receiving station, energy management, treatment and disposal of sewage and sullage water, and solid-waste management and disposal. These are RERA-reported figures, not a technical inspection or a statutory-compliance determination. RERA amenities
No project-specific evidence establishes water-source details, storage capacity, treatment or reuse capacity, electrical backup, EV charging, fire-system specifications, security systems, or accessibility features. Document index RERA amenities
8. Location, access & connectivity
The registered project location is VOLVO SERVICE CENTER OPP. ROAD, Bachupally village and mandal, Medchal-Malkajgiri district, Telangana 500090. The HMDA draft-layout letter identifies Bachupally Gram Panchayath and gives the northern boundary as a 40 FEET WIDE ROAD. RERA record RERA filing
Supplied location data lists these distances: Location record
| Nearby place / service | Distance |
|---|---|
| Nearest Metro: Miyapur | 5.1 km |
| National bank | 0.2 km |
| New Mallampet Bus Stop | 2.0 km |
| Sri Chaitanya Jr. College | 0.5 km |
| Sri Swastik Multispeciality Hospital | 0.3 km |
| Dr. Reddy's Laboratories Limited | 1.7 km |
| PPZ Park | 0.3 km |
| Silver Oaks | 0.2 km |
The supplied evidence does not provide measured travel times. Location record
9. Developer & development status
The registered promoter is AR ANMOL DEVELOPERS, recorded as a partnership. The project record names NAGABADHRI RAJU M, INTHA HARI RAHA REDDY and DUBBAKA MAHIPAL REDDY as partners, and SANGAREDDYPETA PRAKASH as authorized signatory. RERA record RERA filing Corporate record
The registration certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project record separately gives the address at Hemadurga Plaza, Miyapur Allwyn X Road, Bachupally, Medchal-Malkajgiri, 500090. Corporate record
The HMDA draft-layout letter assigns layout development work to the applicant/developer and requires specified roads, drainage, utilities, planting and park works. No independently verified construction-stage report or final completion evidence is supplied. RERA amenities No occupancy or completion certificate is included in the reviewed documents. Document index
10. Approvals, official records & documents
| Record | Evidence in supplied file |
|---|---|
| TG-RERA registration | Form C for P02200001948, granted to AR ANMOL DEVELOPERS; certificate states issue/commencement 06/07/2020 and expiry 31/03/2020. |
| HMDA layout record | Draft layout letter / approval No. 000054/LO/Plg/HMDA/2018, dated 06 April, 2018, concerning Survey No. 332 and 332/p; forwarded to Bachupally Gram Panchayath for further action and release. |
| Layout drawing | Proposed residential draft-layout plan dated 6-04-2018, showing the site areas, land-use allocations and mortgage plots. |
| Title and promoter declarations | Form B declarations filed by S. Prakash for AR Anmol Developers, dated 26th day of January 2019; they state title and encumbrance declarations and include promoter undertakings. |
| Completion / occupancy evidence | No completion certificate or occupancy certificate is present in the supplied document set. Document index |
The reviewed approval document is described as a draft layout letter, and the evidence supplied does not include a final layout release. The detailed conditions are recorded in the HMDA letter.
1. Project at a glance
Project identity
Registered project name: AR ANMOL DEVELOPERS
Project type: Plotted development / proposed open-plot gated-community layout
Phase or registered portion: Phase not separately identified; the registration record names the project as a whole.
TG-RERA registration: P02200001948
Registration validity: The certificate records issue/commencement on 06/07/2020 and expiry on 31/03/2020, and describes the term as “0 years.” The supplied record states no extension.
Registered promoter: AR ANMOL DEVELOPERS, described in the project record as a partnership.
RERA status: The supplied certificate records a grant of registration under section 5; the supplied dates are reproduced above, without treating registration validity as the project completion deadline.
Land and geographic identity
Locality / address description: VOLVO SERVICE CENTER OPP. ROAD
Revenue village: Bachupally in the project record; the HMDA draft-layout letter also uses Bachpalle Village.
Mandal: Bachupally
District: Medchal-Malkajgiri
PIN: 500090
Survey numbers / subdivisions: Project record: Survey No. 332. The HMDA draft-layout letter also identifies 332/p in its survey list and refers to plot Nos. in Sy. No. 332/p.
Registered site extent: 32379.78 Sq.Mt. in the HMDA draft-layout letter.
Net / total area: RERA land record gives total and net area as 32379.78 sq m; the HMDA draft-layout letter also records total and net site area as 32379.78 Sq.Mt.
Boundaries: North: 40 FEET WIDE ROAD; South: SURVEY NO 332 PART; East: SURVEY NO 332 PART; West: SY NO 332 PART AND SY NO1171 OF AMEENPER VILLAGE.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout letter / approval No. 000054/LO/Plg/HMDA/2018, dated 06 April, 2018. The filed letter says it technically approves and forwards a draft layout proposal to Bachupally Gram Panchayath for further action and release.
File / application reference: File No. 002297/MED/LT/U6/HMDA/24072017; the letter also prints application reference 002297/MED/LT/UG/HMDA/24072017 dated 07 February, 2018.
Approved built-up area: Not applicable/not disclosed as a building figure in the supplied records for this plotted layout. The RERA form lists 19439.51 sq m as approved built-up area, while the layout drawing labels 19439.51 as plotted area; this table does not treat that as a building-area specification.
Buildings, floors and parking levels: No building count, floor configuration or structured parking levels are established in the supplied project records. The HMDA letter says buildings are not to be constructed on plots until final layout release.
Layout plot count: 95 plots, read by software from the approved-layout drawing; verify against the drawing.
Final-layout status: The supplied HMDA document is identified as a draft layout and sets out conditions before release of the final layout. A final layout release is not included in the supplied evidence.
Offering and status
Offering: Plots in a proposed residential layout; no RERA unit-type inventory, booked/available count or plot-wise sales status is supplied.
Plot sizes: Software-measured from the drawing: 124.58–790.14 sq m (149–945 sq yd); median 142.14 sq m (170 sq yd). Verify against the drawing.
Construction stage: RERA record labels the project New Project; the supplied RERA amenity fields report selected infrastructure percentages, but these are not independent site verification.
Completion dates: Header records proposed completion 31/03/2020. Form B documents state completion undertakings, including one with the extracted wording “315 August, 2024” and another stating 31 August, 2024; these are promoter declarations, not proof of completion.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records.
2. The project story
This is a plotted residential layout in Survey No. 332 at Bachupally, Medchal-Malkajgiri, rather than a tower or apartment scheme. The filed proposal covers 32379.78 Sq.Mt. and is described by HMDA as an open-plot gated-community layout. The drawing-derived layout record identifies 95 plots; plot sizes are software-measured and should be checked against the plan.
The HMDA letter is a draft-layout document dated 06 April, 2018. It records technical approval and forwarding to Bachupally Gram Panchayath for further action and release, and specifies that the final layout plan is to be released only after stated development and handover conditions. The supplied evidence does not establish that final release occurred.
RERA records the project as a New Project and gives proposed completion as 31/03/2020. Promoter Form B declarations separately state completion undertakings; these are declarations and do not establish actual progress or completion. RERA’s reported infrastructure percentages are filing data, not an independent inspection of the site.
3. Master plan, architecture & building design
The proposed layout drawing allocates the 32379.78 sq m net layout area as follows. These are areas printed in the drawing; the percentage shares are software-derived from its area statement.
Plotted area: 19439.51 sq m
Roads: 9589.27 sq m
Parks / open space: 2539.27 sq m
Social infrastructure: 811.72 sq m
The drawing identifies 95 plots and internal roads, with widths printed at multiple locations. The HMDA letter lists 30' wide road and 40' wide road; the registered land boundary also identifies a 40-foot-wide road to the north. The supplied records do not establish a building footprint, residential floor configuration, tower arrangement or apartment common-area plan.
The draft-layout letter describes required layout works including road formation, storm-water drainage, underground drainage and common septic tank/STP, internal water pipelines and overhead tank, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are stated development conditions, not confirmation that the works are complete.
4. Homes, configurations & floor plans
This is a plotted layout, and the supplied RERA data does not provide plot-wise RERA configuration counts, booked/available inventory or RERA saleable-area figures. The following plot count and size distribution are software-measured from the layout drawing, not RERA-filed inventory; verify them against the plan.
Plots identified: 95
Smallest–largest: 124.58–790.14 sq m (149–945 sq yd)
Median: 142.14 sq m (170 sq yd)
Size bands: 100–150 sq yd: 5; 150–200 sq yd: 63; 200–250 sq yd: 11; 250–300 sq yd: 5; 300–400 sq yd: 1; 500–1000 sq yd: 10
Common printed plot sizes: 170 sq yd: 42 plots; 175 sq yd: 7; 182 sq yd: 6; 149 sq yd: 5; 250 sq yd: 4
The floor-plan review records two layout sheets and no apartment floor plans with homes to measure. Carpet-area measurements for dwellings therefore are not available. Plot area is not apartment carpet area or saleable area.
5. Parking & vehicle circulation
No sanctioned parking count, visitor or accessible parking provision, parking levels, parking allocation to individual plots, EV charging provision, or resident/visitor arrangement is established in the supplied records. The layout includes internal roads, and the HMDA draft letter requires roads to be formed and kept open for access to neighbouring sites; it also refers to road formation, side drains and related works. These are layout conditions, not evidence that the works have been completed.
The layout drawing marks 18 plots—Nos. 37–40, 84–90 and 91–97—as mortgage area, extent 3061.92. This is a mortgage designation in the plan, not evidence of parking allocation.
6. Amenities, recreation & open spaces
| Description / size | 2539.27 sq m |
|---|---|
| Evidence source | HMDA draft-layout letter and layout drawing |
| Declared progress / verified status | Required for development and handover under the draft-layout conditions; no independent completion verification supplied. |
| Description / size | 811.72 sq m |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Identified for handover to the local body before final layout release; completion not verified in the supplied evidence. |
| Description / size | No size stated |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Listed as a layout development condition; completion not independently verified. |
The RERA filing lists Internal Roads & Footpaths, Water Supply, Sewerage, Storm Water Drains, Green Strip/TOT LOT/Park, Street Lighting and Water Conservation, Rain water Harvesting as available, with reported percentages of 50%, 55%, 70%, 10%, 10%, 80% and 50%, respectively. These are filing-reported progress figures, not independent verification.
A third-party listing mentions a swimming pool, gym, clubhouse, children’s play area, common garden, power backup, fire safety, CCTV security and covered car parking. These are vendor-reported features, not established by the supplied TG-RERA or HMDA layout evidence.
7. Utilities, building services & safety
The HMDA draft-layout conditions describe the proposed layout infrastructure, including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage and a common septic tank/STP; storm-water drainage and nala channelization; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. The document describes these as works to be undertaken; no capacities or independent completion verification are supplied.
RERA’s filed progress fields report water supply at 55%, sewerage at 70%, storm-water drains at 10%, street lighting at 80% and water conservation/rainwater harvesting at 50%. The filing shows 0% for fire protection and fire-safety requirements, electrical meter room/substation/receiving station, energy management, treatment and disposal of sewage and sullage water, and solid-waste management and disposal. These are RERA-reported figures, not a technical inspection or a statutory-compliance determination.
No project-specific evidence establishes water-source details, storage capacity, treatment or reuse capacity, electrical backup, EV charging, fire-system specifications, security systems, or accessibility features.
8. Location, access & connectivity
The registered project location is VOLVO SERVICE CENTER OPP. ROAD, Bachupally village and mandal, Medchal-Malkajgiri district, Telangana 500090. The HMDA draft-layout letter identifies Bachupally Gram Panchayath and gives the northern boundary as a 40 FEET WIDE ROAD.
Supplied location data lists these distances:
Nearest Metro: Miyapur: 5.1 km
National bank: 0.2 km
New Mallampet Bus Stop: 2.0 km
Sri Chaitanya Jr. College: 0.5 km
Sri Swastik Multispeciality Hospital: 0.3 km
Dr. Reddy's Laboratories Limited: 1.7 km
PPZ Park: 0.3 km
Silver Oaks: 0.2 km
The supplied evidence does not provide measured travel times.
9. Developer & development status
The registered promoter is AR ANMOL DEVELOPERS, recorded as a partnership. The project record names NAGABADHRI RAJU M, INTHA HARI RAHA REDDY and DUBBAKA MAHIPAL REDDY as partners, and SANGAREDDYPETA PRAKASH as authorized signatory.
The registration certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project record separately gives the address at Hemadurga Plaza, Miyapur Allwyn X Road, Bachupally, Medchal-Malkajgiri, 500090.
The HMDA draft-layout letter assigns layout development work to the applicant/developer and requires specified roads, drainage, utilities, planting and park works. No independently verified construction-stage report or final completion evidence is supplied. No occupancy or completion certificate is included in the reviewed documents.
10. Approvals, official records & documents
TG-RERA registration: Form C for P02200001948, granted to AR ANMOL DEVELOPERS; certificate states issue/commencement 06/07/2020 and expiry 31/03/2020.
HMDA layout record: Draft layout letter / approval No. 000054/LO/Plg/HMDA/2018, dated 06 April, 2018, concerning Survey No. 332 and 332/p; forwarded to Bachupally Gram Panchayath for further action and release.
Layout drawing: Proposed residential draft-layout plan dated 6-04-2018, showing the site areas, land-use allocations and mortgage plots.
Title and promoter declarations: Form B declarations filed by S. Prakash for AR Anmol Developers, dated 26th day of January 2019; they state title and encumbrance declarations and include promoter undertakings.
Completion / occupancy evidence: No completion certificate or occupancy certificate is present in the supplied document set.
The reviewed approval document is described as a draft layout letter, and the evidence supplied does not include a final layout release. The detailed conditions are recorded in the HMDA letter.
Frequently asked questions
Is AR ANMOL DEVELOPERS registered with Telangana RERA?
Yes. AR ANMOL DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P02200001948; the registration status is New Project.
Who is the developer of AR ANMOL DEVELOPERS?
The promoter named in the RERA registration is AR ANMOL DEVELOPERS.
Where is AR ANMOL DEVELOPERS located?
AR ANMOL DEVELOPERS is in VOLVO SERVICE CENTER OPP. ROAD, Bachupally, Medchal-Malkajgiri, Telangana (500090).
When will AR ANMOL DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2020. This is the promoter's declaration, not a guarantee.