Anish Tower 3

MEPRA PROJECTS · Sangareddy · RERA P01100003892

ANISH TOWER 3 is a residential apartment project in Ameenapur, Ameenpur Mandal, Sangareddy District. The registered promoter is MEPRA PROJECTS, a partnership. The project has a site area of 962.3 sq. m and one building with 1 Stilt + 5 upper floors, comprising 20 2BHK units with a saleable area of 115.56 m² per unit. Its TG-RERA registration number is P01100003892, and the proposed completion date is 16/07/2023.

More from Mepra Projects · 3 projects →

01What we found

Period endedTG-RERA registration ran to 16 Jul 2023 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameANISH TOWER 3 RERA record
Project type / useResidential apartment project RERA record RERA filing
Phase / registered portionNew Project; registration is for the project identified as ANISH TOWER 3. The filed land and building approval identify Plot No. 58/1 (Northern Side), Survey No. 171. RERA record
TG-RERA registrationP01100003892 RERA record
Registration validity06/01/2022–16/07/2023 as stated in the registration certificate; no extension is recorded in the supplied certificate. This is registration validity, not the occupancy-certificate status. RERA record
Registered promoterMEPRA PROJECTS, a partnership RERA filing Corporate record
RERA-record statusThe project is listed as “New Project”; the registration certificate records the above validity period. RERA record

Land and geographic identity

ItemProject record
LocalityAmeenpur / Ameenapur, as recorded in project and registration documents RERA record
Revenue villageAMEENAPUR in the project identity and land details; the building approval describes the village as AMEENPUR. RERA record RERA filing
Mandal / district / PINAmeenpur Mandal, Sangareddy District, 502032 RERA record RERA filing
Survey number and subdivisionSurvey No. 171; the registered portion is described as Plot No. 58/1 NORTHERN SIDE / Plot No. 58/1 (NORTHERN SIDE). No further project-held subdivision is specified in the supplied RERA identity. RERA record
Registered site extent962.3 sq. m total site area; 290.45 sq. m road-affected area; 671.85 sq. m net area in the RERA land fields. RERA filing
Building-approval area figuresThe filed building approval states site area 962.3 m², road-affected area 290.45 m², and net area 667.99 m².
BoundariesEast: OTHER LAND; West: OTHER LAND; North: OTHER LAND; South: OTHER LAND RERA filing

Development identity

ItemProject record
Sanctioning authorityAmeenpur Municipality / Municipal Corporation Approvals record
Principal building approval0008/BP/3121/2021, approved 19 November, 2021 Approvals record
File number002170/BP/DTCP/3121/0026/2021 Approvals record
Approved built-up area1,775.35 m² in the RERA project fields. The approval extraction separately records 1,750.80 m² for residential upper floors and 359.78 m² for stilt. RERA filing
Building count and configurationOne building; approval identifies Building - A (MEPRA PROJECTS) and sanctions 1 Stilt + 5 upper floors. RERA filing
Height / parking levelsApproval records building height 14.85 m and parking floors as Cellar 0; Stilt 1; U.Floors 0.
Unit countsRERA record: 20 total units; the approved-plan field records 1 total building unit, while the project’s proposed building-unit field also records 1. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration2BHK, 20 units; saleable area 115.56 m² per unit RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the supplied booking record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageThe supplied RERA-filed Architect’s Form–1A certifies overall project completion. This is a filed certificate, not an independent site inspection.
Promoter-declared completion date16/07/2023, stated in Form B2
Occupancy certificateThe Form–1A records an occupancy certificate for ANISH TOWER 3 issued by Ameenpur Municipality, number 004038/0C/DTCP/3121/0043/2023, dated 15/04/2023.
Revised completion dateNot disclosed in the supplied record.

2. The project story

ANISH TOWER 3 is a single-building residential apartment project registered for the northern-side portion of Plot 58/1 in Survey No. 171, in Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District. The building approval describes a residential building with one stilt level and five upper floors; the project is recorded as having 20 two-bedroom apartments. RERA record RERA unit table

The RERA-filed architect’s Form–1A certifies overall completion and records a municipal occupancy certificate dated 15/04/2023. That filed certificate is evidence of the project’s reported completion and OC status; the supplied materials do not include an independent site inspection or a separate tower-by-tower completion assessment. The promoter’s Form B2 gives a completion undertaking of 16/07/2023.

3. Master plan, architecture & building design

The building approval identifies one residential building, Building - A (MEPRA PROJECTS), on Plot No. 58/1 (Northern Side), Survey No. 171. It sanctions 1 Stilt + 5 upper floors, with a stated building height of 14.85 m. The approval records 1,750.80 m² for residential upper floors and 359.78 m² for stilt; the RERA project fields separately report approved built-up area of 1,775.35 m². These are the figures as recorded in their respective project documents; no FSI-counted area is supplied. RERA filing

The project filing reports a total site area of 962.3 m², road-affected area of 290.45 m², and net area of 671.85 m². The building approval extraction records 667.99 m² as net area. RERA filing

The supplied extracts do not establish the number of apartments per floor, building footprint, lift or stair configuration, detailed circulation, internal roads, or landscaping dimensions. The building approval lists front, rear and side-I setbacks of 2.5 m each.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020115.56 m²Software-measured: median 70.0 m²; range 69.2–70.8 m²39%

RERA records one 2BHK configuration with 20 units and saleable area of 115.56 m². The carpet-area range and loading figure are software measurements from the supplied floor-plan drawing record, not RERA-filed disclosures; the measured set covers four flat designs and is flagged as needing review. RERA unit details Floor plans RERA unit table

The measured drawing panel identifies a fifth-floor flat (03). The extracted room schedule includes a hall, dining area, kitchen, master bedroom, bedroom, dress room, attached toilet and wash area. The supplied evidence does not provide a complete, verified room schedule or dimensions for every flat design. RERA unit details

Saleable area and software-measured carpet area are different measures. The supplied record notes that saleable area includes the home’s share of common areas and is greater than the drawing-measured carpet area; the figures should not be treated as interchangeable. Floor plans

5. Parking & vehicle circulation

The building approval records one stilt parking level, no cellar parking and no upper-floor parking levels. It does not state the number of parking spaces, whether spaces are for residents or visitors, accessible-parking provision, or a unit-by-unit parking allocation.

The RERA unit record marks the 2BHK units as mortgaged, but the supplied material does not establish an individual parking entitlement or exclusive ownership of a parking bay. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record lists the following project infrastructure. The recorded progress percentages are 0 where shown; the “YES” entries indicate availability recorded in the filing, not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenitiesProgress recorded as 0; completion not independently verified
Green Strip / Tot Lot / ParkSize not suppliedRERA amenities“YES” recorded; progress 0; completion not independently verified
Community BuildingsDetails not suppliedRERA amenitiesProgress recorded as 0
Aggregate recreational open spaceArea not suppliedRERA amenitiesProgress recorded as 0

No clubhouse, indoor recreation facility, sports facility or convenience/community facility with a documented size or delivery status is established in the supplied RERA amenity data. The building approval also refers to a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate where applicable.

7. Utilities, building services & safety

Water supply
RERA-filed / approval evidence“Water Supply” is marked “YES” in the amenity record. RERA amenities
Status limitationSource, storage capacity and treatment arrangements are not supplied; completion is not independently verified.
Sewerage and sewage treatment
RERA-filed / approval evidence“Sewerage (Chamber, Lines, Septic Tank, STP)” is marked “YES.” RERA amenities
Status limitationThe record does not specify the selected system, capacity, reuse arrangements or completion status.
Storm-water drainage
RERA-filed / approval evidenceListed in the amenity record. RERA amenities
Status limitationProgress is recorded as 0; design and completion details are not supplied.
Rainwater harvesting / water conservation
RERA-filed / approval evidenceMarked “YES.” RERA amenities
Status limitationCapacity and completed installation status are not supplied.
Electrical infrastructure
RERA-filed / approval evidence“Electrical Meter Room, Sub-Station, Receiving Station” is marked “YES”; the approval requires space for a transformer on site. RERA amenities
Status limitationTransformer/substation capacity and installation status are not supplied.
Fire and life safety
RERA-filed / approval evidenceListed in the amenity record. RERA amenities
Status limitationSpecific fire systems, escape-stair details, clearances and completion evidence are not supplied.
Lifts, backup, waste and security
RERA-filed / approval evidenceDetails not disclosed in the supplied project records.
Status limitationNo capacity or delivery status can be stated.
Accessibility
RERA-filed / approval evidenceDetails not disclosed in the supplied project records.
Status limitationAccessible routes and facilities are not established by the supplied evidence.

8. Location, access & connectivity

The registered project location is Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District, Telangana, PIN 502032. The supplied cadastral parcel centroid is 17.52383, 78.34446; it is a software-referenced parcel location, not a surveyed building entrance point. RERA record RERA filing Cadastral map

The nearest sampled Outer Ring Road interchange is recorded at approximately 9.0 km. The supplied project records do not provide measured distances to public transport stops or other landmarks. Location record

9. Developer & development status

The registered promoter is MEPRA PROJECTS, identified in the RERA filing as a partnership, with GSTIN 36ABLFM7251P1ZI. The RERA address record is B, HYDERSHAKOTE, AMEENPUR, Ameenpur, Sangareddy, 502032. RERA filing Corporate record Parties record

The project record names BOGI REDDY VENKATA RAMANA REDDY as an authorized signatory and VELLELA PRAVEENA as a partner. Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100003892; issued 06/01/2022, valid to 16/07/2023
Scope and evidenceFORM ‘C’ registration certificate for ANISH TOWER 3.
Building approval
Identifier / date0008/BP/3121/2021; 19 November, 2021
Scope and evidenceAmeenpur Municipality / Municipal Corporation approval for Building - A on Survey No. 171.
Building-approval file number
Identifier / date002170/BP/DTCP/3121/0026/2021
Scope and evidenceFile number recorded on the building approval.
Occupancy certificate, as recorded in Form–1A
Identifier / date004038/0C/DTCP/3121/0043/2023; 15/04/2023
Scope and evidenceAmeenpur Municipality certificate number and date recorded by the project architect in the completion certificate.
Form B2 promoter declaration
Identifier / dateDated 16/12/2021
Scope and evidencePromoter declaration including the 16/07/2023 completion undertaking.
Filed title-related documents
Identifier / dateIncludes title report, development agreement/GPA, supplementary deed and public-utility gift-deed records
Scope and evidenceAvailable RERA-filed documents include and.

The supplied project records do not include a separate detailed floor-plan extraction beyond the drawing-based unit measurements cited above.

Other registrations of Anish

Frequently asked questions

Is ANISH TOWER 3 registered with Telangana RERA?

Yes. ANISH TOWER 3 is registered with the Telangana Real Estate Regulatory Authority as P01100003892; the registration status is New Project.

Who is the developer of ANISH TOWER 3?

The promoter named in the RERA registration is MEPRA PROJECTS.

Where is ANISH TOWER 3 located?

ANISH TOWER 3 is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will ANISH TOWER 3 be completed?

The promoter's proposed date of completion filed with RERA is 16/07/2023. This is the promoter's declaration, not a guarantee.