Aaro Creek
AARO INFRA · Sangareddy · RERA P01100001871
AARO CREEK is a residential apartment project in SAIRAM NAGAR, AMEENPUR mandal, Sangareddy district. The registered promoter is AARO INFRA. The project is on 667.22 sq. m and comprises one building with STILT + 5 Upper floors and 20 2BHK apartments. It is registered under TG-RERA P01100001871, with a proposed completion date of 21/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | AARO CREEK RERA record |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not disclosed. RERA record |
| TG-RERA registration | P01100001871; certificate issued 21/03/2020, valid through 21/11/2025. The retrieved record says it was not extended; current registration status should be confirmed with TG-RERA. RERA record Approvals record |
| Registered promoter | AARO INFRA; partnership, as recorded in the RERA project data. RERA record RERA filing |
| RERA status | The project record labels it “New Project.” Registration validity is stated above; that date is not itself an occupancy or completion certificate. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / PIN | SAIRAM NAGAR; 503021. RERA record RERA filing |
| Revenue village / mandal / district | AMEENAPUR village; AMEENPUR mandal; Sangareddy district. RERA record Land records |
| Project survey number(s) | 955 OF AMEENPUR VILLAGE (also stated in approval documents as Survey No. 955); no project subdivision is disclosed. RERA record Land records |
| Plot numbers | 78, 79 AND 80. RERA filing |
| Registered site extent | RERA and approval records state 667.22 sq. m. The record also states net area 667.22 sq. m and total area 667.22 sq. m. RERA filing |
| Boundaries | North: PLOT NO81; South: PLOT NO77; East: PLOT NOS 64 65 AND 66; West: 30 WIDE ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Principal sanctioning authority | Ameenpur Municipality issued the building permit; HMDA issued technical approval. Approvals record |
| Principal approval identifiers / dates | Ameenpur Municipality building permit 302/2019-2020, approved 29.01.2020; HMDA technical approval 025077/SKP/R1/U6/HMDA/25062019, approved 21/11/2019. Approvals record |
| Approved built-up area | The RERA project data records 1994.04 sq. m as approved built-up area. HMDA’s extracted approval parameters separately state “Built up Area 1661.7” and “Proposed Built-up Area 1994.04”; these are labels as extracted from the approval record, not interchangeable area measures. RERA filing |
| Building and floors | One building/unit is recorded. The building permit describes STILT + 5 Upper floors; HMDA technical approval describes 1Stilt + 5 Upper floors. No basement or podium is stated in the supplied records. RERA filing |
| Parking provision | The municipality permit says the approved stilt and parking area are to be used exclusively for parking. No sanctioned parking-space count or individual unit allocation is supplied. |
| Unit counts | Approved-plan data records 1 building unit; the RERA unit schedule records 20 apartments. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK; 20 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 54.72 sq. m per filed 2BHK configuration. RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available, as shown in the retrieved TG-RERA record; that record gives no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | Not established by the supplied records. The RERA progress fields show 90% completeness, but no date or supporting site verification is supplied; this is not an independently verified construction assessment. RERA record RERA amenities |
| Completion deadline | The RERA record and promoter Form B state 21/11/2025. This is the declared completion deadline, separate from registration validity. RERA record |
| OC / completion certificate | No occupancy or completion certificate is supplied. HMDA’s extracted record states completion_certified: false; the municipal permit makes an occupancy certificate compulsory before occupation. |
2. The project story
AARO CREEK is a residential apartment development recorded on Plot Nos. 78, 79 and 80 in Survey No. 955 of AMEENAPUR village, AMEENPUR mandal, Sangareddy district. The RERA filing describes one building and a 20-unit, 2BHK offering. The approved building-permit record describes a stilt level and five upper floors. The RERA record shows a proposed completion date of 21/11/2025, and the promoter’s Form B repeats that undertaking. The available material does not establish the project’s present construction stage through an independently verified site inspection, nor does it include an OC or completion certificate. The project’s “90% completeness” field is a filed record value without a supplied date or measurement basis. RERA record Land records RERA unit table
3. Master plan, architecture & building design
The supplied approval extracts describe one residential building on a site extent of 667.22 sq. m, with STILT + 5 Upper floors. The municipal permit lists residential area as 332.34 m² per floor and five residential upper floors with area 1661.70 m²; HMDA’s extracted parameters separately list Built up Area 1661.7 and Proposed Built-up Area 1994.04. The RERA project record labels 1994.04 sq. m as approved built-up area. These are source-record labels; the supplied material does not provide enough drawing-derived detail to reconcile or further classify the area figures. RERA filing
The approval record also gives a building height of 15 Mts in the municipal permit and 14.8 in HMDA’s extracted parameters. The municipal permit specifies setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m, and Side II 3.50 m. It records 20 trees and a compound wall of 109.54 RMT.
The approved floor-plan drawing set contains two drawings, but neither is recorded as having measured flat geometry; no drawing-derived room dimensions, carpet areas, typical-floor arrangement, lift count, stair count, building footprint, or open-space dimensions are available in the supplied extraction. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 54.72 sq. m | Not measured from supplied drawings | Not supplied |
The configuration, count, booking figures and saleable area above are from the TG-RERA unit record; booking figures have no supplied as-of date. The drawing set has no measured flat layouts, so no software-measured carpet area or room dimensions can be reported. Saleable area is the RERA-filed figure and should not be read as a measured carpet-area figure. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The Ameenpur Municipality building permit states that the approved stilt and parking area must be used exclusively for vehicle parking and not partitioned, converted or misused. It also requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. No count of parking spaces, visitor or accessible spaces, two-wheeler provision, ramp details, EV charging provision, or unit-specific parking allocation is supplied.
6. Amenities, recreation & open spaces
The municipality permit identifies a tot-lot, rainwater-harvesting percolation pit, transformer space and garbage house as permit conditions or site provisions. It requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate, and tree planting along the site periphery and in front of the premises. The RERA amenity schedule records facilities and infrastructure items, but their progress fields are shown as 0; the schedule does not establish that the items are complete. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Tot-lot area; to be fenced and maintained as greenery before OC. No size supplied. | RERA amenities | Permit condition; completion not verified. |
| Green strip / tot-lot / park | RERA amenity schedule item; no size supplied. | RERA amenities | Progress recorded as 0; completion not verified. |
| Internal roads and footpaths | No dimensions supplied. | RERA amenities | Progress recorded as 0. |
| Community buildings | No description or size supplied. | RERA amenities | Progress recorded as 0. |
| Street lighting | No quantity or specification supplied. | RERA amenities | Progress recorded as 0. |
| Aggregate recreational open space | No area supplied. | RERA amenities | Progress recorded as 0. |
7. Utilities, building services & safety
The Ameenpur Municipality permit requires a rainwater-harvesting percolation pit, a garbage house and space for a transformer. It specifies separate underground static water storage and terrace tanks of 25,000 lits. capacity each. It also specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and listed fire-safety provisions including manual alarm systems, hose reels and downcomers. The permit says an automatic sprinkler system is to be provided if basement area exceeds 200 Sq.mts.; the supplied records do not establish whether that condition applies to the building.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station. The schedule records “YES” for water supply, sewerage, solid-waste management and energy management, but progress is shown as 0 and it does not establish completion. HMDA’s approval extract lists a septic tank. No water-source details, STP capacity, reuse arrangements, lift count or capacity, security/CCTV system, accessibility details, or independently verified safety-compliance evidence are supplied. RERA amenities
8. Location, access & connectivity
The registered project location is SAIRAM NAGAR, AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 503021. The parcel location is represented by the supplied cadastral centroid at 17.52587, 78.33949. A location dataset reports the nearest sampled Outer Ring Road interchange at 8.4 km (approx); this is a dataset measurement, not a travel-time estimate. The approval record refers to an 18 mt. road width and a 30-wide-road boundary, but the supplied material does not provide public-transport routes or measured distances to other landmarks. RERA record RERA filing Location record RERA filing
9. Developer & development status
The registered promoter is AARO INFRA, recorded as a partnership. The project record names KATTA TRIVENI and BALLA JAYALAKSHMI SAVITHA DEVI as partners and KATTA SRIHARSHA VARMA as authorised signatory. The Form B affidavit is dated 21 NOVEMBER 2019 and is signed through the authorised signatory; it states a completion undertaking of 21 NOVEMBER 2025 and includes the promoter’s declaration concerning title basis and encumbrances. These are promoter declarations, not independent verification. RERA filing Corporate record Parties record
The supplied RERA record lists one building and 20 apartments, and provides no tower-by-tower or phase-wise development schedule. It does not include an OC or independently verified construction-progress report. The registration certificate records validity through 21/11/2025 and states that registration may be extended by the Authority in accordance with the Act and rules; the supplied certificate says it was not extended. RERA record RERA unit table
10. Approvals, official records & documents
| Identifier / date | P01100001871; issued 21/03/2020; valid through 21/11/2025. |
|---|---|
| What the supplied record establishes | Form C registers AARO CREEK under section 5 and sets out registration conditions, including the separate-account requirement. |
| Identifier / date | 025077/SKP/R1/U6/HMDA/25062019; 21/11/2019. |
|---|---|
| What the supplied record establishes | Technical approval for a residential apartment building on Plot Nos. 78, 79 and 80 in Survey No. 955; it directs the applicant to obtain local executive-authority sanction. |
| Identifier / date | 302/2019-2020; 29.01.2020; file 349356/2019-2020. |
|---|---|
| What the supplied record establishes | Permit record for residential construction on Plot Nos. 78, 79 and 80 in Survey No. 955, describing stilt plus five upper floors and stated conditions. |
| Identifier / date | Dated 21 NOVEMBER 2019. |
|---|---|
| What the supplied record establishes | Promoter affidavit containing stated title basis, encumbrance declaration and completion undertaking. |
| Identifier / date | Title report 88085; deed records also supplied under 88096–88099. |
|---|---|
| What the supplied record establishes | Advocate’s title scrutiny and extracts of registered instruments; detailed title-chain review is addressed in the Land & Title section. |
| Identifier / date | Not supplied. |
|---|---|
| What the supplied record establishes | The approval record states that an occupancy certificate is compulsory before occupation; the supplied records do not establish that one has been issued. |
1. Project at a glance
Project identity
Registered name: AARO CREEK
Project type / registered portion: Residential apartment project; phase or separately registered portion is not disclosed.
TG-RERA registration: P01100001871; certificate issued 21/03/2020, valid through 21/11/2025. The retrieved record says it was not extended; current registration status should be confirmed with TG-RERA.
Registered promoter: AARO INFRA; partnership, as recorded in the RERA project data.
RERA status: The project record labels it “New Project.” Registration validity is stated above; that date is not itself an occupancy or completion certificate.
Land and geographic identity
Locality / PIN: SAIRAM NAGAR; 503021.
Revenue village / mandal / district: AMEENAPUR village; AMEENPUR mandal; Sangareddy district.
Project survey number(s): 955 OF AMEENPUR VILLAGE (also stated in approval documents as Survey No. 955); no project subdivision is disclosed.
Plot numbers: 78, 79 AND 80.
Registered site extent: RERA and approval records state 667.22 sq. m. The record also states net area 667.22 sq. m and total area 667.22 sq. m.
Boundaries: North: PLOT NO81; South: PLOT NO77; East: PLOT NOS 64 65 AND 66; West: 30 WIDE ROAD.
Development identity
Principal sanctioning authority: Ameenpur Municipality issued the building permit; HMDA issued technical approval.
Principal approval identifiers / dates: Ameenpur Municipality building permit 302/2019-2020, approved 29.01.2020; HMDA technical approval 025077/SKP/R1/U6/HMDA/25062019, approved 21/11/2019.
Approved built-up area: The RERA project data records 1994.04 sq. m as approved built-up area. HMDA’s extracted approval parameters separately state “Built up Area 1661.7” and “Proposed Built-up Area 1994.04”; these are labels as extracted from the approval record, not interchangeable area measures.
Building and floors: One building/unit is recorded. The building permit describes STILT + 5 Upper floors; HMDA technical approval describes 1Stilt + 5 Upper floors. No basement or podium is stated in the supplied records.
Parking provision: The municipality permit says the approved stilt and parking area are to be used exclusively for parking. No sanctioned parking-space count or individual unit allocation is supplied.
Unit counts: Approved-plan data records 1 building unit; the RERA unit schedule records 20 apartments.
Offering and status
RERA-filed configuration: 2BHK; 20 units.
RERA-filed saleable area: 54.72 sq. m per filed 2BHK configuration.
Booked / available: 0 booked / 20 available, as shown in the retrieved TG-RERA record; that record gives no as-of date, so these counts are indicative.
Construction stage: Not established by the supplied records. The RERA progress fields show 90% completeness, but no date or supporting site verification is supplied; this is not an independently verified construction assessment.
Completion deadline: The RERA record and promoter Form B state 21/11/2025. This is the declared completion deadline, separate from registration validity.
OC / completion certificate: No occupancy or completion certificate is supplied. HMDA’s extracted record states completion_certified: false; the municipal permit makes an occupancy certificate compulsory before occupation.
2. The project story
AARO CREEK is a residential apartment development recorded on Plot Nos. 78, 79 and 80 in Survey No. 955 of AMEENAPUR village, AMEENPUR mandal, Sangareddy district. The RERA filing describes one building and a 20-unit, 2BHK offering. The approved building-permit record describes a stilt level and five upper floors. The RERA record shows a proposed completion date of 21/11/2025, and the promoter’s Form B repeats that undertaking. The available material does not establish the project’s present construction stage through an independently verified site inspection, nor does it include an OC or completion certificate. The project’s “90% completeness” field is a filed record value without a supplied date or measurement basis.
3. Master plan, architecture & building design
The supplied approval extracts describe one residential building on a site extent of 667.22 sq. m, with STILT + 5 Upper floors. The municipal permit lists residential area as 332.34 m² per floor and five residential upper floors with area 1661.70 m²; HMDA’s extracted parameters separately list Built up Area 1661.7 and Proposed Built-up Area 1994.04. The RERA project record labels 1994.04 sq. m as approved built-up area. These are source-record labels; the supplied material does not provide enough drawing-derived detail to reconcile or further classify the area figures.
The approval record also gives a building height of 15 Mts in the municipal permit and 14.8 in HMDA’s extracted parameters. The municipal permit specifies setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m, and Side II 3.50 m. It records 20 trees and a compound wall of 109.54 RMT.
The approved floor-plan drawing set contains two drawings, but neither is recorded as having measured flat geometry; no drawing-derived room dimensions, carpet areas, typical-floor arrangement, lift count, stair count, building footprint, or open-space dimensions are available in the supplied extraction.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 54.72 sq. m | Not measured from supplied drawings | Not supplied |
The configuration, count, booking figures and saleable area above are from the TG-RERA unit record; booking figures have no supplied as-of date. The drawing set has no measured flat layouts, so no software-measured carpet area or room dimensions can be reported. Saleable area is the RERA-filed figure and should not be read as a measured carpet-area figure.
5. Parking & vehicle circulation
The Ameenpur Municipality building permit states that the approved stilt and parking area must be used exclusively for vehicle parking and not partitioned, converted or misused. It also requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. No count of parking spaces, visitor or accessible spaces, two-wheeler provision, ramp details, EV charging provision, or unit-specific parking allocation is supplied.
6. Amenities, recreation & open spaces
The municipality permit identifies a tot-lot, rainwater-harvesting percolation pit, transformer space and garbage house as permit conditions or site provisions. It requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate, and tree planting along the site periphery and in front of the premises. The RERA amenity schedule records facilities and infrastructure items, but their progress fields are shown as 0; the schedule does not establish that the items are complete.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Tot-lot area; to be fenced and maintained as greenery before OC. No size supplied. | Permit condition; completion not verified. | |
| Green strip / tot-lot / park | RERA amenity schedule item; no size supplied. | Progress recorded as 0; completion not verified. | |
| Internal roads and footpaths | No dimensions supplied. | Progress recorded as 0. | |
| Community buildings | No description or size supplied. | Progress recorded as 0. | |
| Street lighting | No quantity or specification supplied. | Progress recorded as 0. | |
| Aggregate recreational open space | No area supplied. | Progress recorded as 0. |
7. Utilities, building services & safety
The Ameenpur Municipality permit requires a rainwater-harvesting percolation pit, a garbage house and space for a transformer. It specifies separate underground static water storage and terrace tanks of 25,000 lits. capacity each. It also specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and listed fire-safety provisions including manual alarm systems, hose reels and downcomers. The permit says an automatic sprinkler system is to be provided if basement area exceeds 200 Sq.mts.; the supplied records do not establish whether that condition applies to the building.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station. The schedule records “YES” for water supply, sewerage, solid-waste management and energy management, but progress is shown as 0 and it does not establish completion. HMDA’s approval extract lists a septic tank. No water-source details, STP capacity, reuse arrangements, lift count or capacity, security/CCTV system, accessibility details, or independently verified safety-compliance evidence are supplied.
8. Location, access & connectivity
The registered project location is SAIRAM NAGAR, AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 503021. The parcel location is represented by the supplied cadastral centroid at 17.52587, 78.33949. A location dataset reports the nearest sampled Outer Ring Road interchange at 8.4 km (approx); this is a dataset measurement, not a travel-time estimate. The approval record refers to an 18 mt. road width and a 30-wide-road boundary, but the supplied material does not provide public-transport routes or measured distances to other landmarks.
9. Developer & development status
The registered promoter is AARO INFRA, recorded as a partnership. The project record names KATTA TRIVENI and BALLA JAYALAKSHMI SAVITHA DEVI as partners and KATTA SRIHARSHA VARMA as authorised signatory. The Form B affidavit is dated 21 NOVEMBER 2019 and is signed through the authorised signatory; it states a completion undertaking of 21 NOVEMBER 2025 and includes the promoter’s declaration concerning title basis and encumbrances. These are promoter declarations, not independent verification.
The supplied RERA record lists one building and 20 apartments, and provides no tower-by-tower or phase-wise development schedule. It does not include an OC or independently verified construction-progress report. The registration certificate records validity through 21/11/2025 and states that registration may be extended by the Authority in accordance with the Act and rules; the supplied certificate says it was not extended.
10. Approvals, official records & documents
| Identifier / date | P01100001871; issued 21/03/2020; valid through 21/11/2025. |
|---|---|
| What the supplied record establishes | Form C registers AARO CREEK under section 5 and sets out registration conditions, including the separate-account requirement. |
| Identifier / date | 025077/SKP/R1/U6/HMDA/25062019; 21/11/2019. |
|---|---|
| What the supplied record establishes | Technical approval for a residential apartment building on Plot Nos. 78, 79 and 80 in Survey No. 955; it directs the applicant to obtain local executive-authority sanction. |
| Identifier / date | 302/2019-2020; 29.01.2020; file 349356/2019-2020. |
|---|---|
| What the supplied record establishes | Permit record for residential construction on Plot Nos. 78, 79 and 80 in Survey No. 955, describing stilt plus five upper floors and stated conditions. |
| Identifier / date | Dated 21 NOVEMBER 2019. |
|---|---|
| What the supplied record establishes | Promoter affidavit containing stated title basis, encumbrance declaration and completion undertaking. |
| Identifier / date | Title report 88085; deed records also supplied under 88096–88099. |
|---|---|
| What the supplied record establishes | Advocate’s title scrutiny and extracts of registered instruments; detailed title-chain review is addressed in the Land & Title section. |
| Identifier / date | Not supplied. |
|---|---|
| What the supplied record establishes | The approval record states that an occupancy certificate is compulsory before occupation; the supplied records do not establish that one has been issued. |
Frequently asked questions
Is AARO CREEK registered with Telangana RERA?
Yes. AARO CREEK is registered with the Telangana Real Estate Regulatory Authority as P01100001871; the registration status is New Project.
Who is the developer of AARO CREEK?
The promoter named in the RERA registration is AARO INFRA.
Where is AARO CREEK located?
AARO CREEK is in SAIRAM NAGAR, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (503021).
When will AARO CREEK be completed?
The promoter's proposed date of completion filed with RERA is 21/11/2025. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur