AARO CREEK is a residential apartment project in SAIRAM NAGAR, AMEENPUR mandal, Sangareddy district. The registered promoter is AARO INFRA. The project is on 667.22 sq. m and comprises one building with STILT + 5 Upper floors and 20 2BHK apartments. It is registered under TG-RERA P01100001871, with a proposed completion date of 21/11/2025.

01What we found

Period endedTG-RERA registration ran to 21 Nov 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameAARO CREEK RERA record
Project type / registered portionResidential apartment project; phase or separately registered portion is not disclosed. RERA record
TG-RERA registrationP01100001871; certificate issued 21/03/2020, valid through 21/11/2025. The retrieved record says it was not extended; current registration status should be confirmed with TG-RERA. RERA record Approvals record
Registered promoterAARO INFRA; partnership, as recorded in the RERA project data. RERA record RERA filing
RERA statusThe project record labels it “New Project.” Registration validity is stated above; that date is not itself an occupancy or completion certificate. RERA record

Land and geographic identity

ItemProject record
Locality / PINSAIRAM NAGAR; 503021. RERA record RERA filing
Revenue village / mandal / districtAMEENAPUR village; AMEENPUR mandal; Sangareddy district. RERA record Land records
Project survey number(s)955 OF AMEENPUR VILLAGE (also stated in approval documents as Survey No. 955); no project subdivision is disclosed. RERA record Land records
Plot numbers78, 79 AND 80. RERA filing
Registered site extentRERA and approval records state 667.22 sq. m. The record also states net area 667.22 sq. m and total area 667.22 sq. m. RERA filing
BoundariesNorth: PLOT NO81; South: PLOT NO77; East: PLOT NOS 64 65 AND 66; West: 30 WIDE ROAD. RERA filing

Development identity

ItemProject record
Principal sanctioning authorityAmeenpur Municipality issued the building permit; HMDA issued technical approval. Approvals record
Principal approval identifiers / datesAmeenpur Municipality building permit 302/2019-2020, approved 29.01.2020; HMDA technical approval 025077/SKP/R1/U6/HMDA/25062019, approved 21/11/2019. Approvals record
Approved built-up areaThe RERA project data records 1994.04 sq. m as approved built-up area. HMDA’s extracted approval parameters separately state “Built up Area 1661.7” and “Proposed Built-up Area 1994.04”; these are labels as extracted from the approval record, not interchangeable area measures. RERA filing
Building and floorsOne building/unit is recorded. The building permit describes STILT + 5 Upper floors; HMDA technical approval describes 1Stilt + 5 Upper floors. No basement or podium is stated in the supplied records. RERA filing
Parking provisionThe municipality permit says the approved stilt and parking area are to be used exclusively for parking. No sanctioned parking-space count or individual unit allocation is supplied.
Unit countsApproved-plan data records 1 building unit; the RERA unit schedule records 20 apartments. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration2BHK; 20 units. RERA unit table RERA unit details
RERA-filed saleable area54.72 sq. m per filed 2BHK configuration. RERA unit table RERA unit details
Booked / available0 booked / 20 available, as shown in the retrieved TG-RERA record; that record gives no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageNot established by the supplied records. The RERA progress fields show 90% completeness, but no date or supporting site verification is supplied; this is not an independently verified construction assessment. RERA record RERA amenities
Completion deadlineThe RERA record and promoter Form B state 21/11/2025. This is the declared completion deadline, separate from registration validity. RERA record
OC / completion certificateNo occupancy or completion certificate is supplied. HMDA’s extracted record states completion_certified: false; the municipal permit makes an occupancy certificate compulsory before occupation.

2. The project story

AARO CREEK is a residential apartment development recorded on Plot Nos. 78, 79 and 80 in Survey No. 955 of AMEENAPUR village, AMEENPUR mandal, Sangareddy district. The RERA filing describes one building and a 20-unit, 2BHK offering. The approved building-permit record describes a stilt level and five upper floors. The RERA record shows a proposed completion date of 21/11/2025, and the promoter’s Form B repeats that undertaking. The available material does not establish the project’s present construction stage through an independently verified site inspection, nor does it include an OC or completion certificate. The project’s “90% completeness” field is a filed record value without a supplied date or measurement basis. RERA record Land records RERA unit table

3. Master plan, architecture & building design

The supplied approval extracts describe one residential building on a site extent of 667.22 sq. m, with STILT + 5 Upper floors. The municipal permit lists residential area as 332.34 m² per floor and five residential upper floors with area 1661.70 m²; HMDA’s extracted parameters separately list Built up Area 1661.7 and Proposed Built-up Area 1994.04. The RERA project record labels 1994.04 sq. m as approved built-up area. These are source-record labels; the supplied material does not provide enough drawing-derived detail to reconcile or further classify the area figures. RERA filing

The approval record also gives a building height of 15 Mts in the municipal permit and 14.8 in HMDA’s extracted parameters. The municipal permit specifies setbacks of Front 3.00 m, Rear 3.50 m, Side I 3.50 m, and Side II 3.50 m. It records 20 trees and a compound wall of 109.54 RMT.

The approved floor-plan drawing set contains two drawings, but neither is recorded as having measured flat geometry; no drawing-derived room dimensions, carpet areas, typical-floor arrangement, lift count, stair count, building footprint, or open-space dimensions are available in the supplied extraction. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002054.72 sq. mNot measured from supplied drawingsNot supplied

The configuration, count, booking figures and saleable area above are from the TG-RERA unit record; booking figures have no supplied as-of date. The drawing set has no measured flat layouts, so no software-measured carpet area or room dimensions can be reported. Saleable area is the RERA-filed figure and should not be read as a measured carpet-area figure. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The Ameenpur Municipality building permit states that the approved stilt and parking area must be used exclusively for vehicle parking and not partitioned, converted or misused. It also requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. No count of parking spaces, visitor or accessible spaces, two-wheeler provision, ramp details, EV charging provision, or unit-specific parking allocation is supplied.

6. Amenities, recreation & open spaces

The municipality permit identifies a tot-lot, rainwater-harvesting percolation pit, transformer space and garbage house as permit conditions or site provisions. It requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate, and tree planting along the site periphery and in front of the premises. The RERA amenity schedule records facilities and infrastructure items, but their progress fields are shown as 0; the schedule does not establish that the items are complete. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / greeneryTot-lot area; to be fenced and maintained as greenery before OC. No size supplied.RERA amenitiesPermit condition; completion not verified.
Green strip / tot-lot / parkRERA amenity schedule item; no size supplied.RERA amenitiesProgress recorded as 0; completion not verified.
Internal roads and footpathsNo dimensions supplied.RERA amenitiesProgress recorded as 0.
Community buildingsNo description or size supplied.RERA amenitiesProgress recorded as 0.
Street lightingNo quantity or specification supplied.RERA amenitiesProgress recorded as 0.
Aggregate recreational open spaceNo area supplied.RERA amenitiesProgress recorded as 0.

7. Utilities, building services & safety

The Ameenpur Municipality permit requires a rainwater-harvesting percolation pit, a garbage house and space for a transformer. It specifies separate underground static water storage and terrace tanks of 25,000 lits. capacity each. It also specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and listed fire-safety provisions including manual alarm systems, hose reels and downcomers. The permit says an automatic sprinkler system is to be provided if basement area exceeds 200 Sq.mts.; the supplied records do not establish whether that condition applies to the building.

The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station. The schedule records “YES” for water supply, sewerage, solid-waste management and energy management, but progress is shown as 0 and it does not establish completion. HMDA’s approval extract lists a septic tank. No water-source details, STP capacity, reuse arrangements, lift count or capacity, security/CCTV system, accessibility details, or independently verified safety-compliance evidence are supplied. RERA amenities

8. Location, access & connectivity

The registered project location is SAIRAM NAGAR, AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 503021. The parcel location is represented by the supplied cadastral centroid at 17.52587, 78.33949. A location dataset reports the nearest sampled Outer Ring Road interchange at 8.4 km (approx); this is a dataset measurement, not a travel-time estimate. The approval record refers to an 18 mt. road width and a 30-wide-road boundary, but the supplied material does not provide public-transport routes or measured distances to other landmarks. RERA record RERA filing Location record RERA filing

9. Developer & development status

The registered promoter is AARO INFRA, recorded as a partnership. The project record names KATTA TRIVENI and BALLA JAYALAKSHMI SAVITHA DEVI as partners and KATTA SRIHARSHA VARMA as authorised signatory. The Form B affidavit is dated 21 NOVEMBER 2019 and is signed through the authorised signatory; it states a completion undertaking of 21 NOVEMBER 2025 and includes the promoter’s declaration concerning title basis and encumbrances. These are promoter declarations, not independent verification. RERA filing Corporate record Parties record

The supplied RERA record lists one building and 20 apartments, and provides no tower-by-tower or phase-wise development schedule. It does not include an OC or independently verified construction-progress report. The registration certificate records validity through 21/11/2025 and states that registration may be extended by the Authority in accordance with the Act and rules; the supplied certificate says it was not extended. RERA record RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100001871; issued 21/03/2020; valid through 21/11/2025.
What the supplied record establishesForm C registers AARO CREEK under section 5 and sets out registration conditions, including the separate-account requirement.
HMDA technical approval
Identifier / date025077/SKP/R1/U6/HMDA/25062019; 21/11/2019.
What the supplied record establishesTechnical approval for a residential apartment building on Plot Nos. 78, 79 and 80 in Survey No. 955; it directs the applicant to obtain local executive-authority sanction.
Ameenpur Municipality building permit
Identifier / date302/2019-2020; 29.01.2020; file 349356/2019-2020.
What the supplied record establishesPermit record for residential construction on Plot Nos. 78, 79 and 80 in Survey No. 955, describing stilt plus five upper floors and stated conditions.
Form B declaration
Identifier / dateDated 21 NOVEMBER 2019.
What the supplied record establishesPromoter affidavit containing stated title basis, encumbrance declaration and completion undertaking.
Title report and supporting instruments
Identifier / dateTitle report 88085; deed records also supplied under 88096–88099.
What the supplied record establishesAdvocate’s title scrutiny and extracts of registered instruments; detailed title-chain review is addressed in the Land & Title section.
Occupancy / completion certificate
Identifier / dateNot supplied.
What the supplied record establishesThe approval record states that an occupancy certificate is compulsory before occupation; the supplied records do not establish that one has been issued.

Frequently asked questions

Is AARO CREEK registered with Telangana RERA?

Yes. AARO CREEK is registered with the Telangana Real Estate Regulatory Authority as P01100001871; the registration status is New Project.

Who is the developer of AARO CREEK?

The promoter named in the RERA registration is AARO INFRA.

Where is AARO CREEK located?

AARO CREEK is in SAIRAM NAGAR, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (503021).

When will AARO CREEK be completed?

The promoter's proposed date of completion filed with RERA is 21/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur