Sikharas Lissy Avenue

SIKHARA CONSTRUCTIONS · Sangareddy · RERA P01100003857

SIKHARAS LISSY AVENUE is a residential apartment project in AMEENAPUR, Ameenpur Mandal, Sangareddy District, developed by the registered promoter SIKHARA CONSTRUCTIONS. It covers 668.88 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 15 units: 5 2BHK and 10 3BHK. The project is registered with TG-RERA as P01100003857, with a proposed completion date of 30/11/2027.

More from Sikhara Constructions · 2 projects →

01What we found

RegisteredTG-RERA - valid till 31 Jul 2027
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSIKHARAS LISSY AVENUE. RERA record
Project type and phaseResidential apartment project; phase/registered-portion description is not separately disclosed. RERA record RERA filing
TG-RERA registrationP01100003857. Registration certificate issued 03/01/2022; valid from 03/01/2022 to 31/07/2027. The certificate records five years’ validity and no extension. Registration validity is separate from the construction-completion deadline and does not establish an occupancy certificate. RERA record Approvals record
Registered promoterSIKHARA CONSTRUCTIONS, identified in the RERA filing as a partnership. RERA filing Corporate record
RERA statusThe supplied record identifies the project as “New Project.” The registration certificate confirms registration; the evidence supplied does not establish a current construction or occupancy status. RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageAMEENAPUR / Ameenpur Village; revenue village is recorded as AMEENAPUR. RERA record Land records
Mandal / district / PINAMEENPUR, Sangareddy, 502032. RERA record RERA filing
Survey number(s) / plot identitySurvey No. 97; Plot Nos. 115 and 98. No survey subdivision is stated in the supplied project identity. Land records
Site areaRERA land details state 668.88 sq. m total and net area. The building-permit extraction separately records 668.5 m2 site area and 661.81 m2 net area. Land records
Boundaries in RERA land detailsEast: 40 FEET WIDE ROAD; West: 40 FEET WIDE ROAD; South: 40 FEET WIDE ROAD; North: PLOT NOS 99 AND 114. Land records

Development identity

ItemProject record
Sanctioning authority and principal approvalBuilding permit issued by AMEENPUR MUNICIPALITY, approval/file No. 3121/W1/2021/0288, approved 31 July, 2021. The approval is filed with TG-RERA. Approvals record
Building and floorsOne residential building; sanctioned configuration: 1 Stilt + 5 upper floors. The supplied evidence does not state a basement or podium level.
Height14.95 m, as stated in the building-permit extraction.
Approved built-up areaRERA filing states 1,594.10 sq. m approved built-up area. The building-permit extraction separately labels 1,594.10 m2 as residential upper floors and 326.46 m2 as stilt. These are reported as the document labels, not combined into a derived figure. RERA filing
UnitsThe building-permit extraction states 15 units in the RERA filing; the approved-plan unit total is 1. The evidence does not explain the basis of the approved-plan field. RERA filing RERA unit table
ParkingThe sanctioned plan conditions refer to stilt parking. A sanctioned parking-space count, allocation schedule and visitor-space count are not supplied.

Offering and status

ItemProject record
Configurations2BHK: 5 units; 3BHK: 10 units. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 102.19 sq. m; 3BHK: 139.35 sq. m. RERA unit table RERA unit details
Booked / availablePortal counts last read show 0 booked / 5 available for 2BHK and 0 booked / 10 available for 3BHK. The portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageNo independently verified or dated site-progress assessment is supplied. The RERA amenity-progress entries shown in the supplied data are 0%; these entries do not establish overall construction progress. RERA amenities
Completion deadlineBuilding-permit extraction states construction was to be completed before 31 July, 2027; the Form B declaration also undertakes completion by 31 July, 2027. The RERA header separately records a proposed completion date of 30/11/2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the evidence reviewed. The building permit states that an occupancy certificate is compulsory before occupation.

2. The project story

SIKHARAS LISSY AVENUE is registered with TG-RERA as a residential apartment project on Survey No. 97, covering Plot Nos. 115 and 98 in Ameenapur, Ameenpur Mandal, Sangareddy District. The RERA filing describes one building and 15 proposed apartments: five 2BHK and ten 3BHK units. RERA record Land records RERA unit table

The building permit identifies a single residential building with one stilt level and five upper floors. It records approval for a 14.95 m building and specifies a construction deadline of 31 July, 2027; the promoter’s Form B declaration also gives that date. The project header, however, records a proposed completion date of 30/11/2027. No site inspection, dated construction-progress report, or occupancy/completion certificate is included here, so the supplied record does not establish whether construction is underway, complete, or occupied. RERA record

3. Master plan, architecture & building design

The filed project is a one-building apartment development on Plot Nos. 98 and 115 in Survey No. 97. The RERA filing reports a 668.88 sq. m site and 1,594.10 sq. m approved built-up area. The building-permit extraction records one stilt plus five upper floors, 14.95 m height, and a stilt area of 326.46 m2; it labels 1,594.10 m2 as residential upper floors. Land records RERA filing

The approved floor-plan document is identified as document 193507, but the supplied record provides drawing-derived apartment measurements rather than a complete description of the building plan. It does not establish building footprint, flats per floor, lift or stair count, entrances, internal circulation, or a full floor-by-floor allocation. No layout sheet is recorded. Floor plans

The building permit lists a tot-lot, transformer space, garbage house and rainwater-harvesting percolation pit, and includes conditions on tree planting and maintaining a greenery strip. These are approval conditions or stated provisions; the supplied evidence does not independently verify their installation or completion.

4. Homes, configurations & floor plans

RERA filing counts and saleable areas are shown below. Carpet areas are software-measured from the filed floor-plan drawing, not RERA-filed figures; they remain drawing measurements requiring review. Saleable area and carpet area are different measures: saleable area can include a share of common areas, while the measured carpet figure represents the drawing-based internal area used by the measurement process. Balcony area is excluded from the stated 3BHK measured carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505102.19 sq. m76.6 sq. m median (76.6–76.6 sq. m)25%
3BHK10010139.35 sq. m89.2 sq. m median (88.7–89.8 sq. m)36%

For the measured 2BHK drawing, the listed rooms include a living/dining area, two bedrooms, kitchen, wash area and two toilets. For the measured 3BHK drawing, the listed rooms include living and dining areas, three bedrooms, kitchen, wash area and a balcony; the measured balcony is excluded from carpet area. These are measurements from the first-floor plan panel in document 193507, not a substitute for checking the approved drawing and unit-specific agreement. RERA unit details

5. Parking & vehicle circulation

The building permit specifies one stilt level and states that approved stilt and cellar space (where provided in the plan) must be used exclusively for vehicle parking and not partitioned or converted. The supplied extraction does not establish a cellar level for this building, a count of sanctioned parking bays, parking by unit, visitor or accessible bays, or an allocation arrangement. A drawing or general parking condition alone does not establish exclusive ownership or assignment to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity register lists 15 infrastructure and facility items. It marks water supply, green strip/tot-lot/park, rainwater harvesting, electrical meter room/sub-station/receiving station, and generator as available; all listed progress figures are 0%. These portal fields are not independent verification of completed facilities. RERA amenities

Tot-lot / green strip
Description / sizeTot-lot and peripheral greenery are specified in the building-permit conditions; no size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusPermit condition / RERA-listed availability; 0% progress shown; not independently verified complete.
Water supply
Description / sizeListed as available; source, storage and capacity not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed availability; 0% progress shown; not independently verified complete.
Rainwater harvesting
Description / sizeRERA-listed; permit requires a rainwater-harvesting percolation pit and records 7 RWHPs.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed availability; 0% progress shown; installation not independently verified.
Electrical meter room / sub-station / receiving station
Description / sizeListed as available; capacity not supplied. Permit also requires transformer space.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed availability; 0% progress shown; not independently verified complete.
Generator
Description / sizeListed as available; capacity and backup coverage not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed availability; 0% progress shown; not independently verified complete.
Internal roads and footpaths
Description / sizeListed in the RERA amenity register; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Sewerage and treatment/disposal of sewage and sullage
Description / sizeListed; specific system, capacity and reuse arrangement are not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Storm-water drains
Description / sizeListed; design and progress details not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Street lighting
Description / sizeListed; no specification supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Community buildings
Description / sizeListed; no building, size or capacity is described in the supplied evidence.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Solid-waste management and disposal
Description / sizeListed; system details not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Energy management
Description / sizeListed; system details not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Fire protection and fire-safety requirements
Description / sizeListed; specific systems and installation status are not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.
Recreational open space
Description / sizeListed; area not supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress shown; not independently verified complete.

The supplied vendor record also describes indoor games and children’s play areas, but these are third-party marketing details rather than evidence of sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The RERA amenity register lists water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, electrical infrastructure, generator, energy management and fire-safety requirements. It does not provide system capacities, technical specifications or independent completion verification. RERA amenities

The building permit requires a rainwater-harvesting structure, transformer space, a garbage house, qualified technical supervision of services, and provision of fire-fighting installations as stipulated in the National Building Code of India, 2005. It also makes occupancy certification a condition before occupation and states that regular service connections are to be provided before possession. These are permit requirements, not evidence that the systems have been installed or that statutory clearances have been obtained.

No lift number or capacity, backup-power capacity, water source or storage capacity, STP capacity, fire-system specification, CCTV or access-control system, accessibility plan, or independent service-completion certificate is included in the supplied record. RERA amenities

8. Location, access & connectivity

The official project location in the supplied record is AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502032. The registered land is Survey No. 97, Plot Nos. 115 and 98. The site boundaries recorded in the RERA land details include 40-foot-wide roads on the east, west and south sides, and Plot Nos. 99 and 114 to the north. RERA record Land records

The project’s cadastral-parcel centroid is recorded at 17.52587, 78.33949. A location-data connectivity entry gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. This is a supplied approximate distance, not a travel-time estimate. Location record

9. Developer & development status

The registered promoter is SIKHARA CONSTRUCTIONS, recorded in the RERA filing as a partnership, with GSTIN 36AEDFS2289G1ZT. The filing identifies SRINIVASARAO MANAM as authorised signatory and LAKSHMI VENKATA NAGARAJU INDUKURI as partner. The registration certificate records the promoter office as Village: Kukatpally, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072. Corporate record Parties record RERA filing

The promoter’s Form B declaration, dated 29 October, 2021, undertakes completion by 31 July, 2027. The building-permit extraction likewise specifies completion before 31 July, 2027. The project header records 30/11/2027 as the proposed completion date. No dated construction assessment or occupancy/completion certificate is supplied, so the current construction stage and completion status cannot be confirmed from this evidence. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100003857; issued 03/01/2022; valid to 31/07/2027
What the supplied record establishesForm C certificate for SIKHARAS LISSY AVENUE; records Survey No. 97, Plot Nos. 115 and 98, and promoter Sikhara Constructions.
Building permit / commencement-permit record
Identifier / date3121/W1/2021/0288; 31 July, 2021
What the supplied record establishesAmeenpur Municipality permit extraction for the residential building on Survey No. 97, with one stilt plus five upper floors and stated construction conditions.
Layout/subdivision reference
Identifier / date2707/MP2/Plg/ZO-SKP/HMDA/2007
What the supplied record establishesReference stated in the building-permit extraction; a separate approved-layout plan is not supplied here.
Approved floor-plan record
Identifier / dateDocument 193507
What the supplied record establishesIdentified as the floor-plan approval record; drawing-derived measurements are available, but the supplied record does not provide a complete plan description.
Form B declaration
Identifier / date29 October, 2021
What the supplied record establishesPromoter declaration concerning the project, including its stated completion undertaking and project-fund commitments.
Occupancy/completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo certificate is present in the supplied documents reviewed. Document index
HMDA layout lookup
Identifier / dateNot publicly reachable in the supplied research record
What the supplied record establishesThe HMDA DPMS lookup is reported as unavailable from the public internet; this is not evidence of approval or refusal. HMDA

Frequently asked questions

Is SIKHARAS LISSY AVENUE registered with Telangana RERA?

Yes. SIKHARAS LISSY AVENUE is registered with the Telangana Real Estate Regulatory Authority as P01100003857; the registration status is New Project.

Who is the developer of SIKHARAS LISSY AVENUE?

The promoter named in the RERA registration is SIKHARA CONSTRUCTIONS.

Where is SIKHARAS LISSY AVENUE located?

SIKHARAS LISSY AVENUE is in AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will SIKHARAS LISSY AVENUE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2027. This is the promoter's declaration, not a guarantee.