Mahitha S Green Orchids B - Block
MAHITHA DEVELOPERS · Rangareddy · RERA P02400004839
MAHITHA S GREEN ORCHIDS B - BLOCK is a residential apartment project in Madina Guda / Madeenaguda, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter Mahitha Developers. The registered site extent is 431.04 sq. m, and the project comprises one residential building with 1 Stilt + 5 upper floors and 10 homes: five 2BHK and five 3BHK. TG-RERA registration number P02400004839 was issued 23/08/2022, and the promoter’s stated completion date is 17-02-2025.
More from Mahitha Developers · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MAHITHA S GREEN ORCHIDS B - BLOCK RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | B - BLOCK; one building/block is recorded for this registered project. RERA record |
| TG-RERA registration | P02400004839, issued 23/08/2022; certificate states validity through 17/02/2025. No extension is recorded in the supplied registration certificate. |
| Registered promoter | Mahitha Developers; RERA filing identifies the organisation type as Partnership. RERA record RERA filing Corporate record |
| RERA status | The filing identifies the project as “New Project.” The registration validity dates above are separate from the completion deadline and do not establish current registration status. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Madeenaguda / Madina Guda, as recorded in project documents RERA record Land records |
| Revenue village | Madina Guda (also written Madeenaguda in project documents) RERA record |
| Mandal | Serilingampally RERA record Land records |
| District | Ranga Reddy RERA record Land records |
| PIN | 500049 RERA record |
| Survey numbers and subdivisions | 202/2/A and 203/A Land records |
| Plot reference | Plot Nos. 101 PART AND 102 PART RERA record |
| Registered site extent | RERA filing: 431.04 sq. m; total area and net area are each recorded as 431.04 sq. m, with affected area recorded as 0. Land records |
| Boundaries | East: 40 Feet Wide Road; West: Plot No 114; North: Plot No 103; South: Existing 10 Feet and Proposed 40 Feet Wide Road. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 2203/GHMC/SLP/2022-BP, dated 17 February 2022 Approvals record |
| Related building permit file | 000956/GHMC/0558/SLP2/2021-BP Approvals record |
| Approved built-up area | 1,011.53 sq. m as recorded in the building permit order |
| Building count and configuration | One residential building, recorded as 1 Stilt + 5 upper floors in the permit order |
| Parking levels / area | The permit order records stilt parking area of 204.13 Sq.Mt. and total parking area of 204.1; it does not supply a parking-space count. |
| Unit counts | RERA unit schedule records 10 units: five 2BHK and five 3BHK. RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations and saleable areas | 2BHK: 111.48 sq. m; 3BHK: 156.07 sq. m RERA unit table RERA unit details |
| Booked / available | Portal snapshot records 5 of 5 2BHK and 5 of 5 3BHK units booked, with 0 available in each configuration. The portal extract gives no as-of date; treat these counts as indicative. RERA unit table RERA unit details |
| Construction stage | RERA registration describes a new project; supplied GHMC documents include an occupancy certificate for the building. The supplied records do not establish a current, independently inspected construction stage. RERA record |
| Completion dates | Promoter’s RERA Form B undertaking states completion by 17-02-2025; the building permit order also records a construction completion deadline of 17 February, 2025. |
| Occupancy certificate | GHMC occupancy certificate 3310/GHMC/SLP/2023-OC, dated 07 September, 2023, identifies the residential building on Plot Nos. 101 Part and 102 Part in Survey Nos. 202/2/A and 203/A. |
2. The project story
MAHITHA S GREEN ORCHIDS B - BLOCK is recorded with TG-RERA as a residential apartment project in Madina Guda / Madeenaguda, Serilingampally Mandal, Ranga Reddy District. Its registered land identity is Plot Nos. 101 Part and 102 Part in Survey Nos. 202/2/A and 203/A, with a site extent of 431.04 sq. m. RERA record Land records
The RERA unit schedule lists ten apartments in one building: five 2BHK and five 3BHK homes. A GHMC building permit order records one stilt level and five upper floors. The project’s RERA registration certificate ran from 23/08/2022 through 17/02/2025, while the promoter’s Form B and the permit order give 17-02-2025 as the completion deadline. These dates describe registration validity and stated completion timing respectively; neither alone establishes present registration status. RERA unit table
A GHMC occupancy certificate for the identified building is in the supplied project record. The certificate records the building as fit for occupation and identifies its own building and land schedule; the submitted documents do not provide an independent current-site inspection.
3. Master plan, architecture & building design
The GHMC building permit order identifies a residential building at the project site and records 431.04 Sq. Mtrs plot area, 431.04 Sq. Mtrs net plot area and 1,011.53 residential built-up area. It records 1 Stilt + 5 upper floors and a building height of 14.95.
The occupancy certificate extract also records the sanctioned floor area as 1011.53 and height as 14.95, and identifies the building as stilt plus five upper floors. It states that an occupancy certificate was issued for the residential building.
The supplied records do not provide a drawing-derived building footprint, flats-per-floor arrangement, lift or stair count, internal circulation plan, landscaped-area schedule, or a breakdown of gross built-up, FSI-counted, carpet and common areas. The permit order lists a tot-lot condition, but the occupancy-certificate extract records tot-lot area as 0 m2; facility status is set out below.
4. Homes, configurations & floor plans
TG-RERA’s unit schedule records ten homes: five 2BHK and five 3BHK. The following carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed carpet-area disclosures. The RERA saleable-area figures are shown separately. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 5 | 0 | 111.48 sq. m | 65.3–77.2 sq. m; median 71.2 sq. m | 36% |
| 3BHK | 5 | 5 | 0 | 156.07 sq. m | 77.1–92.2 sq. m; median 84.7 sq. m | 46% |
The drawing measurement covers two designs for each configuration and is flagged for review. For one drawn 2BHK, the labelled rooms include two bedrooms, two toilets, dining/kitchen and hall; a labelled balcony is excluded from the measured carpet area. For one drawn 3BHK, the labelled rooms include three bedrooms, three toilets, dining, kitchen, hall, puja and wash areas; its labelled balcony is excluded from measured carpet area. Room dimensions are drawing-based software measurements and should be checked against the plan. RERA unit details Floor plans
Carpet area is the drawing-measured internal area used in the software assessment; saleable area is the area disclosed in the RERA schedule and includes a share of common areas. The supplied evidence does not provide separately verified balcony/utility measurements for every design or a legal unit-by-unit allocation schedule. Booking counts have no stated portal snapshot date. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit order records 204.13 Sq.Mt. as stilt parking area and 204.1 as total parking area. It also states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The supplied permit extract gives no number of car or two-wheeler spaces, visitor or accessible-space provision, or unit-wise parking allocation.
The occupancy-certificate extract records parking area as 206.19 m2 in its sanctioned-plan entry and 204.1 m2 in its site-building-plan entry. The records do not establish exclusive ownership of any drawn parking bay or document individual parking allocations.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists project facilities and progress fields as follows. “100%” is the filed progress figure, not independent verification of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Area not supplied; building-permit order includes a tot-lot and perimeter greenery conditions. | RERA amenities | RERA schedule: 100%; occupancy-certificate extract records tot-lot area as 0 m2. No independent delivery verification supplied. |
| Water Conservation, Rain water Harvesting | GHMC permit order specifies rainwater-harvesting structures; it records 4 pits. | RERA amenities | RERA schedule: 100%; occupancy-certificate extract records 4 pits in both sanctioned-plan and site-building-plan entries. |
| Water Supply | Source, capacity and storage details are not supplied in the RERA amenity schedule. | RERA amenities | RERA schedule: “YES”, 100%; no independent verification supplied. |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System type and capacity not specified in the RERA amenity schedule. | RERA amenities | RERA schedule: “YES”, 100%; no independent verification supplied. |
| Internal Roads & Footpaths | No size or layout details supplied. | RERA amenities | RERA schedule: 0%. |
| Storm Water Drains | No system details supplied. | RERA amenities | RERA schedule: 0%. |
| Street Lighting | No details supplied. | RERA amenities | RERA schedule: 0%. |
| Community Buildings | No building or facility details supplied. | RERA amenities | RERA schedule: 0%. |
| Treatment and Disposal of Sewage and Sullage Water | No treatment or capacity details supplied. | RERA amenities | RERA schedule: 0%. |
| Solid Waste Management and Disposal | GHMC permit order requires a garbage house and includes waste-related conditions; the RERA amenity schedule records this item separately. | RERA amenities | RERA schedule: 0%; delivery not independently verified. |
| Energy management | No details supplied. | RERA amenities | RERA schedule: 0%. |
| Fire Protection and Fire Safety Requirements | GHMC permit order includes fire-safety conditions. | RERA amenities | RERA schedule: 0%; no independent verification of installed systems supplied. |
| Electrical Meter Room, Sub-Station, Receiving Station | GHMC permit order requires space for a transformer; no further facility details supplied. | RERA amenities | RERA schedule: 0%; delivery not independently verified. |
| Aggregate area of recreational Open Space | Area not supplied. | RERA amenities | RERA schedule: 0%. |
7. Utilities, building services & safety
The GHMC building permit order requires a rainwater-harvesting structure, space for a transformer and a garbage house; it records four rainwater-harvesting pits. The RERA amenity schedule marks water supply and sewerage as available and each as 100% complete, but supplies no water source, storage capacity, treatment capacity or sewage-treatment system details. RERA amenities
The permit order requires fire-fighting installations under the stated building-safety conditions, and a fire occupancy NOC is referenced as required before issue of an occupancy certificate. The RERA amenity schedule records fire protection and fire safety at 0%; the documents supplied do not detail installed fire equipment or independently establish its current status. RERA amenities
The supplied project records do not specify lift quantity or capacity, backup-power provision, EV charging, CCTV installation status, access-control arrangements, accessibility features, or the capacity and operating status of any building services. The building permit order includes conditions concerning CCTV, waste handling, worker safety and construction-stage dust control; these are approval conditions, not evidence by themselves that the facilities are installed or operating.
8. Location, access & connectivity
The registered project location is Madina Guda / Madeenaguda, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500049. The RERA land record identifies a 40 Feet Wide Road on the east boundary and an Existing 10 Feet and Proposed 40 Feet Wide Road on the south boundary. RERA record Land records
The supplied location record lists HITEC City — 4.7 km as a connectivity point. It provides no measured distances or travel times for other landmarks or public-transport facilities. Location record
9. Developer & development status
The registered promoter is MAHITHA DEVELOPERS, identified in the RERA filing as a partnership. The supplied corporate record includes GSTIN 36ABJFM5644A1ZE and lists SUBASH BABU KORRAPATI as Authorized Signatory and MOUNIKA KORRAPATI as Partner. Corporate record RERA filing Parties record
The RERA certificate records a promoter office at Village: Vasantha Nagar, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN: 500085. The project’s RERA Form B contains the promoter’s completion undertaking of 17-02-2025. The supplied records do not provide a current construction progress certificate or independently verified present site status.
10. Approvals, official records & documents
| Identifier / date | P02400004839; issued 23/08/2022; valid through 17/02/2025 as stated in the certificate |
|---|---|
| Scope and evidence | Registered project name and promoter; identifies Survey Nos. 202/2/A and 203/A and Plot Nos. 101 Part and 102 Part. |
| Identifier / date | 2203/GHMC/SLP/2022-BP; 17 February 2022 |
|---|---|
| Scope and evidence | Building permit order for the residential building; includes survey schedule, floor configuration, area and conditions. |
| Identifier / date | 000956/GHMC/0558/SLP2/2021-BP |
|---|---|
| Scope and evidence | File number recited in the permit and occupancy-certificate records. |
| Identifier / date | 3310/GHMC/SLP/2023-OC; 07 September 2023 |
|---|---|
| Scope and evidence | Occupancy certificate identifying the residential building at Plot Nos. 101 Part and 102 Part, Survey Nos. 202/2/A and 203/A. |
| Identifier / date | July 2022; authorized signatory K. Subash Babu |
|---|---|
| Scope and evidence | Promoter declaration for the project, including its stated completion date and fund-management undertaking. |
| Identifier / date | Document 246964 |
|---|---|
| Scope and evidence | Drawing source used for software-measured unit areas; those measurements are not RERA-filed carpet-area figures. |
1. Project at a glance
Project identity
Registered project name: MAHITHA S GREEN ORCHIDS B - BLOCK
Project type: Residential apartment project
Phase / registered portion: B - BLOCK; one building/block is recorded for this registered project.
TG-RERA registration: P02400004839, issued 23/08/2022; certificate states validity through 17/02/2025. No extension is recorded in the supplied registration certificate.
Registered promoter: Mahitha Developers; RERA filing identifies the organisation type as Partnership.
RERA status: The filing identifies the project as “New Project.” The registration validity dates above are separate from the completion deadline and do not establish current registration status.
Land and geographic identity
Locality: Madeenaguda / Madina Guda, as recorded in project documents
Revenue village: Madina Guda (also written Madeenaguda in project documents)
Mandal: Serilingampally
District: Ranga Reddy
PIN: 500049
Survey numbers and subdivisions: 202/2/A and 203/A
Plot reference: Plot Nos. 101 PART AND 102 PART
Registered site extent: RERA filing: 431.04 sq. m; total area and net area are each recorded as 431.04 sq. m, with affected area recorded as 0.
Boundaries: East: 40 Feet Wide Road; West: Plot No 114; North: Plot No 103; South: Existing 10 Feet and Proposed 40 Feet Wide Road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 2203/GHMC/SLP/2022-BP, dated 17 February 2022
Related building permit file: 000956/GHMC/0558/SLP2/2021-BP
Approved built-up area: 1,011.53 sq. m as recorded in the building permit order
Building count and configuration: One residential building, recorded as 1 Stilt + 5 upper floors in the permit order
Parking levels / area: The permit order records stilt parking area of 204.13 Sq.Mt. and total parking area of 204.1; it does not supply a parking-space count.
Unit counts: RERA unit schedule records 10 units: five 2BHK and five 3BHK.
Offering and status
RERA-filed configurations and saleable areas: 2BHK: 111.48 sq. m; 3BHK: 156.07 sq. m
Booked / available: Portal snapshot records 5 of 5 2BHK and 5 of 5 3BHK units booked, with 0 available in each configuration. The portal extract gives no as-of date; treat these counts as indicative.
Construction stage: RERA registration describes a new project; supplied GHMC documents include an occupancy certificate for the building. The supplied records do not establish a current, independently inspected construction stage.
Completion dates: Promoter’s RERA Form B undertaking states completion by 17-02-2025; the building permit order also records a construction completion deadline of 17 February, 2025.
Occupancy certificate: GHMC occupancy certificate 3310/GHMC/SLP/2023-OC, dated 07 September, 2023, identifies the residential building on Plot Nos. 101 Part and 102 Part in Survey Nos. 202/2/A and 203/A.
2. The project story
MAHITHA S GREEN ORCHIDS B - BLOCK is recorded with TG-RERA as a residential apartment project in Madina Guda / Madeenaguda, Serilingampally Mandal, Ranga Reddy District. Its registered land identity is Plot Nos. 101 Part and 102 Part in Survey Nos. 202/2/A and 203/A, with a site extent of 431.04 sq. m.
The RERA unit schedule lists ten apartments in one building: five 2BHK and five 3BHK homes. A GHMC building permit order records one stilt level and five upper floors. The project’s RERA registration certificate ran from 23/08/2022 through 17/02/2025, while the promoter’s Form B and the permit order give 17-02-2025 as the completion deadline. These dates describe registration validity and stated completion timing respectively; neither alone establishes present registration status.
A GHMC occupancy certificate for the identified building is in the supplied project record. The certificate records the building as fit for occupation and identifies its own building and land schedule; the submitted documents do not provide an independent current-site inspection.
3. Master plan, architecture & building design
The GHMC building permit order identifies a residential building at the project site and records 431.04 Sq. Mtrs plot area, 431.04 Sq. Mtrs net plot area and 1,011.53 residential built-up area. It records 1 Stilt + 5 upper floors and a building height of 14.95.
The occupancy certificate extract also records the sanctioned floor area as 1011.53 and height as 14.95, and identifies the building as stilt plus five upper floors. It states that an occupancy certificate was issued for the residential building.
The supplied records do not provide a drawing-derived building footprint, flats-per-floor arrangement, lift or stair count, internal circulation plan, landscaped-area schedule, or a breakdown of gross built-up, FSI-counted, carpet and common areas. The permit order lists a tot-lot condition, but the occupancy-certificate extract records tot-lot area as 0 m2; facility status is set out below.
4. Homes, configurations & floor plans
TG-RERA’s unit schedule records ten homes: five 2BHK and five 3BHK. The following carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed carpet-area disclosures. The RERA saleable-area figures are shown separately.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 5 | 0 | 111.48 sq. m | 65.3–77.2 sq. m; median 71.2 sq. m | 36% |
| 3BHK | 5 | 5 | 0 | 156.07 sq. m | 77.1–92.2 sq. m; median 84.7 sq. m | 46% |
The drawing measurement covers two designs for each configuration and is flagged for review. For one drawn 2BHK, the labelled rooms include two bedrooms, two toilets, dining/kitchen and hall; a labelled balcony is excluded from the measured carpet area. For one drawn 3BHK, the labelled rooms include three bedrooms, three toilets, dining, kitchen, hall, puja and wash areas; its labelled balcony is excluded from measured carpet area. Room dimensions are drawing-based software measurements and should be checked against the plan.
Carpet area is the drawing-measured internal area used in the software assessment; saleable area is the area disclosed in the RERA schedule and includes a share of common areas. The supplied evidence does not provide separately verified balcony/utility measurements for every design or a legal unit-by-unit allocation schedule. Booking counts have no stated portal snapshot date.
5. Parking & vehicle circulation
The GHMC permit order records 204.13 Sq.Mt. as stilt parking area and 204.1 as total parking area. It also states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The supplied permit extract gives no number of car or two-wheeler spaces, visitor or accessible-space provision, or unit-wise parking allocation.
The occupancy-certificate extract records parking area as 206.19 m2 in its sanctioned-plan entry and 204.1 m2 in its site-building-plan entry. The records do not establish exclusive ownership of any drawn parking bay or document individual parking allocations.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists project facilities and progress fields as follows. “100%” is the filed progress figure, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Area not supplied; building-permit order includes a tot-lot and perimeter greenery conditions. | RERA schedule: 100%; occupancy-certificate extract records tot-lot area as 0 m2. No independent delivery verification supplied. | |
| Water Conservation, Rain water Harvesting | GHMC permit order specifies rainwater-harvesting structures; it records 4 pits. | RERA schedule: 100%; occupancy-certificate extract records 4 pits in both sanctioned-plan and site-building-plan entries. | |
| Water Supply | Source, capacity and storage details are not supplied in the RERA amenity schedule. | RERA schedule: “YES”, 100%; no independent verification supplied. | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System type and capacity not specified in the RERA amenity schedule. | RERA schedule: “YES”, 100%; no independent verification supplied. | |
| Internal Roads & Footpaths | No size or layout details supplied. | RERA schedule: 0%. | |
| Storm Water Drains | No system details supplied. | RERA schedule: 0%. | |
| Street Lighting | No details supplied. | RERA schedule: 0%. | |
| Community Buildings | No building or facility details supplied. | RERA schedule: 0%. | |
| Treatment and Disposal of Sewage and Sullage Water | No treatment or capacity details supplied. | RERA schedule: 0%. | |
| Solid Waste Management and Disposal | GHMC permit order requires a garbage house and includes waste-related conditions; the RERA amenity schedule records this item separately. | RERA schedule: 0%; delivery not independently verified. | |
| Energy management | No details supplied. | RERA schedule: 0%. | |
| Fire Protection and Fire Safety Requirements | GHMC permit order includes fire-safety conditions. | RERA schedule: 0%; no independent verification of installed systems supplied. | |
| Electrical Meter Room, Sub-Station, Receiving Station | GHMC permit order requires space for a transformer; no further facility details supplied. | RERA schedule: 0%; delivery not independently verified. | |
| Aggregate area of recreational Open Space | Area not supplied. | RERA schedule: 0%. |
7. Utilities, building services & safety
The GHMC building permit order requires a rainwater-harvesting structure, space for a transformer and a garbage house; it records four rainwater-harvesting pits. The RERA amenity schedule marks water supply and sewerage as available and each as 100% complete, but supplies no water source, storage capacity, treatment capacity or sewage-treatment system details.
The permit order requires fire-fighting installations under the stated building-safety conditions, and a fire occupancy NOC is referenced as required before issue of an occupancy certificate. The RERA amenity schedule records fire protection and fire safety at 0%; the documents supplied do not detail installed fire equipment or independently establish its current status.
The supplied project records do not specify lift quantity or capacity, backup-power provision, EV charging, CCTV installation status, access-control arrangements, accessibility features, or the capacity and operating status of any building services. The building permit order includes conditions concerning CCTV, waste handling, worker safety and construction-stage dust control; these are approval conditions, not evidence by themselves that the facilities are installed or operating.
8. Location, access & connectivity
The registered project location is Madina Guda / Madeenaguda, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500049. The RERA land record identifies a 40 Feet Wide Road on the east boundary and an Existing 10 Feet and Proposed 40 Feet Wide Road on the south boundary.
The supplied location record lists HITEC City — 4.7 km as a connectivity point. It provides no measured distances or travel times for other landmarks or public-transport facilities.
9. Developer & development status
The registered promoter is MAHITHA DEVELOPERS, identified in the RERA filing as a partnership. The supplied corporate record includes GSTIN 36ABJFM5644A1ZE and lists SUBASH BABU KORRAPATI as Authorized Signatory and MOUNIKA KORRAPATI as Partner.
The RERA certificate records a promoter office at Village: Vasantha Nagar, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN: 500085. The project’s RERA Form B contains the promoter’s completion undertaking of 17-02-2025. The supplied records do not provide a current construction progress certificate or independently verified present site status.
10. Approvals, official records & documents
| Identifier / date | P02400004839; issued 23/08/2022; valid through 17/02/2025 as stated in the certificate |
|---|---|
| Scope and evidence | Registered project name and promoter; identifies Survey Nos. 202/2/A and 203/A and Plot Nos. 101 Part and 102 Part. |
| Identifier / date | 2203/GHMC/SLP/2022-BP; 17 February 2022 |
|---|---|
| Scope and evidence | Building permit order for the residential building; includes survey schedule, floor configuration, area and conditions. |
| Identifier / date | 000956/GHMC/0558/SLP2/2021-BP |
|---|---|
| Scope and evidence | File number recited in the permit and occupancy-certificate records. |
| Identifier / date | 3310/GHMC/SLP/2023-OC; 07 September 2023 |
|---|---|
| Scope and evidence | Occupancy certificate identifying the residential building at Plot Nos. 101 Part and 102 Part, Survey Nos. 202/2/A and 203/A. |
| Identifier / date | July 2022; authorized signatory K. Subash Babu |
|---|---|
| Scope and evidence | Promoter declaration for the project, including its stated completion date and fund-management undertaking. |
| Identifier / date | Document 246964 |
|---|---|
| Scope and evidence | Drawing source used for software-measured unit areas; those measurements are not RERA-filed carpet-area figures. |
Frequently asked questions
Is MAHITHA S GREEN ORCHIDS B - BLOCK registered with Telangana RERA?
Yes. MAHITHA S GREEN ORCHIDS B - BLOCK is registered with the Telangana Real Estate Regulatory Authority as P02400004839; the registration status is New Project.
Who is the developer of MAHITHA S GREEN ORCHIDS B - BLOCK?
The promoter named in the RERA registration is MAHITHA DEVELOPERS.
Where is MAHITHA S GREEN ORCHIDS B - BLOCK located?
MAHITHA S GREEN ORCHIDS B - BLOCK is in Madeenaguda, Madina Guda, Serilingampally, Rangareddy, Telangana (500049).
When will MAHITHA S GREEN ORCHIDS B - BLOCK be completed?
The promoter's proposed date of completion filed with RERA is 17/02/2025. This is the promoter's declaration, not a guarantee.