SAI SREE DIVIJ is a residential apartment project in Madina Guda / Madeenaguda, Serilingampally mandal, Ranga Reddy district, developed by registered promoter UVR INFRA. The RERA filing states a site area of 334.44 sq. m and one building; the GHMC permit describes 1 Stilt + 5 upper floors. The RERA unit schedule lists 10 2BHK apartments. The project is registered under TG-RERA P02400005331, with a promoter-declared completion date of 1 February 2025.

More from Uvr Infra · 3 projects →

01What we found

Period endedTG-RERA registration ran to 1 Feb 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSAI SREE DIVIJ
Project typeResidential apartment project
Phase / registered portionNot separately identified as a phase; the RERA record covers Survey No. 161 and Plot Nos. 30 and 31.
TG-RERA registrationP02400005331
Registration validity23 November 2022 to 1 February 2025. The supplied certificate says two years and notes validity could be extended by the Authority; no extension is recorded in the supplied evidence. Registration validity is distinct from the completion deadline and from occupancy certification.
Registered promoterUVR INFRA; the RERA filing identifies the organisation type as a partnership.
RERA status in supplied recordRegistration certificate issued. The supplied certificate’s validity ended on 1 February 2025; current registration status is not established by the supplied record.

RERA record RERA filing Corporate record

Land and geographic identity

FieldProject record
LocalityMadeenaguda / Madina Guda, as recorded in the project materials
Revenue villageMadina Guda (also recorded in project documents as Madinaguda or Madeenaguda)
MandalSerilingampally
DistrictRanga Reddy
PIN500049
Project survey number(s)Survey No. 161; no subdivision is stated in the supplied project identity.
Plot numbers30 and 31
Registered site extent334.44 sq. m in the RERA land details; the GHMC building-permit order states a plot area and net plot area of 332.88 Sq. Mtrs.
RERA land-area fieldsTotal area 334.44 sq. m; net area 334.44 sq. m; road-widening/FTL/nala-affected area recorded as 0 sq. m.
Boundaries in RERA filingEast: Plot Nos. 44 and 45; West: 30 feet wide road; North: Plot No. 32; South: 30 feet wide road.

RERA record RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit Order No. 2023/GHMC/SLP/2022-BP, approved 1 February 2022; GHMC file no. 004183/GHMC/2327/SLP2/2021-BP.
Approved built-up area1,019.91 sq. m is stated in the RERA project information. The supplied GHMC permit extraction separately states 861.90 Sq.Mt. for residential upper floors and 158.01 Sq.Mt. for the stilt; these are the permit’s listed components, not a separately described RERA built-up-area figure.
Building count and configurationOne building; GHMC permit describes Building A (SRI KRANTH), with 1 Stilt + 5 upper floors.
Parking levels / areaGHMC permit lists 158 as total parking area and says the stilt approved for parking must be used exclusively for vehicle parking. A parking-space count is not established by the supplied evidence.
Unit countsRERA project details state 1 total building unit and 1 proposed building unit as per agreement; the RERA unit schedule separately lists 10 apartments. GHMC’s extracted permit conditions state sanctioned unit numbers must not be increased, but the supplied extraction does not give the sanctioned apartment count.

RERA filing RERA filing Approvals record

Offering and status

FieldProject record
RERA-filed configuration2BHK
RERA-filed units10 units; 0 booked and 10 available in the portal data, which has no stated as-of date and is indicative only.
RERA-filed saleable area107.86 sq. m per unit.
Construction stageNot established by the supplied evidence. The RERA registration certificate and building-permit extraction do not certify construction progress.
Completion datePromoter-declared completion date: 1 February 2025, in the Form B declaration and registration/permit records.
Occupancy / completion certificateNo completion certification is recorded in the supplied building-permit extraction. GHMC’s permit requires an Occupancy Certificate before occupation; an issued OC is not supplied or established here.

RERA unit table RERA unit table Document index

2. The project story

SAI SREE DIVIJ is registered with TG-RERA as a residential apartment project on Survey No. 161, Plot Nos. 30 and 31, in the Madina Guda / Madeenaguda area of Serilingampally mandal, Ranga Reddy district. Its registered promoter is UVR INFRA. The project record describes one building, while the RERA unit schedule lists ten 2BHK apartments. RERA record RERA filing RERA unit table Corporate record

GHMC’s supplied building-permit order describes a residential building with one stilt level and five upper floors. The promoter’s Form B declaration and the permit record give 1 February 2025 as the completion date. The evidence supplied for this overview does not establish the construction stage, independently verified progress, or an issued occupancy certificate. GHMC’s permit states that an OC is compulsory before occupation.

3. Master plan, architecture & building design

The project filing gives a site area of 334.44 sq. m and an approved built-up area of 1,019.91 sq. m. The GHMC permit extraction describes a 332.88 Sq. Mtrs. plot/net plot area and one building, A (SRI KRANTH), configured as 1 Stilt + 5 upper floors. It lists 861.90 Sq.Mt. for residential upper floors and 158.01 Sq.Mt. for the stilt. These figures are reported as stated in their respective records; the supplied material does not define them as carpet area, saleable area or FSI-counted area. RERA filing RERA filing

The supplied floor-plan document is described in the RERA file as a submission requiring the floor-plan approval document or equivalent declaration; the extraction indicates an approved-plan drawing, but does not provide reliable, RERA-matched unit layouts for the filed 2BHK configuration. Detailed flat arrangements, flats per floor, lifts, stairs, building entries, circulation and landscaping/open-space dimensions are not established by the supplied drawing-derived data. Document index

The permit extraction identifies one rainwater-harvesting pit, a transformer space, a garbage house, a septic tank and a green strip/tot-lot condition. It does not provide measured sizes for these features.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010107.86 sq. mNot measured for the RERA-filed configurationNot supplied

The unit counts, booking figures and saleable area are from the TG-RERA unit record; the portal data has no stated as-of date, so availability is indicative rather than a live inventory confirmation. RERA saleable area is distinct from carpet area: the supplied floor-plan measurement note says drawing-based carpet measurements are software-measured, are not RERA disclosures, and are smaller than saleable area, which also includes a share of common areas. RERA unit table RERA unit table Floor plans

A supplied drawing-derived measurement record reports four measured 3BHK designs, with software-measured carpet area from 49.8 to 58.3 sq. m (median 55.5 sq. m). This is not a RERA-filed configuration and is not matched to the project’s RERA 2BHK schedule; the drawing measurement is marked as needing review. It is therefore not presented as the project’s RERA offering. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction lists a total parking area of 158 and requires the approved stilt parking to be used exclusively for parking, without partition walls or rolling shutters and without conversion to another use. The RERA filing records a mortgage area of 106 sq. m, while the permit states that the mortgaged built-up area may be registered only after an OC is produced. The supplied records do not establish a number of parking spaces, visitor or accessible bays, parking allocation to individual apartments, a ramp arrangement, or EV charging. RERA filing RERA unit table

6. Amenities, recreation & open spaces

Green strip / tot-lot
Description / sizeGHMC permit requires a tot-lot to be fenced and maintained as greenery before OC; no size supplied.
Evidence sourceGHMC building-permit order
Declared progress / verified statusPermit condition; completion not independently established.
Rainwater harvesting
Description / sizeOne rainwater-harvesting pit is listed.
Evidence sourceGHMC building-permit order
Declared progress / verified statusPermit-listed provision; completion not independently established.
Water supply
Description / sizeRERA amenity record marks water supply “YES”; no source or capacity is stated there.
Evidence sourceRERA amenity record
Declared progress / verified statusDeclared; progress shown as 0%.
Sewerage and drainage
Description / sizeRERA amenity record lists sewerage, storm-water drains, and sewage/sullage treatment and disposal; the GHMC permit calls for a septic tank of suitable size.
Evidence sourceRERA amenity record; GHMC building-permit order
Declared progress / verified statusRERA progress is shown as 0%; the evidence does not establish completion.
Solid-waste management
Description / sizeRERA amenity record lists solid-waste management; GHMC permit requires a garbage house within the premises.
Evidence sourceRERA amenity record; GHMC building-permit order
Declared progress / verified statusRERA progress is shown as 0%; completion not established.
Electrical room / substation
Description / sizeRERA amenity record marks an electrical meter room/sub-station/receiving station “YES”; GHMC permit requires transformer space.
Evidence sourceRERA amenity record; GHMC building-permit order
Declared progress / verified statusDeclared/permit-listed; completion not established.
Fire protection and safety
Description / sizeListed in the RERA amenity schedule and addressed by GHMC permit conditions; the permit requires an Occupancy Fire NOC before OC.
Evidence sourceRERA amenity record; GHMC building-permit order
Declared progress / verified statusNo completion or clearance is established by the supplied evidence.

RERA amenities

The supplied RERA amenity schedule lists internal roads and footpaths, street lighting, community buildings, energy management and aggregate recreational open space, but does not provide sizes or confirm delivery; the recorded progress for these items is 0%. No clubhouse, pool, gym or other recreational facility is established by the RERA/approval documents supplied for this overview. RERA amenities

7. Utilities, building services & safety

GHMC’s permit lists a rainwater-harvesting pit, transformer space, garbage house and septic tank of suitable size. The RERA amenity schedule marks water supply and rainwater harvesting “YES,” but does not identify the water source, storage, treatment, sewerage-treatment capacity, reuse arrangements, power backup or electrical supply capacity. The permit does not state lift count or capacity, and the supplied records do not establish completed building services. RERA amenities

The permit requires statutory fire-fighting installations, structural and means-of-escape safety provisions, an Occupancy Fire NOC before the OC, and an OC before occupation. These are approval conditions; the supplied evidence does not establish that the systems are installed, inspected or cleared.

8. Location, access & connectivity

The registered project location is Madina Guda / Madeenaguda, Serilingampally mandal, Ranga Reddy district, Telangana 500049. The RERA filing gives the site boundaries as Plot Nos. 44 and 45 to the east, a 30 feet wide road to the west, Plot No. 32 to the north, and a 30 feet wide road to the south. The GHMC permit extraction also refers to an 18 mt. road in its conditions; the supplied materials do not identify which site boundary this road-width reference concerns. RERA record RERA filing

A supplied location record lists HITEC City at 4.7 km. This is a recorded distance; no travel time is supplied. Location record

9. Developer & development status

The registered promoter is UVR INFRA, identified in the RERA filing as a partnership. Its GSTIN is 36AAEFU3893R1Z7. The registration certificate gives the promoter’s office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500049. The supplied evidence does not provide a verified official website or contact number. Corporate record RERA filing

The promoter’s Form B declaration states a completion period ending 1 February 2025. The available evidence does not establish present construction progress or an issued OC; the completion deadline should not be read as proof that the project was completed.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SAI SREE DIVIJ, registration P02400005331, issued 23 November 2022 and valid through 1 February 2025.
GHMC building permitBuilding Permit Order 2023/GHMC/SLP/2022-BP, approved 1 February 2022; GHMC file 004183/GHMC/2327/SLP2/2021-BP.
Form B declarationPromoter-authorised declaration, with completion undertaking of 1 February 2025 and statements concerning title, encumbrances and project funds.
Floor-plan submissionRERA document entry 262407 identifies the floor-plan material; the supplied record does not establish a RERA-matched 2BHK drawing measurement.
Occupancy / completion certificateNot supplied; the GHMC permit requires an OC before occupation.

Frequently asked questions

Is SAI SREE DIVIJ registered with Telangana RERA?

Yes. SAI SREE DIVIJ is registered with the Telangana Real Estate Regulatory Authority as P02400005331; the registration status is New Project.

Who is the developer of SAI SREE DIVIJ?

The promoter named in the RERA registration is UVR INFRA.

Where is SAI SREE DIVIJ located?

SAI SREE DIVIJ is in MADEENAGUDA, Madina Guda, Serilingampally, Rangareddy, Telangana (500049).

When will SAI SREE DIVIJ be completed?

The promoter's proposed date of completion filed with RERA is 01/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Madina Guda