Pride Elina
PRIDE INFRA DEVELOPERS · Rangareddy · RERA P02400003180
PRIDE ELINA is a residential apartment project in WARD NO 4, Hayathnagar Mandal, Ranga Reddy District. The registered promoter is Pride Infra Developers, a partnership. The project is on a 498.13 sq m site and comprises one proposed building with 1 Stilt + 5 upper floors and 10 3BHK units. It is registered under TG-RERA number P02400003180, with proposed completion on 16/07/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | PRIDE ELINA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied records; registration and building permit refer to the project at the stated site. RERA record |
| TG-RERA registration | P02400003180 RERA record |
| Registration validity | 24/07/2021 to 16/03/2027; the certificate states five years. This is registration validity, not a statement that construction is complete. RERA record |
| Registered promoter | Pride Infra Developers; the promoter record identifies it as a partnership. RERA record Corporate record |
| RERA status in supplied record | New Project; registration certificate supplied. No extension is recorded in that certificate. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / ward | WARD NO 4; the filed land description also identifies Commercial Tax Colony. RERA record RERA filing |
| Revenue village | HAYATHNAGAR; the filed land description specifies Khalsa Hayathnagar Village. RERA record |
| Mandal | Hayathnagar; also described in the Form B land description as Hayathnagar Revenue Mandal. RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501505 RERA record |
| Project survey numbers | 19/A and 19/AA. The supplied project records do not state a separate subdivision suffix for either number. RERA filing Land records |
| RERA plot/site description | B-16 AND WEST PART OF WESTERN PART P. NO. B-17 RERA filing |
| Registered site extent | 498.13 sq m in the project land fields and building permit. The Form B land description states 595 Sq.Yards. RERA filing |
| Total / net area | Total area 498.13 sq m; net area 498.13 sq m; filed road-widening/FTL/Nala affected area 0. RERA filing |
| Boundaries | East: PLOT NO 15; west: PLOT NO B-17; north: NEIGHBOURS LAND; south: 50FT WIDE ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 2/C3/04172/2021, approved 16 March, 2021; the permit also records file no. 2/C3/03459/2021. Approvals record |
| Sanctioned building | Building - PROPOSED -2 (MM); 1 Stilt + 5 upper floors. |
| Sanctioned height | 15 m |
| Approved built-up area | The RERA filing’s built-up-area field states 1,402.73 sq m. The permit separately lists 1,377.20 m² for upper floors and 249.91 m² for parking floors; these are distinct permit entries, not interchangeable measures. RERA filing |
| Approved parking / stilt area | Parking floors area 249.91 m² in the permit. The supplied extracts do not establish a parking-space count. |
| RERA-declared units | 10 units, in one building; the filing identifies one proposed building unit. RERA unit table RERA filing |
| Floor-by-floor unit schedule | Not disclosed in the supplied extract. |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed unit type | 3BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 152.58 sq m RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so the counts are indicative. RERA unit table |
| Construction stage | The supplied permit identifies proposed construction; no independently verified current site progress is supplied. The RERA amenity records show 0% progress for the listed items. RERA amenities |
| Completion dates in supplied records | The RERA header states proposed completion 16/07/2027; the Form B promoter declaration undertakes completion by 17-03-2027. RERA record |
| Occupancy / completion certificate | The permit extract records completion_certified: false. No occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation. |
2. The project story
PRIDE ELINA is registered as a residential apartment project on the described B-16 and part-B-17 site in Khalsa Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. Its TG-RERA filing identifies one building and 10 proposed 3BHK apartments; the registration certificate identifies the registered project and its validity period. RERA record RERA filing RERA filing
The GHMC permit describes a proposed building with 1 Stilt + 5 upper floors and a height of 15 m. This is the sanctioned configuration in the supplied permit, not evidence that construction has reached any particular floor. The supplied RERA amenity progress entries are all recorded as 0%; no independent site inspection or verified construction-stage evidence is provided here. RERA amenities
The promoter’s Form B affidavit declares that the project land is free from encumbrances and undertakes completion by 17-03-2027. These are promoter declarations. The project header separately records a proposed completion date of 16/07/2027; the dates are shown in their respective records and are not a site-progress finding. RERA record
3. Master plan, architecture & building design
The RERA filing identifies a 498.13 sq m site and 1,402.73 sq m approved built-up area. The GHMC permit describes a single proposed residential building, 1 Stilt + 5 upper floors, 15 m high, with upper-floor area 1,377.20 m² and parking-floor area 249.91 m². These are separately labelled figures from different fields of the supplied records; the evidence does not provide a reconciled area schedule or a separate FSI-counted area. RERA filing RERA filing
A floor-plan/layout document is present in the RERA file, but the supplied evidence does not establish a full architectural schedule for the building—such as flats per floor, lift and stair counts, entrances, internal circulation, or a detailed open-space plan. The permit lists 20 trees and includes a tot-lot and greenery conditions; it does not provide a tot-lot area in the supplied extract.
The building permit requires construction in accordance with the sanctioned plan and separately identifies a FIRST FLOOR area of 140.53 m² as handed over in its permit fields. The extract does not explain that entry’s scope; it is not treated here as a statement that the building or a floor is complete or occupied.
4. Homes, configurations & floor plans
- The TG-RERA record lists 10 3BHK units, all shown as available and none booked in the last-read portal data; no as-of date accompanies those counts. The RERA-filed saleable area is 152.58 sq m per unit. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 152.58 sq m | Software-measured range: 94.5–105.9 sq m; median 101.8 sq m | 33% |
- The carpet-area figures are software measurements from the filed floor-plan drawing, not TG-RERA disclosures; the supplied measurement record says four flat designs were measured and notes one item needs review. The stated median is also reported as 1096 sq ft. Verify the measured geometry against the drawing before relying on it. RERA unit details Floor plans
- The measured example drawing identifies a living/kitchen, drawing room, three bedrooms, two toilets, and a 2.00 M. WIDE BALC. The balcony is excluded from the stated carpet measurement. The RERA saleable area and drawing-measured carpet area are different area concepts; the evidence does not provide a separate RERA-filed carpet area or a unit-specific common-area allocation. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC permit records 249.91 m² as parking-floors area and states that the cellar and stilt approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and must not be converted to another use. The supplied extract describes 1 Stilt + 5 upper floors but does not establish a cellar count or the number of car, two-wheeler, visitor, or accessible spaces.
- The promoter-marketing record lists “Closed Car Parking,” but no TG-RERA unit-wise parking allocation or exclusive ownership documentation is supplied. A parking provision or drawn bay does not by itself establish an allottee’s exclusive right to a particular space. Promoter website
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule lists the following facilities or works. Each item is recorded at 0% in the supplied progress extract; that is a filed progress value, not an independent site verification. RERA amenities
| Description / size | Size not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Size/capacity not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Type/capacity not specified in the extract |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Size not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Area not stated; permit also requires a fenced tot-lot maintained as greenery |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities; GHMC permit |
| Declared progress / verified status | 0% in RERA schedule; completion not independently verified |
| Description / size | Details not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Details/size not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | System/capacity not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Details/capacity not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Permit requires a rainwater-harvesting structure; size/capacity not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities; GHMC permit |
| Declared progress / verified status | “YES” in the RERA schedule; 0% progress; completion not independently verified |
| Description / size | Details not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | System details not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities; GHMC permit |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Details/capacity not stated; permit requires transformer space |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities; GHMC permit |
| Declared progress / verified status | 0%; no independent completion verification supplied |
| Description / size | Area not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied |
7. Utilities, building services & safety
- The TG-RERA schedule includes water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire safety, and electrical meter/sub-station/receiving-station facilities. The supplied extract gives no capacities or detailed designs for these systems. The permit requires a rainwater-harvesting structure, a garbage house within the premises, space for a transformer, and services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. These are requirements or filed facility categories, not confirmation of installation or completion. RERA amenities
- The permit also states that an occupancy certificate is compulsory before occupation and requires an occupancy Fire NOC before issue of the occupancy certificate. No occupancy certificate or Fire NOC is included in the supplied documents. The available evidence does not specify lift count or capacity, backup-power provision, water storage/treatment capacity, CCTV/security systems, accessible routes, or EV charging. Document index
8. Location, access & connectivity
- The registered location is WARD NO 4, HAYATHNAGAR revenue village, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The RERA land fields describe the southern boundary as a 50FT WIDE ROAD. The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 0.8 km; no route, travel time, public-transport details, or other measured landmark distances are supplied. RERA record RERA filing Location record
- The project is identified in the filed land description as Commercial Tax Colony in Khalsa Hayathnagar Village. The available evidence does not provide a verified neighborhood or public-transport connectivity schedule.
9. Developer & development status
- The registered promoter is PRIDE INFRA DEVELOPERS, identified in the RERA filing as a partnership. The listed partners are T SUDHARSHAN REDDY, VARALA SAKETH REEDY, and BOMMIDI SUMANTH REDDY; THUMMALA SIDDHARTHA REDDY is listed as authorized signatory. The supplied promoter address is 165, VAIDEHI NAGAR`, KHALSA HAYATHNAGAR VILLAGE, WARD NO 4, Hayathnagar, Ranga Reddy, 501505. The evidence does not supply a verified official website or contact details. Corporate record Parties record RERA filing
- The Form B affidavit, dated 20th day of April 2021, is a promoter declaration and includes a completion undertaking of 17-03-2027. The project header records proposed completion 16/07/2027; the supplied materials do not establish a revised-completion order or verified construction progress. The RERA registration certificate runs through 16/03/2027; registration validity, the stated completion dates, and occupancy status are distinct matters. No occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C for PRIDE ELINA, registration P02400003180, issued 24/07/2021 and valid through 16/03/2027. |
| GHMC building permit | Building Permit Order dated 16 March, 2021, approval no. 2/C3/04172/2021, file no. 2/C3/03459/2021; identifies Survey Nos. 19/A and 19/AA, site area 498.13 m², and proposed 1 Stilt + 5 upper floors. |
| Form B promoter declaration | Dated 20th day of April 2021; identifies the land as Plot No. B-16 and B-17, total 595 Sq.Yards, forming part of Sy.Nos. 19/A, 19/AA, and contains promoter declarations and undertakings. |
| Filed floor-plan/layout document | TG-RERA file includes document 164848, described as a layout-plan submission; the supplied drawing-based measurement record uses it for apartment-plan measurements. |
| Occupancy / completion documentation | No occupancy or completion certificate is supplied; the building-permit extract marks completion certified as false. Document index |
| Other project records | The supplied file includes a partnership deed, title-search report, sale-agreement form, encumbrance statement and other title-chain documents. Their title and encumbrance implications are addressed in the relevant report sections. Document index |
1. Project at a glance
Project identity
Registered project name: PRIDE ELINA
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied records; registration and building permit refer to the project at the stated site.
TG-RERA registration: P02400003180
Registration validity: 24/07/2021 to 16/03/2027; the certificate states five years. This is registration validity, not a statement that construction is complete.
Registered promoter: Pride Infra Developers; the promoter record identifies it as a partnership.
RERA status in supplied record: New Project; registration certificate supplied. No extension is recorded in that certificate.
Land and geographic identity
Locality / ward: WARD NO 4; the filed land description also identifies Commercial Tax Colony.
Revenue village: HAYATHNAGAR; the filed land description specifies Khalsa Hayathnagar Village.
Mandal: Hayathnagar; also described in the Form B land description as Hayathnagar Revenue Mandal.
District: Ranga Reddy
PIN: 501505
Project survey numbers: 19/A and 19/AA. The supplied project records do not state a separate subdivision suffix for either number.
RERA plot/site description: B-16 AND WEST PART OF WESTERN PART P. NO. B-17
Registered site extent: 498.13 sq m in the project land fields and building permit. The Form B land description states 595 Sq.Yards.
Total / net area: Total area 498.13 sq m; net area 498.13 sq m; filed road-widening/FTL/Nala affected area 0.
Boundaries: East: PLOT NO 15; west: PLOT NO B-17; north: NEIGHBOURS LAND; south: 50FT WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 2/C3/04172/2021, approved 16 March, 2021; the permit also records file no. 2/C3/03459/2021.
Sanctioned building: Building - PROPOSED -2 (MM); 1 Stilt + 5 upper floors.
Sanctioned height: 15 m
Approved built-up area: The RERA filing’s built-up-area field states 1,402.73 sq m. The permit separately lists 1,377.20 m² for upper floors and 249.91 m² for parking floors; these are distinct permit entries, not interchangeable measures.
Approved parking / stilt area: Parking floors area 249.91 m² in the permit. The supplied extracts do not establish a parking-space count.
RERA-declared units: 10 units, in one building; the filing identifies one proposed building unit.
Floor-by-floor unit schedule: Not disclosed in the supplied extract.
Offering and status
RERA-filed unit type: 3BHK
RERA-filed saleable area: 152.58 sq m
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so the counts are indicative.
Construction stage: The supplied permit identifies proposed construction; no independently verified current site progress is supplied. The RERA amenity records show 0% progress for the listed items.
Completion dates in supplied records: The RERA header states proposed completion 16/07/2027; the Form B promoter declaration undertakes completion by 17-03-2027.
Occupancy / completion certificate: The permit extract records completion_certified: false. No occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation.
2. The project story
PRIDE ELINA is registered as a residential apartment project on the described B-16 and part-B-17 site in Khalsa Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. Its TG-RERA filing identifies one building and 10 proposed 3BHK apartments; the registration certificate identifies the registered project and its validity period.
The GHMC permit describes a proposed building with 1 Stilt + 5 upper floors and a height of 15 m. This is the sanctioned configuration in the supplied permit, not evidence that construction has reached any particular floor. The supplied RERA amenity progress entries are all recorded as 0%; no independent site inspection or verified construction-stage evidence is provided here.
The promoter’s Form B affidavit declares that the project land is free from encumbrances and undertakes completion by 17-03-2027. These are promoter declarations. The project header separately records a proposed completion date of 16/07/2027; the dates are shown in their respective records and are not a site-progress finding.
3. Master plan, architecture & building design
The RERA filing identifies a 498.13 sq m site and 1,402.73 sq m approved built-up area. The GHMC permit describes a single proposed residential building, 1 Stilt + 5 upper floors, 15 m high, with upper-floor area 1,377.20 m² and parking-floor area 249.91 m². These are separately labelled figures from different fields of the supplied records; the evidence does not provide a reconciled area schedule or a separate FSI-counted area.
A floor-plan/layout document is present in the RERA file, but the supplied evidence does not establish a full architectural schedule for the building—such as flats per floor, lift and stair counts, entrances, internal circulation, or a detailed open-space plan. The permit lists 20 trees and includes a tot-lot and greenery conditions; it does not provide a tot-lot area in the supplied extract.
The building permit requires construction in accordance with the sanctioned plan and separately identifies a FIRST FLOOR area of 140.53 m² as handed over in its permit fields. The extract does not explain that entry’s scope; it is not treated here as a statement that the building or a floor is complete or occupied.
4. Homes, configurations & floor plans
- The TG-RERA record lists 10 3BHK units, all shown as available and none booked in the last-read portal data; no as-of date accompanies those counts. The RERA-filed saleable area is 152.58 sq m per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 152.58 sq m | Software-measured range: 94.5–105.9 sq m; median 101.8 sq m | 33% |
- The carpet-area figures are software measurements from the filed floor-plan drawing, not TG-RERA disclosures; the supplied measurement record says four flat designs were measured and notes one item needs review. The stated median is also reported as 1096 sq ft. Verify the measured geometry against the drawing before relying on it.
- The measured example drawing identifies a living/kitchen, drawing room, three bedrooms, two toilets, and a 2.00 M. WIDE BALC. The balcony is excluded from the stated carpet measurement. The RERA saleable area and drawing-measured carpet area are different area concepts; the evidence does not provide a separate RERA-filed carpet area or a unit-specific common-area allocation.
5. Parking & vehicle circulation
- The GHMC permit records 249.91 m² as parking-floors area and states that the cellar and stilt approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and must not be converted to another use. The supplied extract describes 1 Stilt + 5 upper floors but does not establish a cellar count or the number of car, two-wheeler, visitor, or accessible spaces.
- The promoter-marketing record lists “Closed Car Parking,” but no TG-RERA unit-wise parking allocation or exclusive ownership documentation is supplied. A parking provision or drawn bay does not by itself establish an allottee’s exclusive right to a particular space.
6. Amenities, recreation & open spaces
The TG-RERA amenity schedule lists the following facilities or works. Each item is recorded at 0% in the supplied progress extract; that is a filed progress value, not an independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Water Supply | Size/capacity not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Type/capacity not specified in the extract | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Storm Water Drains | Size not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Green Strip/TOT LOT/Park | Area not stated; permit also requires a fenced tot-lot maintained as greenery | TG-RERA amenity schedule; GHMC permit | 0% in RERA schedule; completion not independently verified |
| Street Lighting | Details not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Community Buildings | Details/size not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Treatment and Disposal of Sewage and Sullage Water | System/capacity not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Solid Waste Management and Disposal | Details/capacity not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Water Conservation, Rain water Harvesting | Permit requires a rainwater-harvesting structure; size/capacity not stated | TG-RERA amenity schedule; GHMC permit | “YES” in the RERA schedule; 0% progress; completion not independently verified |
| Energy management | Details not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
| Fire Protection and Fire Safety Requirements | System details not stated | TG-RERA amenity schedule; GHMC permit | 0%; no independent completion verification supplied |
| Electrical Meter Room, Sub-Station, Receiving Station | Details/capacity not stated; permit requires transformer space | TG-RERA amenity schedule; GHMC permit | 0%; no independent completion verification supplied |
| Aggregate area of recreational Open Space | Area not stated | TG-RERA amenity schedule | 0%; no independent completion verification supplied |
7. Utilities, building services & safety
- The TG-RERA schedule includes water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire safety, and electrical meter/sub-station/receiving-station facilities. The supplied extract gives no capacities or detailed designs for these systems. The permit requires a rainwater-harvesting structure, a garbage house within the premises, space for a transformer, and services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. These are requirements or filed facility categories, not confirmation of installation or completion.
- The permit also states that an occupancy certificate is compulsory before occupation and requires an occupancy Fire NOC before issue of the occupancy certificate. No occupancy certificate or Fire NOC is included in the supplied documents. The available evidence does not specify lift count or capacity, backup-power provision, water storage/treatment capacity, CCTV/security systems, accessible routes, or EV charging.
8. Location, access & connectivity
- The registered location is WARD NO 4, HAYATHNAGAR revenue village, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The RERA land fields describe the southern boundary as a 50FT WIDE ROAD. The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 0.8 km; no route, travel time, public-transport details, or other measured landmark distances are supplied.
- The project is identified in the filed land description as Commercial Tax Colony in Khalsa Hayathnagar Village. The available evidence does not provide a verified neighborhood or public-transport connectivity schedule.
9. Developer & development status
- The registered promoter is PRIDE INFRA DEVELOPERS, identified in the RERA filing as a partnership. The listed partners are T SUDHARSHAN REDDY, VARALA SAKETH REEDY, and BOMMIDI SUMANTH REDDY; THUMMALA SIDDHARTHA REDDY is listed as authorized signatory. The supplied promoter address is 165, VAIDEHI NAGAR`, KHALSA HAYATHNAGAR VILLAGE, WARD NO 4, Hayathnagar, Ranga Reddy, 501505. The evidence does not supply a verified official website or contact details.
- The Form B affidavit, dated 20th day of April 2021, is a promoter declaration and includes a completion undertaking of 17-03-2027. The project header records proposed completion 16/07/2027; the supplied materials do not establish a revised-completion order or verified construction progress. The RERA registration certificate runs through 16/03/2027; registration validity, the stated completion dates, and occupancy status are distinct matters. No occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for PRIDE ELINA, registration P02400003180, issued 24/07/2021 and valid through 16/03/2027.
GHMC building permit: Building Permit Order dated 16 March, 2021, approval no. 2/C3/04172/2021, file no. 2/C3/03459/2021; identifies Survey Nos. 19/A and 19/AA, site area 498.13 m², and proposed 1 Stilt + 5 upper floors.
Form B promoter declaration: Dated 20th day of April 2021; identifies the land as Plot No. B-16 and B-17, total 595 Sq.Yards, forming part of Sy.Nos. 19/A, 19/AA, and contains promoter declarations and undertakings.
Filed floor-plan/layout document: TG-RERA file includes document 164848, described as a layout-plan submission; the supplied drawing-based measurement record uses it for apartment-plan measurements.
Occupancy / completion documentation: No occupancy or completion certificate is supplied; the building-permit extract marks completion certified as false.
Other project records: The supplied file includes a partnership deed, title-search report, sale-agreement form, encumbrance statement and other title-chain documents. Their title and encumbrance implications are addressed in the relevant report sections.
Frequently asked questions
Is PRIDE ELINA registered with Telangana RERA?
Yes. PRIDE ELINA is registered with the Telangana Real Estate Regulatory Authority as P02400003180; the registration status is New Project.
Who is the developer of PRIDE ELINA?
The promoter named in the RERA registration is PRIDE INFRA DEVELOPERS.
Where is PRIDE ELINA located?
PRIDE ELINA is in WARD NO 4, HAYATHNAGAR, Rangareddy, Telangana (501505).
When will PRIDE ELINA be completed?
The promoter's proposed date of completion filed with RERA is 16/07/2027. This is the promoter's declaration, not a guarantee.