Vasudha Towers A Block is a residential apartment project in Sai Baba Colony, Kukatpally mandal, Medchal-Malkajgiri district, developed by registered promoter Goldy Corp. The project occupies 668.68 m² and comprises one building, Building A, with Stilt + 5 floors. It has 15 homes: 10 two-bedroom and 5 three-bedroom units, with RERA-filed saleable areas of 111.57 m² and 131.97 m², respectively. Its TG-RERA registration number is P02200001190, and its proposed completion date is 10/03/2020.

01What we found

Period endedTG-RERA registration ran to 10 Mar 2020 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 454, Kukatpally)
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in
Kukatpally, Kukatpally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameVasudha Towers A Block RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionA Block; the registration certificate identifies Vasudha Towers A Block.
TG-RERA registrationP02200001190 RERA record
Registration validity24/09/2019 to 10/03/2020; the supplied certificate record says it was not extended. This is the registration period, not a statement of the project’s completion or occupancy status.
Registered promoterGoldy Corp, recorded as a partnership RERA record Corporate record
RERA statusRecorded as On-Going Project. RERA record RERA filing

Land and geographic identity

ItemRecord
Locality / site descriptionSai Baba Colony; the GHMC permit describes premises 42, 43 and 44 at Saibaba Colony Phase I and II. RERA record
Revenue villageKukatpally RERA record
MandalKukatpally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500072 RERA record
Project survey numbers / subdivisions45/A, 454/AA and 454/E RERA record
Site area668.68 m² total and 668.68 m² net; the filed record gives road-affected area as 0 m². RERA filing
BoundariesEast: 30 feet wide road; South: 30 feet wide road; West: Plot no 53 54 55; North: Plot 45. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit2/C22/04291/2018, dated 10 March, 2018; file no. 2/C22/13870/2017. Approvals record
Approved built-up area2,040.79 m² filed as approved built-up area. The permit separately records residential upper-floor area of 1,605.55 m² and stilt area of 435.24 m². RERA filing
Building count and configurationOne building, Building A; GHMC permit records Stilt + 5 and height 14.9 m. RERA filing
Parking levels / provisionStilt area is recorded as 435.24 m². A parking-space count and allocation schedule are not supplied.
Unit count15 units are recorded in the RERA unit schedule: 10 two-bedroom and 5 three-bedroom units. The permit extraction records the sanctioned unit count field but does not provide its numerical value. RERA unit table RERA unit details

Offering and status

ItemRecord
Configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 111.57 m²; 3BHK: 131.97 m² RERA unit table RERA unit details
Portal booking / availability snapshot2BHK: 3 booked, 7 available; 3BHK: 0 booked, 5 available. Counts are as last read from the TG-RERA portal; no as-of date is recorded, so treat them as indicative. RERA unit table RERA unit details
Construction stageRERA header records the project as “On-Going Project”; supplied data gives no independently verified current site-progress assessment. RERA record RERA amenities
Completion datesProposed and revised proposed completion date: 10/03/2020. The promoter’s Form B declaration undertakes completion by 31" March 2020. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The available permit states an occupancy certificate is compulsory before occupation. Document index

2. The project story

Vasudha Towers A Block is recorded with TG-RERA as a residential apartment project on premises 42, 43 and 44 in Sai Baba Colony, Kukatpally. The registered land identity is survey numbers 45/A, 454/AA and 454/E, in Kukatpally village and mandal, Medchal-Malkajgiri district. RERA record RERA filing

The GHMC permit describes a single residential building, Building A, with stilt and five upper floors. The RERA unit schedule lists 15 homes across 2BHK and 3BHK configurations. The RERA header labels the project “On-Going Project,” while the supplied records do not provide a dated, independently verified construction-progress report. The RERA-filed completion date is 10/03/2020; the certificate record does not show an extension, and no occupancy or completion certificate is included in the evidence supplied for this overview. RERA unit table RERA record Document index

3. Master plan, architecture & building design

The GHMC building permit records a site area of 668.68 m², net area of 668.68 m², and road-affected area of 0 m². It sanctions Building A, described as a residential building of Stilt + 5 floors and 14.9 m height. The permit separately lists 1,605.55 m² of residential upper-floor area and 435.24 m² of stilt area; the RERA filing records approved built-up area as 2,040.79 m². These are distinct recorded area figures; the supplied data does not identify them as carpet area or saleable area. RERA filing

The RERA filing identifies one approved building unit and one proposed building unit. The supplied permit extraction does not establish floor-by-floor flat counts, lift or stair arrangements, building footprint, internal circulation, or a detailed layout of common areas. It records 3.5 m setbacks. RERA filing

The permit lists 30 trees, 8 No. of RWHPs, space for a transformer, a garbage house within the premises, and an ETP. It records a tot-lot area of 0 m². These are permit-recorded requirements or provisions, not evidence that they have been completed or independently inspected.

4. Homes, configurations & floor plans

The RERA unit schedule lists 10 2BHK and 5 3BHK homes. The filed saleable areas are 111.57 m² for 2BHK and 131.97 m² for 3BHK. The table also includes software-measured carpet areas from floor-plan drawing geometry; those measurements are not RERA disclosures and are flagged for review. The available drawing review reports one of two drawings measured and one scan pending. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1037111.57 m²Software-measured: 65.4–82.3 m²; median 78.4 m²30%
3BHK505131.97 m²Software-measured: 73.9–77.3 m²; median 75.6 m²43%

The drawing-based measurements are software-measured from the supplied floor-plan record, not RERA-filed carpet-area figures, and need review against the drawings. The record notes that RERA saleable area includes the home’s share of common areas, so it is not interchangeable with the measured carpet area. For one 2BHK drawing, identified rooms include bedrooms, kitchen, living/dining and toilets; a utility area is separately identified. For one 3BHK drawing, the listed spaces include bedrooms, hall, dining/kitchen, toilets, puja and a separately identified utility area. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit records a 435.24 m² stilt area, but the supplied evidence does not establish how much of it is allocated to parking, the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, or a parking-allocation schedule for individual homes. The RERA project information does not provide a parking count in the supplied extracts. A drawn or described parking provision would not, by itself, establish exclusive ownership or allocation. RERA filing RERA unit table

6. Amenities, recreation & open spaces

The GHMC permit lists certain site provisions, while the RERA amenity register marks several infrastructure categories “YES.” The amenity register shows progress as 0% for its listed items; it does not establish that the facilities are complete. No independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not statedRERA amenity register RERA amenitiesListed “YES”; 0% recorded; completion not independently verified
Green strip / tot lot / parkGHMC permit records Tot-lot: 0 m²; RERA amenity register lists Green Strip/TOT LOT/ParkRERA amenitiesRERA amenity register lists “YES”; 0% recorded; completion not independently verified
Water conservation / rainwater harvestingGHMC permit lists 8 No. of RWHPsRERA amenitiesPermit-listed provision; completion not independently verified
Community buildingsSize not statedRERA amenity register RERA amenities0% recorded; no completion status established
Sewage treatment / disposalGHMC permit lists ETP; RERA amenity register lists sewage infrastructure and treatment/disposalRERA amenitiesRERA register shows 0%; completion not independently verified
Storm-water drainsSize not statedRERA amenity register RERA amenitiesListed “YES”; 0% recorded; completion not independently verified
Street lightingSize not statedRERA amenity register RERA amenitiesListed “YES”; 0% recorded; completion not independently verified
Solid-waste management and disposalGHMC permit specifies a garbage house within the premisesRERA amenitiesRERA register shows 0%; completion not independently verified
Electrical meter room / sub-station / receiving stationGHMC permit specifies space for a transformerRERA amenitiesRERA register lists “YES”; 0% recorded; completion not independently verified
Energy managementDetails not statedRERA amenity register RERA amenities0% recorded; completion not independently verified
Fire protection and fire safetyDetails not statedRERA amenity register RERA amenities0% recorded; completion not independently verified
Recreational open spaceAggregate area not statedRERA amenity register RERA amenities0% recorded; area and completion status not established

7. Utilities, building services & safety

The GHMC permit lists an ETP, a garbage house within the premises, space for a transformer and eight rainwater-harvesting provisions. The RERA amenity register also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, electrical facilities and fire protection/safety categories. The supplied evidence does not specify water source or storage capacity, sewage-treatment capacity or reuse arrangements, electrical backup, lift provision or capacity, fire-system details, or accessibility arrangements. Listed provisions and amenity-register entries do not establish installation, completion or statutory compliance. RERA amenities

The permit requires a commencement notice before construction and a completion notice after construction, and states that an occupancy certificate is compulsory before occupation. These are stated permit conditions; the supplied evidence does not include a completion or occupancy certificate.

8. Location, access & connectivity

The official project location is Sai Baba Colony, Kukatpally village and mandal, Medchal-Malkajgiri district, PIN 500072. The GHMC permit refers to Saibaba Colony Phase I and II and premises 42, 43 and 44. The site boundaries recorded in the RERA filing include 30 feet wide roads on the east and south sides. RERA record RERA filing

The supplied location record lists the following distances. They are recorded as location-connectivity data; no travel times are provided. Location record

Listed nearby place or serviceRecorded distance
(unnamed hospital)0.1 km
Vasara Vidyalaya High School0.1 km
State Bank of Hyderabad0.3 km
(unnamed park)0.3 km
Auto Stand1.4 km
CMR Family Mall1.5 km
Sri Chaitanya Junior College1.5 km
KPHB Colony / Nearest Metro: KPHB Colony1.8 km
Lampex Electronics Limited2.3 km

9. Developer & development status

The registered promoter is Goldy Corp, recorded as a partnership. The RERA filing identifies Kothapalli Kodanda Venkata Satya Chandra Raju and Raghu Rama Raju Uddaraju as partners, and Saradhi Pardha Mudnuri as authorized signatory. The promoter address recorded in the project data is Venkata Sai Residency, 6th Phase, Phase I Phase II, Sai Baba Colony, Kukatpally, Medchal-Malkajgiri, 500072. The supplied evidence does not identify a corporate registration number or official contact details or website. Corporate record Parties record RERA record

The RERA record labels the project “On-Going Project.” The promoter’s Form B affidavit declares a completion undertaking of 31" March 2020; the project header records proposed and revised completion as 10/03/2020. The registration certificate records validity through 10/03/2020 and no extension. These records do not establish present construction progress or occupancy certification; no completion or occupancy certificate is included in the supplied evidence. RERA record RERA filing Document index

10. Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C; registration no. P02200001190; Goldy Corp; Vasudha Towers A Block; issued 24/09/2019; validity through 10/03/2020.
GHMC building permit orderPermit no. 2/C22/04291/2018; file no. 2/C22/13870/2017; dated 10 March, 2018; Building A, Stilt + 5.
Survey identity in project records45/A, 454/AA and 454/E RERA record
Layout subdivision numbers listed in the building-permit extractionLRS/663/CR-14/WEST ZONE/GHMC/2012 and LRS/665/CR-14/WEST ZONE/GHMC/2012.
Promoter declarationForm B affidavit by M.Pardha Saradhi, identified as authorized by Goldy Corp; dated “06* December 2018” in the extraction; includes a completion undertaking and other promoter declarations.
Occupancy/completion documentationNo project occupancy or completion certificate is present in the supplied evidence. The building permit states an occupancy certificate is required before occupation. Document index

The permit extraction records 161 m² as mortgaged and identifies a second-floor mortgage-related entry. The permit also states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. RERA filing

Frequently asked questions

Is Vasudha Towers A Block registered with Telangana RERA?

Yes. Vasudha Towers A Block is registered with the Telangana Real Estate Regulatory Authority as P02200001190; the registration status is On-Going Project.

Who is the developer of Vasudha Towers A Block?

The promoter named in the RERA registration is Goldy Corp.

Where is Vasudha Towers A Block located?

Vasudha Towers A Block is in Sai Baba Colony, Kukatpally, Medchal-Malkajgiri, Telangana (500072).

When will Vasudha Towers A Block be completed?

The promoter's proposed date of completion filed with RERA is 10/03/2020. This is the promoter's declaration, not a guarantee.