SRI PADMAVATHI HEIGHTS is a residential apartment project in Madeenaguda, Serilingampally mandal, Ranga Reddy district, developed by the registered promoter EMARALD CONSTRUCTIONS. The project is on **745.49 m²** of land and comprises one residential building with **1 Stilt + 5 upper floors** and 20 apartments, all in the 2BHK configuration, with a RERA-filed saleable area of **111.94 m²** per unit. Its TG-RERA registration number is **P02400002358**, and the promoter’s completion undertaking states **29" July, 2026**.

More from Emarald Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 29 Jul 2026 - check its extension on TG-RERA
27documents on file - each fact links to its page
2court cases on this project's land (survey 23, Madeenaguda)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSRI PADMAVATHI HEIGHTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase is identified in the supplied record; the registered site is on SY NO 23 PART RERA record
TG-RERA registrationP02400002358
Registration validityThe certificate states validity from 20/11/2020 to 29/07/2026, unless extended by the Authority. The supplied certificate does not record an extension
Registered promoterEMARALD CONSTRUCTIONS (also styled “M/s. Emarald Constructions” in filed documents); entity type: Partnership RERA record Corporate record
RERA statusThe project is recorded as New Project in the filing. The supplied record also includes GHMC occupancy-certificate documents; the certificate’s building scope is described below RERA filing

Land and geographic identity

FieldProject record
LocalityMADEENAGUDA RERA record RERA filing
Revenue villageMadeenaguda / MADEENAGUDA RERA record
MandalSerilingampally RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN500049 RERA record
Project survey number and subdivisionSY NO 23 PART; the GHMC permit and occupancy-certificate records also identify Survey No. 23/PART or SY 23/PART RERA record
Registered site extent745.49 m² Land records
Total / net land areaTotal area: 745.49 m²; net area: 745.49 m²; reported road-affected and nala-affected areas: 0 RERA filing
Boundaries recorded in the RERA filingEast: “LAND IN SY NO 69 AND 24 OR NEIGHBOURS LAND”; west: “40 FEET WIDE ROAD”; north: “NEIGHBOURS LAND IN SY NO 23 PART”; south: “LAND OF VENDOR IN SY NO 23” RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit No. 2/C21/08202/2020, approved 29 July, 2020 Approvals record
Approved building formOne residential building; permit records 1 Stilt + 5 upper floors
Approved built-up area1,940 m² in the project filing and GHMC certificate record RERA filing
Height14.95 m as stated in the GHMC occupancy-certificate record
Parking provision recordedGHMC certificate states parking area 390.63 m² as per sanctioned plan; a parking-space count is not supplied
Unit counts20 total units in the RERA unit record; GHMC’s supplied permit extraction does not give a separate approved unit count RERA unit table RERA filing
Sanctioned-plan unit controlThe permit states that the sanctioned number of units must not be increased without prior GHMC approval

Offering and status

FieldProject record
RERA-filed configuration2BHK RERA unit table RERA unit details
RERA-filed saleable area111.94 m² per unit RERA unit table RERA unit table
Booked / available0 booked; 20 available, as shown in the TG-RERA-derived unit record; no as-of date is provided, so these counts are indicative RERA unit table
Construction stageGHMC occupancy-certificate records state that the building was inspected and declared fit for occupation
Completion date in GHMC record15 May, 2022
Occupancy certificateGHMC 3048/GHMC/SLP/2022-OC, dated 07 September, 2022, for the residential building at SY 23/PART, Madeenaguda
Promoter-declared completion undertakingForm B undertakes completion by 29" July, 2026

The registration end date, the promoter’s stated completion undertaking and the GHMC occupancy-certificate record are separate records and should not be treated as interchangeable dates.

2. The project story

SRI PADMAVATHI HEIGHTS is registered as a residential apartment project on a 745.49 m² site in Madeenaguda village, Serilingampally mandal, Ranga Reddy district, identified in the project record as SY NO 23 PART. The GHMC permit describes one residential building, 1 Stilt + 5 upper floors, and the registration record lists 20 apartments, all in the 2BHK configuration RERA record Land records RERA unit table.

The supplied GHMC occupancy-certificate record says the building at SY 23/PART was inspected and declared fit for occupation, with a recorded completion date of 15 May, 2022 and an occupancy certificate dated 07 September, 2022. An architect’s certificate filed for the project also identifies that occupancy certificate and certifies project completion. These are documentary records; no independent site inspection or present-day physical-condition assessment is supplied.

3. Master plan, architecture & building design

The filed project land area is 745.49 m². The GHMC building-permit record describes a single residential building with 1 Stilt + 5 upper floors, and records a building height of 14.95 m. The approved built-up area recorded for the project is 1,940 m² Land records RERA filing.

The supplied completion record identifies 1,940 m² as floor area per the sanctioned plan. The detailed floor-plan drawing is not available as an extracted architectural description in the supplied evidence; information such as flats per floor, lift and stair arrangements, entries, internal circulation, balconies and floor-by-floor layout therefore cannot be confirmed here.

The GHMC permit lists 0 m² as road-affected area and records a requirement to surrender any road-affected portion to GHMC without compensation. It also specifies rainwater harvesting, transformer space, a garbage house and an ETP among its conditions or provisions. The permit extraction lists the tot-lot area as 0 m².

4. Homes, configurations & floor plans

The RERA-derived unit record lists 20 two-bedroom apartments, with 0 booked and 20 available; the booking counts have no supplied as-of date. The RERA-filed saleable area is 111.94 m² per unit RERA unit table RERA unit details.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020111.94 m²Software-measured from drawings: median 77.5 m²; range 70.8–78.4 m²31%

The carpet-area figures are software measurements from the supplied floor-plan drawing record, not RERA-filed measurements, and are identified as needing review. The record says eight 2BHK flat designs were measured; a typical extracted first-floor unit shows a hall, kitchen, two bedrooms and two toilets, with individual room measurements in the drawing-derived data Floor plans RERA unit details. RERA saleable area and software-measured carpet area are different area measures; the supplied drawing record notes that saleable area includes the home’s share of common areas. Confirm the applicable unit plan and areas against the approved drawing before purchase Floor plans RERA unit details.

5. Parking & vehicle circulation

The GHMC occupancy-certificate record gives sanctioned-plan parking area as 390.63 m². The supplied record does not establish the number of car or two-wheeler spaces, visitor or accessible parking, parking levels, ramps, internal vehicle routes, EV charging, or unit-by-unit parking allocations.

The building-permit record requires that no extra rooms be constructed in the parking area and states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. A parking area shown or recorded in a plan does not, on this evidence alone, establish exclusive parking ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The project’s RERA amenity record lists several site facilities or service categories, but most have no disclosed progress beyond a recorded percentage of 0. The GHMC permit separately specifies some provisions or conditions. Neither a listed facility nor a permit requirement establishes that it is currently installed or operational.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit extraction records Tot-lot (m²) 0RERA amenitiesNo completed facility independently verified in supplied material
Community buildingsNo size or quantity stated RERA amenitiesRERA amenitiesProgress recorded as 0
Aggregate recreational open spaceNo area stated RERA amenitiesRERA amenitiesProgress recorded as 0

The supplied RERA amenity list does not provide project-filed dimensions or verified completion status for indoor recreation, sports facilities or clubhouse facilities RERA amenities. Third-party amenity descriptions are not used here as evidence of sanctioned or delivered facilities.

7. Utilities, building services & safety

ServiceSupplied record
Water“Water Supply” is marked available in the RERA amenity record, but no source, storage, treatment method or capacity is stated RERA amenities
Sewerage and drainage“Sewerage (Chamber, Lines, Septic Tank, STP)” is marked available; no system type or capacity is specified. The amenity record lists storm-water drains and treatment/disposal of sewage and sullage water, but records no progress for those entries RERA amenities
RainwaterRainwater harvesting is marked available in the RERA amenity record. The GHMC permit specifies one rainwater-harvesting structure; the occupancy-certificate record also lists rainwater harvesting RERA amenities
ElectricalElectrical meter room / sub-station / receiving station is marked available in the RERA amenity record. The permit requires space for a transformer; no electrical capacity or backup specification is supplied RERA amenities
LiftsNo lift count, type or capacity is supplied in the project evidence RERA amenities
Fire and life safetyThe permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied evidence does not include the Fire NOC itself
WasteThe permit requires a garbage house within the premises; no operating waste-segregation or disposal details are supplied
ETPThe permit states that the applicant shall provide the ETP as per standard specification; no capacity or operating-status record is supplied
AccessibilityNo project-specific accessibility details are supplied RERA amenities

8. Location, access & connectivity

The registered location is Madeenaguda, Serilingampally, Ranga Reddy district, Telangana 500049. The GHMC permit identifies the site’s west boundary as a 40 FEET WIDE ROAD RERA record RERA filing RERA filing.

The supplied location record gives Financial District (Nanakramguda) as an anchor at 1.2 km Location record. No other verified approach-road, public-transport, landmark-distance or travel-time measurements are supplied.

9. Developer & development status

The registered promoter is EMARALD CONSTRUCTIONS, recorded as a Partnership. The project record lists partners GOGA LALITH ADITYA, GANDAVARAPU ASRITHA, AMRUTH SAI GANDAVARAPU and SATYANARAYANA RAJU GOGA; GOGA KUSUMA KUMARI and GANDAVARAPU SARWANI are listed as authorized signatories Corporate record. Form B is signed on behalf of the promoter by Goga Kusuma Kumari and Gandavарapu Sarwani and states a completion undertaking of 29" July, 2026.

The supplied project documents include a GHMC occupancy certificate for the residential building and an architect’s completion certificate identifying the same occupancy-certificate number. No independent current site-progress assessment is included. The promoter’s registered office address and official contact details are not fully established by the supplied evidence; the registration certificate gives a promoter-office line but it is incomplete: “Village: Mandal: District: Hyderabad, Pin: 500018”.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400002358; issued 20/11/2020; validity to 29/07/2026 unless extended
Scope and evidenceRegisters SRI PADMAVATHI HEIGHTS under EMARALD CONSTRUCTIONS
GHMC building permit
Identifier / date2/C21/08202/2020; approved 29 July, 2020
Scope and evidenceConditional building permission for a residential building on Survey No. 23/PART, Madeenaguda; records 1 Stilt + 5 upper floors
GHMC permit file number
Identifier / date2/C21/09060/2020
Scope and evidenceIdentified in the building-permit extraction
GHMC occupancy certificate
Identifier / date3048/GHMC/SLP/2022-OC; dated 07 September, 2022
Scope and evidenceGHMC record identifies SY 23/PART, Madeenaguda, and states that the inspected building was fit for occupation; recorded completion date 15 May, 2022
GHMC occupancy application
Identifier / date005294/GHMC/2649/SLP2/2022-OC
Scope and evidenceApplication reference associated with the occupancy-certificate record
Architect’s completion certificate
Identifier / dateIdentifies 3048/GHMC/SLP/2022-OC and TG-RERA P02400002358
Scope and evidenceArchitect’s certificate records overall project completion
Form B promoter declaration
Identifier / dateDated 20' day of September, 2020
Scope and evidencePromoter declaration includes title, encumbrance, fund-use and completion statements
Floor-plan drawing record
Identifier / date131808
Scope and evidenceDrawing record used for software-measured 2BHK carpet-area estimates; the supplied extraction says the measurement needs review
HMDA approved-layout lookup
Identifier / dateSource unavailable
Scope and evidenceThe supplied record says the public HMDA DPMS lookup was not reachable; no approved-layout record is established from that lookup HMDA

Frequently asked questions

Is SRI PADMAVATHI HEIGHTS registered with Telangana RERA?

Yes. SRI PADMAVATHI HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400002358; the registration status is New Project.

Who is the developer of SRI PADMAVATHI HEIGHTS?

The promoter named in the RERA registration is EMARALD CONSTRUCTIONS.

Where is SRI PADMAVATHI HEIGHTS located?

SRI PADMAVATHI HEIGHTS is in MADEENAGUDA, Serilingampally, Rangareddy, Telangana (500049).

When will SRI PADMAVATHI HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 29/07/2026. This is the promoter's declaration, not a guarantee.

More projects in Madina Guda