ASR DIAMOND is a residential apartment project in Makthamahaboobpet, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter ASR INFRA. It occupies 669.04 sq. m and comprises one building with one stilt and five upper floors, with 20 2BHK homes. The project is registered with TG-RERA under P02400004894, and the promoter’s declared completion date is 12 January 2028.

01What we found

RegisteredTG-RERA - valid till 12 Jan 2028
19documents on file - each fact links to its page
173court cases on this project's land (survey 44, Makutha)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameASR DIAMOND RERA record
Project type / categoryResidential apartment project RERA record RERA filing
Phase / registered portionOne residential building; the registration certificate identifies the project as ASR DIAMOND. No separate phase name is disclosed. RERA record
TG-RERA registrationP02400004894 RERA record
Registration validity29 August 2022 to 12 January 2028; the certificate states a period of five years. This is the registration-validity period, not an occupancy certificate. RERA record
Registered promoterASR INFRA (also rendered “Asr Infra” on the certificate); entity type recorded as partnership. RERA record RERA filing Corporate record
RERA statusRegistered project. The record also contains an occupancy certificate dated 18 April 2026; registration validity and occupancy status are distinct. RERA record

Land and geographic identity

ItemProject record
Locality / site addressMakthamahaboobpet / Maktha Mahaboobpet; Plot No. 84 RERA filing
Revenue villageMakutha (the building-permit and occupancy documents also render the village as MAKTHAMAHOOB PETA / Makthamahaboobpet). RERA record RERA filing
MandalSerilingampally RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN500049 RERA record
Project survey number(s) and subdivision(s)Survey No. 44/4. The supplied project records do not state a further subdivision. RERA record RERA filing
Site extentRERA-filed total area and net area: 669.04 sq. m; road-widening/FTL/nala-affected area recorded as 0 sq. m. RERA filing Land records
Boundaries (RERA filing)North: ROAD; South: PLOT NO 79; East: PLOT NO 83; West: PLOT NO 85. RERA filing
Occupancy-certificate site-area figuresThe certificate records 668.8 sq. m site area and net site area.

Development identity

ItemProject record
Sanctioning authorityBuilding permit recorded as issued by Greater Hyderabad Municipal Corporation (GHMC); occupancy certificate issued by Cyberabad Municipal Corporation. Approvals record
Principal building approvalBuilding Permit No. 2/C21/00039/2022, approved 12 January 2022. Approvals record
Approved built-up area1,570.35 sq. m in the building-permit record.
Building countOne building / one block. RERA filing RERA unit table
Sanctioned configurationOne stilt plus five upper floors; building height 15 m. The building permit lists residential upper-floor area as 1,570.35 sq. m and stilt parking area as 327.55 sq. m.
Parking provision shown in the permitStilt parking; the permit conditions say approved cellar and stilt areas are to be used exclusively for vehicle parking. The supplied record does not establish a parking-space count or any cellar level.
Approved versus RERA-filed homesApproved plan record: 1 building unit; RERA unit filing: 20 “DOUBLE BEDROOM” units. RERA filing RERA unit table

Offering and status

ItemProject record
Configuration2BHK; RERA filing label: “DOUBLE BEDROOM” RERA unit table RERA unit table
RERA-filed saleable area97.55 sq. m per unit RERA unit table RERA unit table
Booked / available10 booked / 10 available in the TG-RERA portal data supplied; no as-of date is provided, so these figures are indicative rather than a live inventory confirmation. RERA unit table
Construction stage / completionAn occupancy certificate for ASR DIAMOND is recorded as issued on 18 April 2026. The certificate states the building was inspected and declared fit for occupation; the supplied record does not provide a separate original/revised RERA completion-date history beyond the promoter’s declared completion date of 12 January 2028.
Occupancy certificate scopeThe certificate names ASR DIAMOND at Plot No. 84, Survey No. 44/4 and describes one residential building with one stilt floor and five upper floors.

2. The project story

ASR DIAMOND is a single-building residential apartment project on Plot No. 84 in Survey No. 44/4, Makutha / Makthamahaboobpet, Serilingampally Mandal, Ranga Reddy District. The building permit describes a residential building with one stilt and five upper floors. The RERA filing lists 20 two-bedroom homes; the portal snapshot records 10 as booked and 10 as available, without an inventory as-of date. RERA record RERA unit table RERA unit table

The promoter’s Form-B declaration undertook completion by 12 January 2028. Separately, the supplied occupancy certificate records an inspection and fitness for occupation for the named building, dated 18 April 2026. This is documentary evidence of OC for the building described in that certificate; it is not a statement about any other phase or building.

3. Master plan, architecture & building design

The RERA-filed land record gives a site area of 669.04 sq. m, with the same net area and no affected area recorded. The building permit describes one residential block and records an approved built-up area of 1,570.35 sq. m, a 15 m building height, and one stilt parking level with an area of 327.55 sq. m. It specifies one stilt plus five upper floors. RERA filing

The occupancy certificate describes one stilt floor and five upper floors. It records total built-up area as 1,570.35 sq. m sanctioned and 1,646.197 sq. m at completion, with 75.85 recorded as total deviated built-up area for the block.

The building permit also records 30 trees, one rainwater-harvesting pit, transformer space, a garbage house, and an ETP requirement. Its conditions refer to maintaining a fenced tot-lot and a peripheral greenery strip; the permit’s area schedule records tot-lot area as 0 sq. m.

No supplied drawing-derived record establishes the number of flats per floor, lift or stair arrangements, building footprint, internal circulation, or detailed residential/common-area distribution. The layout-plan document is listed but not extracted. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (“DOUBLE BEDROOM” in filing)20101097.55 sq. mSoftware-measured median 56.5 sq. m; range 53.0–57.1 sq. m42%

The unit-count, booking and saleable-area figures are from the RERA filing. The carpet-area measurements are software measurements from the approved floor-plan drawing record, not RERA-filed figures; the measurement record notes they need review. It measured eight 2BHK designs. RERA unit table RERA unit table RERA unit details Floor plans

The supplied typical-floor drawing example identifies a living/dining room, kitchen, two bedrooms, two toilets and a utility area. In that example, the utility is excluded from the stated measured carpet area. These drawing-derived measurements should be checked against the drawing; saleable area is a separate RERA-filed measure and includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit records a stilt parking area of 327.55 sq. m and requires approved cellar/stilt areas to be used exclusively for parking, without partition walls or rolling shutters. The occupancy certificate records parking area of 343.6 sq. m sanctioned and 343.6 sq. m at completion. The supplied records do not state a number of car or two-wheeler spaces, visitor or accessible provision, parking allocation by unit, parking ramps, EV charging, or a cellar level.

A parking area shown in an approval record does not by itself establish exclusive parking rights for a particular apartment. No unit-specific parking allocation is available in the supplied evidence.

6. Amenities, recreation & open spaces

Water supply
Description / sizeListed as available, 100% in the supplied amenities record; capacity and source are not stated.
Evidence sourceRERA amenities
Declared progress / verified statusPortal/record status; independent verification not supplied.
Sewerage
Description / size“Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available, 100%; individual components are not separately detailed.
Evidence sourceRERA amenities
Declared progress / verified statusPortal/record status; independent verification not supplied.
Green strip / tot-lot / park
Description / sizeListed as available, 100% in the amenities record. The building permit records tot-lot area as 0 sq. m and requires a fenced tot-lot and peripheral greenery strip.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record and permit conditions; delivered condition not independently verified.
Water conservation / rainwater harvesting
Description / sizeListed as available, 100%; permit specifies one rainwater-harvesting pit, and the OC records one sanctioned and one at completion.
Evidence sourceRERA amenities
Declared progress / verified statusOC records one pit at completion; independent site verification not supplied.
Electrical meter room / sub-station / receiving station
Description / sizeListed as available, 100% in the amenities record. Permit requires space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRecord/permit evidence; operational status not independently verified.
Trees and peripheral greenery
Description / sizeBuilding permit records 30 trees and requires a peripheral greenery strip to be maintained.
Declared progress / verified statusPermit schedule/condition; completed planting not independently verified.
Garbage house
Description / sizeRequired within the premises by the building-permit conditions.
Declared progress / verified statusSanction condition; completion not independently verified.
ETP
Description / sizeBuilding permit says the applicant shall provide an ETP as per standard specification.
Declared progress / verified statusPermit condition; completion and operating status not supplied.

The amenities record marks internal roads and footpaths, storm-water drains, street lighting, community buildings, treatment/disposal of sewage and sullage water, solid-waste management, energy management, fire-protection requirements, and aggregate recreational open space as 0%. The supplied evidence does not provide a clubhouse, sports facility, or facility-size schedule. RERA amenities

7. Utilities, building services & safety

The permit requires a rainwater-harvesting structure, transformer space, a garbage house and an ETP. The occupancy certificate records one rainwater-harvesting pit at completion. The RERA amenities record lists water supply, sewerage, water conservation/rainwater harvesting, and the electrical meter-room/sub-station/receiving-station category as available; it does not provide water source, storage or treatment capacity, STP/ETP capacity, reuse arrangements, storm-water details, or electrical backup information. RERA amenities

The building permit conditions require occupancy certification before occupation and direct that approved plans be followed; they also require a completion notice and identify worker-safety obligations. The supplied material does not specify lift numbers or capacities, fire-system equipment, escape-stair details, CCTV or access control, accessibility provisions, or independent verification of service operation.

8. Location, access & connectivity

The project’s registered location is Makutha / Makthamahaboobpet, Serilingampally Mandal, Ranga Reddy District, PIN 500049, at Plot No. 84 in Survey No. 44/4. The building-permit record specifies an 18 mt. road width and identifies the northern boundary as a road. RERA record RERA filing

The supplied location data gives HITEC City at 4.7 km. No measured distances or travel times for public transport or other landmarks are included in the location record. Location record

9. Developer & development status

The registered promoter is ASR INFRA, recorded as a partnership; the RERA filing lists GSTIN 36ABQFA1130N1ZB. The registration certificate gives the promoter office as Village: Phase-Iv, V & Vi, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN 500072. The project record separately lists an address at ANK TOWERS, Phase 6, B K Enclave, Makthamahaboobpet, Serilingampally, Ranga Reddy, 500049. Corporate record RERA filing Parties record

V Sita Rama Raju signed the Form-B declaration as promoter and was authorized in the supplied partner-resolution record for TG-RERA registration documents. The declaration undertook completion by 12 January 2028 and included the promoter’s declarations concerning project funds, audit, approvals and allottee obligations.

The occupancy certificate records the named ASR DIAMOND building as inspected and fit for occupation, with the certificate dated 18 April 2026. The supplied record does not provide independently verified construction-progress percentages or a separate phase-wise programme.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for ASR DIAMOND, Registration No. P02400004894, valid 29 August 2022–12 January 2028.
Building permitGHMC Building Permit No. 2/C21/00039/2022, dated 12 January 2022; the permit describes one stilt and five upper floors.
Occupancy certificateCyberabad Municipal Corporation OC No. 012125/GHMC/05440/SWOC/SLP2/2025, dated 18 April 2026, for ASR DIAMOND at Plot No. 84, Survey No. 44/4, Makthamahaboobpet.
Architect’s completion certificateForm–1A dated 21 April 2026, recording the same OC number and certifying project completion in all aspects.
Promoter declarationForm-B affidavit-cum-declaration by V Sita Rama Raju dated 26 July 2022.
Layout planListed among the RERA documents, but the supplied record marks it as not extracted. Document index
Title and encumbrance materialRERA-filed title reports and an encumbrance statement are present in the shared project record; their detailed title and encumbrance issues are addressed in the relevant report sections. Document index

The supplied occupancy-certificate record also notes 75.85 as total deviated built-up area for the block. This overview reports the certificate’s recorded content without assessing the sanction or its conditions.

Frequently asked questions

Is ASR DIAMOND registered with Telangana RERA?

Yes. ASR DIAMOND is registered with the Telangana Real Estate Regulatory Authority as P02400004894; the registration status is New Project.

Who is the developer of ASR DIAMOND?

The promoter named in the RERA registration is ASR INFRA.

Where is ASR DIAMOND located?

ASR DIAMOND is in MAKTHAMAHABOOBPET, Makutha, Serilingampally, Rangareddy, Telangana (500049).

When will ASR DIAMOND be completed?

The promoter's proposed date of completion filed with RERA is 12/01/2028. This is the promoter's declaration, not a guarantee.