Singam Residency
AKSHAYA ASSOCIATES · Medchal-Malkajgiri · RERA P02200003383
SINGAM RESIDENCY is a residential apartment project in Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District. The registered promoter is Akshaya Associates, recorded as a proprietorship. The project has a site area of 417.88 m² and one residential building with 1 stilt + 5 upper floors, comprising 10 3BHK units. Its TG-RERA registration number is P02200003383, and its proposed completion date is 30/06/2027.
More from Akshaya Associates · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project | SINGAM RESIDENCY |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase is not separately identified in the supplied record; the registration and approvals describe the residential building at Plot No. 31 |
| TG-RERA registration | P02200003383; granted under section 5; issued 24/09/2021 |
| Registration validity | 24/09/2021–30/06/2027; the certificate says it is valid for five years unless extended |
| Registered promoter | Akshaya Associates, recorded as a proprietorship RERA filing |
| RERA status | The supplied registration record labels the project “New Project”; the registration certificate is present. Current completion/occupancy status is separately summarised below. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / plot | Kukatpally locality; Plot No. 31 RERA record |
| Revenue village | Gopanpally (also rendered in supplied records as GOPANPALLY / GOPANPALLE); the GHMC occupancy records also use SERILINGAMPALLE. The exact village identifier should be checked against the underlying land records. |
| Mandal | Kukatpally in the project identity record; Serilingampally Mandal in the GHMC permit record RERA record |
| District / PIN | Medchal-Malkajgiri / 500072 RERA record |
| Project survey numbers | GOPANPALLY SY NO 231 PART AND 316 PART16 as registered; building-permit and occupancy records state Survey Nos. 231 PART and 316 PART |
| Site area | 417.88 m² in the RERA project record and building-permit record RERA filing |
| Total / net area | RERA land record: total 417.88 m², net 417.88 m², affected area 0 m². GHMC occupancy certificate records 12.00 m² road widening area and 405.88 m² net area. RERA filing |
| Boundaries (RERA filing) | North: Plot No. 30; South: Plot No. 32; East: Plot No. 22; West: 12 m road RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order 2/C20/08129/2021, approved 30 June 2021 |
| Related file number | 2/C20/08051/2021 |
| Approved built-up area | 1,152.70 m² in the project record and sanctioned parameters RERA filing |
| Building count and configuration | One proposed residential building: 1 stilt + 5 upper floors; sanctioned height 14.95 m |
| Parking level / area | Stilt parking; sanctioned parking area 216.92 m² |
| Units | Approved-plan record: 10 units in the RERA unit schedule; the GHMC permit condition says sanctioned unit numbers must not be increased without prior GHMC approval. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; recorded as 10 booked and 0 available when the portal data was read. The booking record has no as-of date, so counts are indicative. RERA unit table |
| RERA-filed saleable area | 134.29 m² per 3BHK unit RERA unit table |
| Construction stage | GHMC records completion on 20 August 2022 and issued an occupancy certificate dated 06/10/2022 for the building at Plot No. 31. This is an occupancy-certified building record, not evidence of current construction activity. |
| Completion date / registration deadline | Promoter-proposed RERA completion date: 30/06/2027; registration validity also ends 30/06/2027 unless extended. These are distinct record fields, although the dates coincide. RERA record |
| Occupancy certificate scope | GHMC occupancy certificate 3525/GHMC/SLP/2022-OC concerns the residential building at Plot No. 31, Survey Nos. 231 PART and 316 PART. |
2. The project story
SINGAM RESIDENCY is registered as a residential apartment project at Plot No. 31, in Kukatpally, with the land identified in the registration as GOPANPALLY SY NO 231 PART AND 316 PART16. GHMC’s building permit describes a single residential building on a 417.88 m² site, with one stilt level and five upper floors. RERA record
The RERA unit record lists ten 3BHK homes, all recorded as booked, with a filed saleable area of 134.29 m² per unit. The portal booking count has no stated as-of date. GHMC’s occupancy record states that the building was completed on 20 August 2022 and fit for occupation under the certificate dated 06/10/2022. The supplied material therefore includes an occupancy-certified building record; it does not establish current physical condition or independently verify that every registered-project obligation or facility has been delivered. RERA unit table
3. Master plan, architecture & building design
The GHMC permit describes one residential building, 1 stilt + 5 upper floors, with a sanctioned height of 14.95 m. It records 1,152.70 m² of residential floor area and 216.92 m² of stilt parking area. These are sanctioned figures; they are not carpet or saleable areas.
The occupancy-certificate extraction records a site building-plan floor area of 1,188.93 m² and parking area of 237.79 m², alongside the sanctioned-plan figures. The drawing-based floor-plan source is an approved drawing, but the supplied records do not provide a verified account of the building’s internal circulation, number of flats per floor, lifts, stairs, entrances, landscaping layout, or common-area distribution.
The building permit lists a tot-lot, six rainwater-harvesting pits, transformer space, a garbage house and an ETP among the recorded provisions. Detailed plans and dimensions for these features are not available in the supplied extracts.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 134.29 m² | Software-measured range: 80.3–88.6 m²; median 85.3 m² | 36% |
The 3BHK configuration is present in the TG-RERA record. Its 134.29 m² figure is the RERA-filed saleable area. Carpet-area figures were software-measured from the approved floor-plan drawing, not filed as RERA carpet-area disclosures; the drawing measurement needs review. Saleable area and carpet area are different measures, and the supplied drawing notes that saleable area includes the home’s share of common areas. RERA unit table Floor plans RERA unit details
The measured typical-floor drawing identifies a bedroom, kitchen, living/dining area, toilets, a balcony and a utility area for one flat. For that drawing, the recorded room dimensions include living/dining 4.5 × 5.89 m, kitchen 2.0 × 3.62 m, and balcony 1.42 × 1.5 m. The drawing extraction identifies the balcony and utility as excluded from carpet area; measurements are drawing-derived and should be checked against the plan. RERA unit details
The booking count is the portal figure last read, without a supplied as-of date. It is indicative rather than a live inventory confirmation. RERA unit table
5. Parking & vehicle circulation
The sanctioned permit provides stilt parking with an area of 216.92 m². The occupancy-certificate extraction records 237.79 m² of parking area in the site building plan. The available extracts do not establish the number of parking bays, visitor or accessible spaces, two-wheeler provision, parking allocation to individual units, or whether any bay is exclusively assigned to a buyer.
The permit requires a zero-ramp condition at the road slope and refers to keeping the area in front of the compound wall clear for footpath, greenery and utilities. Detailed vehicle-entry, ramp and internal-driveway arrangements are not established by the supplied text extracts.
6. Amenities, recreation & open spaces
The table below distinguishes GHMC permit provisions from the RERA amenities record. The percentages in the RERA record are reported percentages, not independent site verification.
| Description / size | No size supplied |
|---|---|
| Evidence source | GHMC permit; RERA amenities record |
| Declared progress / verified status | Permit-listed; RERA record says Green Strip/TOT LOT/Park: YES, 100%; independent completion not established RERA amenities |
| Description / size | Six RWHPs in sanctioned parameters |
|---|---|
| Evidence source | GHMC permit; RERA amenities record |
| Declared progress / verified status | Permit-listed; RERA record says water conservation/rainwater harvesting: YES, 100%; independent completion not established RERA amenities |
| Description / size | Permit calls for avenue planting inside the perimeter and rooftop greenery; no area or quantity supplied |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit condition; completion not independently verified |
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% reported RERA amenities |
| Description / size | No area supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% reported RERA amenities |
7. Utilities, building services & safety
The GHMC permit lists an ETP, transformer space, a garbage house and rainwater-harvesting provisions, and includes conditions concerning construction safety, fire extinguishers on each floor, a fire NOC before issue of the occupancy certificate, twin bins for each tenement, dust mitigation, and worker facilities. These are permit-listed provisions or conditions; the supplied extracts do not establish their present operating status.
The RERA amenities record reports water supply, sewerage (chambers, lines, septic tank/STP), rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES” and 100%. It reports storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management and fire protection/fire-safety requirements at 0%. These are the recorded progress figures, not independent verification of service capacity or statutory compliance. RERA amenities
No supplied project record establishes water source or storage capacity, sewerage-treatment capacity, electrical backup, lift count or capacity, CCTV, access-control arrangements, or accessible circulation. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072; the project identity also specifies Plot No. 31 and the survey identifiers shown above. GHMC permit records place the building at Gopanpally and identify an 18 m road width. RERA record
The supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the cadastral parcel centroid. No other measured access distances or public-transport details are supplied. Location record
9. Developer & development status
The registered promoter is Akshaya Associates, recorded as a proprietorship. The registration certificate lists its office as Village Miyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500090; the project filing separately records a Kukatpally address. RERA filing RERA filing
The RERA project record gives a proposed completion date of 30/06/2027 and the registration certificate is valid through that date unless extended. Separately, the GHMC occupancy certificate records completion on 20 August 2022 for the Plot No. 31 residential building. No current construction-progress percentage is established by the supplied evidence. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200003383, issued 24/09/2021; validity to 30/06/2027 unless extended |
|---|---|
| What the supplied record establishes | Registration of SINGAM RESIDENCY under section 5, with the registered promoter and stated conditions |
| Identifier / date | 2/C20/08129/2021, 30 June 2021; related file 2/C20/08051/2021 |
|---|---|
| What the supplied record establishes | Conditional building permission for the proposed residential building at Gopanpally, Survey Nos. 231 PART and 316 PART |
| Identifier / date | 3525/GHMC/SLP/2022-OC, dated 06/10/2022; application 009269/GHMC/4568/SLP2/2022-OC |
|---|---|
| What the supplied record establishes | Occupancy certification for the Plot No. 31 residential building; records completion date 20 August 2022 |
| Identifier / date | Title report, Development Agreement cum GPA, Form B declaration and encumbrance statement |
|---|---|
| What the supplied record establishes | Documents filed with the project registration; the Form B contains promoter declarations, while the title report and development agreement are separate records |
| Identifier / date | 3593/MP2/PLG/HUDA/2001 |
|---|---|
| What the supplied record establishes | Cited in project documents; a standalone approved-layout document is not established by the supplied extracts |
The supplied GHMC records identify the authority and the principal building permit and occupancy-certificate references. This evidence index is limited to the records and extracts provided here. Approvals record Document index
1. Project at a glance
Project identity
Registered project: SINGAM RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; the registration and approvals describe the residential building at Plot No. 31
TG-RERA registration: P02200003383; granted under section 5; issued 24/09/2021
Registration validity: 24/09/2021–30/06/2027; the certificate says it is valid for five years unless extended
Registered promoter: Akshaya Associates, recorded as a proprietorship
RERA status: The supplied registration record labels the project “New Project”; the registration certificate is present. Current completion/occupancy status is separately summarised below.
Land and geographic identity
Locality / plot: Kukatpally locality; Plot No. 31
Revenue village: Gopanpally (also rendered in supplied records as GOPANPALLY / GOPANPALLE); the GHMC occupancy records also use SERILINGAMPALLE. The exact village identifier should be checked against the underlying land records.
Mandal: Kukatpally in the project identity record; Serilingampally Mandal in the GHMC permit record
District / PIN: Medchal-Malkajgiri / 500072
Project survey numbers: GOPANPALLY SY NO 231 PART AND 316 PART16 as registered; building-permit and occupancy records state Survey Nos. 231 PART and 316 PART
Site area: 417.88 m² in the RERA project record and building-permit record
Total / net area: RERA land record: total 417.88 m², net 417.88 m², affected area 0 m². GHMC occupancy certificate records 12.00 m² road widening area and 405.88 m² net area.
Boundaries (RERA filing): North: Plot No. 30; South: Plot No. 32; East: Plot No. 22; West: 12 m road
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C20/08129/2021, approved 30 June 2021
Related file number: 2/C20/08051/2021
Approved built-up area: 1,152.70 m² in the project record and sanctioned parameters
Building count and configuration: One proposed residential building: 1 stilt + 5 upper floors; sanctioned height 14.95 m
Parking level / area: Stilt parking; sanctioned parking area 216.92 m²
Units: Approved-plan record: 10 units in the RERA unit schedule; the GHMC permit condition says sanctioned unit numbers must not be increased without prior GHMC approval.
Offering and status
RERA-filed configuration: 3BHK, 10 units; recorded as 10 booked and 0 available when the portal data was read. The booking record has no as-of date, so counts are indicative.
RERA-filed saleable area: 134.29 m² per 3BHK unit
Construction stage: GHMC records completion on 20 August 2022 and issued an occupancy certificate dated 06/10/2022 for the building at Plot No. 31. This is an occupancy-certified building record, not evidence of current construction activity.
Completion date / registration deadline: Promoter-proposed RERA completion date: 30/06/2027; registration validity also ends 30/06/2027 unless extended. These are distinct record fields, although the dates coincide.
Occupancy certificate scope: GHMC occupancy certificate 3525/GHMC/SLP/2022-OC concerns the residential building at Plot No. 31, Survey Nos. 231 PART and 316 PART.
2. The project story
SINGAM RESIDENCY is registered as a residential apartment project at Plot No. 31, in Kukatpally, with the land identified in the registration as GOPANPALLY SY NO 231 PART AND 316 PART16. GHMC’s building permit describes a single residential building on a 417.88 m² site, with one stilt level and five upper floors.
The RERA unit record lists ten 3BHK homes, all recorded as booked, with a filed saleable area of 134.29 m² per unit. The portal booking count has no stated as-of date. GHMC’s occupancy record states that the building was completed on 20 August 2022 and fit for occupation under the certificate dated 06/10/2022. The supplied material therefore includes an occupancy-certified building record; it does not establish current physical condition or independently verify that every registered-project obligation or facility has been delivered.
3. Master plan, architecture & building design
The GHMC permit describes one residential building, 1 stilt + 5 upper floors, with a sanctioned height of 14.95 m. It records 1,152.70 m² of residential floor area and 216.92 m² of stilt parking area. These are sanctioned figures; they are not carpet or saleable areas.
The occupancy-certificate extraction records a site building-plan floor area of 1,188.93 m² and parking area of 237.79 m², alongside the sanctioned-plan figures. The drawing-based floor-plan source is an approved drawing, but the supplied records do not provide a verified account of the building’s internal circulation, number of flats per floor, lifts, stairs, entrances, landscaping layout, or common-area distribution.
The building permit lists a tot-lot, six rainwater-harvesting pits, transformer space, a garbage house and an ETP among the recorded provisions. Detailed plans and dimensions for these features are not available in the supplied extracts.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 134.29 m² | Software-measured range: 80.3–88.6 m²; median 85.3 m² | 36% |
The 3BHK configuration is present in the TG-RERA record. Its 134.29 m² figure is the RERA-filed saleable area. Carpet-area figures were software-measured from the approved floor-plan drawing, not filed as RERA carpet-area disclosures; the drawing measurement needs review. Saleable area and carpet area are different measures, and the supplied drawing notes that saleable area includes the home’s share of common areas.
The measured typical-floor drawing identifies a bedroom, kitchen, living/dining area, toilets, a balcony and a utility area for one flat. For that drawing, the recorded room dimensions include living/dining 4.5 × 5.89 m, kitchen 2.0 × 3.62 m, and balcony 1.42 × 1.5 m. The drawing extraction identifies the balcony and utility as excluded from carpet area; measurements are drawing-derived and should be checked against the plan.
The booking count is the portal figure last read, without a supplied as-of date. It is indicative rather than a live inventory confirmation.
5. Parking & vehicle circulation
The sanctioned permit provides stilt parking with an area of 216.92 m². The occupancy-certificate extraction records 237.79 m² of parking area in the site building plan. The available extracts do not establish the number of parking bays, visitor or accessible spaces, two-wheeler provision, parking allocation to individual units, or whether any bay is exclusively assigned to a buyer.
The permit requires a zero-ramp condition at the road slope and refers to keeping the area in front of the compound wall clear for footpath, greenery and utilities. Detailed vehicle-entry, ramp and internal-driveway arrangements are not established by the supplied text extracts.
6. Amenities, recreation & open spaces
The table below distinguishes GHMC permit provisions from the RERA amenities record. The percentages in the RERA record are reported percentages, not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | No size supplied | GHMC permit; RERA amenities record | Permit-listed; RERA record says Green Strip/TOT LOT/Park: YES, 100%; independent completion not established |
| Rainwater harvesting | Six RWHPs in sanctioned parameters | GHMC permit; RERA amenities record | Permit-listed; RERA record says water conservation/rainwater harvesting: YES, 100%; independent completion not established |
| Avenue planting / rooftop greenery | Permit calls for avenue planting inside the perimeter and rooftop greenery; no area or quantity supplied | GHMC permit | Permit condition; completion not independently verified |
| Community buildings | No size supplied | RERA amenities record | 0% reported |
| Aggregate recreational open space | No area supplied | RERA amenities record | 0% reported |
7. Utilities, building services & safety
The GHMC permit lists an ETP, transformer space, a garbage house and rainwater-harvesting provisions, and includes conditions concerning construction safety, fire extinguishers on each floor, a fire NOC before issue of the occupancy certificate, twin bins for each tenement, dust mitigation, and worker facilities. These are permit-listed provisions or conditions; the supplied extracts do not establish their present operating status.
The RERA amenities record reports water supply, sewerage (chambers, lines, septic tank/STP), rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES” and 100%. It reports storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management and fire protection/fire-safety requirements at 0%. These are the recorded progress figures, not independent verification of service capacity or statutory compliance.
No supplied project record establishes water source or storage capacity, sewerage-treatment capacity, electrical backup, lift count or capacity, CCTV, access-control arrangements, or accessible circulation.
8. Location, access & connectivity
The registered project location is Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072; the project identity also specifies Plot No. 31 and the survey identifiers shown above. GHMC permit records place the building at Gopanpally and identify an 18 m road width.
The supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the cadastral parcel centroid. No other measured access distances or public-transport details are supplied.
9. Developer & development status
The registered promoter is Akshaya Associates, recorded as a proprietorship. The registration certificate lists its office as Village Miyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500090; the project filing separately records a Kukatpally address.
The RERA project record gives a proposed completion date of 30/06/2027 and the registration certificate is valid through that date unless extended. Separately, the GHMC occupancy certificate records completion on 20 August 2022 for the Plot No. 31 residential building. No current construction-progress percentage is established by the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02200003383, issued 24/09/2021; validity to 30/06/2027 unless extended |
|---|---|
| What the supplied record establishes | Registration of SINGAM RESIDENCY under section 5, with the registered promoter and stated conditions |
| Identifier / date | 2/C20/08129/2021, 30 June 2021; related file 2/C20/08051/2021 |
|---|---|
| What the supplied record establishes | Conditional building permission for the proposed residential building at Gopanpally, Survey Nos. 231 PART and 316 PART |
| Identifier / date | 3525/GHMC/SLP/2022-OC, dated 06/10/2022; application 009269/GHMC/4568/SLP2/2022-OC |
|---|---|
| What the supplied record establishes | Occupancy certification for the Plot No. 31 residential building; records completion date 20 August 2022 |
| Identifier / date | Title report, Development Agreement cum GPA, Form B declaration and encumbrance statement |
|---|---|
| What the supplied record establishes | Documents filed with the project registration; the Form B contains promoter declarations, while the title report and development agreement are separate records |
| Identifier / date | 3593/MP2/PLG/HUDA/2001 |
|---|---|
| What the supplied record establishes | Cited in project documents; a standalone approved-layout document is not established by the supplied extracts |
The supplied GHMC records identify the authority and the principal building permit and occupancy-certificate references. This evidence index is limited to the records and extracts provided here.
Frequently asked questions
Is SINGAM RESIDENCY registered with Telangana RERA?
Yes. SINGAM RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200003383; the registration status is New Project.
Who is the developer of SINGAM RESIDENCY?
The promoter named in the RERA registration is AKSHAYA ASSOCIATES.
Where is SINGAM RESIDENCY located?
SINGAM RESIDENCY is in KUKATPALLY, Medchal-Malkajgiri, Telangana (500072).
When will SINGAM RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 30/06/2027. This is the promoter's declaration, not a guarantee.
More projects in Kukatpally