E11 Cedar
SRIKARA PROPERTY DEVELOPERS LLP · Rangareddy · RERA P02400001953
E11 CEDAR is a residential apartment project in MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District, developed by Srikara Property Developers LLP. The site area is 919.6 sq m, and the project comprises one building, Building A-1, with 1 Cellar + Stilt + 5 upper floors and 20 2BHK homes. It is registered under TG-RERA registration P02400001953, with a proposed completion date of 15/01/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | E11 CEDAR RERA record |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not disclosed RERA record RERA filing |
| TG-RERA registration | P02400001953; granted under section 5; issued 06/07/2020; valid from 06/07/2020 to 15/01/2022. The certificate records one year and states extension is subject to Authority approval; the supplied certificate data says no extension |
| Registered promoter | Srikara Property Developers LLP (also rendered “Shrikara Property Developers LLP” in the Form B extraction) RERA record |
| RERA status in supplied record | Registration validity ended 15/01/2022; current registration status is not established by the supplied record |
Land and geographic identity
| Item | TG-RERA record |
|---|---|
| Locality | MADEENAGUDA RERA record RERA filing |
| Revenue village | Madina Guda; the building permit identifies MADEENAGUDA RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500050 RERA record RERA filing |
| Project survey number(s) | SY NO 33/1; the building permit records survey 33/1 RERA record |
| Plot reference | Plot No. 40 RERA filing |
| Site extent | RERA filing: total area 919.6 sq m; net area 919.60 sq m RERA filing |
| Building-permit area figures | Site area 919.6 sq m; net area 915.25 sq m |
| Registered boundaries | East: ROAD WIDTH 12; West: PLOT NO 49; North: 50 WIDE ROAD; South: PLOT NO 41 RERA filing |
Development identity
| Item | Evidence |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Permit No. 2/C20/01243/2020, approved 30 January 2020; file No. 2/C21/18943/2019 Approvals record |
| Approved building | Building A-1, residential; 1 Cellar + Stilt + 5 upper floors |
| Approved built-up area | 2,066.05 sq m, recorded in the permit’s residential parameters |
| Building / tower count | One building in the permit; one block/tower in the RERA unit summary RERA unit table |
| Parking levels | Cellar and stilt are approved for vehicle parking; the permit says they must be used exclusively for parking |
| Unit counts | 20 units in the TG-RERA unit record; the RERA filing fields separately state one total building unit, so the building-unit field does not provide a usable apartment count RERA unit table RERA filing |
Offering and status
| Item | TG-RERA record |
|---|---|
| Filed configuration | 2BHK RERA unit table |
| Filed saleable area | 33.03 sq m per unit RERA unit table |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is recorded, so counts are indicative RERA unit table |
| Promoter-declared completion deadline | 15/01/2022 in the Form B declaration |
| Construction stage | No current or independently verified construction-progress information is supplied Document index |
| Completion / occupancy certificate | The building-permit extraction says completion is not certified. The supplied record does not establish an occupancy or completion certificate for Building A-1 |
2. The project story
- E11 CEDAR is registered as a residential apartment project at Plot No. 40, SY NO 33/1, in Madina Guda/MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District. Its GHMC permit describes one residential building, Building A-1, with a cellar, stilt and five upper floors. The permit records 2,066.05 sq m of residential built-up area and identifies the cellar and stilt for parking. RERA record RERA filing
- The TG-RERA unit record identifies 20 2BHK homes. It reports 0 booked and 20 available, but the portal data has no as-of date and should be treated as indicative rather than current inventory. The project’s registration certificate and promoter Form B set 15/01/2022 as the stated completion date; the supplied evidence does not establish present construction progress or certified completion. RERA unit table
3. Master plan, architecture & building design
- The supplied GHMC building-permit extraction describes a single residential building, A-1, on a site area of 919.6 sq m, with one cellar, a stilt level and five upper floors. It records residential built-up area of 2,066.05 sq m, a 14.75 m building height, and cellar and stilt areas of 488.38 sq m and 338.27 sq m respectively. These are permit-record figures; no FSI-counted area or independently measured gross built-up area is supplied.
- The permit lists a tot-lot of 58.1 sq m, six rainwater-harvesting structures, 45 trees, a transformer space and a garbage house. It also requires a strip of greenery on the site periphery and states that the tot-lot is to be fenced and maintained as greenery before occupancy certification. The drawing file is identified as doc 110382, but it was not extracted here; detailed layouts, floor-by-floor apartment arrangements, circulation, lifts, stairs and entrances therefore cannot be described from the available material. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 33.03 sq m | Not established | Not supplied |
The TG-RERA filing provides the unit count and saleable area. The floor-plan review reports that no plausible 2BHK design measurement was produced; consequently, no software-measured carpet area or room dimensions are available. Saleable area and carpet area are distinct measures: the supplied material explains that saleable area includes a share of common areas, while carpet area is measured from the home’s drawing geometry. No balcony, utility or loading figures are provided. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit does not provide a parking-space count or distinguish resident, visitor, accessible or two-wheeler spaces. No unit-specific parking allocation, ramp details, internal driveway arrangement or EV-charging provision is established by the supplied records. RERA amenities
6. Amenities, recreation & open spaces
The available records identify the following facilities. The permit establishes specified design requirements; the RERA amenity schedule records entries as available but reports 0% progress, so it does not establish delivery or independent completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | 58.1 sq m; permit requires fencing and maintenance as greenery | Required by permit; completion not established | |
| Trees and peripheral greenery | 45 trees; peripheral strip of greenery required | Required by permit; completion not established | |
| Water supply | No source or capacity stated | RERA amenities | RERA schedule says “YES”; 0% progress; completion not independently verified |
| Sewerage and sewage/sullage treatment | Schedule names chambers, lines, septic tank and STP; no capacity given | RERA amenities | “YES” recorded for sewerage; 0% progress; treatment/disposal entry has no stated availability; completion not verified |
| Storm-water drains | No dimensions or capacity stated | RERA amenities | Listed at 0% progress; completion not established |
| Rainwater harvesting | Permit specifies percolation pit structures and records six RWHPs | RERA amenities | Permit requirement; completion not established |
| Electrical meter room / sub-station / receiving station | Permit requires transformer space on site; schedule lists electrical room/sub-station/receiving station | RERA amenities | Schedule says “YES”; 0% progress; completion not independently verified |
| Energy management | No system or capacity specified | RERA amenities | “YES” recorded; 0% progress; completion not verified |
| Solid-waste management / garbage house | Permit requires a garbage house within the premises | RERA amenities | Permit requirement; RERA schedule lists the service at 0% progress; completion not established |
| Internal roads and footpaths | No design or dimensions supplied | RERA amenities | Listed at 0% progress; completion not established |
| Street lighting | No details supplied | RERA amenities | Listed at 0% progress; completion not established |
| Community buildings | No details supplied | RERA amenities | Listed at 0% progress; completion not established |
| Recreational open space | No aggregate area stated in the amenity schedule | RERA amenities | Listed at 0% progress; completion not established |
| Fire protection and fire safety | Permit requires an occupancy Fire NOC before occupancy certificate | RERA amenities | Requirement recorded; no Fire NOC or completion evidence supplied |
7. Utilities, building services & safety
- The permit requires a rainwater-harvesting percolation pit structure, transformer space and a garbage house. The RERA amenity schedule records water supply, sewerage, storm-water drainage, rainwater harvesting and energy management, but its listed progress is 0%; the supplied information does not establish operational completion, water source or storage capacity, STP capacity, reuse arrangements, backup power, lift provision or waste-segregation arrangements. RERA amenities
- The permit states that an occupancy Fire NOC must be obtained before issue of the occupancy certificate and that the occupancy certificate is compulsory before a building is occupied. It also requires construction-worker safety. No fire-system details, escape-stair configuration, lift capacity, accessibility arrangements, CCTV or access-control specifications are established in the supplied records.
8. Location, access & connectivity
The registered location is Madina Guda/MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District, PIN 500050. The RERA site boundaries identify a road width of 12 on the east and a 50 WIDE ROAD on the north; the GHMC permit also refers to an 18 mt. road width in its conditions. The supplied location record identifies HITEC City at 4.7 km. No public-transport details or verified travel times are provided. RERA record RERA filing Location record
9. Developer & development status
- The registered promoter is SRIKARA PROPERTY DEVELOPERS LLP, an LLP. The RERA record names A V Anirudh Reddy as partner and authorized signatory, with Anusha Reddy and A Sailaja Reddy also listed as partners. The supplied promoter address is SHRI NILAYA ESTATES, AMEERPET, RANGAREDDY, MADEENAGUDA, Serilingampally, Ranga Reddy, 500050; a corporate registration number or official contact details are not supplied. Corporate record Parties record
- In Form B dated 14 March 2020, the promoter’s designated partner declared a legal title basis, declared the land free from encumbrances and undertook completion by 15/01/2022. These are promoter declarations, not independent findings of title or completion. No phase-wise progress update, current construction-stage evidence or occupancy certification is supplied.
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C for E11 CEDAR, registration P02400001953, issued 06/07/2020; validity recorded through 15/01/2022. The certificate lists promoter conditions including the separate-account requirement. |
| GHMC building permit | Permit 2/C20/01243/2020, file 2/C21/18943/2019, approved 30 January 2020; applies to Building A-1 at survey 33/1, Madeenaguda. The permit describes the cellar, stilt and five upper floors and sets out project conditions. |
| Building-plan drawing | Doc 110382 is the RERA-filed layout-plan document, but its drawing content was not extracted in the supplied evidence. The drawing stamp is recorded as 31-01-2020 and flagged for review. Document index Approvals record |
| Form B promoter declaration | Form B for E11 CEDAR, dated 14 March 2020, including the promoter’s completion undertaking and title/encumbrance declarations. |
| Occupancy / completion certificate | No such certificate is established in the supplied records; the building-permit extraction says completion is not certified. |
| Other project-specific approvals or records | No additional project-specific approval instrument is supplied in this Overview evidence set. |
1. Project at a glance
Project identity
Registered project name: E11 CEDAR
Project type / registered portion: Residential apartment project; phase or separately registered portion is not disclosed
TG-RERA registration: P02400001953; granted under section 5; issued 06/07/2020; valid from 06/07/2020 to 15/01/2022. The certificate records one year and states extension is subject to Authority approval; the supplied certificate data says no extension
Registered promoter: Srikara Property Developers LLP (also rendered “Shrikara Property Developers LLP” in the Form B extraction)
RERA status in supplied record: Registration validity ended 15/01/2022; current registration status is not established by the supplied record
Land and geographic identity
Locality: MADEENAGUDA
Revenue village: Madina Guda; the building permit identifies MADEENAGUDA
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500050
Project survey number(s): SY NO 33/1; the building permit records survey 33/1
Plot reference: Plot No. 40
Site extent: RERA filing: total area 919.6 sq m; net area 919.60 sq m
Building-permit area figures: Site area 919.6 sq m; net area 915.25 sq m
Registered boundaries: East: ROAD WIDTH 12; West: PLOT NO 49; North: 50 WIDE ROAD; South: PLOT NO 41
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Permit No. 2/C20/01243/2020, approved 30 January 2020; file No. 2/C21/18943/2019
Approved building: Building A-1, residential; 1 Cellar + Stilt + 5 upper floors
Approved built-up area: 2,066.05 sq m, recorded in the permit’s residential parameters
Building / tower count: One building in the permit; one block/tower in the RERA unit summary
Parking levels: Cellar and stilt are approved for vehicle parking; the permit says they must be used exclusively for parking
Unit counts: 20 units in the TG-RERA unit record; the RERA filing fields separately state one total building unit, so the building-unit field does not provide a usable apartment count
Offering and status
Filed configuration: 2BHK
Filed saleable area: 33.03 sq m per unit
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is recorded, so counts are indicative
Promoter-declared completion deadline: 15/01/2022 in the Form B declaration
Construction stage: No current or independently verified construction-progress information is supplied
Completion / occupancy certificate: The building-permit extraction says completion is not certified. The supplied record does not establish an occupancy or completion certificate for Building A-1
2. The project story
- E11 CEDAR is registered as a residential apartment project at Plot No. 40, SY NO 33/1, in Madina Guda/MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District. Its GHMC permit describes one residential building, Building A-1, with a cellar, stilt and five upper floors. The permit records 2,066.05 sq m of residential built-up area and identifies the cellar and stilt for parking.
- The TG-RERA unit record identifies 20 2BHK homes. It reports 0 booked and 20 available, but the portal data has no as-of date and should be treated as indicative rather than current inventory. The project’s registration certificate and promoter Form B set 15/01/2022 as the stated completion date; the supplied evidence does not establish present construction progress or certified completion.
3. Master plan, architecture & building design
- The supplied GHMC building-permit extraction describes a single residential building, A-1, on a site area of 919.6 sq m, with one cellar, a stilt level and five upper floors. It records residential built-up area of 2,066.05 sq m, a 14.75 m building height, and cellar and stilt areas of 488.38 sq m and 338.27 sq m respectively. These are permit-record figures; no FSI-counted area or independently measured gross built-up area is supplied.
- The permit lists a tot-lot of 58.1 sq m, six rainwater-harvesting structures, 45 trees, a transformer space and a garbage house. It also requires a strip of greenery on the site periphery and states that the tot-lot is to be fenced and maintained as greenery before occupancy certification. The drawing file is identified as doc 110382, but it was not extracted here; detailed layouts, floor-by-floor apartment arrangements, circulation, lifts, stairs and entrances therefore cannot be described from the available material.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 33.03 sq m | Not established | Not supplied |
The TG-RERA filing provides the unit count and saleable area. The floor-plan review reports that no plausible 2BHK design measurement was produced; consequently, no software-measured carpet area or room dimensions are available. Saleable area and carpet area are distinct measures: the supplied material explains that saleable area includes a share of common areas, while carpet area is measured from the home’s drawing geometry. No balcony, utility or loading figures are provided.
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as parking levels and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit does not provide a parking-space count or distinguish resident, visitor, accessible or two-wheeler spaces. No unit-specific parking allocation, ramp details, internal driveway arrangement or EV-charging provision is established by the supplied records.
6. Amenities, recreation & open spaces
The available records identify the following facilities. The permit establishes specified design requirements; the RERA amenity schedule records entries as available but reports 0% progress, so it does not establish delivery or independent completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | 58.1 sq m; permit requires fencing and maintenance as greenery | Required by permit; completion not established | |
| Trees and peripheral greenery | 45 trees; peripheral strip of greenery required | Required by permit; completion not established | |
| Water supply | No source or capacity stated | RERA schedule says “YES”; 0% progress; completion not independently verified | |
| Sewerage and sewage/sullage treatment | Schedule names chambers, lines, septic tank and STP; no capacity given | “YES” recorded for sewerage; 0% progress; treatment/disposal entry has no stated availability; completion not verified | |
| Storm-water drains | No dimensions or capacity stated | Listed at 0% progress; completion not established | |
| Rainwater harvesting | Permit specifies percolation pit structures and records six RWHPs | Permit requirement; completion not established | |
| Electrical meter room / sub-station / receiving station | Permit requires transformer space on site; schedule lists electrical room/sub-station/receiving station | Schedule says “YES”; 0% progress; completion not independently verified | |
| Energy management | No system or capacity specified | “YES” recorded; 0% progress; completion not verified | |
| Solid-waste management / garbage house | Permit requires a garbage house within the premises | Permit requirement; RERA schedule lists the service at 0% progress; completion not established | |
| Internal roads and footpaths | No design or dimensions supplied | Listed at 0% progress; completion not established | |
| Street lighting | No details supplied | Listed at 0% progress; completion not established | |
| Community buildings | No details supplied | Listed at 0% progress; completion not established | |
| Recreational open space | No aggregate area stated in the amenity schedule | Listed at 0% progress; completion not established | |
| Fire protection and fire safety | Permit requires an occupancy Fire NOC before occupancy certificate | Requirement recorded; no Fire NOC or completion evidence supplied |
7. Utilities, building services & safety
- The permit requires a rainwater-harvesting percolation pit structure, transformer space and a garbage house. The RERA amenity schedule records water supply, sewerage, storm-water drainage, rainwater harvesting and energy management, but its listed progress is 0%; the supplied information does not establish operational completion, water source or storage capacity, STP capacity, reuse arrangements, backup power, lift provision or waste-segregation arrangements.
- The permit states that an occupancy Fire NOC must be obtained before issue of the occupancy certificate and that the occupancy certificate is compulsory before a building is occupied. It also requires construction-worker safety. No fire-system details, escape-stair configuration, lift capacity, accessibility arrangements, CCTV or access-control specifications are established in the supplied records.
8. Location, access & connectivity
The registered location is Madina Guda/MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District, PIN 500050. The RERA site boundaries identify a road width of 12 on the east and a 50 WIDE ROAD on the north; the GHMC permit also refers to an 18 mt. road width in its conditions. The supplied location record identifies HITEC City at 4.7 km. No public-transport details or verified travel times are provided.
9. Developer & development status
- The registered promoter is SRIKARA PROPERTY DEVELOPERS LLP, an LLP. The RERA record names A V Anirudh Reddy as partner and authorized signatory, with Anusha Reddy and A Sailaja Reddy also listed as partners. The supplied promoter address is SHRI NILAYA ESTATES, AMEERPET, RANGAREDDY, MADEENAGUDA, Serilingampally, Ranga Reddy, 500050; a corporate registration number or official contact details are not supplied.
- In Form B dated 14 March 2020, the promoter’s designated partner declared a legal title basis, declared the land free from encumbrances and undertook completion by 15/01/2022. These are promoter declarations, not independent findings of title or completion. No phase-wise progress update, current construction-stage evidence or occupancy certification is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for E11 CEDAR, registration P02400001953, issued 06/07/2020; validity recorded through 15/01/2022. The certificate lists promoter conditions including the separate-account requirement.
GHMC building permit: Permit 2/C20/01243/2020, file 2/C21/18943/2019, approved 30 January 2020; applies to Building A-1 at survey 33/1, Madeenaguda. The permit describes the cellar, stilt and five upper floors and sets out project conditions.
Building-plan drawing: Doc 110382 is the RERA-filed layout-plan document, but its drawing content was not extracted in the supplied evidence. The drawing stamp is recorded as 31-01-2020 and flagged for review.
Form B promoter declaration: Form B for E11 CEDAR, dated 14 March 2020, including the promoter’s completion undertaking and title/encumbrance declarations.
Occupancy / completion certificate: No such certificate is established in the supplied records; the building-permit extraction says completion is not certified.
Other project-specific approvals or records: No additional project-specific approval instrument is supplied in this Overview evidence set.
Frequently asked questions
Is E11 CEDAR registered with Telangana RERA?
Yes. E11 CEDAR is registered with the Telangana Real Estate Regulatory Authority as P02400001953; the registration status is New Project.
Who is the developer of E11 CEDAR?
The promoter named in the RERA registration is SRIKARA PROPERTY DEVELOPERS LLP.
Where is E11 CEDAR located?
E11 CEDAR is in MADEENAGUDA, Madina Guda, Serilingampally, Rangareddy, Telangana (500050).
When will E11 CEDAR be completed?
The promoter's proposed date of completion filed with RERA is 15/01/2022. This is the promoter's declaration, not a guarantee.