Sign in

Sri Virinchi Signature

SRI VIRINCHI NIVAS CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200003862

SRI VIRINCHI SIGNATURE is a residential apartment project in Swaroop Nagar Colony, Uppal Mandal, Medchal-Malkajgiri District, developed by SRI VIRINCHI NIVAS CONSTRUCTIONS, a partnership. It is on **334.60 sq m** and comprises one residential building with **1 Stilt + 5 upper floors** and **10** 3BHK units, each with a filed saleable area of **116.12 m²**. The project is registered with TG-RERA as **P02200003862**, and its proposed completion date is **31 August 2023**.

01What we found

Period endedTG-RERA registration ran to 31 Aug 2023 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 56, Uppal)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI VIRINCHI SIGNATURE RERA record
Project type / phaseResidential apartment project; phase or separately registered portion not stated in the supplied record RERA record RERA filing
TG-RERA registrationP02200003862; registration certificate issued 06/01/2022, valid through 31/08/2023. The certificate records no extension Approvals record
Registered promoterSRI VIRINCHI NIVAS CONSTRUCTIONS, a partnership RERA filing Parties record
TG-RERA statusThe supplied certificate records the registration period above; it does not establish the project’s current registration status

Land and geographic identity

FieldRecord
Locality / revenue villageSwaroop Nagar Colony (also rendered Swaroopnagar); revenue village: Uppal RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500039 RERA record RERA filing
Survey identitySurvey No. 56; plot described as Plot No. 36 Part. No subdivision is specified in the project filing Land records RERA filing
Registered site extent334.60 sq m (also recorded as 334.6 m²) RERA filing
Total / net areaTotal area 334.60 sq m; net area 334.60 sq m; road-widening/FTL/nala affected area recorded as 0 sq m RERA filing
BoundariesEast: Plot No. 37 Part; west: 30 Feet Wide Road; north: Plot No. 35; south: Plot No. 36 Part RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit2/C2/08966/2021, approved 10 August 2021; file no. 2/C2/05122/2021 Approvals record
Approved built-up area949.90 m² residential upper-floor area; the permit separately lists 173.98 m² stilt-parking area RERA filing
Building and floorsOne residential building, shown as 1 Stilt + 5 upper floors; sanctioned height 14.5 m
Parking levelOne stilt parking floor; the record gives parking area, but not a total number of parking spaces
Unit count10 RERA-filed 3BHK units; the approved plan records 1 building unit, while the RERA filing records 10 proposed units RERA filing RERA unit table

Offering and status

FieldRecord
Unit type and RERA saleable area3BHK; 116.12 m² saleable area as filed RERA unit table RERA unit details
Booked / availablePortal-derived filing data shows 0 booked and 10 available; no as-of date is supplied, so these counts are indicative RERA unit table
Construction completion date declared to TG-RERA31 August 2023
GHMC occupancy certificateGHMC OC 0585/GHMC/LBN/2024-OC, dated 08 April 2024, for the building identified as Sri Virinchi Signature, Survey No. 56, with stilt and five upper floors Approvals record
Registration validity versus completion / OCRegistration validity ended 31/08/2023; the promoter’s declared completion deadline was 31 August 2023; the supplied OC is dated 08 April 2024. These are separate record dates

2. The project story

SRI VIRINCHI SIGNATURE is registered with TG-RERA as a residential apartment project on 334.60 sq m in Survey No. 56, Plot No. 36 Part, Uppal. The GHMC building permit describes one residential building with one stilt level and five upper floors. The RERA filing lists ten 3BHK units; the available portal-derived count shows all ten as available, although it is not dated RERA record Land records RERA unit table.

The promoter’s Form B declaration gave a completion deadline of 31 August 2023. The supplied GHMC occupancy certificate is dated 08 April 2024 and certifies the named building as inspected and fit for occupation. It records a completion notice dated 03 January 2024. The certificate concerns the identified building; it does not itself establish the current booking status of individual units.

The OC document lists a 0 m² tot-lot area. Although the filing’s amenities schedule marks several services as available, the supplied material does not provide independent site verification of their present condition RERA amenities.

3. Master plan, architecture & building design

The GHMC building-permit record identifies a single residential building, BLDG-1, on a site of 334.6 m², with 1 stilt + 5 upper floors and a sanctioned height of 14.5 m. Its listed residential upper-floor area is 949.90 m². The permit separately lists 173.98 m² for stilt parking; the OC record gives parking area as 174 m². These are the areas stated in their respective records, not carpet or saleable areas.

The permit states setbacks of 3 m front, 2 m rear, and 2 m on each side. It records 15 trees, a compound wall of 68.09 RM, and 0 m² tot-lot area. No basement, podium, internal road network, landscaped-area schedule, residential/commercial split, or phase-wise building arrangement is established by the supplied records.

The floor-plan drawing record supports software measurement of unit layouts, but the supplied information does not establish further architectural details such as the number of flats per floor, lifts, staircases, or circulation arrangements Floor plans.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010116.12 m²73.8–83.5 m²; median 78.7 m²32%

Unit count, booking count and saleable area are filing-derived; the booking figures have no supplied as-of date. Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not TG-RERA disclosures, and are marked for review RERA unit details RERA unit table Floor plans.

The distinction matters: the RERA-filed saleable area is 116.12 m² per unit, while the measured carpet-area range is 73.8–83.5 m². Carpet area describes the measured internal space under the drawing-based method; saleable area is the separate filed figure and includes a share of common areas. Do not treat the measured carpet figures as a replacement for the filed saleable area RERA unit details Floor plans.

The typical plan panel identified as “TYPICAL - 2-5 FLOOR PLAN” shows a living/kitchen, three bedrooms, two toilets and two utility areas for the measured example. Drawing measurements for that example include a living/kitchen area of 37.82 m², bedroom areas of 9.07 m², 12.87 m² and 9.14 m², toilet areas of 2.98 m² and 2.81 m², and utility areas of 3.89 m² and 1.58 m². These are software-measured drawing details, not RERA-filed room areas RERA unit details.

5. Parking & vehicle circulation

The sanctioned plan provides one stilt parking level, with parking area recorded as 173.98 m²; the OC record states 174 m². Neither supplied record establishes the number of car or two-wheeler spaces, visitor or accessible spaces, EV charging, ramps, or parking allocation to individual units.

The portal-derived unit data marks the 3BHK units as mortgaged, and the permit record separately identifies a 96.53 m² first-floor area handed over to GHMC under registration no. 10835/2021. These entries do not establish an individual buyer’s parking entitlement RERA unit table.

6. Amenities, recreation & open spaces

Water supply
Description / sizeListed as available; no source, capacity or storage details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Sewerage and sewage treatment
Description / sizeSewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage water listed as available
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Storm-water drains
Description / sizeListed as available
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Rainwater harvesting
Description / sizeListed as available; permit lists a rainwater-harvesting structure (percolation pit)
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Green strip / tot-lot / park
Description / sizeListed as available; no area stated in the RERA amenities schedule. The permit and OC each record tot-lot area as 0 m²
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Solid-waste management and disposal
Description / sizeListed as available; permit lists a garbage house
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Electrical meter room / substation / receiving station
Description / sizeListed as available; permit lists space for a transformer
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities schedule: 100%; current site condition not independently verified
Community buildings
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule
Internal roads and footpaths
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule
Street lighting
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule
Energy management
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule
Fire protection and fire-safety requirements
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule
Aggregate recreational open space
Description / sizeListed at 0% in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as available in that schedule

The supplied third-party vendor record also lists security, visitor parking, a community hall, common garden, children’s play area, CCTV, rainwater harvesting and EV provision. These are vendor-listed claims, not established here as sanctioned or delivered facilities Promoter website.

7. Utilities, building services & safety

The RERA amenities schedule marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, and electrical meter room/substation/receiving station as available. The permit lists a transformer space, garbage house, rainwater-harvesting structure (percolation pit) and ETP. The supplied documents do not specify system capacities, water sources, storage, treated-water reuse, backup power, lift provision, or waste-security arrangements RERA amenities.

The amenities schedule records fire protection and fire-safety requirements at 0%. The permit contains conditions requiring construction to follow the sanctioned plan and stating that an occupancy certificate is compulsory before occupation; the supplied OC document certifies the building as fit for occupation. The available evidence does not provide a detailed fire-system inventory or accessibility plan RERA amenities.

8. Location, access & connectivity

The registered location is Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039; the project land is identified as Survey No. 56, Plot No. 36 Part, in revenue village Uppal, with the permit describing Swaroop Nagar Colony, Uppal RERA record RERA filing Land records.

The filed boundary on the west is a 30 Feet Wide Road; the permit separately records an 18 mt. road width. The supplied location data identifies Financial District (Nanakramguda) at 2.0 km as an anchor, but does not provide a verified travel route or travel time. No other specific public-transport stops or landmarks are documented in the supplied evidence RERA filing Location record.

9. Developer & development status

The registered promoter is SRI VIRINCHI NIVAS CONSTRUCTIONS, recorded as a partnership. The supplied promoter address is Flat No. 202, 2nd Floor, Gokhale Nagar, Swaroopnagar, Uppal, Medchal-Malkajgiri, Telangana, PIN 500039. The GSTIN recorded for the promoter is 36AEFFS5083N1ZE. The evidence does not supply an official website or contact details Parties record RERA filing.

The promoter’s Form B declaration, dated October 2021, states that the promoter has legal title, that the land is free from encumbrances, and that the project would be completed by 31st August 2023. Those are promoter declarations. The supplied GHMC OC is for the named building and dated 08 April 2024; no separate tower or phase is identified in the filing.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02200003862; issued 06/01/2022; valid through 31/08/2023
Scope and noteProject registration for SRI VIRINCHI SIGNATURE
GHMC building permit order
Identifier / dateApproval no. 2/C2/08966/2021; file no. 2/C2/05122/2021; 10 August 2021
Scope and noteResidential building permission for Plot No. 36 Part, Survey No. 56, Uppal; 1 stilt + 5 upper floors
GHMC occupancy certificate
Identifier / dateProceedings no. 0585/GHMC/LBN/2024-OC; application no. 002471/GHMC/1183/LBN2/2024-OC; 08 April 2024
Scope and noteOC for Sri Virinchi Signature, Survey No. 56; certificate records completion notice dated 03 January 2024
GHMC handover record referenced in permit
Identifier / dateRegistration no. 10835/2021; 02 July 2021
Scope and notePermit identifies 96.53 m² first-floor handed-over area in favour of GHMC
Promoter’s Form B declaration
Identifier / dateOctober 2021
Scope and noteIncludes promoter declarations on title, encumbrances, completion deadline and statutory undertakings
Title search report
Identifier / dateDoc. 203763
Scope and noteAdvocate’s title report concerning Plot No. 36 in part of Survey No. 56, Uppal
Filed sale deed
Identifier / dateDoc. 203779; registration no. 10402/2021
Scope and noteDescribes Plot No. 36 Part, Survey No. 56, Uppal, measuring 400 sq. yds. or 334 sq. m., in favour of the promoter and Sri Sonaji Raju
Gift settlement deed
Identifier / dateDoc. 203780; registration no. 4902/2011
Scope and noteRecited in the supplied title materials for Plot No. 36 Part, Survey No. 56
Approved floor-plan drawing
Identifier / dateDoc. 203764
Scope and noteDrawing source for software-measured unit layouts; measurements are not RERA disclosures

The supplied record does not identify a separate approved-layout number for this apartment development.

Frequently asked questions

Is SRI VIRINCHI SIGNATURE registered with Telangana RERA?

Yes. SRI VIRINCHI SIGNATURE is registered with the Telangana Real Estate Regulatory Authority as P02200003862; the registration status is New Project.

Who is the developer of SRI VIRINCHI SIGNATURE?

The promoter named in the RERA registration is SRI VIRINCHI NIVAS CONSTRUCTIONS.

Where is SRI VIRINCHI SIGNATURE located?

SRI VIRINCHI SIGNATURE is in Uppal, Medchal-Malkajgiri, Telangana (500039).

When will SRI VIRINCHI SIGNATURE be completed?

The promoter's proposed date of completion filed with RERA is 31/08/2023. This is the promoter's declaration, not a guarantee.

More projects in Uppal