Thirumala Haasini Enclave
THIRUMALA CONSTRUCTIONS DEVELOPERS · Medchal-Malkajgiri · RERA P02200001131
THIRUMALA HAASINI ENCLAVE is a residential apartment project in Chilkanagar Colony, Uppal mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter, THIRUMALA CONSTRUCTIONS DEVELOPERS. The project covers 637 sq.m. and comprises one residential building with 1 Stilt + 5 upper floors and one 2-bedroom unit. It is registered with TG-RERA under P02200001131, with a promoter-declared completion date of 29 January 2025.
More from Thirumala Constructions Developers · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | THIRUMALA HAASINI ENCLAVE RERA record |
| Project type | Residential apartment project; registered as a new project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration concerns the project on Survey No.55, with the site recorded as House No.2-20-5/17/2, Plot Nos.313 & 314 RERA filing |
| TG-RERA registration number | P02200001131 |
| Registration validity | 05/09/2019–29/01/2025; the supplied certificate records a five-year validity period and no extension |
| Registered promoter | THIRUMALA CONSTRUCTIONS DEVELOPERS |
| RERA status in supplied record | Registration term ended 29/01/2025. No extension is recorded in the supplied certificate; current portal status is not established by this record Approvals record |
Land and geographic identity
| Item | TG-RERA record |
|---|---|
| Locality | Chilkanagar Colony; the building permit describes the site as Adarsh Nagar, Uppal RERA record RERA filing |
| Revenue village(s) | Uppal is stated in the project filing; the building permit says UPPAL VILLAGE. The title documents also use Uppal Khalsa / Uppal Kalan and Uppal Khalsa (M)/Chilkanagar RERA filing |
| Mandal / district / PIN | Uppal mandal; Medchal-Malkajgiri district; PIN 500039 RERA record RERA filing |
| Project survey identity | Survey No. 55, stated in the RERA certificate and building permit; the RERA filing also gives Premises No.20. Site address: 2-20-5/17/2, Plot No.313 & 314 RERA filing |
| Subdivision | No project-held survey subdivision is specified in the filing RERA filing |
| Site extent | 637 sq.m. total and net area in the RERA filing; the building permit also states 637 m2 RERA filing |
| Boundaries | North: Plot Nos.309, 310 and 311; South: 30 Wide Road; East: Neighbours Land; West: Plot No.312 RERA filing |
Development identity
| Item | TG-RERA / sanction record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C2/01708/2019, approved 29 January 2019; file no. 2/C2/23317/2018 Approvals record |
| Approved built-up area | 1,747.53 sq.m. in the RERA filing RERA filing |
| Sanctioned building | One residential building; 1 Stilt + 5 upper floors RERA filing |
| Height | 14.9 m stated in the building permit parameters |
| Sanctioned / RERA-declared units | The filing records 1 total building unit and 1 proposed building unit; the RERA unit schedule contains 1 2-bedroom unit and zero 1-bedroom units RERA filing RERA unit table |
| Parking levels | Stilt is sanctioned for parking; the permit also refers to cellar and stilts approved for parking, but the supplied record does not establish a cellar in this building’s floor configuration |
| Approved layout record | A layout/subdivision reference LRS/486/3675/CR-2/EAST ZONE/2008 appears in the building-permit document; a separate approved-layout drawing is not available in the supplied extraction |
Offering and status
| Item | Supplied record |
|---|---|
| RERA configuration | 2-bedroom (“DOUBLE BED ROOM”): 1 unit; 1-bedroom (“SINGLE BED ROOM”): 0 units RERA unit table RERA unit details |
| RERA saleable area | 2-bedroom unit: 1076.35 sq.m. as recorded in the filing RERA unit table RERA unit table |
| Booking / availability | The portal-derived schedule records 0 booked and 1 available for the 2-bedroom unit, with no as-of date supplied; treat as indicative, not a current availability confirmation RERA unit table RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site-stage evidence is supplied. The RERA completion undertaking and building permit validity date are not proof of completion |
| Completion deadline | Promoter-declared completion date: 29 January 2025 |
| OC / completion certificate | No occupancy or completion certificate is included in the supplied documents; OC status is not established for the building Document index |
2. The project story
- THIRUMALA HAASINI ENCLAVE is registered with TG-RERA as a residential apartment project at House No.2-20-5/17/2, Plot Nos.313 & 314, Survey No.55, Uppal. The filing describes a 637 sq.m. site in Chilkanagar Colony, Uppal mandal, Medchal-Malkajgiri district; the GHMC permit places the building at Adarsh Nagar, Uppal RERA record RERA filing.
- The sanctioned scheme is a single residential building with one stilt and five upper floors. The RERA unit schedule records one 2-bedroom unit and no 1-bedroom units; the portal-derived booking figures show the one 2-bedroom unit as unbooked and available, but are undated RERA unit table.
- The promoter’s Form B affidavit undertakes completion by 29 January 2025. The supplied evidence does not establish actual construction progress, completion, or an occupancy certificate Document index.
3. Master plan, architecture & building design
- The RERA filing records a 637 sq.m. site and 1,747.53 sq.m. approved built-up area. These are distinct filed figures; the supplied record does not provide a separate FSI-counted area, gross built-up calculation, or carpet-area schedule RERA filing RERA filing.
- GHMC’s building-permit order sanctions one residential building with 1 Stilt + 5 upper floors, with a stated height of 14.9 m. The permit’s parameters list residential area 1,427.30, stilt area 307.96, proposed covered built-up area 99,910.00, compound wall 97.55 RM, and two rainwater-harvesting pits; the supplied extraction does not specify units for every parameter, and these figures should be read in the context of the permit rather than treated as interchangeable area measures.
- The supplied material does not establish building footprint, floor-by-floor unit arrangement, flats per floor, lifts or stairs, entrance and exit layout, internal roads, landscaped-area dimensions, or residential/common-area distribution. A separate approved-layout document is listed as unextracted, so its drawing content cannot be described here.
4. Homes, configurations & floor plans
The TG-RERA schedule lists one 2-bedroom (“DOUBLE BED ROOM”) unit and zero 1-bedroom (“SINGLE BED ROOM”) units. Its recorded 2-bedroom saleable area is 1076.35 sq.m.; the filing does not supply carpet area or loading RERA unit table RERA unit table.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (“DOUBLE BED ROOM”) | 1 | 0 | 1 | 1076.35 sq.m. | Not established | Not supplied |
| 1BHK (“SINGLE BED ROOM”) | 0 | 0 | 0 | Not stated | Not established | Not supplied |
The floor-plan input reports two drawings reviewed but no measured flat designs for the 2BHK configuration. It therefore provides no usable software-measured carpet or room dimensions. The supplied floor-plan caveat distinguishes drawing-derived carpet area from RERA saleable area, which may include the home’s share of common areas; no drawing measurement is stated here as a RERA disclosure Floor plans.
5. Parking & vehicle circulation
- The GHMC permit states that the stilt is approved for parking and requires cellar and stilt areas approved for parking to be used exclusively for vehicles, without partition walls or rolling shutters. It does not provide a reliable parking-space count in the supplied extraction, identify resident or visitor allocations, or establish exclusive parking rights for the recorded unit.
- The permit’s building configuration records one stilt and five upper floors. Although its conditions refer to cellar and stilt parking, the evidence provided does not establish a cellar as a sanctioned level for this building. No ramp, vehicle entry/exit, internal driveway, pedestrian separation, accessible parking, mechanical parking, EV charging, or unit-specific parking allocation is documented.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists facilities and records “YES” for some items, while the percentage fields shown are 0. The schedule does not establish that these facilities have been completed or independently verified RERA amenities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | No size supplied | RERA amenity schedule RERA amenities | Marked “YES”; progress field 0; completion not verified |
| Community buildings | No size or capacity supplied | RERA amenity schedule RERA amenities | Listed; progress field 0; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenity schedule RERA amenities | Listed; progress field 0; completion not verified |
| Street lighting | No details supplied | RERA amenity schedule RERA amenities | Listed; progress field 0; completion not verified |
The building-permit parameters additionally list a Garbage House and 30 Trees, and record a Tot-lot (m2) 0; the evidence does not establish their delivered status.
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage (chambers, lines, septic tank, STP), water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; it does not supply capacities or establish operation or completion. Storm-water drains, sewage/sullage treatment and disposal, solid-waste management and disposal, energy management, and fire-protection/fire-safety requirements are also listed, with progress fields of 0 RERA amenities.
GHMC’s permit requires a rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house; its parameters specify 2 rainwater-harvesting pits. These are permit requirements or recorded parameters, not evidence of completed installations. The supplied record does not establish water source or storage capacity, STP capacity or reuse arrangements, electrical backup, lift provision, fire-system details, CCTV/security, or accessible circulation.
8. Location, access & connectivity
The registered location is Chilkanagar Colony, Uppal, Medchal-Malkajgiri district, Telangana, PIN 500039. The project filing identifies Survey No.55 and Premises No.20; the site is described as House No.2-20-5/17/2, Plot Nos.313 & 314. The building-permit order describes the location as Adarsh Nagar, Uppal, and records a 30 Wide Road along the southern boundary RERA record RERA filing.
The supplied connectivity entries do not provide a verified, project-specific approach route, public-transport connection, landmark distance, or travel time. No connectivity claims are made here.
9. Developer & development status
- The registered promoter is THIRUMALA CONSTRUCTIONS DEVELOPERS, recorded in the project material as a partnership. The supplied corporate identifier is GSTIN 36AAGFT3933P1ZL. The filing gives the promoter’s address as Survey No.37, Peerzadiguda, Adarsh Nagar, Chilkanagar Colony, Uppal, Medchal-Malkajgiri, PIN 500039 Corporate record Parties record RERA filing RERA filing.
- The Form B affidavit was made by Gattamaneni Venkata Sudhakar Rao as an authorised representative and states that the promoter undertook to complete the project by 29 January 2025. The supplied record identifies Prasanthi Gattamaneni as a partner and Venkata Sudhakar Rao as an authorised signatory Parties record. It does not provide a verified construction-progress report, current official contact details, official website, or occupancy/completion certificate.
10. Approvals, official records & documents
| Identifier / date | P02200001131; issued 05/09/2019; valid through 29/01/2025 |
|---|---|
| What the supplied evidence establishes | Registration of THIRUMALA HAASINI ENCLAVE under section 5; certificate includes a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | Approval 2/C2/01708/2019; file 2/C2/23317/2018; 29 January 2019 |
|---|---|
| What the supplied evidence establishes | Permission for one residential building at Uppal, with 1 stilt and 5 upper floors, subject to permit conditions. |
| Identifier / date | 01 August 2019 |
|---|---|
| What the supplied evidence establishes | Promoter declaration covering title-related submission, project obligations and completion undertaking of 29 January 2025. |
| Identifier / date | Documents 68238–68243 Document index |
|---|---|
| What the supplied evidence establishes | Extracted sale-deed and development-agreement material for properties in Survey No.55; the supplied material includes a registered development agreement and advocate title-search report. |
| Identifier / date | Documents 68244–68245 Document index |
|---|---|
| What the supplied evidence establishes | Encumbrance material filed with the project. |
| Identifier / date | Document 68246 |
|---|---|
| What the supplied evidence establishes | Listed as a required or alternative layout document, but not extracted in the supplied record. |
| Identifier / date | Not supplied Document index |
|---|---|
| What the supplied evidence establishes | The supplied document set does not establish issuance or status. |
1. Project at a glance
Project identity
Registered project name: THIRUMALA HAASINI ENCLAVE
Project type: Residential apartment project; registered as a new project
Phase / registered portion: No separate phase name is disclosed. The registration concerns the project on Survey No.55, with the site recorded as House No.2-20-5/17/2, Plot Nos.313 & 314
TG-RERA registration number: P02200001131
Registration validity: 05/09/2019–29/01/2025; the supplied certificate records a five-year validity period and no extension
Registered promoter: THIRUMALA CONSTRUCTIONS DEVELOPERS
RERA status in supplied record: Registration term ended 29/01/2025. No extension is recorded in the supplied certificate; current portal status is not established by this record
Land and geographic identity
Locality: Chilkanagar Colony; the building permit describes the site as Adarsh Nagar, Uppal
Revenue village(s): Uppal is stated in the project filing; the building permit says UPPAL VILLAGE. The title documents also use Uppal Khalsa / Uppal Kalan and Uppal Khalsa (M)/Chilkanagar
Mandal / district / PIN: Uppal mandal; Medchal-Malkajgiri district; PIN 500039
Project survey identity: Survey No. 55, stated in the RERA certificate and building permit; the RERA filing also gives Premises No.20. Site address: 2-20-5/17/2, Plot No.313 & 314
Subdivision: No project-held survey subdivision is specified in the filing
Site extent: 637 sq.m. total and net area in the RERA filing; the building permit also states 637 m2
Boundaries: North: Plot Nos.309, 310 and 311; South: 30 Wide Road; East: Neighbours Land; West: Plot No.312
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C2/01708/2019, approved 29 January 2019; file no. 2/C2/23317/2018
Approved built-up area: 1,747.53 sq.m. in the RERA filing
Sanctioned building: One residential building; 1 Stilt + 5 upper floors
Height: 14.9 m stated in the building permit parameters
Sanctioned / RERA-declared units: The filing records 1 total building unit and 1 proposed building unit; the RERA unit schedule contains 1 2-bedroom unit and zero 1-bedroom units
Parking levels: Stilt is sanctioned for parking; the permit also refers to cellar and stilts approved for parking, but the supplied record does not establish a cellar in this building’s floor configuration
Approved layout record: A layout/subdivision reference LRS/486/3675/CR-2/EAST ZONE/2008 appears in the building-permit document; a separate approved-layout drawing is not available in the supplied extraction
Offering and status
RERA configuration: 2-bedroom (“DOUBLE BED ROOM”): 1 unit; 1-bedroom (“SINGLE BED ROOM”): 0 units
RERA saleable area: 2-bedroom unit: 1076.35 sq.m. as recorded in the filing
Booking / availability: The portal-derived schedule records 0 booked and 1 available for the 2-bedroom unit, with no as-of date supplied; treat as indicative, not a current availability confirmation
Construction stage: No construction-progress percentage or independently verified site-stage evidence is supplied. The RERA completion undertaking and building permit validity date are not proof of completion
Completion deadline: Promoter-declared completion date: 29 January 2025
OC / completion certificate: No occupancy or completion certificate is included in the supplied documents; OC status is not established for the building
2. The project story
- THIRUMALA HAASINI ENCLAVE is registered with TG-RERA as a residential apartment project at House No.2-20-5/17/2, Plot Nos.313 & 314, Survey No.55, Uppal. The filing describes a 637 sq.m. site in Chilkanagar Colony, Uppal mandal, Medchal-Malkajgiri district; the GHMC permit places the building at Adarsh Nagar, Uppal.
- The sanctioned scheme is a single residential building with one stilt and five upper floors. The RERA unit schedule records one 2-bedroom unit and no 1-bedroom units; the portal-derived booking figures show the one 2-bedroom unit as unbooked and available, but are undated.
- The promoter’s Form B affidavit undertakes completion by 29 January 2025. The supplied evidence does not establish actual construction progress, completion, or an occupancy certificate.
3. Master plan, architecture & building design
- The RERA filing records a 637 sq.m. site and 1,747.53 sq.m. approved built-up area. These are distinct filed figures; the supplied record does not provide a separate FSI-counted area, gross built-up calculation, or carpet-area schedule.
- GHMC’s building-permit order sanctions one residential building with 1 Stilt + 5 upper floors, with a stated height of 14.9 m. The permit’s parameters list residential area 1,427.30, stilt area 307.96, proposed covered built-up area 99,910.00, compound wall 97.55 RM, and two rainwater-harvesting pits; the supplied extraction does not specify units for every parameter, and these figures should be read in the context of the permit rather than treated as interchangeable area measures.
- The supplied material does not establish building footprint, floor-by-floor unit arrangement, flats per floor, lifts or stairs, entrance and exit layout, internal roads, landscaped-area dimensions, or residential/common-area distribution. A separate approved-layout document is listed as unextracted, so its drawing content cannot be described here.
4. Homes, configurations & floor plans
The TG-RERA schedule lists one 2-bedroom (“DOUBLE BED ROOM”) unit and zero 1-bedroom (“SINGLE BED ROOM”) units. Its recorded 2-bedroom saleable area is 1076.35 sq.m.; the filing does not supply carpet area or loading.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (“DOUBLE BED ROOM”) | 1 | 0 | 1 | 1076.35 sq.m. | Not established | Not supplied |
| 1BHK (“SINGLE BED ROOM”) | 0 | 0 | 0 | Not stated | Not established | Not supplied |
The floor-plan input reports two drawings reviewed but no measured flat designs for the 2BHK configuration. It therefore provides no usable software-measured carpet or room dimensions. The supplied floor-plan caveat distinguishes drawing-derived carpet area from RERA saleable area, which may include the home’s share of common areas; no drawing measurement is stated here as a RERA disclosure.
5. Parking & vehicle circulation
- The GHMC permit states that the stilt is approved for parking and requires cellar and stilt areas approved for parking to be used exclusively for vehicles, without partition walls or rolling shutters. It does not provide a reliable parking-space count in the supplied extraction, identify resident or visitor allocations, or establish exclusive parking rights for the recorded unit.
- The permit’s building configuration records one stilt and five upper floors. Although its conditions refer to cellar and stilt parking, the evidence provided does not establish a cellar as a sanctioned level for this building. No ramp, vehicle entry/exit, internal driveway, pedestrian separation, accessible parking, mechanical parking, EV charging, or unit-specific parking allocation is documented.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists facilities and records “YES” for some items, while the percentage fields shown are 0. The schedule does not establish that these facilities have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | No size supplied | RERA amenity schedule | Marked “YES”; progress field 0; completion not verified |
| Community buildings | No size or capacity supplied | RERA amenity schedule | Listed; progress field 0; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenity schedule | Listed; progress field 0; completion not verified |
| Street lighting | No details supplied | RERA amenity schedule | Listed; progress field 0; completion not verified |
The building-permit parameters additionally list a Garbage House and 30 Trees, and record a Tot-lot (m2) 0; the evidence does not establish their delivered status.
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage (chambers, lines, septic tank, STP), water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; it does not supply capacities or establish operation or completion. Storm-water drains, sewage/sullage treatment and disposal, solid-waste management and disposal, energy management, and fire-protection/fire-safety requirements are also listed, with progress fields of 0.
GHMC’s permit requires a rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house; its parameters specify 2 rainwater-harvesting pits. These are permit requirements or recorded parameters, not evidence of completed installations. The supplied record does not establish water source or storage capacity, STP capacity or reuse arrangements, electrical backup, lift provision, fire-system details, CCTV/security, or accessible circulation.
8. Location, access & connectivity
The registered location is Chilkanagar Colony, Uppal, Medchal-Malkajgiri district, Telangana, PIN 500039. The project filing identifies Survey No.55 and Premises No.20; the site is described as House No.2-20-5/17/2, Plot Nos.313 & 314. The building-permit order describes the location as Adarsh Nagar, Uppal, and records a 30 Wide Road along the southern boundary.
The supplied connectivity entries do not provide a verified, project-specific approach route, public-transport connection, landmark distance, or travel time. No connectivity claims are made here.
9. Developer & development status
- The registered promoter is THIRUMALA CONSTRUCTIONS DEVELOPERS, recorded in the project material as a partnership. The supplied corporate identifier is GSTIN 36AAGFT3933P1ZL. The filing gives the promoter’s address as Survey No.37, Peerzadiguda, Adarsh Nagar, Chilkanagar Colony, Uppal, Medchal-Malkajgiri, PIN 500039.
- The Form B affidavit was made by Gattamaneni Venkata Sudhakar Rao as an authorised representative and states that the promoter undertook to complete the project by 29 January 2025. The supplied record identifies Prasanthi Gattamaneni as a partner and Venkata Sudhakar Rao as an authorised signatory. It does not provide a verified construction-progress report, current official contact details, official website, or occupancy/completion certificate.
10. Approvals, official records & documents
| Identifier / date | P02200001131; issued 05/09/2019; valid through 29/01/2025 |
|---|---|
| What the supplied evidence establishes | Registration of THIRUMALA HAASINI ENCLAVE under section 5; certificate includes a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | Approval 2/C2/01708/2019; file 2/C2/23317/2018; 29 January 2019 |
|---|---|
| What the supplied evidence establishes | Permission for one residential building at Uppal, with 1 stilt and 5 upper floors, subject to permit conditions. |
| Identifier / date | 01 August 2019 |
|---|---|
| What the supplied evidence establishes | Promoter declaration covering title-related submission, project obligations and completion undertaking of 29 January 2025. |
| Identifier / date | Documents 68238–68243 |
|---|---|
| What the supplied evidence establishes | Extracted sale-deed and development-agreement material for properties in Survey No.55; the supplied material includes a registered development agreement and advocate title-search report. |
| Identifier / date | Documents 68244–68245 |
|---|---|
| What the supplied evidence establishes | Encumbrance material filed with the project. |
| Identifier / date | Document 68246 |
|---|---|
| What the supplied evidence establishes | Listed as a required or alternative layout document, but not extracted in the supplied record. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The supplied document set does not establish issuance or status. |
Frequently asked questions
Is THIRUMALA HAASINI ENCLAVE registered with Telangana RERA?
Yes. THIRUMALA HAASINI ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200001131; the registration status is New Project.
Who is the developer of THIRUMALA HAASINI ENCLAVE?
The promoter named in the RERA registration is THIRUMALA CONSTRUCTIONS DEVELOPERS.
Where is THIRUMALA HAASINI ENCLAVE located?
THIRUMALA HAASINI ENCLAVE is in Chilkanagar Colony, Uppal, Medchal-Malkajgiri, Telangana (500039).
When will THIRUMALA HAASINI ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 29/01/2025. This is the promoter's declaration, not a guarantee.
More projects in Uppal