Sign in

Magnas Premium Apartments

SAYA INFRATECH · Hyderabad · RERA P02500011421

MAGNAS PREMIUM APARTMENTS is a residential apartment project in Ibrahim bagh, Golconda mandal, Hyderabad district. The registered promoter is SAYA INFRATECH. The project covers 668.74 sqmts and records one building with 15 apartments: 10 2BHK units of 74.08 sqm each and 5 3BHK units of 130.95 sqm each. Its TG-RERA registration number is P02500011421, and its proposed completion date is 19/11/2028.

01What we found

RegisteredTG-RERA - valid till 19 Nov 2028
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ibrhimbagh, Golconda, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameMAGNAS PREMIUM APARTMENTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied record; the registration covers the project named above.
TG-RERA registration numberP02500011421 Approvals record
Registration validity19/11/2025 to 19/11/2028; stated as 3 Year. This is the registration period, not a construction-completion or occupancy certificate. Approvals record
Registered promoterSAYA INFRATECH RERA record
RERA statusRegistered under Form C; certificate issue date 18/11/2026.

Land and geographic identity

ItemProject record
LocalityIbrahim bagh; the certificate spells this “IbrhimBagh.” RERA record Promoter website
Revenue villageIbrhimBagh as recorded; revenue-village identity is not independently verified in the supplied evidence. RERA record
Mandal / district / PINGolconda / Hyderabad / 500031 (project certificate). RERA record
Project survey numbersSy.no 143 and 150; the certificate lists them as “Sy.no 143” and “150.” No subdivisions are supplied. Land records
Site identifiersPlot numbers 9-5-1/A/102/A, 9-5-1/A/102 and 9-5-1/A/109. RERA filing
Total site area668.74 sqmts. RERA filing
Area affected / net area54.29 sqmts affected in road widening/FTL/Nala widening; net area 614.45 sqmts. RERA filing
BoundariesEast: Land of Grand City Avenues Private Limited; west: 25ft road; north: 30ft road; south: 25ft road. RERA filing

Development identity

ItemProject record
Sanctioning authorityGHMC, as recorded in the project filing. RERA filing Approvals record
Principal approval number / date1857/GHMC/SWBP/KHB2/2025; filed approval date 19/11/2025. The supplied record identifies this as the plan approval number, but does not include the sanction document or its conditions. Approvals record RERA filing
Approved built-up area1627.20 sqmts, labelled “Approved Built up Area” in the filing. RERA filing
Buildings / blocksOne building is recorded. RERA filing RERA unit table
Floor configuration and heightNot disclosed in the supplied evidence.
Parking levels / sanctioned parking countNot disclosed in the supplied evidence.
Unit count15 total units in the RERA-derived unit record: 10 2BHK and 5 3BHK. RERA unit table RERA unit table

Offering and status

ItemProject record
RERA-filed configurations and saleable areas2BHK: 10 units, 74.08 sqm each; 3BHK: 5 units, 130.95 sqm each. RERA unit table RERA unit table
Booked / availablePortal-derived record shows 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal record has no as-of date, so counts are indicative. RERA unit table RERA unit table
Construction stageNo construction-progress percentage or independently verified site status is supplied. The filing’s amenity entries show 0% progress. RERA amenities
Completion dateProposed completion date recorded as 19/11/2028. RERA record RERA filing
Original / revised completion datesNo separate original or revised dates are identified in the supplied evidence.
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the project is recorded as “New Project.” The absence of a certificate in this evidence set does not establish whether one has since been issued. RERA filing Document index

2. The project story

MAGNAS PREMIUM APARTMENTS is recorded with TG-RERA as a residential apartment project in Ibrahim bagh, Golconda mandal, Hyderabad district, on Sy.no 143 and 150. Its site record identifies three plot numbers, a total area of 668.74 sqmts and a net area of 614.45 sqmts after recording 54.29 sqmts as affected in road widening/FTL/Nala widening. RERA record Land records RERA filing

The filing describes one building containing 15 units: ten 2BHK apartments and five 3BHK apartments. The supplied record identifies the project’s proposed completion date as 19/11/2028, but provides no construction-stage percentage or independent site inspection evidence. The listed amenity progress entries are 0%; they should not be read as evidence that those facilities have been completed. RERA unit table RERA unit table RERA record RERA amenities

3. Master plan, architecture & building design

The filing records a site area of 668.74 sqmts, a net area of 614.45 sqmts, and an approved built-up area of 1627.20 sqmts. These are separately labelled site and built-up figures in the filing; no FSI-counted area, gross built-up-area breakdown, or carpet-area schedule is supplied. RERA filing RERA filing

One building is recorded, but the supplied evidence does not include extracted sanctioned drawings or sufficient design data to establish its floor configuration, height, footprint, number of apartments per floor, lifts, stairs, entries, circulation, open-area dimensions, landscaping, or residential/common-area distribution. The approval reference is 1857/GHMC/SWBP/KHB2/2025; the underlying sanction and drawings are not available here for architectural verification. Approvals record Document index HMDA

4. Homes, configurations & floor plans

The RERA-derived record lists 15 apartments in two configurations. Saleable areas below are the filed figures; no drawing-based carpet measurements or loading figures were supplied. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001074.08 sqmNot suppliedNot supplied
3BHK505130.95 sqmNot suppliedNot supplied

Booked and available counts are portal-derived and have no recorded as-of date, so they are indicative. No floor plans, room dimensions, balcony or utility-area schedule, or drawing-derived carpet-area measurements are included in the supplied evidence. Saleable area should not be treated as carpet area. RERA unit table RERA unit details

5. Parking & vehicle circulation

The filing identifies 165.16 sqmts as “Mortgage Area”; this is not identified in the supplied evidence as a parking count or parking allocation. The number and type of sanctioned parking spaces, parking level, vehicle ramps and internal driveways, visitor or accessible spaces, EV charging, and unit-wise parking allotments are not established by the available record. RERA filing Document index

6. Amenities, recreation & open spaces

The RERA-derived amenity record contains 14 listed items. Each entry shows 0% progress; the list records availability as “YES” for 13 items, while Community Buildings has no availability value shown. These entries are filing disclosures, not evidence of completed or independently verified facilities. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Water SupplySize/capacity not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Capacity or system details not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Storm Water DrainsDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Green Strip/TOT LOT/ParkArea not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Street LightingDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Community BuildingsSize and facility details not suppliedRERA-derived amenity record RERA amenities0%; availability not stated; not independently verified
Treatment and Disposal of Sewage and Sullage WaterDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Solid Waste Management and DisposalDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Water Conservation, Rain water HarvestingDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Energy managementDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Fire Protection and Fire Safety RequirementsSystems/details not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Aggregate area of recreational Open SpaceArea not suppliedRERA-derived amenity record RERA amenitiesListed “YES”; 0%; not independently verified

No separate clubhouse or indoor recreation schedule, sports-facility list, quantities, capacities, or facility drawing evidence is supplied. RERA amenities Document index

7. Utilities, building services & safety

The RERA-derived amenity record lists water supply, sewerage and sewage/sullage treatment, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It supplies no capacities, system specifications, completion evidence, or detailed service drawings; these are listed disclosures, not independently verified installations. RERA amenities

The available evidence does not establish water sources or storage, treatment-plant capacity or reuse arrangements, electrical supply or backup capacity, lift provision, fire-system details or escape configuration, security systems, or accessibility features. Document index RERA amenities

8. Location, access & connectivity

The official project record places the site in Ibrahim bagh, IbrhimBagh revenue-village wording, Golconda mandal, Hyderabad district, PIN 500031. The site boundary record identifies a 30ft road to the north and 25ft roads to the west and south. RERA record Land records RERA filing

A location record gives HITEC City as an anchor at 7.2 km. The supplied evidence does not identify the measurement method or establish road route, travel time, public-transport links, or additional nearby landmarks. Location record

9. Developer & development status

The registered promoter is SAYA INFRATECH, recorded as a partnership. The filing identifies SHAIk ABDUL SAHEB as a partner and MOHAMMED YOUNUS ALI ANSARI as authorized signatory. The supplied corporate identifiers include GSTIN 36ACTFS6980J2Z3; no company registration number, official website, or official contact details are provided here. RERA record RERA filing Corporate record Parties record

The registration certificate states that quarterly updates are to be submitted and includes the separate-account condition.

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, P02500011421; valid 19/11/2025–19/11/2028; issued 18/11/2026.
Scope / noteMAGNAS PREMIUM APARTMENTS; certificate records promoter SAYA INFRATECH.
Principal plan approval reference
Supplied evidence1857/GHMC/SWBP/KHB2/2025; filed with GHMC identified as authority; approval date recorded as 19/11/2025. Approvals record RERA filing
Scope / noteApproval document and detailed conditions are not supplied for review.
Commencement certificate
Supplied evidenceA RERA document entry is titled “Commencement Certificates for each building in each phase.” Document index
Scope / noteListed document is not extracted; its contents and coverage are not established.
Mortgage deed
Supplied evidenceRERA document entry 742095, titled “Mortgage Deed.” Document index
Scope / noteDocument is not extracted; no lender, terms, or parcel-level scope can be confirmed from the supplied material.
Encumbrance statements
Supplied evidenceRERA document entries 757541 and 757540, titled “Details of encumbrances.” Document index
Scope / noteNot extracted; contents and search period are not established.
Title and layout records
Supplied evidenceMultiple title-report entries, plus layout-plan and building-plan document entries, are listed in the RERA document register. Document index
Scope / noteThe files are not extracted; their contents are not summarized here.
Occupancy / completion certificate
Supplied evidenceNo extracted certificate supplied. Document index
Scope / noteStatus cannot be confirmed from the supplied evidence.

Frequently asked questions

Is MAGNAS PREMIUM APARTMENTS registered with Telangana RERA?

Yes. MAGNAS PREMIUM APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P02500011421; the registration status is New Project.

Who is the developer of MAGNAS PREMIUM APARTMENTS?

The promoter named in the RERA registration is SAYA INFRATECH.

Where is MAGNAS PREMIUM APARTMENTS located?

MAGNAS PREMIUM APARTMENTS is in Ibrahim bagh, IbrhimBagh, Golconda, Hyderabad, Telangana (500031).

When will MAGNAS PREMIUM APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 19/11/2028. This is the promoter's declaration, not a guarantee.

More projects in Ibrhimbagh