SUMERU NIVAS is a residential apartment project at L B NAGAR, Saroornagar mandal, Ranga Reddy district. It is being developed by registered promoter LAXMI GANESHA DEVELOPERS, a partnership. The project covers 2667.99 sq.m and comprises one residential building with 1 Cellar + 1 Stilt + 5 Floors, containing 40 3BHK units. Its TG-RERA registration number is P02400010553, and its proposed completion date is 14/11/2028.

More from Laxmi Ganesha Developers · 3 projects →

01What we found

RegisteredTG-RERA - valid till 14 Nov 2028
25documents on file - each fact links to its page
5court cases on this project's land (survey 30, Mansoorabad)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameSUMERU NIVAS RERA record
Project type / phaseResidential apartment project; the project is registered as a single project. No separate phase name or phase number is disclosed. RERA record
TG-RERA registrationP02400010553 RERA record
Registration validity14/11/2025 to 14/11/2028 (three years, unless extended by the Authority). This is the registration period, not the construction-completion deadline. RERA record
Registered promoterLAXMI GANESHA DEVELOPERS, partnership RERA record Corporate record
RERA statusRecorded as New Project; the registration certificate is on file. RERA record

Land and geographic identity

ItemProject record
Locality / colonyL B NAGAR; the building-permit extract also identifies Vivekananda Nagar Colony. RERA record RERA filing
Revenue villageMansoorabad (also rendered “MANSOORABAD VILLAGE” in the permit extract). RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500074 RERA record
Project survey number(s)Survey No. 30; no project subdivision is specified in the project identity or permit record. RERA record Land records
Plot referencePlot No. 4/B RERA filing
Registered site extent2667.99 sq.m; the permit records both plot area and net plot area as 2667.99 sq.m. RERA filing
BoundariesEast: SY NO 30; West: 30FT WIDE ROAD; North: PLOT NO 4 C; South: PLOT NO 4 A. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval1788/GHMC/SWBP/LBN1/2025, approved 14/11/2025 Approvals record
Permit file number006065/GHMC/02937/SWBP/LBN1/2025-REV
Approved built-up areaTotal Proposed BUA excluding Parking: 7057.71 sq.m; the permit also records total proposed BUA including parking as 7057.71 sq.m.
Building countOne residential building RERA filing
Sanctioned configuration1 Cellar + 1 Stilt + 5 Floors
Sanctioned units40 dwelling units
RERA-filed units40 RERA unit table
Parking provision in permit51.00 car parking spaces; cellar and stilt are designated for parking in the permit conditions.

Offering and status

ItemProject record
RERA-filed configuration3BHK; 40 units RERA unit table
RERA-filed saleable area53.77 sq.m per recorded configuration RERA unit table
Bookings / availabilityPortal snapshot records 0 booked and 40 available; the record has no as-of date, so counts are indicative. RERA unit table
Construction stageNo construction-progress percentage or independently verified site-stage information is supplied. Document index
Completion deadlineThe RERA registration certificate and Form B declaration state 14/11/2028; the revised permit states construction is to be completed before 14/11/2028.
Occupancy certificateNo occupancy certificate is supplied. The permit requires completion notice and an occupancy certificate before occupation.

The project story

SUMERU NIVAS is a single-building residential apartment project registered for Survey No. 30, Plot No. 4/B, in Mansoorabad village, Saroornagar mandal, Ranga Reddy district. The registered offering is 40 three-bedroom apartments. GHMC’s revised building permit describes a building with one cellar, one stilt level and five floors; the permit names the landowner and the developer-side applicants and expressly states that the permission does not itself confer ownership rights. RERA record Land records RERA unit table

The project’s stated completion date is 14/11/2028, while its TG-RERA registration remains valid to the same date unless extended. No construction-progress figure, site inspection or occupancy certificate is provided in the available records, so the project’s present physical stage and completion status cannot be confirmed from this evidence. RERA record

Master plan, architecture & building design

The permit describes one residential building on a stated gross and net plot area of 2667.99 sq.m, with a proposed coverage area of 1560.14 sq.m and vacant plot area of 1085.51 sq.m. It records a proposed building area of 1694.25 sq.m and total proposed built-up area of 7057.71 sq.m. These are permit figures; they are not RERA-filed carpet or saleable areas.

The sanctioned arrangement is 1 Cellar + 1 Stilt + 5 Floors. The permit states a building height of 17.9 m; Height from GL: 14.8 m in its sanctioned-parameter list, and separately records “Total Height: 20.7 m” and “Height from GL: 17.9 m.” The supplied material does not include a usable floor-by-floor architectural schedule, flat-per-floor count, lift count, stair arrangement, or a measured building footprint beyond the permit’s proposed coverage figures.

The permit lists a 2m Wide Corridor, a 4.50 MT WIDE DRIVEWAY, a 1.0 Mt Wide Greenery strip and a central courtyard. It also requires a tot-lot to be maintained as greenery and calls for tree planting along the site periphery and in front of the premises. These are plan/permit-recorded provisions; no completion or independent site-verification evidence is supplied.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK4004053.77 sq.mNot availableNot supplied

The 3BHK configuration, unit count, booking count and saleable area are from the TG-RERA filing; the portal record has no as-of date for the booking snapshot. RERA unit table RERA unit details The supplied drawing-measurement record reports no measured flat designs for this configuration, so no software-measured carpet area or room dimensions can be reported. Floor plans

Parking & vehicle circulation

GHMC’s permit records 51.00 car parking spaces and identifies the cellar and stilt as parking areas. The permit’s sanctioned-parameter list states parking area required as 2117.31 sq.m and proposed as 3349.89 sq.m, visitor parking required as 211.73 (10.00 %) and proposed as 249.73 (11.79 %), and net parking area as 3599.61 sq.m. These are permit figures; the available material does not establish completed spaces, two-wheeler provision, accessible or EV-equipped bays, or exclusive parking allocations to individual units.

The permit records a 4.50 MT WIDE DRIVEWAY and a 1:8 ramp slope. It also directs that cellar and stilt areas approved for parking be used exclusively for vehicle parking and not converted to other uses.

Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Central courtyardSize not statedGHMC permit plan extractionPlan-listed; completion not verified
Tot-lot / green area134.11 Sq. Mtrs in the permit; permit conditions require it to be fenced and maintained as greenerySanction/permit-recorded; completion not verified
Peripheral greenery1.0 Mt Wide Greenery; permit also requires trees along the periphery and in frontPermit-recorded; completion not verified
Trees125Permit-listed; planting not verified
Internal roads and footpathsListed as available in the RERA amenity record; no measurements suppliedRERA amenitiesRERA-recorded; progress shown as 0%; completion not verified
Street lightingListed as available in the RERA amenity record; no quantities suppliedRERA amenitiesRERA-recorded; progress shown as 0%; completion not verified

No clubhouse or indoor community facility, sports facility, or quantified recreational-space schedule is established by the supplied project records. The vendor material lists badminton, indoor games and children’s play features, but these are promoter-marketed descriptions rather than evidence of sanctioned or delivered facilities. Promoter website

Utilities, building services & safety

The permit lists an STP, sump, overhead tank, transformer, dry transformer, garbage house and rainwater-harvesting structure. It specifies 8 rainwater-harvesting pits and requires a percolation pit; the RERA amenity record also lists water supply, sewerage/STP, storm-water drains, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These are proposed or recorded provisions, not proof of installation or operation. RERA amenities

The permit conditions require a fire NOC from the Director (EV&DM) before issue of an occupancy certificate, and refer to fire-fighting installations and means-of-escape safety requirements. The available evidence does not include a fire NOC or completion verification.

A lift is listed in the plan-derived utility/amenity data, but no number, capacity or service-lift details are supplied. The permit also requires EV-charging infrastructure in parking places and broadband/digital-connectivity infrastructure, with common access to digital infrastructure as a condition for occupancy certification. No installation or capacity evidence is supplied.

Location, access & connectivity

The registered location is L B NAGAR, Mansoorabad village, Saroornagar mandal, Ranga Reddy district, Telangana 500074. The building-permit extraction also identifies Vivekananda Nagar Colony. RERA record

The project record identifies a 30FT WIDE ROAD along the western boundary; the permit also refers to a 9.00 Mt (30'-0") WIDE ROAD, a 4.50 MT driveway and an 18 mt. road in its listed road-related information. RERA filing The supplied location record gives the nearest sampled Outer Ring Road interchange as 8.3 km (approx). Location record No other verified transit, landmark, or measured-distance details are supplied.

Developer & development status

The registered promoter is LAXMI GANESHA DEVELOPERS, recorded as a partnership, with GSTIN 36AAHFL9513E2ZA. Its listed address is Swasthika Project Apartments, Road No 4, Mansoorabad, L B Nagar, Saroornagar, Ranga Reddy, 500074. Corporate record RERA record The RERA record identifies Yaredla Ravindar Reddy and Jinna Prabhakar Reddy as authorised signatories. Parties record

The RERA-filed Form B declaration states that the promoter undertakes to complete SUMERU NIVAS by 14/11/2028 and describes the promoter’s commitments concerning project funds and approvals. This is a promoter declaration, not independent evidence of construction progress. No construction-stage percentage or occupancy certificate is supplied. Document index

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400010553; valid 14/11/2025–14/11/2028
What the supplied evidence establishesForm C registration record for SUMERU NIVAS and LAXMI GANESHA DEVELOPERS.
GHMC revised building permit
Identifier / date1788/GHMC/SWBP/LBN1/2025; 14/11/2025
What the supplied evidence establishesPermit for the residential building at Plot 4/B, Survey No. 30, Mansoorabad; records 40 units and 1 Cellar + 1 Stilt + 5 Floors.
Permit file reference
Identifier / date006065/GHMC/02937/SWBP/LBN1/2025-REV
What the supplied evidence establishesFile reference in the plan/permit extraction.
Form B declaration
Identifier / date08-02026 as recorded
What the supplied evidence establishesPromoter declaration concerning title basis, encumbrances, funds, approvals and completion undertaking.
Occupancy certificate
Identifier / dateNot supplied
What the supplied evidence establishesThe permit requires a completion notice and occupancy certificate; the available pack does not establish issuance.
Approved layout plan
Identifier / dateNot separately established in the supplied material
What the supplied evidence establishesA RERA filing item requests a layout approval or stamped layout plan, but the available extracted building-permit record does not establish a separate approved-layout document.

The permit’s printed conditions include a requirement for a commencement notice before construction and a completion notice after construction; the provided records do not confirm submission of either notice.

Frequently asked questions

Is SUMERU NIVAS registered with Telangana RERA?

Yes. SUMERU NIVAS is registered with the Telangana Real Estate Regulatory Authority as P02400010553; the registration status is New Project.

Who is the developer of SUMERU NIVAS?

The promoter named in the RERA registration is LAXMI GANESHA DEVELOPERS.

Where is SUMERU NIVAS located?

SUMERU NIVAS is in L B NAGAR, Mansoorabad, Saroornagar, Rangareddy, Telangana (500074).

When will SUMERU NIVAS be completed?

The promoter's proposed date of completion filed with RERA is 14/03/2029. This is the promoter's declaration, not a guarantee.